Loading...
HomeMy WebLinkAbout4F - Bluff Heights Pond Project AGENDA #: PREP ARED BY: SUBJECT: 4F LANOL LEICHTY, WATER RESOURCES COORDINATOR CONSIDER APPROVAL OF RESOLUTION 96-26 ACCEPTING QUOTE FOR BLUFF HEIGHTS POND EXCAVATION PROJECT 96-12. MARCH 4, 1996 DATE: INTRODUCTION: The purpose of this agenda item is to award the quote for Project 96-12, Bluff Heights Pond Excavation. BACKGROUND: Council authorized staff to solicit quotes for Bluff Heights Storm Sewer Project on February 5, 1996. Lots 1 and 2, Block 1, Bluff Heights Addition are located north of the intersection of Franklin Trail and Brunswick Avenue. Platted in 1972, these two lots have not been developed. There is a nineteen (19) acre watershed that drains diagonally north through a channel located in Lots 1 and 2. The street of Bluff Heights Trail dead ends approximately one block north of Franklin Trail. There is a low point at the end of the street where water ponds each time it rains. With the development of new townhomes adjacent to Bluff Heights Trail, correction of this ponding problem becomes a priority so that driveways are not flooded with water. Bluff Heights Storm Sewer Construction Project 95-13 included installation of catch basins at the low point in the street with storm sewer pipe constructed to the proposed water quality pond. The surrounding watershed is approximately 90% developed, consisting of single family homes, multi-family homes and apartments. All of the existing development in this watershed occurred prior to the Clean Water Act, regulated by the Minnesota Pollution Control Agency, which requires water quality basins for construction activities disturbing five or more acres. The project will improve water quality which 16200 Eagle Creek Ave. S.E.. Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER RESOLUTION 96-26 RESOLUTION APPROVING THE ACCEPTANCE OF QUOTE FOR BLUFF HEIGHTS POND EXCAVATION PROJECT 96-12 MOTION BY: SECOND BY: WHEREAS, pursuant to a call for quotes for the construction of Bluff Heights Pond Excavation, City Project 96-12, by the construction of grading, storm sewer, and appurtenant work; the following quotes were received: CONTRACTORS 1. Rud Construction, Inc. 2. Fredrickson Excavating, Inc. 3. Ryan Contracting 4. Friedges, Inc. BASE QUOTE $23,992.50 $24,911.00 $27,037.50 $32,750.00 WHEREAS, it appears that Rud Construction, Inc. submitted the lowest quote. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, that the quote for Project 96-12 in the amount of $23,992.50 be awarded to Rud Construction, Inc. Passed and adopted this 4th day of March, 1996. YES NO Andren Andren Greenfield Greenfield Kedrowski Kedrowski Mader Mader Schenck Schenck { Seal} City Manager City of Prior Lake 16200 Eagle Creek Ave. S.E.. Prior Lake. Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER