HomeMy WebLinkAbout4H - Ridgemont Avenue Project CONSENT AGENDA #: PREPARED BY: SUBJECT: 4H JOHN WINGARD, ASST. CITY ENGINEER CONSIDER APPROVAL OF FINAL PAYMENT FOR: RIDGEMONT AVENUE, PROJECT 95-01 CREEKSIDE CIRCLE, PROJECT 95-02 T.H. 13 DRAINAGE TO MITCHELL POND, PROJECT 93-03 INDUSTRIAL PARK STORM SEWER, PROJECT 93-01 DATE: SEPTEMBER 16, 1996 INTRODUCTION: The purpose of this agenda item is to request the City Council to authorize the final payment of $10,548.65 to S.M, Hentges and Sons for the contract that included four separate projects; Ridgemont Avenue, Creekside Circle, T,H, 13 Drainage to Mitchell Pond, and Industrial Park Storm Sewer, DISCUSSION: Paul Boettcher, MSA project engineer, approved the final payments as shown on the enclosed payment vouchers dated July 3, 1996, The original contract amount for this contract was $424,147,85, The addition of Change Order No.1 which Council approved on September 5, 1995 for the Industrial Park Storm Sewer portion of the contract, increased the contract by $1,263,00 for a total of $425,410.85. On the Ridgemont Avenue project, the Council approved Change Order No, 2 to compensate the Contractor for subcutting an extra 12" of wet clay and replacing this material with 3" minus crushed limestone. Change Order No, 2 increased the contract by $29,941.00, for a total of $455,351.85. This change order which was approved by the Council on September 18, 1995 resulted in a increase of 7% to the contract amount. Change Order No.3 which was approved by the Council on November 20, 1995, substituted 3" minus crushed limestone for select granular borrow in 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 G:\AGENDA96\FPMTPROJ.DOC AN EQUAL OPPORTUNITY EMPLOYER subcut areas on Creekside Circle. Change Order No.3 resulted in no dollar amount change. Shown below is a summary of each project: Ridgemont Avenue, Project 95-01 Project 95-01 involved the upgrading of Ridgemont Avenue from the east parking lot entrance into Lakefront Park to Rutledge Street. Sanitary sewer, watermain and storm sewer facilities were included with street and sidewalk improvements, The original proj ect cost was $179,686.45, There was a change order in the estimated amount of $29,941.00 (for additional 12" subcut and additional 3" limestone), which raised the contract amount to $209,627.45. The final actual project cost is $175,486.32 and the final amount of the change order is $32,800,23 for a total final project cost of $208,286.55. Creekside Circle, Project 95-02 Project 95-02 involved the upgrading of the street from a rural section to an urban section with concrete curb and gutter. The original project cost was $125,404.40. Change Order No.3 was approved to allow the use of 3" minus crushed limestone instead of select granular borrow. The street construction required more 3" minus material than originally estimated, so there was an overrun on this project. The final actual project cost, including the change order totaled $135,301.27. T.H.13 Drainage to Mitchell Pond, Project 93-03 Project 93-03 involved the construction of a 36" storm sewer line from T.H. 13 and Candy Cove Trail to Mitchell Pond. The original project cost was $95,172.50 and there were no change orders for this project. The final actual project cost is $94,839.30, Industrial Park Storm Sewer, Project 93-01 Project 93-01 involved the construction of a storm sewer line that drains the gravel parking lot along Industrial Circle G:\apnda96\fpmtproj.doc and conveys the water down the steep slope to Markley Lake. The original project cost was $23,884,50. Change Order No.1 increased the contract amount by $1,263.00 to $25,147.50 The fmal actual project cost is $23,500.00. ISSUES: The staff and MSA Consulting Engineers worked hard to assure that the final contract amounts for these projects were as close as possible to the original contract amount. The total contact amount increased from $455,351.85 to $461,927.12 which is an increase of $6,575.27 or 1.4%. The overrun is attributable to the extra 3" minus crushed limestone material that was required on the Creekside Circle project. Payment of these final project amounts initiates a twelve month guarantee period for the road construction work which is secured by a performance bond. The performance bond shall remain in full force and effect through the one year guarantee period, ALTERNATIVES: The alternatives are as follows: 1. Approve the Final Pay Voucher for $10,548.65 to S,M. Hentges & Sons, Inc, which will pay all four projects in full. 2. Table this item for specific reason. RECOMMENDATION: The recommendation is to approve alternative No.1. ACTION REQUIRED: Make a motion recommended. I} the final payment as G:\qenda96\fpmtproj.doc CONSTRUCTION PAYMENT VOUCHER Estimate Voucher No. 7 (FINAL) For Period Ending: June 30, 1996 Date: July 3, 1996 C.P. Number: S.A.P.: 93-01, 93-03, 95-01. 95-02 Class of Work: Ridgemonr/Creekside Street Improvements & T.H. 13/Industrial Park Storm Sewer For: City of Prior Lake To: S.M. Hentges & Sons. Inc. 650 Quaker Avenue. Suite 200. P.O. Box 69 Jordan. MN 55352 A, Original Comract Amount $ 424.147.85 B. Total Additions $ 31,204.00 C. Total Deductions $ 0.00 D. Total Funds Encumbered $ .455,351.85 E, Total Value of Work Certified to Date $ 461,927.12 F. Less Retained Percentage 0 % $ G. Less Total Previous Payments $ 451,378.47 H. Approved for Payment, This Report $ 10,548.65 I. J. Total Payment Including This Voucher Balance Carried Forward PaYment Breakdown Ridgemont SS,894.70 5"01- 40'" c; - 50l Creekside $8,827.96 5"01 - 402.C;O - ~C\ Mitchell Pond ($362.02) .5"0 I - 48 ,~ - qo \ Industrial Park ($3.811.99) ,0\ - 1-e 1 ~ l) - )"01 $ $ 461.927.12 (6.575.27) APPROVALS Pursuant to our field observatio~ as performed in accordance with our contract, we hereby certify that the materials arc satisfactory and and the work properly performed in accordance with the plans and specifications and that the total work is 100% completed as of June 11. 1996 I hereby recommend payment of the voucher. Project Engineer Approval: ~~ -=> PAUL BOETrCHER, P.E. This is to certify that to the best of my knowledge, information, and belief. the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher, Contractor: Signed by: Date: Tide: CITY OF PRIOR LAKE ~~~~ ----3 - ~ - q~ Approved for Payment: Authorized Representative Date Date l02023VH.XLS FINAL PAYMENT ESTIMATE NO. 7 (FINAL) FROM: JUNE 1, 1996 TO: JULY 1, 1996 CONTRACTOR: S.M. HENTGES & SONS, INC. ADDRESS: 650 QUAKER AVENUE, SUITE 200, PO. BOX 200, JORDAN, MN 55352 OWNER: CITY OF PRIOR LAKE, MINNESOTA PROJECT: RIDGEMONT/CREEKSIDElINDUSTRIAL PARK STORM SEWERIT.H. 13 MITCHEL POND AMOUNT OF CONTRACT: ORIGINAL: S 424,147.85 REVISED: S 455,351.85 COMPLETION DATE ORIGINAL: SEPTEMBER 14, 1995 REVISED: -- SCHEDULE 1 0 RIDGEMONT A VENnE STREET MOBILIZATION 2 ~ SALVAGE AND REINSTALL SIGNS 3 CLEAR AND GRUB 4 COMMON EXCAVATION 5 SUBGRADE PREPARATION 0 - 12' 6 MILL BITIlMINOUS PAVEMENT 7 AGGREGATE BASE, CLASS 5 8 TYPE 41A. WEAR COURSE MIXTIJRE 9 TYPE 31B, BASE COURSE MIX11JRE 10 BI11JMINOUS MATERIAL FOR TACK COAT 11 CONCRETE CURB & GUTI'ER, 8618 12 BI11JMINOUS DRIVEWAY 13 CONCRETE DRIVEWAY AND APRONS 14 4' CONCRETE SIDEWALK 15 8' CONC. VALLEY GUTI'ER 16 BI11JMINOUS PAm 17 PEDESTRIAN RAMP 18 4' EQUIV WIDTII PAVEMENT STRIPING 19 ADJUST FRAME AND RING CASTING 20 ADJUST GATE VAL YES 21 SILT FENCE 22 SODDING, LAWN & BOULEVARD 23 SEEDING 24 WOOD FIBER BLANKET 25 CATCH BASIN SEDIMENT BARRIER 26 WATER FOR DUST CONTROL 27 JUNIPER. 24- HT. POT 28 ULAC, 36' HT, POT 29 SUBGRADE DENSITY TEST, INPLACE 30 CLASS 5 GRADATION TEST 7,000.00 1,000.00 200.00 10,864.00 0.00 120.80 15,656.16 9,119.88 15,161.43 1J17 . 00 17,517.00 4,504.44 185.25 15,910.00 312.30 1.211.77 300.00 0.00 500.00 SOO.OO 375.00 5,544.00 0.00 0.00 100.00 600.00 140.00 120.00 90.00 90.00 1.00 1.00 0.04 3,104.00 0.00 24.16 2.408.64- 414.54 7'17.'17 173.00 3.244.00 391.69 7.41 7,955.00 104.10 111.11 3.00 0.00 2.00 2.00 2SO.00 3,960.00 0.00 0.00 2.00 30.00 4.00 4.00 3.00 2,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.00 0.00 0.00 O~OO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 7,000.00 1,000.00 5,000.00 3.50 200.00 5.00 6.50 22.00 19.00 1.20 5.40 1l.S0 25.00 2.00 3.00 11.50 100.00 0.30 250.00 250.00 l.S0 1.40 1,250.00 1.45 50.00 20.00 35.00 30.00 30.00 45.00 LS LS AC CY RDST A SY TON TON TON GAL LF SY SY SF SF SY EA LF EA EA LF 5Y AC 5Y EA MGAL EA EA EA EA 0.06 2958 IS .5 54 2223 455 845 236 3100 194 41 7572 104 120 2 3100 2 2 800 4283 0.3 1417 2 35 2 2 3 102~-3O Pale 1 10202317 .XLS -- 31 32 33 34 3.5 36 37 38 39 CLASS .5 PROCTOR TEST CLASS .5 DENSITY TEST, INPLACE CONC. CYLINDER COMPRESSIVE TEST CONC. AIR ENTRAINMENT TEST CONC. SLUMP TEST BITUMINOUS EXTRAcnON BITUMINOUS GRADATION BITUMINOUS AIR VOID TEST BITUMINOUS CORE DENSITY TEST EA EA EA EA EA EA EA EA EA T SCHEDULE 1.0 RIDGEMONT AVENUE STREET - TOTAL BASE BID 2 3 SCHEDULE 1.1 RlDGEMONT AVENUE ALTERNATE A COMMON EXCAVATION - DEDUcr CY AGGREGATE BASE, CLASS .5 - DEDUcr TON MILLED BIT.lSALVAGE CLASS.5 - ADDmON CY 483 898 483 T . SCHEDULE 1,1 RlDGEMONT AVENUE ALTERNATE A-TOTAL 2 3 4 5 6 7 8 9 10 SCHEDlJl.E 20 RIDGEMONT AVENtJE SANITARY SEWER CONNEcrTO EXIST. SANITARY MANHOLE EA 8' PVC (8' TO 10' DEEP) LF 124 8' PVC (10' TO 12' DEEP) LF 46.5 8' PVC (12' TO 14' DEEP) LF 198 8' PVC (14' TO 16' DEEP) LF 131 8'x4'WYE EA 7 4' PVC SDR40 SERVICE PIPE LF 251 STANDARD MANHOLE EA 3 EXTRA DEPTII FOR MANHOLES LF 11.28 IN-PLACE DENSITY TEST EA 19 T SCHEDULE 2.0 RIDGEMONT AVENUE SANITARY SEWER -TOTAL 2 3 4 5 6 7 8 ~(JI.E 30 RIDGEMONT AVENtJE WATERMAIN CONNEcr TO EXISTING W ATERMAIN EA 8' DIP LF 6w GATE VALVE EA FlTrINGS 1.8 HYDRANT WI GATE VALVE EA WATER SERVICE EA I' WATER SERVICE PIPE LF IN-PLACE DENSITY EA T SCHEDULE 3.0 RIDGEMONT AVENUE WATERMAIN - TOTAL l02023n.XLS 3 6 6 6 5 .5 5 5 74.00 40.00 90.00 90.00 7.5.00 75.00 75.00 120.00 100.00 (3..50) (6.50) 10.00 500.00 20.00 20.00 20.00 20.00 100.00 12.00- 1,200.00 100.00 30.00 934 .500.00 22.00 .500.00 1.50 2,2S0.00 150.00 12.00 30.00 710 2 7 180 II Paae 2 0.00 0.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.00 90.00 7.5.00 0.00 0.00 0.00 0.00 345.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3.00 .5.00 .5.00 .5.00 .5.00 .5.00 .5.00 .5.00 0.00 0.00 1.52.87 1.00 124.00 46.5.00 123.00 131.00 8.00 29.5 .00 3.00 11.28 11.00 1.00 8.53.00 1.00 490.00 2.00 8.00 21.5.00 3.00 74.00 120.00 4.50.00 4.50.00 37.5.00 37.5.00 37.5.00 600.00 500.00 110,715.22 0.00 0.00 1.528.70 1.528.70 500.00 2,480.00 9,300.00 2,460.00 2,620.00 800.00 3,540.00 3,600.00 1,128.00 330.00 26,758.00 .500.00 18,766.00 .500.00 73.5.00 4,500.00 1,200.00 2,580.00 90.00 28,871.00 102.()2J-3O -- SCHEDULE 40 RIDGEMONT AVENUE STORM SEWER REMOVE CATCH BASIN EA 15' RCP CLASS 5 LF 15' FES RCP CLASS 5 EA CATCH BASIN EA 72' MANHOLE (SUMPED) EA RIP RAP CL 3 CY GEOTEXTILE FABRIC. TYPE IV SY HA YBALES EA IN-PLACE DENSITY TEST EA 2 3 4 5 6 7 8 9 13 31.7 8 7 T SCHEDULE 4,0 RIDGEMONT AVENUE srORM SEWER - TOTAL 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2.5 26 n 28 29 30 31 32 SCHEDI1I,E 5 0 CREEKSIDE ClRCI,E STREET MOBIUZATION SALVAGE AND REINSTALL SIGNS COMMON EXCAVATION ~GRADEEXCAVATION MILL BITUMINOUS PAVEMENT SELECf GRANULAR BORROW AGGREGATE BASE, CLASS 5 TYPE 41A, WEAR COURSE MIXTURE TYPE 31B, BASE COURSE MIX11JRE BITUMINOUS MATERIAL FOR TACK COAT CONCRETE CURB '" GUTTER, 8618 REM. EX 16'BARREL,INSTALL 12'BARREL REM. EX 24' BARREL. INSTALL 18' BARREL ADJUST FRAME AND RING CASTING ADJUST GATE VAL VB BITUMINOUS DRIVEWAY CONCRETE DRIVEWAY CATCH BASIN SEDIMENT BARRIER WATER FOR DUST CONTROL JUNIPER, 24. HT, POT ULAC, 36' HT, POT SILT FENCE SODDING, LAWN '" BOULEY ARD SUBGRADE DENSITY TEST, INPLACE CLASS 5 GRADATION TEST CLASS 5 PROCTOR TEST CLASS 5 DENSITY TEST, INPLACE CONC. CYUNDER COMPRESSIVE TEST CONC. AIR ENTRAINMENT TEST CONC. SLUMP TEST BITUMINOUS EXTRACI10N BITUMINOUS GRADATION 102023I7.XLS LS LS CY CY SY CY TON TON TON GAL LF EA EA EA EA SY SY EA MGAL EA EA LF SY EA EA EA EA EA EA EA EA EA 2747 645 45 645 1686 358 66S 186 2653 3 5 549 17 9 30 4 4 100 5090 3 84 500.00 2.5 .00 350.00 1,150.00 2,750.00 50.00 2.00 5.00 30.00 3 3 3 3 4 4 7,000.00 1,000.00 3.50 5.00 5.00 5.50 7.00 22.00 19.00 1.20 5.40 .soo.OO 500.00 2.50.00 150.00 11.50 15.00 50.00 20.00 35.00 30.00 1.50 1.40 30.00 45.00 74.00 40.00 90.00 90.00 75.00 75.00 75.00 Pap 3 0.00 0.00 0.00 . 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ~ 0.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 550.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 I~.OO 150.00 1.00 86.00 1.00 1.00 1.00 13.00 31. 70 0.00 0.00 1.00 1.00 1,247.00 433.00 15.56 0.00 1,907.94 305.46 717.23 204.00 2,619.00 1.00 1.00 5.00 2.00 794.00 54.2.5 0.00 10.00 0.00 3.00 0.00 6,260.00 0.00 1.00 1.00 1.00 2.00 2.00 2.00 5.00 5.00 500.00 2,150.00 350.00 1,150.00 2,750.00 650.00 63.40 0.00 0.00 7.613.40 7.000.00 1,000.00 4,364.50 ;2,165.00 127.80 0.00 13,355.58 6,720.12 13.627.37 244.80 14,142.60 500.00 500.00 1,150.00 500.00 9,131.00 1,356.15 0.00 200.00 0.00 90.00 0.00 8,764.00 0.00 45.00 74.00 40.00 180.00 180.00 1~.00 375.00 375.00 102.023-30 -- 33 34 BlTIJMlNOUS AIR VOID TEST BlTIJMlNOUS CORE DENSITY TEST EA EA T SCHEDULE 5,0 CREEKSIDE CIRCLE STREET - TOTAL 2 3 SCHEDULE 51 CRF.F.K..I\IDF. ClRCI.E ALTERNATE B COMMON EXCAVATION - DEDUCT CY AGGREGATE BASE. CLASS 5 - DEDUCT TON MILLED BIT.lSAL V AGE CLASS 5 - ADDmON CY T SCHEDULE 5,1 CREEKSIDE CIRCLE ALTERNATE B - TOTAL 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 SCmmlJl.E 6 0 CREEK..~mE CIRCLE ~RM SEWER REMOVE CATCH BASIN EA CONNECT TO EXISTING STORM SEWER EA 4. TP DRAINTILE LF 12" RCP CLASS 5 LF 15' RCP CLASS 5 . ~F 18' RCP CLASS 3 LF 15. HOPE LF 15' FES RCP CLASS 5 EA 18' FES RCP CLASS 3 EA 15' HOPE APRON EA CATCH BASIN EA 27. MANHOLE EA STANDARD MANHOLE EA n. MANHOLE (SUMPED) EA HAY BALES EA IN-PLACE D~NSITY TEST EA T SCHEDULE 6.0 CREEKSIDE CIRCLE STORM SEWER - TOTAL 430 799 430 731 63 375 60 113 scmmULE 7 0 T H 13 DRAINAGE TO M1TMIF.II. POND CLEARING AC 0.64 GRUBBING AC 0.64 COMMON BORROW (CV) CY 750 TOPSOIL BORROW (LV) CY 260 SALVo &. REINSTALL EX. CHAIN LINK FENCE LF 110 BlTIJMlNOUS RESTORATION SY 53 36' RC APRON WI TRASH GUARD EA 36' RC PIPE 7.5 DEG. BENDS DES. 3006. CL m EA 7 36. RC PIPE SEWER DESIGN 3006. CL m LF 491 CONSTR. DRAIN. STRUCTURE DES. n-4020 EA 3 n' DIAMETER MANHOLE WI SUMP EA CONNECT TO EXISI1NG STORM SEWER EA RANDOM RIP RAP CLASS m CY 278 2 3 4 5 6 7 8 9 10 11 12 13 l02023n.XLS 4 4 120.00 100.00 (3.50) (6.50) 10.00 2 500.00 350.00 5.00 20.00 25.00 30.00 30.00 350.00 400.00 350.00 1.150.00 asO.OO 1.150.00 2.750.00 5.00 30.00 5 2 28 7 4.500.00 4.500.00 5.50 10.00 15.00 20.00 1.750.00 750.00 70.00 2.750.00 2.750.00 500.00 60.00 hae 4 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 240.00 200.00 1.290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 7.00 0.00 0.00 354.64 1.00 1.00 100.00 62.00 350.00 60.00 110.00 1.00 2.00 1.00 1.00 1.00 5.00 2,00 0.00 5.00 0.62 0.62 750.00 275.00 180.00 155.26 1.00 7.00 491.00 3.00 1.00 1.00 255.66 600.00 700.00 87.758.02 0.00 0.00 3.546.40 3.546.40 500.00 350.00 500.00 1,240.00 8,750.00 1,800.00 3.300.00 350.00 800.00 350.00 1.150.00 asO.OO 5.750.00 5.500.00 0.00 150.00 31.340.00 2.790.00 2.790.00 4.125.00 2.750.00 2.700.00 3.10's.20 1.750.00 5.250.00 34.370.00 8.250.00 2.750.00 500.00 15.339.60 102~-30 -- 14 15 16 17 18 19 20 21 22 23 24 25 GROUTED RIP RAP CLASS III GEOTEXTILE FABRIC, TYPE IV CATCH BASIN SEDIMENT BARRIER BITUMINOUS CURB TRAFFIC CONTROL BALE CHECK SILT FENCE, HEAVY DUTY SOD, EROSION CONTROL SOD, LAWN & BOULEVARD WOOD FIBER BLANKET, REGULAR SEEDING WI1lI MIX 500 INPLACE DENSITY TEST CY SY EA LF LS EA LF SY SY SY AC EA T SCHEDULE 7.0 m 13 DRAINAGE TO MITCHEL POND-TOTAL SCHEDULE II 0 INDUSTRIAL PARK STORM SEWER 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 CLEARING GRUBBING 12' RCP STORM SEWER, CL V 12" RC APRON WI TRASH GUARD 27' DlA. MANHOLE WI1lI STOOL CASTING 48- DIAMETER MANHOLE 72' DIAMETER MANHOLE WI1lI 3' SUMP CONSTRUcr 48' DIA. MH OVER EX. 12' PVC CL ID RANDOM RIP RAP GEOTEXTILE FABRIC, TYPE V CATCH BASIN SEDIMENT BARRIER HAY BALES SILT FENCE, HEAVY DUTY WOODFIBER BLANKET, REGULAR SEEDING, 1500 INPLACE DENSITY TEST AC AC LF EA EA EA EA EA CY SY EA EA LF SY AC EA T SCHEDULE 8.0 INDUSTRIAL PARK STORM SEWER-TOTAL 28 222 4 50 40 50 1222 222 1222 0.52 3 0.11 0.11 208 2 CHANGE ORDER NO.1 DELETE SCHEDULE 8.0 BID, ADD SCHEDULE 8,0 REVISED ~ULE II 0 INDUSTRIAL PARK STORM ~ tRRVI..~\ CLEARING AC 0.3 GRUBBING AC 0.3 HAUL AWAY CONSTRUcnON DEBRIS CY 125 12- RCP STORM SEWER, CL V LF 200 15- RCP STORM SEWER CL V LF 40 15' RC APRON WI TRASH GUARD EA rr DIA, CB WI1lI STOOL CASTING EA 48- DIAMETER MANHOLE EA 2 2 3 4 5 6 7 8 If11D1JT1.XLS 75.00 2.00 50.00 6.00 2,500.00 5.00 3.00 1.40 1.40 1.45 1,250.00 30.00 2 7,500.;00 7,500.00 30.00 1,000.00 850.00 1.150.00 2,750.00 1,250.00 75.00 2.00 50.00 5.00 3.00 l.S0 1.250.00 30.00 59 180 5 20 200 533 0.2 2 7,500.00 7,500.00 17.50 30.00 35.00 1,100.00 850.00 1,500.00 PapS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 222.00 4.00 99.00 1.00 7.00 50.00 0.00 0.00 670.00 1.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.30 0.30 154.00 186.00 3$.00 1.00 1.00 2.00 2,100.00 444.00 200.00 594.00 2,500.00 35.00 150.00 0.00 0.00 97l..S0 1,375.00 0.00 94,839.30 0.00 0.00' 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.250.00 2.250.00 2.695.00 5,580.00 1,225.00 1,100.00 850.00 3,000.00 102~3O -~ 9 72- DIAMETER MANHOLE WITH 3' SUMP EA 3,250.00 0.00 0.00 1.00 3,250.00 10 EXTEND/CONNECT 12- PVC TO MH 3 LS 350.00 0.00 0.00 1.00 350.00 11 CL III RANDOM RIP RAP CY 4 75.00 0.00 0.00 4.00 300.00 12 GEOTEXTILE FABRIC. TYPE V Sy 10 2.00 0.00 0.00 10.00 20.00 13 HAY BALES EA 20 5.00 0.00 0.00 20.00 100.00 14 SILT FENCE. HEAVY DUTY LF 70 4.00 0.00 0.00 70.00 280.00 15 WOOD FIBER BLANKET, REGULAR SY 1000 1.50 0.00 0.00 0.00 0.00 16 SEEDING, #500 AC 0.2 1,2S0.00 0.00 0.00 0.20 2S0.00 17 INPLACE DENSITY TEST EA 2 30.00 0.00 0.00 0.00 0.00 T : CHANGE ORDER NO, 1 - SCHEDULE 8.0 INDUSTRIAL PARK STORM SEWER (REVISED)-TOTAL 0.00 23..500.00 CHANGE ORDER NO 2 - RIDGEMONT SUBGRADE CORRECTION SUBCUT CY 2150 3.50 2 3' MINUS TN 4000 7.50 3 SUBGRADE PREP. STA 15.42 (200.00) 4 CONTRACfORSHARING LS (4,500.00) 0.00 0.00 2,150.00 7,52S.00 109.82 823.65 4,381.23 32.859.23 0.00 0.00 15.42 (3,084.00) 0.00 0.00 1.00 (4,500.00) 823.65 32,800.23 T CHANGE ORDER NO, 2 - RIDGEMONT SUBGRADE CORRECTION-TOTAL CHANGE ORDER NO :1 - CRF.EK.~E SUBGRADE CORRECTION 3' MINUS CRUSHED LIMESTONE TN 945 7.50 0.00 0.00 1.687 .58 12.656.85 T CHANGE ORDER NO, 3 - CREEKSIDE SUBGRADE CORRECTION-TOTAL 0.00 12,656.85 TOTAL AMOUNT nus PERIOD 2.548.65 TOTAL AMOUNT TO DATE 461,927.12 102023I7.XLS Pap 6 102-023-30 -- DESCRIPTION TOTAL nus PERIOD TOTAL TO DATE SCHEDULE 1.0 RIDGEMONT AVENUE STREET - TOTAL BASE BID 345.00 110,715.22 SCHEDULE 1.1 RIDGEMONT AVENUE ALTERNATE A - TOTAL 0.00 1,528.70 SCHEDULE 2.0 RIDGEMONT AVENUE SANITARY SEWER -TOTAL 0.00 26,758.00 SCHEDULE 3.0 RlDGEMONT AVENUE WATERMAIN - TOTAL 0.00 28,871.00 SCHEDULE 4.0 RIDGEMONT AVENUE STORM SEWER - TOTAL 0.00 7,613.40 SCHEDULE 5.0 CREEKSIDE CIRCLE STREET - TOTAL 1,290.00 87,758.02 SCHEDULE 5.1 CREEKSIDE CIRCLE ALTERNATE B - TOTAL 0.00 3,546.40 SCHEDULE 6.0 CREEKSIDE CIRCLE STORM SEWER - TOTAL 90.00 31,340.00 SCHEDULE 7.0 TH 13 DRAINAGE TO MITCHEL POND-TOTAL 0.00 94,839.30 SCHEDULE 8.0 INDUSTRIAL PARK STORM SEWER-TOTAL 0.00 0.00 CHANGE ORDER NO.1 - SCHEDULE 8.0 INDUSTRIAL PARK STORM SEWER (REVISED)-TOTAL CHANGEORDERNO.2-RIDGEMONTSUBGRADECORRECTION-TOTAL CHANGE ORDER NO.3 - CREEKSIDE SUBGRADE CORRECTION-TOTAL 0.00 823.65 0.00 23,500.00 32,800.23 12.656.85 If,.t.,- ..... ........... ......... ..................... ...................................................... 1I.~i _'It1i1l1 iii~liii11l1l~l1ljl~~~1~~~lj~~ljljl~11l1l1~1l~1~1~1~1~1~1~1~~~1~1~1~j~1~~jljl~1~ljljljl~ljl~:1~j11~1~l11~jj11j:l~lI11I11~l1I~11~11111~11l~1~111~Ij1l~11ljl~jjljl~jj111~lil]jiililj~l1:1~j~~1:l:1~111~11l1~1ljl~lj111~111jl~l11~1~~j11~~1~l11~l~lij~j1jii~~~~j1~~~jj1j~: iii~1iiij~1~1~II~~~~j~~~~~~1~IIII~1~j11I1~j~~1~j~I~I~~II1~Ij~~j~~IIjj~~jj~~1jI~j~jj~I~jjj~~j~jj~~III1Ij~Ij1~j~~~~ii~i~~~j~j~~j~~j~~1~II1I~~111~11~~I~j~I1~j~~j~j~~II~~I1~~1~j~j~i1]il~I1~~. iiii~11iij~jii11~~j~jI1j1j~j111j1j1j~1~~1j1j~jjjj1jj1jIIIj~j11j11j~jI~~1Ij~1~11:I1j~1jj~jj~~jj~~~Ij~~jj111~11I11j~j~j~~1j~j1j111~~11~11j1IIj1111j1~11~1jjIj~~i[~i~11~j1II~I~~1~~1111~1~I111~1~jII~1~I1III11jj~I~j~~:ii~i~jI1~1: i.j~iiii~~1~1~j1j~j~j~j~jI~I1~jI~1l~~~I11~1~j~~111I~~j~l~1~~~1~1l11j1j1jjl~j~~j11ljIjj~I1jj~jjj~Ij~1~1Il1jj~jj1j1Il1~1l1~I1~1lj~1j1jjjjl1~j~~lj~~lI1~1jj~i[jij~~~1j~j~~jj~1~~l~~~j~~j~jIIljI1Ij~1111j11j~j~~1l~ljj~j1~1~1l~j1~1l1ii1i~1~1~~1jl: PREVIOUS P A Yl\fENTS .................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... . . . . . . . . . . . . . . . . . . . . . . .. '. . . . :..:.i::=::~:::::~::=::~:::::;:::::~::=::~:::::~:::::~:::::~::=::~:::::~:::::~:::::=::. :::~::=::~::::.~:::::::.::::~::::.~::::::..:.:::~:::::~:::::::::.::.~::::...;:::::::.:..::.~::=::~::=::::...=:::.::.=::;:::::;:::::=:...=::~::=::;::=::;:::::~::.=:.;::=::;::=::;::=::::...:::;::=::::.:=::;::=::;',:=:,:::. :.':.;::=::=":.=::;::=::;::=::;:::::;:::::;:::::;::::':~:::::;:::::::.::::;::'::: jj1jjjjj1~1~1j1~jjj1111~~jj~jj1~1jj~jj1jjj1~j~1~jjjjj~j~jjI1\1j1~1~1~1jIj~j~jjjjjjjjjjjjjjjjjjjj1j1j1j1j1jjj~~1~jj1j1~1j\jjjj~j~~11j1~j11j1jjj1 ' ~~~11ljlj~1~11~ljjj~I1~1j1~11~~~~j~j~1~~j~~j11~~1~1j~11~lj~1i~~ij~]i1~j~~i~l111j11 AMOUNT DUE ~j~~~I~~j~~jj~j~~Ij~~~\~~~~II~~~~~1~jIj~~~j~j~I~~j~j~IIIII~ttj~jj~~~~j~t~~~j~j~jt\~jI~I~II~ $10,548. 6.S '::.'::.'::.'::.:::':::::'::.'::.'::.'::.'::.'::"::'::.'::..'::'::'::.'::'::'::.'::'::.'::.'::.'::.'::.'::'::.'::.'::.'::.'::.'::.':::::'::.:::'::.'::.'::.':.:'::'::,'::.'::.'::.'::.'::.'::'::.'::.'::.'::.'::.'::.'::.'::.'::'::.'::.'::.'::.'::.~::'::.'::.'::.~::'::.'::.~::..::...::.::.!::..::S.'::'::.'::~::.'::"::'::.'::.'::,"::'::.:::.'::.~::.'::'::'::.'::.'::.'::.'::'::.'::.'::'::,"::'::.'::. ~I1j~~~~1~~~~~j~I~~II~j~~~~~j~~~I~\~~~~IIIj~~~jj~~~~~~\~~~~j~jj~jj~~~~~~j~~I~~~~~~~~j~~j~~I~~ 1a1l11:J17 .XLS Page 7 lOZ.Q23-30 o CO ('f') 0') I ..... ('f') 0') N ~ N o ~ o Z - U Q) .! 0- ca .. C 0. (/) - c: Q) E Q) '- > Q) e ~ ~ Q) E (J) E "- o Ci5 ~ "- CO a. - Q) Q) "- Ci5 Q) "C 'en ~ m Q) 'i:: ~ en fS ::s c: -g Q) o ::::: ~ E ('f') CO Q) __ ..J C) "C 0= J: 0 .... 'i:: ~ a. - u CD 0' .. 0. ~ c J! (3 ~:.\:.: -..: '-,. '6:-:~' . . _ U') ...... U') C'! . g S ~ o 0 ~ N 619- <t- O ('f') &0 ('f') -- 619- o ('f') a) C") to ~ 619- to- ., . W >. <t- __ ca 0. U') 0 0 0 COOOO cD ci ci ci co co -- ('f').. CD - I) W >. ca Q. to ...... 0 0 ~ 0 0 0 ~ cO ci ci -- -- CO ....... ~. -- ...... -- -- o o ci o U') M N 619- o N o -- ci ~ 619-N ~ -- CO ..,. 619- - o U') o CO ci to o ~ o U') aSC'i - 619- - U') 1.0 N 1.0 0) C"i o 0') 1.0 -- Mo) -- N - ~ 10 - I) W >. ca 0. o 0 0 0 en 0 ...... <t- 0 0 ..,. CZ) ex) cO Lci ci 0) 0) o 0 ('f') ..,. N CZ) ..,....... ..,. "": 1.0 r'i"': r'i---.i N ("I) ~ ~ - . W >. ca 0. - o ...... 0 ~ ('f') ~ CO M 0') CO CO CX) ~ N. ~ -- ...... ('f') CO') - CD W >. ca Q. 1.0 C") ...... ...... N cD CZ) U') 1.0 <t- 0) cD ('f') 01.0,.... o ("I) en ci 0) cO N CZ) ~I.O -- as ("I) ~ o 0 CO CZ) ...... 0 C") -- Lci ci --i- ,...: ..,. ,.... CZ) ,.... co "lilt ,..: C'i ("I). 1.0 ~ N - . W >. ca 0. ......OOOC") 1.0 0 ~ 0 "lilt N ,...: 0') ci cO ('f') ...... -- N CO ('f'). U') "!. N--o -- "lilt ,.... -- ,.... 1.0 to N 1.0 -- ..; -- N N ~ ~ - . W >. ca 0. 000 "lilt 0 C N ci ci "lilt U') "lilt U')..- o to ...... ~ c CD o -cs E -; CD ~ a CD :s! ! 0:: (.) ~'J#'~ ~ -cs .. c ca o 0. 0. 'ii -cs -= "C CD - ., c "5 ! s ; ~ ~ Q(M C N 0 o co ~ ci a) N "lilt 0) en en MaS ...... ~ U') ..... 0 La C'! C") cO <t- a) to 0 C") N C") ~ as&O~ o C") 0') N -- 619- 619- 619- o N o <t- o ~ C N U') ~ M-- N co 619- ..,. 619- - - o co N en ...... C).C! ~ --i- ~ N <t- O') N co <t- CX) CD ('f') CD anaS-M - 1.0 CZ) ~ ("I) -- M. co en ..... ,.... cD an -- -- CX) 0') 0 ~ en ex) ('t) M N C ~ C -- c...... ananN "lilt ~ ..... en 1.0 0 -- N ..... C'! 0 C") ex) ci ('f') cD ci C") N ('f') co co N ('f') C't CZ). r'i"': NN N C") 619- - C C ,.... N N ci ('f') C co ...... -0)' N NON -- 0 co ci ci ~ 0') U') 1.0. co ,..... cD ('f') ~ -- 0) NON co ,..... ~ 0 CZ) M ci CD ci N 01.01.0 __ -- C'1 ('f'). to 0)'..,...... 0 ('f') U') 619- ..,. 1.0 1.0 en -- ~ ci ex) ('f') o 0 C) o C") en "':o)'cD o C") co -- o "lilt o -- ci N o C") M -- N 619- CX) 0 0 C CX) N C ~ 0 ..... ci ci N ci N N N ..,. en -- C cD CX) an co ,..... 619- "'0 ~ CD _ .. c" C ca CD ; ca-,,~ 00.::::1 CD a.C -o.-Q _ ... 0 "'0 ca C C Efia;"C g g &1i"5i E E:s! !~-CS c( c( 0:: (.) :E .5 ~!f{J ___L_~ ~~ ~ U') co ex) ~ an o -- 619- ... C ::::I o E c(~ 6-s ,.,~. ..,...~_.. . I ~~-'-~ <.-