NOTICE OF PUBLIC ASSESSMENT HEARING
PUBLIC IMPROVEMENT PROJECT #95-02
CREEKSIDE CIRCLE
OVERLA Y/RECONSTRUCTION IMPROVEMENT PROJECT
GRADING, STORM SEWER, AGGREGAIE BASE, CONCRETE CURB
AND GUTTER, BITUMINOUS SURFACING, AND APPURTENANT WORK
IN THE
CITY OF PRIOR LAKE, SCO II COUNTY, MINNESOTA
Notice is hereby given that the City Council of the City of Prior Lake, Minnesota will meet in
the Council Chambers at Fire Station No.1, 16776 Fish Point Road, on Monday, the 18th of
September, 1995 at 7:45 P.M. to consider the assessment of the installation of grading, storm
sewer, aggregate base, concrete curb and gutter, bituminous surfacing, and appurtenant work for
the improvement of the following streets:
CREEKSIDE CIRCLE
The area proposed to be assessed is every lot, piece, and parcel benefiting from said
improvement, whether abutting or not, within the following described areas:
Creekside Circle from Trunk Highway 13, north to its terminus within the Jo-Anna Stepka Hi-
View 3rd Addition Subdivision in Section 1, Township 114 North, Range 22 West, Scott
County, Minnesota.
The estimated total of the Assessment roll is $98.200.00.
The Council proposes to proceed under the authority granted by Chapter 429 M.S.A.
The proposed assessment roll is on file in the City Manager's office and any written or oral
objections will be considered at the public hearing. No appeal may be taken as to the amount of
any assessment unless a signed, written objection is filed with the City Manager prior to the
hearing or presented to the presiding officer at the hearing. An appeal to district court may be
made by serving notice upon the Mayor or City Manager within 30 days after adoption of the
assessment roll and filing such notice with district court within 10 days after service upon the
Mayor or City Manager. The City also has adopted a deferred assessment ordinance whereby the
City Council may defer the payment of special assessments for those individuals who are
permanently disabled or have attained the age of 65 or older. Guideline criteria and applications
16200~reek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
are available at City Hall. Applications must be made within 30 days following the adoption of
the assessment roll by the City Council.
r
Published in the Prior Lake American, September 2, 1995.
9502CREE.DOC
PL~
q-:< -9~
~PUBk\~
1" OT,. CES I
P.l.~ q-;>.J1~
NOTICE OF PUBUC HEARING
PUBUC IMPROVEMENT PROJECT
*95-02
CREEKSIDE CIRCLE
OVERLA Y/RECON;) H\.UcnON
IMPROVEMENT PROJECT
ORADING, STORM SEWER,
AGGREGATE BASE, CONCRr.l~
CURB
~ Gu lid, BITUMINOUS
SURFACING, AND APPURTENANT
WORK.
tN THE
~Il { OF PRIOR LAKE, SCOTI'
COUNTY, MINNESOTA
: Notice is hereby given that the City
Council of the City of Prior Lake, Minne-
sota will meet in the Council Chambers at
FireStatioDNo.l~ 16'T76 FilhPoint Road,
on Mooday, the 18th of,.".....I995
at 7:45 p.m. to ~tbe "IIT~tof
O;<:'-O'd-
the installation of grading, storm ICwer,
aggregate base, concrete curb and gutter,
bituminous surfacing, and appurtenant
work for the improvement of the follow-
ing streets:
CREEKSIDE CIRCLE
The area proposed to be assessed is
every lot, piece, and parcel benefiting
from said improvement, whether abutting
or not, within the following described
areas:
Creekside Circle from Trunk High-
way 13, north to its terminus within the
lo-Anna Stepka Hi-View 3rd Addition
Subdivision in Section 1, Township 114
North, Range 22 West, Scott County,
Minnesota.
The estimated total of the Assessment
roll is $98,200.00.
The Council proposes to proceed un-
der the authority granted by Chapter 429
M.S.A.
The proposed assessment roll is on
fIle in the City Manager's office and any
written or oral objections will be consid-
ered at the public hearing. No appeal may
be taken as to the amount of any assess-
ment unless a signed, written objection is
filed with the City Manager prior to the
hearing or presented to the presiding of-
ficer at the hearing. An appeal to district
court may be made by serving notice upon
the Mayor or City Manager within 30 days
after adoption of the assessment roll and
filing such notice with district court within
10 days after service upon the Mayor or
City Manager. The City also has adopted
a deferred assessment ordinance whereby
the City Council may defer the payment of
special assessments for those individuals
who are permanently disabled or have
attained the age of 65 or older. Guideline
criteria and applications are available at
City Hall. Applications must be made
within 30 days following the adoption of
the assessment roll by the City Council.
Frank Boyles
City Manaler
(Published in the Prior Lake American on
Satmday, Sept. 2, 1995; No. 2660)
,<) , ':tJu.- ~
UJ~
4?/31QrS
0'>
(f~
~
NOTICE OF PUBUC ASSESSMENT
HEARlNG
PUBUC IMPROVEMENT PROJECT
#95-02
CREEKSIDE CIRCLE
o VERLA YIRECONSTRU\..llON
IMPROVE:MENT PROJECT
GRADlN"G. STORM SEWER.
AGGREGATE BASE. CONCRr..n:
CURB AND Gu 11.t::.R. BITUMINOUS
SURFACING. AND APPUR1.t:.L~ANT
WORK IN THE
CITY OF PRIOR LAKE, -
SCOTI COUNTY. MINNESOTA
Notice is herebv given that tbe Cirv
Council of the Citv" of Prior Lake. Min".
nesota will meet in the Council Cham-
bers at Fire Station No. 1. 16776 Fish
PointRoad. on Mondav , the 19th of June,
1995. at 8:00 O.m.. to consider the assess-
men t of the installation of grading, storm
sewer. aggre g a.te base. concrete curb and
gutter. bituminous suriacing, and appur-
tenant work for the improvement of the
following streets:
CREEKSIDE CIRCLE
The area proposed to be assessed is
every lot. piece. and parcel benefiting
from .iaid imorovement. whether abut-
ting 0r not. ~.vithin the following de-
scribed areas:
Creekside Circle from Trunk High-
wa\.' 13. north to its terminus within the
Jo-:~nna Stepka HiView 3rd Addition
Subdivision in Section 1. Township 114
North. Range 22 West. Scott County.
Minnesota.
The estimat.ed total of the Assess-
mentroll is S98.217.00.
The Council proposes to proceed
under the authority granted by Chapter
.+29 M.S.A.
The proposed assessment roll is on
file in the City lYfanager' s office and any
written or oral objections will be consid-
ered at the public hearing. No appeal
mav be taken as to the amount of any
assessment unless a signed. written ob-
jection is filed with the City Manager
prior to the hearing or presented to the
presiding officer at the hearing. An ap-
peal to district court may be made by
serving notice upon the Mayor or City
Manager within 30 days after adoption
of the assessment roll and filing such
notice with district court within 10 days
after service upon the Mayor or CIty
Manager. The City has also adopted a
deferred assessment ordinance wherebv
the Citv Council mav defer the pavment
or special assessments for those indi-
viduals who are permanently disabled or
have a.ttained the age of 65 or older.
Guideline criteria and applications are
available at City Hall. Applications must
be made within 30 days following the
adoption of the assessment roll by the
City Council.
Frank Bovles
City Man~ger
(Published in the Prior Lake American
()~S~t~~y. Jt,me 3. 1995: No. 2558)
June 8, 1995
RE: PUBLIC HEARING NOTICE ON ASSESSMENTS FOR STREET AND
UTILITY IMPROVEMENTS ON RIDGEMONT AVENUE AND CREEKSIDE
CIRCLE
PROJECT #95-01 & 95-02
Dear Resident:
Due to an error in the mailing of the Assessments Notices for the Ridgemont A venue and
Creekside Circle, Project 95-01 & 95-02, the June 19, 1995 Public Assessment Hearing
WILL NOT BE CONDUCTED ON JUNE 19, 1995. A new Public Hearing will be
scheduled and new notices mailed and published in the local paper a minimum of 2
weeks prior to the hearing date.
The June 12, 1995 bid opening for these projects will be held as scheduled. The City
Council will consider awarding the contract for these projects at the June 19, 1995
council meeting. The actual bids for the construction will be received and used for the
Assessment Hearing. Each resident will be re-notified by mail 2 weeks prior to the
Assessment Hearing with the new assessments rates and totals.
If you have any questions, please call Larry Anderson or me at City Hall, 447-4230.
Sincerely,
John Wingard
Assistant City Engineer
CITY OF PRIOR LAKE
Co N s r Ra c rl (j;y'
/'
01
I
'r
Prior lak
AVElCR e, Scott Co MN
: ~~~~d~::;~!I~;r~:R~I~~~~1~?o~~~~
Owner Prior tlma~ed Value: No Jun~ 12,
Prior Lake ~~e City Hall, 4629 0 t kAvallable
612/447-42'45 55372, 612J447~4 ota St SE,
Cansultin ,Attn: Frank Sa 230, Fax:
Paul MNg5~nglneers, 1326 E/ies Engr MSA
9446 Incl 7501 oLaF' 6121644_438gerWa ~a6rk Dr, St
Sani S -12" 36" RC ' x, 121644-
Excav, W~4~3~y:~-6" Wtrmn. 6~to~~y~2 8 LF-8"
A9gr. 2.300 T. 01 Gran Sorrow. 1 omm~~
S,dewalk, 12 o~~tum Paving, {,60g00 T-CI :)
~'ans available f:.;,S~d. 3.1 00 LF.Pv~.~onc
p~;:,~~~~dable. Bond~gl~~er5~!a~s cost ~ci
o. . /0 ert: 100%
, 1) u LL E r / ^/
!qCf~
i ---.....
(0 N s ,R tJ.. C/(ON
64 LLF-rt' IV
/\
\""~
!J
,,3
JqqS-
/
Prior Lake, Scott Co., MN . AIDGEMON1
AVE/CREEKSIDE CIRCLE 51 [93-01] Hwy
1311ndustr1al Park . Low Bids Announced
BIDS: 0If12195, 10:00 AM EstIII'NIfed Value:
Not Avsllable Owner Prior Lake City HaU. 4629
Dakota St SE. Prior Lake. MN 55372, 612/447-
4230. Fax: 612/447-4245, Attn: Frank Boyles
Engr MSA Consulting Engineers, 1326 Energy
Park Dr, St Paul, MN 55108. 612/644-4389.
Fax: 612/644-9446 Low Bidders S M Hentges
& Son Inc, 650 Quaker Ave. PO Box 520
(Shakopee 55379), Jordan, MN 55352,
612/492-5700, Fax: 612/492-5705. $429.243.
McNamara Contr Co. 14605 Johnny Cake
Ridge, Apple Valley, MN 55124, 612/432-7171,
Fax: 612/432-7176. $464.530. Ryan Contr Inc.
8700 13th Ave E, Shakopee, MN 55379,
612/894-3200, Fax: 612/894-3207. $481,966.
~~w~
Prior Lake. Scott Co., MN . RIOGEMONT
AVE/CREEKSIDE CIRCLE ST [93-01] Hwy
13/lndustrial Park - Bids close June 12,
10:00 AM Estimated Value: Not Available
Owner Prior Lake City Hall, 4629 Dakota SI SE,
Pnor Lake. MN 55372, 612/447-4230, Fax:
612/447-4245, Attn: Frank Boyles Engr MSA
Consulting Engineers, 1326 Energy Park Dr. SI
Paul, MN 55108. 612/644-4389, Fax: 612/644-
9446 Incl 750 LF-12" 36" RC St Swr. 918 LF-8"
Sani Swr, 934 LF-6" Wtrmn, 6,000 CY-Common
Excav, 645 CY-Sel Gran Borrow. 1,000 T-C: 5
Aggr. 2,300 T-Bitum Paving, 7.600 T-Conc
Sidewalk. 12,000 T-Sod. 3,100 LF-Pvmt Mark,
Plans available from Engineer. Plans cost $50
Nonrefundable. Bonds Bid: 5% Perf: 100%
Pay: 100%.
~
~=4.
'~~
~,
199.j
STREET & STORM SEWER
IMPS
BIDS CLOSE JUN 12
Prior Lake. MN
ADVERTISEMENT FOR BIDS -
Ridgemont Avenue/Creekside
Circle Street lI!!Provements
and Trunk Higbwav 13lIndustri.
al Park Stonn sewer fmprovements
in tbe Citv of Prior Lake
Cit~. P'roiect Nos. 93.01, 93.03,
95.01. and 95-02
NOTICE IS HEREBY GIVEN that
sealed prQPosals will be received by
the City Council of the City of Prior
Lake. Minnesota at the Prior Lake
City Hall. located at 16200 Eagle
Creek Avenue S.E.. Prior Lake. Min-
nesota 55372 until 10:00 a.m.. local
time. on the 12th day of June.I995,
and will be publicly opened at said
time and place by two or more desig-
nated officers or agents of the City of
Prior Lake. said proposals for the 'fur-
nishing of all labor and materials for
the construction. complete in place of
the followi~~:
APPROXIMATE QUAA lILIES
12" to 36" RC Storm Sewer 750 LF
8" SanitarY Sewer 918 LF
6" Watemiain 934 LF
Common Excavation 6.000 CY
Select Granular Borrow 645 CY
Class 5 A2srre2ate 1.000 TON
Biwminous Paving 2.300 TON
Concrete SidewalK 7.600 TON
Sod 12.000 TON
Pavement Marking 3.100 LF
Proposals arriving after the desig-
nated ume will be returned unopened.
The Bids must be submined on the
proposal forms provided in accor-
Oance with contract documents. plans.
and specifications as prepared by
MSA Consulting Engineers. 1326
Energy Park Dnve. S1. Paul. MN
55108. Contract documents. plans.
and specifications may be obtained
from MSA Consulting Engineers upon
deposit of Fifty dollars ($50.00)non-
refundable de~sit per set.
No bids wIll be considered unless
sealed and filed with the City Clerk of
Prior Lake and accompanied' by a cash
deposit. cashier's check. bid bond. or
cenified check pavable to Clerk of the
City of Prior Lake. for five (5%) per-
cent of the amount bid to be forfeIted
as li'luidated damages in the event that
the Did be accepted and bidder shall
fail to enter promptlY into a written
contract and furnisb the required
bond.
No bids may be withdrawn for a
period of ninetv (90) davs from the
aate of opening" of bids. The City of
Prior Lake reserves the right to r~ect
any or all bids. Further. the City
reserves the right to accept a bid high-
er than the lowest bid if. 10 the opimon
of the Council. the public interest will
be better served.
Frank Boyles
City Manager
Citv of Prior Lake. Minnesota
05-16 / 06-02
r
O~;jab- ~
57 dO / q ~-
+
51;).1 / q s-
/lr 01
1 ~'
'"
~. (_G,J-
q3-{)(
?
o -:> / ()~
ADVERTISEMENT FOR BIDS
Ridgemont Avenue/Creekside Circle
Street Improvements
and Trunk Highway 13/1ndustrial Park
Storm Sewer Improvements
in the City of Prior Lake
City Project Nos. 93-01, 93-03. 95-01,
and 95-02
NOTICE IS HEREBY GIVEN that
sealed proposals will be received by the
City Council of the City of Prior Lake,
Minnesota at the Prior Lake City Hall,
located at 16200 Eagle Creek Avenue
S .E., Prior Lak~ MN 55372 until 10:00
a.m. local time, on the 12th day of June,
1995, and will be publicly opened at said
time and place by two or more desig-
nated officers or agents of the City of
Prior Lake, said proposals for the fur-
nishing of all labor and materials for the
construction, complete in place of the
following:
At'rKOXIMA TE QUAA 111 u:.S
12" to 36". RC Storm Sewer 750 LF
8" Sanitary Sewer 918 LF
6" Watermain 934 LF
Common Excavation 6,000 CY
Select Granular Borrow 645 CY
Class 5 Aggregate 1,000 TON
Bituminous Paving 2,300 TON
Concrete Sidewalk 7,600 TON
Sod 12,000 TON
Pavement Marking 3,100 LF
Proposals arriving after the designated
time will be returned unopened.
The Bids must be submitted on the
proposal forms provided in accordance
with contract documents, plans, and
specifications as prepared by MSA
Consulting Engineers, 1326 Energy
Park Drive, St. Paul, MN 55108.
Contract documents, plans, and
specifications may be obtained from
MSA Consulting Engineers upon
deposit upon deposit of Fifty dollars
(S50) non-refundable deposit per set.
No bids will be considered unless
sealed and filed with the City Clerk of
Prior Lake and accompanied by a cash
deposit, cashier's check, bid bond, or
certified check payable to Clerk of the
City of Prior Lake, for five (5%)
percent of the bid to be forfeited as
liquidated damages in the event that
the bid be accepted and bidder shall
fail to enter promptly into a written
contract and furnish the required bond.
No bids maybe withdrawn for a period
of ninety (90) days 1& U&&& the date of
opening of bids. The City of Prior
Lake reserves the right to reject any or
all bids. Further, the City reserves the
right to accept a bid higher than the
lowest bid if, in the opinion of the
Council, the public interest will be
better served.
IslFrank Boyles
. City Manager. ._, . ..' " . .
City of. Prior, take', Minnesota
(published'in'the Prior Lake American
on Saturdays, May 20 and 27,1995; No.
2549)
Cll" 'i OF PKlOR LAKE
PUBLIC IiEARING
CREEKSllJE C1KCLE
~'EBRUARY 6, 1995
8:00 P.M., COUNLlL CHAMBERS
LARRY ANDERSON, CII i ENGINEER
TOM ROUSHAR, CITY'S CONSULTANT ENGINEER
i) 5 - 0 .z--
102l04S-2603.jan
I~lfORMA TIONAL l\'l~ETING
I. IN1;RODUCTION
II. PROJECT mSTORY
III. SLIIJE PRESENTAtION
IV. PROPOSED IMPROVEME~ IS
V. PROJECT COST/ESTIMATED ASSESSM~~'I'S
VI. PROJECT SCIlliDULE
VII. GENERAL QUESTIONS AND ANSWERS
I02/04S-2603.jan
"PR~
~
I. I~'l'KODUCTION - CREEKSIDE ClJ.{CLE
PROJECT PURPOSE:
Street reconstruction of Creekside Circle, including grading, aggregate
base, storm sewer, concrete curb and gutter, bituminous surfacing, and
appurtenant work.
l02/045-2603.jan
~
II. PROJECT HISTORY
The City of Prior Lake initiated a street reconstruction program in 1985.
To date, four projects have been completed. A fifth project will be
completed in 1995.
This project was included in the 1995 Capital Improvement Program. If
approved by the City Council, this project will also be constructed in 1995.
The City Council approved the feasibility study for this project on
December 5, 1994.
I02/045-2603.jan
IV. PROPOSED IMPRO"ElVIE~l'S
CREEKSWE CIKCLE
· CURB AND GUTTER ON AN URBAN PORI10N
· NEW STREET
· STORMW A TER SYSTEM
CATCH BASINS
STORM SEWER
· TURF RESTORAI10N
SODDING
· DRIVEW A Y RESTORATION
BITUMINOUS
CONCRETE
102/045-2603.jan
PROPOSED 18"RCP STORM SEWER\
7 ' 8 \ 9
j.. \
BEGIN 8618 6 [1
CURB AND GUTTER ,r- .
END RURAL SECTION /~,/~'i 12
CONSTRUCTION //'
/<<
PROPOSED
BEEHIVES IN DITCH
AND 18"RCP
STORM SEWER
BEGIN RURAL SECTIO~J
CONSTRUCTION
PL027EX
YSJ~
13
L1.
w
d :t.
0::-
G
U.J
o
- V5
::::s::::
---1:I:t
w
a::::
u
, \
\. \.
- -- -. - -_.-- ,-- '\ \.
" \
\ \
, \
\..--J
10
EXISTING 18ft RCP
STORM SEWER
11
CREEK
14
1 ,-
,)
I
~
~
II
. I
I
I
\
---~, '
\
.., \
\)
~O.
G0~~'{
'0\
~j~~
\\
~
o
,
200
.
STREET IMPROVEMENTS
, coEXISTING STORM SEWER
..... <__ PROP. STORM SEWER
PROPOSED CONS I MUCTlON
~ONSULTINC KNCINlKRS
CREEKSIDE CIRel F
~~[x]D~Otr
@
ROW
66'
24' WIDE ~AT
EXISTING
- DITCH
EXISTING
DITCH
~+-
T--
J'OO~__
- - ~
--~:-..~
-
-
~
- 1 1/2" TYPE 41A BITUMINOUS WEAR COURSE
TACK COAT
3" TYPE 31 B BITUMINOUS BASE COURSE
4" CLASS 5 AGGREGATE BASE
12- SUBCUT / GRANULAR BORROW
AURAL SECTION
ROW
66'
~
24' FACE TO FACE
~
(8618 CONCRETE CURB & GUTTER
~ ~ t .~~ -~~~-:;;;
.~:.~;;~j'r ~ l-~ 1 - _
,
. ~4" 1FT
----,',"" t.'~7
j~ ~~;.; ~~
- 1 1/2" TYPE 41 A BITUMINOUS WEAR COURSE
TACK COAT
3" TYPE 31B BITUMINOUS BASE COURSE
4" CLASS 5 AGGREGATE BASE
12" SUBCUT / GRANULAR BORROW
URBAN SECTION
PL027EX
MSJ~
A-PR
PROPOSED TYPICAL S I NEt:: I SECTIONS U / \ "'
7 TON DESIGN ~ / \
CREEKSIDE CIRCLE ~ .
;QNSULTIIC INCIMlIRS
ROW
-
ROW
=--
- -----
~iA[M]U ~Dlr
@
January 23, 1995
RE: CORRECTION OF PUBLIC HEARING TIME ON CREEKSIDE CIRCLE STREET
IMPROVEMENT PROJECT
Dear Property Owner:
This letter is to correct the Public Hearing time shown on the Informational Meeting
letter for the Creekside Circle street improvement project. The Informational Meeting
notice stated that the Public Hearing will start at 8:15 P.M. and the attached Public
Hearing notice has the starting time for the Public Hearing at 8:00 P.M.
The correct starting time for the Public Hearing for Creekside Circle street improvement
project is 8:00 P.M. on the 6th of February, 1995, as shown in the Public Hearing notice.
If you have any questions, please call either Larry Anderson or me at City Hall, at
447-4230.
Sincerely yours,
~~
Bruce Loney, P. E.
Assistant City Engineer
CITY OF PRIOR LAKE
BL:acj
9502L 1. ENG
16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
January 17, 1995
RE: INFORMATIONAL MEETING ON STREET IMPROVEMENT ON CREEKSIDE CIRCLE
Dear Property Owner:
The City of Prior Lake's Engineering Department will be conducting an Infonnational Meeting on the
proposed improvements for Ridgemont Avenue, Titus Addition and Creekside Circle in the City of Prior
Lake to be held in the Council Chambers at City Hall on Monday, the 30th of January, 1995 starting at
6:30 P.M. for CREEKSIDE CIRCLE, 7: 15 P.M. for Titus Addition, and 8:00 P.M. for Ridgemont
Avenue. The Creekside Circle project is for the rehabilitation of the bituminous street pavement.
This Infon11ational Meeting is intended to provide a better understanding of the proposed improvements
prior to the Public Hearing to those affected property owners in the project area. A Public Hearing is
scheduled for Monday, the 6th of February, 1995 starting at 8:15 P.M. for the Creekside Circle street
improvement. A Public Hearing notice is enclosed which indicates the time and place of the hearing,
general nature of the improvement. estimated cost, and the area proposed to be assessed.
~REEKSIDE CIRCLE
Informational Meeting - January 30, 1995 @ 6:30 P.M.
Public Hearing Meeting - February 6, 1995 @ 8: 15 P.M.
The Informational Meeting will be an infonnal meeting in which engineering personnel will explain the
scope of the project, estimated costs of the improvements. the special assessment process and answer any
questions in regard to the project. No decision or approval will be made at this meeting. The Public
Hearing meeting on February 6, 1995 will be when the City Council will consider the proposed public
improvement project.
If you have any questions, please call either Larry Anderson or me at City Hall, at 447-4230.
Sincerely yours,
~~
Bruce Loney, P.E.
Assistant City Engineer
CITY OF PRIOR LAKE
B L: acj
95021.T.ENG
16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORlUNITY EMPLOYER
NOTICE OF PUBLIC HEARING
ON 1995 PUBLIC IMPROVEMENT PROJECTS
SANITARY SEWER, WATERMAIN, STORM SEWER, GRADING,
CURBING, WALKS, STREET PAVING, LIGHTING, LANDSCAPING
PARK RESTROOMS/SHELTER, TRAFFIC CONTROL SIGNAL
AND APPURTENANT WORK
IN THE
CITY OF PRIOR LAKE, SCOTI COUNTY, MINNESOTA
Notice is hereby given that the City Council of the City of Prior Lake. Minnesota will meet in the Council Chambers
in City Hall on the following dates and times to consider the improvement for the following project areas:
Public Hearing Date: Eclm.Iarv 6. 199:).
Public Hearing Time: 7:45 P.M.
PROJECT DESCRIPTION
Area 1 - Rid'lemont Avenue
Ridgemont Avenue from the existing concrete curb and gutter to Rutledge Street. including sanitary sewer,
watermain. storm sewer. grading, aggregate base, concrete curb and gutter. bituminous surfacing, and
appurtenant work.
Area 4 - Construction of Restrooms/Storav-e in Memorial Park
Construction of restrooms/storage beneath the grandstand in Memorial Park.
Area 5 - CSAH 18 From Citv Limits to CSAH 42
CSAH 18 from the City limits to CSAH 42 by the construction of storm sewer. utility crossings. concrete
curb and gutter. sidewalk. landscaping. and appurtenant work.
Area 6 - CSAH 44 From T.H. 13 to East Citv Limit Line
CSAH 44 from T.H. 13 to east City limit line by the construction of storm sewer, concrete curb and gutter,
sidewaLk. trail. lighting. landscaping. traffic control signal, and appurtenant work.
Area 7 - Countv Road 83 From County Road 82 to CSAH 42
County Road 83 from County Road 82 to CSAH 42 by the construction of storm sewer. concrete curb and
gutter, trail. landscaping. traffic control signal, and appurtenant work. .
Area 8 - Construction of Restrooms/Shelter in Grainwood Park
Construction of restrooms and shelter at Grainwood Crossing Park.
The area proposed to be assessed is every lot, piece and parcel benefitting from said improvement. whether abutting
or not. within the following described areas:
AREA 1 - Ridgemont Avenue
The south half of Secribns 35 and 36, Township 115 north, Range 22 west, Scott County, Minnesota.
Specific property descriptions included in the above described area, but not inclusive, are as follows:
16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
R.L.S. No. 13, Tract E
Hannen ZIid Addition, Lot 1
Mitchell Pond, Lots 1-3, Block 2
Calvin Erbele's 1st Addition, Lot 1
Edwards 1st Addition, Lot 2, Block 1
The Oaks, Lots 1-3, Block 1
Unplatted property south of Hannen 2nd Addition adjacent to Ridgemont Avenue.
The Council proposes 10 proceed under the authority granted by Chapter 429 M.S.A.
************************************************************
Public Hearing Date: Februarv 6. 1995
Public Hearing Time: 8:00 P.M.
PROJECT DESCRIPTION
Area 2 - Creekside Circle
Street reconstruction of Creekside Circle, including grading, aggregate base, storm sewer, concrete curb
and gutter, bituminous surfacing, and appurtenant work.
Area 4 - Construction of Restrooms/Storae-e in Memorial Park
Construction of restrooms/storage beneath the grandstand in Memorial Park.
Area 5 - CSAH 18 From City Limits to CSAH 42
CSAH 18 from the City limits to CSAH 42 by the construction of storm sewer, utility crossings, concrete
curb and gutter, sidewalk, landscaping, and appurtenant work.
Area 6 - CSAH 44 From T.H. 13 to East City Limit Line
CSAH 44 from T.H. 13 to east City limit line by the construction of storm sewer, concrete curb and gutter,
sidewalk, trail, lighting, landscaping, traffic control signal, and appurtenant work.
Area 7 - County Road 83 From County Road 82 to CSAH 42
County Road 83 from County Road 82 to CSAH 42 by the construction of storm sewer, concrete curb and
gutter, trail, landscaping, traffic control signal, and appurtenant work.
Area 8 - Construction of RestroomslShelter in Grainwood Park
Construction of restrooms and shelter at Grainwood Crossing Park.
The area proposed to be assessed is every lot, piece and parcel benefitting from said improvement, whether abutting
or not, within the following described areas:
Area 2 - Creekside Circle
The south half of Section 2, Township 114 north, Range 22 west, Scott County, Minnesota.
Specific property descriptions included in the abo~e described area, but not exclusive, are as follows:
Property abutting Creekside Circle including Lots 1-16 of the area known and platted as Jo-Anna Stepka
Hi-View 3rd, and the properties south of Lot 16 and Lot 2.
The Council proposes to proceed under the authority granted by Chapter 429 M.S.A.
All persons desiring to be heard with reference to the proposed improvements will be heard at this meeting. Written
or oral comments will be considered.
)
************************************************************
Public Hearing Date: Februarv 6. 1995
Public Hearing Time: 8:15 P.M.
PROJECT DESCRIPTION
Area 3 - Titus Addition
Bituminous resurfacing of Martindale Street, Henning Circle and Hickory Lane within the Titus
Subdi vision. In addition, work includes the reconstruction of Martindale at Pike Lake Trail, including
grading, aggregate base, bituminous curb, bituminous surfacing, and appurtenant work.
Area 4 - Construction of RestroomslStora~e in Memorial Park
Construction of restroomslstorage beneath the grandstand in Memorial Park.
Area 5 - CSAH 18 From Citv Limits to CSAH 42
CSAH 18 from the City limits to CSAH 42 by the construction of storm sewer, utility crossings, concrete
curb and gutter, sidewalk, landscaping, and appurtenant work.
Area 6 - CSAH 44 From T.H. 13 to East Citv Limit Line
CSAH 44 from T.H. 13 to east City limit line by the construction of storm sewer, concrete curb and gutter,
sidewalk, trail, lighting, landscaping, traffic control signal, and appurtenant work.
Area 7 - Countv Road 83 From Countv Road 82 to CSAH 42
County Road 83 from County Road 82 to CSAH 42 by the construction of stVllU sewer, concrete curb and
gutter, trail, landscaping, traffic control signal, and appurtenant work.
Area 8 - Construction of Restrooms/Shelter in Grainwood Park
Construction of restrooms and shelter at Grainwood Crossing Park.
The area proposed to be assessed is every lot, piece and parcel benefitting from said improvement, whether abutting
or not, within the following described areas:
,Area 6 - Titus Addition
The north half of Section 23, Township 115 north, Range 22 west, Scott County, Minnesota.
Specific property descriptions included in the above described area, but not inclusive, are as follows:
Property abutting Martindale Drive, Henning Circle and Hickory Lane in Blocks 1, 2 and 3, and Outlot B
within the area known and platted as Titus 1 st Addition.
The Council proposes to proceed under the authority granted by Chapter 429 M.S.A.
The total estimated cost of such improvements for Areas 1 through 8 is $1,297,968.00.
All persons desiring to be heard with reference to the proposed improvements will be heard at this meeting. Written
or oral comments will be considered.
Dated:
January 17, 1995
rOO
By Order of the City Council
Isl
Frank Boyles
City Manager
Published in the Prior Lake American, January 21, 1995 and January 28, 1995.