199'7 STREET Ie tmLrrY IMPS
BIDS CLOSE AUG 4
Prior Lake MN
ADVERTISEMENT FOR BIDS -
1997 Street and Utility Improve-
ments
in the City of Prior Lake
City Project No. 97-02
City ProJect No. 95-07
City_PrQJect No. 97-17
NOTICE IS HEREBY GIVEN that
sealed proposals will be received by
the City Council of the City of Prior
Lake, Minnesota at the Prior Lake
City Hall, located at 16200 Eagle
Creek Avenue S.E., Prior Lake, MN
55372 until 10:00 a.m., local time, on
the 4th day of August, 1997, and will
be publicly openea at said time and
place by two or more designated offi-
cers or agents of the City of Prior
Lake, said pro~sals for the furnishing
of all labor and materials for the con-
struction, complete in place of the fol-
10wkPiiROXIMATE QUANTITIES
Concrete Curb ana Gutter 11930
LF
Class 5 Aggregate Base 11350 Ton
Bituminous Pavi_n..g 5685 Ton
Storm Sewer 2100LF
Concrete Sidewalk 12186 SF
Pavement Stril'ing 8725 LF
Watermain 1450 LF
Sanitary Sewer 430 LF
Retaining Wall 6000 SF
Proposars arriving after the desig-
nated tIme will be retUrned unopened.
The Bids must be submitted on the
proposal forms provided in accor-
aance with contract documents, plans,
and specifications as prepared by
Howard R. Green Company, 1326
Energy Park Drive, St. Paul, MN
55108. Contract documents, plans,
and specifications may be obtained
from Howard R. Green Company
upon cteposit of One hundred dollars
($100.00) non-refundable deposit per
set.
No bids will be considered unless
sealed and filed with the City Clerk of
Prior Lake and accompanied by a cash
deposit, cashier's check, bid bond, or
certified check payable to Clerk of the
City of Prior Lake, for five (5%) per-
cent of the amount bid to be forfeited
as liquidated damages in the event that
the oid be accepted and bidder shall
fail to enter promptly into a written
contract and furnisn the required
bond.
No bids max be withdrawn for a
period of sixtr (60) days from the date
of opening 0 bids. The City of Prior
Lake reserves the right to reject any or
all bids. Further, the City reserves the
right to accert a bid higher than the
lowest bid i , in the opinion of the
Council. the public interest will be
better served.
Frank Boyles
City Manager
City of Prior Lake, Minnesota
07-11/07-18/07-25
;)
{G~\
;1
~-.I~
--
----
---
,..-
-
~
d,~,
era
_../ )vL/fYL
\l1
ADVERTISEMENT fOR BIDS
1997 Street and .utility lri1.provements
in the City of Prier Lake
City Project No. 97.;02
City froject Nck9S-07
City ProjectNo.97-17 ".
. NOnCE IS HEREBY GIVEN that
sealed proposals will be received by the
City Council oftheC;ity of Prior Lake,
Minnesota at thePriC>f Lake ,City Hall
"located at1620(lEagleCteek Avenue S .E.,
Prior Lake. MN,55372UrltillO:OO a.m.
local tiirte, On the 4th d~y of~ligust, 1997,
and will be publicly opened at said tune
and place by two or more designated offic:-
erS or agents of the City of Prior Lake, said
proposals for the furnishing of a1l1abor and
m~terials for the construction; complete in
place of the following:. ., " .<
APPROXIMATE QUANTITIES
ConcreteCurb ~dGutter ,'11930.LF
Class 5 Aggregate ,Base 11350 ton
Bituminous PaVing 5685 . ion
Storm Sewer 2100LF
Concrete Sidewalk '12186 SF
Pavement Striping 8725 1.F
Watermain 1450 LF
Sanitary Sewer ,4~0 LF
RetainingWall . ."..'.... . 6000 sF
Proposals arriVing after the designated
time will be retumed unopened.
The Bids must be submitted on the
proposal forms provided in ~ccordance
with corttractdocuments, plans, andspeci~
f,ications a,<; prepared by Howard R. Green
Company, 1326 Energy Park Drive,St.
Paul, MN 55108. Contract docu~ent<;,
plans. and specifications may be~btained
from Howard, R.Green Company upon
'deposit of One hundr.e~dolllU's($1 00.00)
non-refundable deposit ptrset. ... .,
No bids will beconside1'ed unless sealed
and filed with the City Clerk of Pribr Lake
and accompanied bi a cash deposit.
cashier's check, bid bortd, 0]; certified check
payable to Clerk Of the City of Prior Lake, .
for five (5%) of ,thearnount bid to be
forfeited a.~liquidateddamagesin the event
that the bid bea~cepted and biddershallfail
. to enter promptly into a ",'ritten contract
and furnish the required b()nd.
No bids may be withdrawn for a pe-
.riodo! sixty (60) days frotn the date of
opening ~fbids..The,City of ~iorLake;
reserves the right to' reJectanyorafl bid,S.
Further, the City. reserves. Ute right. to
accept a bid higher than the lowest bid if, .
in the opinion of the Council, the public
interest will be better served. . .. .. ..... .
.' FtankBbyles
..... ..' .' ..... City Manager
. City of PrioiUke, Minnesota
(Published in the Prior LakeAmerican on
Saturdays, July 12 and 19, .'1997; No.,
J201) .
~ 0 q 7
c' ~ ct~
'-s~
r\JL
'--.rY~-- 0-
~
11 91
1997 S'I'R.r...!..l " Ul1LlTY IMPS
BIDS CLOSE AUG 4
Prior Lake, MN .
ADV tKuSEMENT FOR BIDS -
1997 Street and Utility Improve-
ments .
in the Ci~ of Prior Lake
City Project No. 97-02
City Pro~ect No. 95-07
City Project No. 97-17
NOTICE IS HEREBY GIVEN that
sealed proposals will be received by
the City Council of the City of Pri.or
Lake, Minnesota at the Prior Lake
City Hall, located at 16200 Eagle
Creek Avenue S.E., Prior Lake, MN
55372 until 10:00 a.m., local time, on
the 4th day of August, 1997, and will
be publicly openea at said time and
place by two .or more designated offi-
cers or agents of the City of Pri.or
Lake, said pro~sals for tbe furnishing
of all labor and materials for the con-
structi.on, c.omplete in place .of the fol-
lowing:
APPROXIMATE QUA1'lUlu:.S
C.oncrete Curb and Gutter 11930
LF
Class 5 Aggregate Base 11350 Ton
Bituminous Paving 5685 Ton
Storm Sewer 2100 LF
Concrete Sidewalk 12186 SF
Pavement Striping 8725 LF
Watennain 1450 LF
Sanitary Sewer 430 u~
Retaining Wall 6000 SF
Proposals arriving after the desig-
nated time will be returned unopened.
The Bids must be submitted on the
proposal forms provided in accor-
ClanCe with contract docwnents, plans,
and specifications as prepared by
H.oward R. Green C.ompany, 1326
Energy Park Drive, St. Paul, MN
55108. Contract documents, plans,
and sI>.ecificati.ons may be obtained
from Howard R. Grec:n Company
upon ctej!osit of One hundred d.ollars
($100.00) non-refundable deposit per
set
No bids will be considered unless
sealed and filed with the City Clerk of
Prior Lake and accompanied by a cash
dep()sit, cashier's check. bid oond, or
certified check payable 1.0 Clerk of the
City .of Prior Lake, for five (5%) per-
cent of the amount bid to be forfeIted
as liguidated damages in the event that
the oid be accepted and bidder shall
fail to enter promptly into a written
contract and furnish the required
oond.
N.o bids max be wilthdrawD for a
~od of sixty \60) days from the date
of opening of bids. The City of Prior
Lake reserves the right 10 reject any or
all bids. Further, the City reserves the
right t.o ~c~f.t.a bid higher than the
lowest. bid I , In ~e. opinion of the
Councll, the pubhc mterest will be
better served.
Frank Boyles
qty M~ger
City of Prior Lake, Minnesota
07-11/07-18/07-25
T. . AMERICAN INSTITUTE G.* ARCHITEC 1 5
.
A/A Document 1\310
Bid Bond
KNOW ALL MEN BY THESE PRESENTS, . MCNAMARA CONTRACTING, INC.
. lHHe inw-t full Dime and ~ or Ic9' lid~ 01 ContradOrJ
5001 160th Street West, Rosemount. MN 55068
as Principal, hereinafter called the Principal, and NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
222 South 9 th Street (Hefe Ntsert fuB name Iftd adcifas or'epJ !ide of Suretyl
Minneapolis, MN 55402
a corporation duly organized under the laws of the State of Connecticut
as Surety, hereinafter caned the Surety, are held and firmly bound unto
CMer~ ;ft~ It,,. ~me Jft'i address or lqal Uric of Owner)
City of Prior Lake, MN
as Obligee, hereinafter called the Obligee, in the sum of
Five Percent ( 5% ) of Amount Bid . Dollars ($ 5% of Bid ),
for the payment of which sum wen and truly to be made, the said Principal and the said Surety, bind
ourselves, our heirs, executors, administrators, successOrs and assigns, joindy and severally, firmly by
these presents.
. W HER EAS, the Principal has submitted a bid for
CHen! inMtt full name, address .net descripcion of projectl
1997 Street and Utility Improvements in the City of Prior Lake
City Project Nos.: 97-02, 95-07, and 97-17
N 0 \V, THE it E FOR E, if the Obligee s~U ~ccept the bid of tM PrinciDal ~nd th~ Princioaf shUt enter into a Contr.act
with rh~ Ohlig~ in ~ccord~nce with mil! t~$ of such bid, ~nd give sa..ch bond or bonds u may be s~fi-ed in the bidding
or Contract Oocum~nts with gond ...nd sufficiM1: SIJrety for the faithful perinrm~nce oi such ContRa and for the prompt
p:aym~nt ot I.hor ...nd materia' fllmi~h~ in .the Dro~tinn thO".. i. or in the ~t of th'! failtJre ot the Principal to enter
such Cont1'3ct and give such bnnd or bands, if tM Princio.al shaU oay tf) the Obligee the diff~tenc'! not to,_.,...__J the penalty
herenf bll!rw~n the ;amount sDecified in said bid ;and s..chlar~et amnunt fnr whid1 the Obligee may in ~ ~ith contnct
with anath'!r carty to perlorm th~ Wnric cmtf!red by said bid, then this obli~aMn sMll be null and void, otherwise to remain
in full force and effect.
Signed and sealed this
4th
day of
August
19 97
1~
s . cJJM-t
(Witnes1J
~CNAMARA CONTRACTING, !HC.
... (PrinciD~J (Seal)
~~~
Kevin McNamara rrid~ President
NATIOrl~IRE INSY~ANY OF HARTFORD
J J \ lJ (~ure (Seal]
tfJ'\.-tJ j
Donald R. Olson {Tide} Attorney-in-Fact
A~~ ? cl\AL+~
\. (W;c,,~s)
AlA DOCUMF.NT AJ10 . 810 aONO . A'" e . FE3RUAltY 19;0 EO . THE AMEiUCAN
INSTliUiE Or ARCH1TECiS. 1i'JS N.Y. AVE.. N.W.. W".SHI NG7C:-i. O. C. :0005
1
WARNI!'IG; tJntic"!:"s~ onct:J':o~,ng vlol1t~ u.s. c=~r.;n~ 1~ a~c2 :$ ~Olee: :0 leo;31 e~~~~::~n.
ACKNOWLLvGl\tuw.IT OF CORPORATION
State of
Minnesota
County of
Hennepin
} ~
On this 4 th day of Augus t: , 19 97 , bc:C..,,&,.. me appeared
Kevin McNamara
to me personally known, who, being by me duly sworn, did say that (s) he islare the President
of MCNAMARA CONTRACTING J INC. , a corporation, that the seal affixed to the forgoing instrument is the
corporate seal of said corporatio~
(If DO seal. so state., and strike out above as to ~. ''I . ,. ".' seal) and that said instrument was ex.;.....~ in behalf of said W'. t'uuJion by authority of its
Board ofDL.~lOrs; and that said Kevin McNamara ~owledged said instrument to be the fa'...... act and
deed of said corporation.
/(~1
I, J.L~
~J"
~ NINA E. WERSTEIN -1
NOTARY PU8UC - M!NNESOTA
MY COMMISSION EXPIRES
JANUARY 3 ~ 2000 --t
.
Notary Public
My o~l.uuuission expires
ACKNOWLI...uGMENT OF CORPORAl~ SURETY
State of Minnesota
} ~
County of Hennepin
On this 4th dayof Au~ust ,19 97 , beforemeGi'~ Donald R. Olson
to me personally known, who being by me duly swo~ did say that (sthc is the Attorney-in-Fact of NATIONAL FIRE INSURANCE
CaMP ANY OF HARTFORD , a co~&~n, that the seal affixed to the foregoing instrument is the
w&1^'&c:U.C seal of said corporation and that said iIwuu.a.uent was executed in behalf of said corporation by ~I&~~J of its Board of
Oh.:.wLOIS; and that said Donald R. Olson acknowledged said ~~ent to be the
free act and deed of said corporation.
11k~ ? ~~~
NotaIy Public Couutyr
My commission IoH"t'Jes
POWER OF A110RNEY APPO~TJjiG INn!\' mUAL A110RNEY-IN-FACT
Know All Men By These Presents, That CONTINENTAl CASUAlTY COMPANY, an Iffinois corporation, NATIONAL FIRE INSURANCE
COMPANY OF HARTFORD, a Connecticut corporation, AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA. a Pennsylvania
corporation (herein collectively called "'the CNA Surety Companies-), are duly organized and c;~~..g corporations having their principal offices in
the City of Chicago, and State of Illinois, and that they do by virtue of the signature and seals herein a:7""".:.d hereby make, constitute and appoint
Bruce N. Telander. R.W.Frank, John P. Martinsen, Gary S. Soderber~, R. Scott E~~inton. Donald R. Olson. John E. Tauer,
Dennis Under, Mary L Char1es, Individually
of Minneapolis, Minnesota
their true and lawful Attomey( s )-in-Fact with fun power and authority hereby conferred to sign, seal and execute for and on their behalf bonds,
undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly autho. ~c.J officer of their corporations
and all the acts of said Attorney, pursuant to the authority hereby given are hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By-Laws and Resolutions, printed on the reverse hereof, duly
adopted, as indicated, by the Boards of Directors of the corporations. .
In Witness Whereof, the CNA Sureties Companies have caused these presents to be signed by their Group VICe President and
their corporate seals to be hereto affixed on this 11 th day of July , 1996 .
~~~~
(f;;~~)
3 -
J
~~IAJ
~
CONTINENTAL CASUALTY COMPANY
NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA
~1}L
~
M.C. Vonnahme
Group Vice President
State of Illinois, County of Cook, ss:
On this 11 th day of July , 1996 ,before me personally came
M. C. Vonnahme , to me known, who, being by me duly sworn, did depose and say: that he resides in the Village of Darien ,State of Illinois;
that he is a Group Vice President of CONTINENTAl CASUAlTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF HARTFORD,
and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA described in and which executed the above instrument; that he
knows the seals of said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed pursuant to
authority given by the Boards of Directors of said corporations and that he signed his name thereto pursuant to 6ke authOrity, and acknowledges
same to be the act and deed of said corporations.
My Commission Expires June 5, 2000
CERTIFICATE
r~.P~
Eileen T. Pachuta
Notary Public
. I,John M. UttIer ,Assistant Secretary of CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF
HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA do hereby certify that the Power of Attorney herein
above set forth is still in force, and further certify that the By-Law and Resolution of the Board of Directors of each corporation printed on the
reverse hereof are still in force. In testimony whereof I have hereunto subscribed my name and affixed the seals of the said corporations
this 4th day of August 1997 .
(Rev.7/14/95)
CONTINENTAL CASUALTY COMPANY
NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
AMERICAN CASUALTY COMPANY OF READING, PENNSYlVANIA
John M. UttIer
Assistant Secretary
Authorizing By-Laws and Re~.".utions
ADOPTED BY THE BOARD OF DIRECTORS OF CONTINENTAL CASUALTY COMPANY:
This Power of Attorney is made and executed pursuant to and by authority of the following By-law duly adopted by the Board of Directors
of the Company.
· Article lX--Executiol1 of Documents
Section 3. Appointment of Attorney-in-fact The Chairman of the Board of Directors, the President or any Executive, Senior or
Group Vice President may, from time to time, appoint by written certificates attomeys-in-factto act in behalf of the Company in the
execution of policies of insurance, bonds, undertakings and other obfigatory ~..,~ \.Iments of fike nature. Such attorneys-in-fact, subject
: to thefimnations set fo~ in their respective certificates of authority. shaD have fuD power to bind the Company by their signature and
execution of any such instruments and to attach the seal of the Company thereto. The Chairman of the Board of Directors, the President
or any Executive, Senior or Group Vice President or the Board of Directors, may, at any time, revoke aD power and authority previously
given to any attorney-in-fact.
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board
of Directors of the Company at a meeting duly called and held on the 17th clay of February, 1993.
"Resolved, that the signature of the President or any Executive, Senior or Group Vice President and the seal of the Company may
be affixed by facsimile on any power of attorney granted pursuant to Section 3 of Article IX of the By-Laws, and the signature of the
Secretary or an Assistant Secretary and the seal of the Company may be ca:7....ed by facsimile to any certificate of any such power and
. any power or certificate bearing such facsimile signature and seal shaD be valid and binding on the Company. Any such power so executed
and sealed and certified by certificate so executed and sealed shan, with respect to any bond or undertaking to which it is attached,
continue to be valid and binding on the Company_to
ADOPTED BY THE BOARD OF DIRECTORS OF AMERICAN CASUAL TV COMPANY OF READING, PENNSYLVANIA:
This Power of Attorney is made and executed pursuant to and by authority of the fonowing By-Law duly adopted by the B-:u J of Directors
of the Company.
"Article VJ-Execution of Obligations and Appointment of Attorney-in-Fact
Section 2. Appointment of Attorney-in-fact The Chainnan of the Board of Directors, the President or any Executive, Senior or Group
Vice President may, from time to time, appoint by Yr.;ll.::.n certificates "attomeys-in-factto act in behalf of the Company in the execution of
policies of insurance, bonds, undertakings and other obligatory instruments of like nature. Such attorneys-in-fact, subject to the 6mitations
set forth in their respective certificates of authority, shall have full power to bind the Company by their signature and execution of any such
instruments and to attach the seal of the Company thereto. The President or any Executive, Senior or Group Vice President may at any time
revoke all power and authority previously given to any attorney-in-fact.
This Power of Attorney is signed and sealed by facsimile under and by the authority of the fonowing Resolution adopted by the Board
of Directors of the Company at a meeting duly called and held on the 17th day of February, 1993.
"Resolved, that the signature of the President or any Executive, Senior or Group Vice President and the seal of the Company may
be affixed by facsimile on any power of attorney granted pursuant to Section 2 of Article VI of the By-Laws, and the signature of the
Secretary or an Assistant Secretary and the seal of the Company may be affixed by facsimile to any certificate of any such power and any
power or certificate bearing such facsimile signature and seal shalf be valid and binding on the Company. Any such power so executed and
sealed and certified by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue
to be valid and binding on the Company:
ADOPTED BY THE BOARD OF DIRECTORS OF NATIONAL FIRE INSURANCE COMPANY OF HARTFORD:
This Power of Attorney is made and executed pursuant to and by authority of the following Resolution duly adopted on February 17, 1993
by the Board of Directors of the Company.
"RESOl VEO: That the President, an Executive Vice President, or any Senior or Group Vice President of the Corporation may, from time
to time, appoint, by written certificates, Attorneys-in-Fact to act in beh-c31f of the Corporation in the execution of policies of insurance, bonds,
undertakings and other obligatory instruments of like nature. Such Attorney-in-Fact, subject to the 6mitations set forth in their respective
certificates of authority, shall have full power to bind the Corporation by their signature and execution of any such instrument and to attach
the seal of the Corporation thereto. The President, an Executive Vice President, any Senior or Group Vice President or the Board of Directors
may at any time revoke all power and authority previously given to any Attorney-in-Fact. ..
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board
of Directors of the Company at a meeting duly called and held on the 17th day of February, 1993_
"RESOL VEO: That the signature of the President, an Executive Vice President or any Senior or Group Vice President and the seal of the
Corporation may be affixed by facsimile on any power of attorney grant.."<f pursuant to the Resolution adopted by this Board of Directors on
February 17, 1993 and the signature of a Secretary or an Assistant Secretary and the seal of the Corporation may be affixed by facsimite to
any certificate of any such power, and any power or certificate bearing such facsimile signature and seal shall be valid and binding on the
Corporation. Any such power so executed and sealed and certified by certificate so executed and sealed, shall with respect to any bond or
undertaking to which it is attached, continue to be vafid and binding on the Corporation."
Certificate No. 00036038
CERTIFICA'1'.h OF INSURANCE
ISSUE DATE (MMIDDIYY)
04/01198
PRODUCER
COBB STRECKER DUNPHY & ZIMMERMANN, INC.
150 SO. 5th ST.,Suu~ 2000
MINNEAPOLIS, MN 55402
This c:ertificate is issued as a matter of information only and confers no rights
upon the certificate holder. This certificate does not amend, extend or alter the
coverage afforded by the policies listed below.
COMPANIES AFFORDING COVERAGE
RF~~nnsn
COMPANY
LE 11 ~R A TRANSCONTINENTAL INSURANCE CO.
COMPANY
LEll~R B
;.~ .,.~
INSURED
MCNAMARA CONTRACTING, INC.
5001 160TH ~ 1 KEET WEST
TRANSPORTATION INSURANCEefty' roc r'~DiU'I'-i 1\1
I .- n n ~ ,,-, ,,( r::
COMPANY
LEn~R C
COMPANY
LEll~R D
COMPANY
LEll~R E
TRANSPORTATION INSURANCE CO.
VALLEY FORGE INSURANCE COMPANyRe_",
APltSI9s8
ROSEMOUNT
MN 55068
COVERAGES
This is to certify that policies of insurance listed below have been issued to the insured named above for the policy period indicated.
Notwithstanding any requirement, term or condition of any contract or other document with respect to which this certificate may
be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions, and
conditions of such policies. Limits shown may have been reduced by paid claims.
CO Type of Insurance
LTR
A GENERAL LIABILITY
Policy Number
Policy Effective Policy Expiration
Date (mmJdd/yv) Date (mmJdd/vv)
Liability Limits
[X] Commercial General Liability
[ ] Claims Made
[ X ] Occurrence
[ ] Owner's & Contractor's Proto C121134264
[ ]
03/01198
03/01199
General Aggregate
prooucts-Comp/Ups
Af!:J?;reJ?;ate
Personal'" AClvertIsmg
Iniury
bach Uccurrence
.Flre Damage
(Anv One Fire)
Medical Expense
(Anv One Person)
$1,000,000.00
$1,000,000.00
$500,000.00
$500.000.00
$.00
$.00
B AUTOMUJjlL~ LIABILITY
[ X ] Any Auto
[X] All Owned Autos (priv Pass.)
[ X ] All Owned Autos(Other)
[ X ] Hired Autos
[X] Non-Owned Autos C121134278
[ ] Garage Liability
[ ]
CSL
03/01/98
03/01/99
Bodily
Injury
Per Person
Bodily
Injury
Per Accident
Property
n~e
$1.000.000.00
$.00
$.00
C
EXCESS LIABILITY
[ X] Umbrella Form C121134295
[ ] Other Than Umbrella Form
03/01/98
03/01/99
$.00
Each Aggregate
Occurrence
$5,000,000.00 $5,000,000.00
D WORKERS' COMPENSATION
AND
EMPLOYERS'LIABILITY WCC168516047
03/01/98
03/01/99
StatutOry I
~luu,uuu.UO (bach ACCident)
$500,000.00 (Disease Policy Limit)
$100,000.00 (Disease Each Employee)
E OTHER
DESCRu" lION OF OPERA l1UNS/LOCATIONS/VEHICLESI ~~ TRICTIONSISPECIAL ITEMS
1997 ~lKEET & UTILITY CON~IKUCTION OF PROJECT 97-02; FISH POINT ROAD, PROJECT 95-07
MUSHTOWN ROAD PROJECT 97-17 PIKE LAKE TRAIL
ADDITIONAL INSUREDS: CITY OF PRIOR LAKE (OWNER) AND THE PROJECT ENGINEER
C.S.RTJJ~ICA TE HOLDER CANCELLA TIQf'l
Should Any Of The Above Described Policies Be Cancelled Before The
Expiration Date Thereof, The Issuing Company Will Mail 30 Days
CITY OF PRIOR LAKE Written Notice To The Certificate Holder Named To The Left.
16200 EAGLE CREEK AVENUE SE
PRIOR LAKE MN 55372
-=a
AUTHO~t'~AIIV1...J ~,-:_
r~cQ~ .
~ C1J
ISSUE DATE (MM/DD/YY)
Certificate No. 00036038
CERTIFICA'lh OF INSURANCE
08/20/97
PRODUCER
COBB STRECKER DUNPHY & ZIMMERMANN, INC.
150 SO. 5th ST.,SUITE 2000
MINNEAPOLIS, MN 55402
This certificate is issued as a matter of infonnation only and confers no rights
upon the certificate holder. This certificate does not amend, extend or alter the
coverage afforded by the policies listed below.
COMPANIES AFFORDING COVERAGE
COMPANY
LE 1 1 bR A TRANSCONTINENTAL INSURANCE CO.
ROSEMOUNT MN 55068
COMPANY
LEITER B
COMPANY
LE11bR C
COMPANY
LEll.bR D
COMPANY
LEllbR E
TRANSCONTINENTAL INSURANCE CO. ~~
4~ .
CONTINENTAL CASUALTY COMPANY ~ 4
TRANSCONTINENTAL INSURANCE CO. <f9/
INSURED
MCNAMARA CONTRACTING, INC.
500 1 160TH STREET WEST
COVERAGES
This is to certify that policies of insurance listed below have been issued to the insured named above for the policy period indicated.
Notwithstanding any requirement, term or condition of any contract or other document with respect to which this certificate may
be issued or may pertain, the insurance afforded by the policies described herein is subject to all the terms, exclusions, and
conditions of such policies. Limits shown may have been reduced by paid claims.
CO Type of Insurance
LTR
A GENERAL LIABILITY
[ X ] Commercial General Liability
[ ] Claims Made
[ X ] Occurrence
] Owner's & Contractor's Prot. 121134300
]
Policy Number
Policy Effective Policy Expiration
Date (mrnIdd/vv', Date (mrnIdd/vv)
Liabilitv Limits
I
03/01/97
03/01/98
General Aggregate
t'rooucts-comp/ups
~reRiate
"PCfsonal & Advertlsmg
Iniury
bach UCcurrence
tilre .L>ama~
(Any One Fire)
Medical ~xpense
(Anv One Person)
$1,000,000.00
$1,000.000.00
$500.000.00
$500.000.00
$.00
$.00
B AUTOMOBILE LIABILITY
[ X ] Any Auto
[X] All Owned Autos (Priv Pass.)
X ] All Owned Autos(Other)
X ] Hired Autos
[X] Non-Owned Autos 121134278
[ ] Garage Liability
[ ]
CSL
03/01/97
03/01/98
Bodily
Injury
Per Person
Bodlly
Injury
Per Accident
Property
.JamiiP.
$1.000.000.00
$.00
$.00
C EXCESS LIABILITY
[X J Umbrella Form 121134295
[ ] Other Than Umbrella Form
03/01/97
03/01198
,QO
Each Aggregate
Occurrence
$5,000,000.00 $5,000,000.00
D WORKERS' COMPENSATION
AND
EMPLOYERS' LIABILITY 168516047
03/01197
03/01/98
StatutorY I
~lUU,UUU.UU (bach ACCident)
$500,000.00 (Disease Policy Limit)
$100,000.00 (Disease Each Employee)
E OTHER
DESCRIPTION OF OPERA TIONS/LOCA TIONS/VEHICLES/RESTRICTIONS/SPECIAL ITEMS
1997 STREET & UTILITY CONSTRUCTION OF PROJECT 97-02; FISH POINT ROAD, PROJECT 95-07
MUSHTOWN ROAD PROJECT 97-17 PIKE LAKE TRAIL
ADDITIONAL INSUREDS: CITY OF PRIOR LAKE (OWNER) AND THE PROJECT ENGINEER
CERTIFICATE HOLDER
CANCELLATION
Should Any Of The Above Described Policies Be Cancelled Before The
Expiration Date Thereof, The Issuing Company Will Mail 30 Days
Written Notice To The Certificate Holder Named To The Left.
CITY OF PRIOR LAKE
16200 EAGLE CREEK AVENUE SE
PRIOR LAKE MN 55372
AUTjORIZED REPRESENT ATI~
!-,Q...u;-yrH. ,~~
......
<"._,....
Travelers Casualty & Surety Co. of Am.
BID BOND
APPROVED BY T~ AMERICAN INSTITUT~ OF ARCHI~~CTS
A. I.A. DOcurmNT NO. A,-310 (l'.~H 1970 ED.)
KNOW ALL MEN BY THESE PRESENTS, THAT WE
Northdale Construction Company, Inc.
14450 Northdale Blvd
Rogers, MN 55374
as Principal, hereinafter called the Principal, and the Travelers Casualty & Surety Co. of Am., a
corporation duly organized under the laws of the State of Connecticut, with Administrative Offices at One
Tower Square, Hartford, CT 06183, as Surety, hereinafter called the Surety, are held and firmly bound unto
CITY OF PRIOR LAKE, MINNESOTA
as Obligee, hereinafter called the Obligee, in the sum of Five Per Cent (5%) of Amount of Bid -
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind
ourselves, our heirs, executors, administrators, successors and assigns, joinUy and severally, firmly by
these presents.
WHEREAS, the Principal has submitted a bid for
1997 STREET AND UTILITY IMPROVEMENTS FOR THE CITY OF PRIOR LAKE, MN
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a
Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be
specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance
of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or
in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the
Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount
specified in said bid and such larger amount for which the Obligee may in good faith contract with another
party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to
remain in full force and effect.
Signed and sealed this August 4, 1997
No Seal
Northdale Construction Comoanv, Inc.
M 7. ~MA<7~
(Witness)
(Principal) ;::::; . /,--
7f67
~j/
Travelers Casualty
(Seal)
~4../'a- ~
~ (Witness)
_ " (Title)
~
& Surety Co. of Am.
(Seal)
pcl 42682
ADDENDUM NO. 1
TO THE PLANS, SPECIFICATIONS, AND BID PROPOSAL FOR
1997 STREET AND UTILITY CONSTRUCTION FOR
THE CITY OF PRIOR LAKE'S. FOLLOWING PROJECTS;
1) S.A.P.201-105-06 Fish Point Road - From Cardinal Ridge Trail to Victoria
Curve
2) Mushtown Road from Station 8+60 to Station 36+95
3) S.A.P.201-114-03 Pike Lake Trail- From County Road 42 to Knob Hill
Development
Dated May 1997
TO ALL BIDDERS: The above titled plans, specifications, and contract documents are hereby
revised in accordance with the items set forth herein.
Receipt of this addendum must be acknowledged by entering "Addendum No.1" in the space
provided on page 5 of the Bid.
This addendum to the plans and specifications is hereby made a part of the contract documents
for the above-entitled project, to the same extent as though it were originally contained therein.
All bidders are expected to thoroughly examine each item enumerated herein, regardless of its
apparent application(s) and shall be held responsible for furnishing all labor and materials
required in the division of the work that the items indicate. Items herein shall take precedence
over any clauses, which they modify in the contract documents or portions of plans and
specifications, which they modify or supplement.
A. BID SCHEDULE
Chan~e:
The Bidder shall submit his/her bid on the revised Bid Schedule that is attached to this
Addendum No.1. The 12"watermain on the bid schedules have been changed from Class 52 to
Special Class 50 to reflect the Section 3400.2Al of the watermain General Requirement no PVC
watermain is allowed.
Add:
The City of Prior Lake is planning to install a trunk storm sewer on Pike Lake Trail. This
requires the pipe size increases as revised on the Bid Schedule 4.0 Pike Lake Trail (trunk storm
sewer svstem ).
The Contractor shall be required to utilize the revised bid schedules attached to Addendum No.1
to submit his bid, to ensure that the proper pipe sizes and quantities are bid. The storm sewer
trunk system shall become a part of the base bid :fi)r the project.
ADNI-800.810
Alternate 3.0 Pike Lake Trail (storm sewer) has been added to the revised bid schedule. This bid
schedule is to be considered a alternative bid. This schedule reflects the original storm sewer
system. This alternate bid is based upon the State Aid approval. The City reserves the right to
select the storm sewer trunk system as bid on the revised schedule 4.0 or to select the original
State Aid approved storm sewer on revised Alternate 3.0. The City will negotiate with the office
of State Aid to determine State Aid participation based upon the percentage (%) of flow in the
storm sewer system. All trunk storm sewer oversizing is considered to be No-State-Aid funded
by the City; storm water management utility.
The receipt of this Addendum No.1 shall also be acknowledged by the Contractor by entering
"Addendum No.1, dated July 26, 1997, in Section 0 of the Agreement Form on Page 9."
B. SPECIFICATIONS
Section 2500 - Storm Draina~~
Specific Requirements shall be modified as outlined herein by Addendum No.1.
,2500.1 Description
This work shall include the installation of 12" to 36" reinforced concrete pipe (RCP) drain pipe,
aprons, catch basins, manholes, and sump manhole construction, and connection into existing
systems as outlined in the revised plans, specifications, and bid schedules per Addendum No.1.
Section 3400 Watermain Specifics
3400.2
All 12" larger Ductile --- Pipe shall meet the requirements of Special Class 50 as provided for a
Section 34000.2.A10fthe General Requirements. PVC Watermain shall not be allowed.
C. REVISED BID SCHEDULE
The bid schedule in the original specifications manual shall be modified as outlined herein
"Addendum No.1". The Contractor shall be required to submit his bid on the revised bid
schedule that is attached to this Addendum No.1.
The following modifications have been made to the bid schedule;
i)
Schedule 4.0 Pike Lake Trail (storrn sewer) has been revised to state "Schedule
4.0 Pike Lake Trail (trunk stonn sewer system)" and various size pipes have been
added or deleted to match the revised plans for the trunk storm sewer system.
This scheduled is a part of the base bid.
ii)
Alternate 3.0 Pike Lake Trail (Storm Sewer System) Alternative Bid has been
added to the revised bid schedule. The bid schedule matches the original section
4.0 which is the State Aid approved storm se\ver system.
ADNI-800.810
2
iii) Schedule 5.0 watermain has been IIlodified to require Class 50 for 12" and larger
watermains.
D. REVISED PLAN SHEETS
Addendum No.1 has been prepared to provide for a trunk storm sewer system on Pike
Lake Trail. The original plan sheets 2 of 13 and 6 of 13 have been revised to reflect the
City's proposed trunk storm sewer. Enclosed with Addendum No.1 are plan sheets 2R
of 13 and 6R of 13. The Bidders are advised to insert these revised plan sheets into their
plans for Pike Lake Trail to reflect this Addendum No.1.
i) Sheet 2R/13 - has been modified to reflect the trunk storm sewer system. These
modifications include revisions in; pipe sizes, manhole sizes, estimated quantities
per pipe size.
ii) Sheet 6R/13 has been modified to reflect the trunk storm sewer system. These
revisions begin with the proposed 21" stub out at station 6+05, ATMH3 and
continue northward on Pike Lake Trail to County Road 42 (Station 0+70). The
revisions also include the upsizing of the RCP between STMH5 and STMH6,
including the apron with exits STMH6 to the East of Pike Lake Trail.
The revisions related to large stVllU sewer trunk sizes to convey the addition
storm water runoff being delivered by the new 21" stub, due to commercial
development of the W ensman property to the west of Pike Lake Trail. The
inserts, grades, and elevations of the storm sewer system have been revised per
the final hydraulic design of the trunk system.
iii) The Contractor should retain the original sheets 2/13 and 6/13 by marking them as
alternate bid per schedule 4.1.
I hereby certify that these Plans and Specifications were prepared by me or under my direct
supervision and that I am duly registered Professional Engineer under laws of the State of
Minnesota.
iLl /d!~
Thomas J. KaIaUnski, P .E.
Reg. No. 16798
7/U/r7
Date I ".
Issue Date: July 26, 1997
ADNl-800.810 3
.REVISED
BID SCHEDULE:
ADDENDUM NO.1
FISHPOINT ROAD SAP 201-105-06
PIKE LAKE ROAD SAP 201-114-03
MUSHTOWN ROAD
CITY OF PRIOR LAKE, MINNESOTA
SCHEDULE 1.0 FISH POINT ROAD (STREET)
1 MOBILIZATION LS 1 I ~ SlY). (J) IO,~(1J
2 COMMON EXCAVATION CY 1105 JJ,'? -!:1.;/1&1 V.S-
3 SUBGRADE EXCAVATION CY 500 'I. ;J,C; d.I/J.~ /b
,
4 TOPSOIL BORROW CY 1066 ~I fJ.f7 cL 3 -J. '1,51)
5 SUBGRADE PREPARATION RDSTA 12 Lf) 0, CD- :1. nl./n.(J)
6 GEOTEXTILE FABRIC TYPE V SY 1500 I . 3..C:; :1.. O~,5. ~
7 AGGREGATE BASE, CLASS 5 TON 3850 1', q if ."'V .r/;{ 5. (j;)
8 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 ~. ~S '4!JJo t::; . ~
9 TYPE 41A, 21/2" BITUMINOUS PATHWAY TON 300 3;). If) J/o?n IJf)
10 TYPE 41A, WEAR COURSE MIXTURE TON 700 810 9/0 . ~~. tJQ...
11 TYPE 31B, BASE COURSE MIXTURE TON 1410 ;"6. (0 1 ~;;o~
12 BITUMINOUS MATERIAL FOR TACK COAT GAL 220 J. D1 2.3 <". t.lfL
13 ADJUST GATE VALVE EA 4 l) 6-. (i) 5ty! . IX;)
14 ADJUST FRAME AND RING CASTING EA 8 ISO.el) 1,:1m.oJ
15 4" CONCRETE WALK SF 5786 I. q I 11 n51. dIP
L/ . :18 ,
16 CONCRETE CROSSWALK SPECIAL SF 360 ~ /i lf1l......ID
17 CONCRETE CURB & GlJ II t:R, B618 LF 4600 I Q, 3/ ,1~ I 0 A W . tl>
18 CONCRETE PEDESTRIAN RAMP EA 8 ,q ~. {,p() ~.~ l/ () >lb
19 CONCRETE TRIANGULAR VALLEY GUTIER SF 150 5.,~~ ~l)
20 CONCRETE VALLEY GUTTER LF 75 J&,D.~ I, :1D3.15-
21 PERMANENT BARRICADE EA 2 4!1:J. . ~s .54,5, IJ ()
22 PAVEMENT STRIPING, 4" EQUIV. WIDTH LF 5000 . LIIJ ~13Sb.r.v
23 FURNISH & INSTALL SIGN PANELS, TYPE C SF 102 a3 , 0 I d, .~ 41) ,/)d.
24 BALE CHECK EA 30 ~. 00 ~.<~. Q)
25 SILT FENCE, HEAVY DUTY LF 525 ~~ J I L/q lrJ.,1,<,
26 CATCH BASIN SEDIMENT BARRIER EA 17 51 (tJ 1..k$ . (l)
27 DUST CONTROL WATER MGAL 60 J'1.lIJ , . 01.1J . /'I,
28 SEED MIXTURE 500 AC 1.1 J,b/(. &() ;J..J~I).11~
29 SODDING, LAWN & BOULEVARD SY 2350 ~ Li: 5J$.,~
30 WOOD FIBER BLANKET TYPE REGULAR SY 1825 ~~ ~'<1 ()~. ~1)
,
31 TRAFFIC CONTROL LS 1 , . ,5" ()f) . (j) I J S'(){) tD
,
32 SUBGRADE DENSITY TEST, INPLACE EA 2 (oq. S:L '3(1. (0
33 CLASS 5 GRADATION TEST EA 2 3'1.45 1 J./. q <1-
34 CLASS 5 PROCTOR TEST EA 1 Q(J,Q5 90, qS-
35 CLASS 5 DENSITY TEST, INPLACE EA 3 3f). Li5' 1/ A..:D
36 CONCRETE TESTING EA 9 I~S. ~O -1-; LJq:;.. Ub
37 BITUMINOUS AIR VOID TEST EA 6 It'1.l}o "/0/ (J . J.o
38 BITUMINOUS CORE DENSITY TEST EA 6 W. f}5" ~ -D
-~
T SCHEDULE 1.0 FISH POINT ROAD (STREET) - TOTAl :)64 921. q!f
- ,
O:\PROJ\ADDEN 1 02074 5A
SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER) 1L-JDIJ. &L
1 12" RC PIPE SEWER DESIGN 3006 CLASS V LF 480 ~4_3q
2 15" RC PIPE SEWER DESIGN 3006 CLASS V LF 870 .:.25. 1..1) ~:J ' ~c;!3. if)
3 18" RC PIPE SEWER DESIGN 3006 CLASS III LF 70 J!) . if.LL - , ;' q -:1:;. . ~
4 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 200 lj. ~ ~ . J3tJ. (J)
5 CONNECT TO EXISTING MANHOLE EA 1 flEO. I.1L IJ.~ ' d)
6 CONNECT TO EXISTING PIPE EA 1 LRSO.l"h ~tD
7 CONST DRAINAGE STRUCTURE, DESIGN 48-4020 EA 9 -L-312~ dn Id . .~ '75'.11)
. ,
8 CONST DRAINAGE STRUCTURE, DESIGN SPECIAL EA 9 -1,. ,~~. d) / I, ~(5D. m
,/
9 SUBGRADEPROCTOR EA 1 15. tD 1er_ aL
10 SUBGRADE DENSITY - INPLACE EA 8 lf5 tD 3&'0. tJ;J
T SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER) - TOTAL. te3j 1QS. l./(L
SCHEDULE 3.0 PIKE LAKE TRAIL (STREET)
1 MOBILIZATION LS 1 if} :fm, cD jtJ,5/)/J.O)
2 CLEARING AC 0.9 ~ ',5 Of), aJ .-1' :2~O. cf)
3 GRUBBING AC 0.9 ~.500,CD ~: -~i)O. OL.
.. ~
4 CLEARING EA 28 I f}5 (y) ~.ClJ
5 GRUBBING EA 28 10f). (J) !J., ~:>n. a>
6 SALVAGE AND REINSTALL CMP LF 30 15. S () 4 iR__cJ ~
7 REMOVE BITUMINOUS SURFACE SY 280 ~.Sb 1 00. ,,)")
8 COMMON EXCAVATION CY 4960 '-f . ,:J. S' -2..1, ()~D'QL
9 SUBGRADE EXCA VA TION CY 500 4.5/) 2} ~;l,~.Q)
10 SALVAGE TOPSOIL RESPREAD CY 1080 Lt~9J '-/ 'KltJO.('1)
11 MODIFIED SELECT GRANULAR BORROW CY 1920 O,c.J3 .~i: U/),(b
12 GEOTEXTILE FABRIC TYPE V SY 1500 !. ~S -;); 6), f), UJ
13 AGGREGATE BASE, CLASS 5 TON 4075 7~~ 3"'- _ ,~~1.;?~--
14 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 >?5,~ '~~3 .Lto
15 3" BITUMINOUS DRIVEWAY RESTORATION SY 85 Sb.~q 41~1LJ IRS-
16 TYPE 41A, WEARING COURSE MIXTURE TON 550 ;), V . CfJ.L I i.j I 3J.~.lt)
17 TYPE 31 B, BASE COURSE MIXTURE TON 900 d.S. & 'K d3 ,/ f.:J. . elL
18 BIT. MATERIAL FOR TACK COAT GAL 230 . I. 01 ;)l./("Jh
19 MODULAR BLOCK RETAINING WALL SF 6000 I~ . (},<) 8.3 J leo. U)
20 ADUST FRAME AND RING CASTING EA 3 1:;2) . (1"> 4 Sb . c12..
21 4" CONCRETE WALK SF 6400 /.97 ~ I lo(')& .ffi
22 CONCRETE CURB AND GUTTER, DESIGN B618 LF 2700 (0 42 J/), 3~
23 CONCRETE DRIVEWAY PAVEMENT SY 30 d,f-&L 5/le{p. ?D
24 CONCRETE PEDESTRIAN RAMP EA 2 Iff)).. . &-0 3!<S. k>
25 TRAFFIC BARRIER DESIGN A8307 LF 570 t3 . '-/6 '1, U (\.3 .uo
,
26 FURNISH & INSTALL SIGN PANELS. TYPE C SF 103 d3.DI ~ , 3?o. Q ~ .
27 SILT FENCE, HEA W DUTY IF 1200 Q .XS- 3 I 4).D. f.1l.
28 CATCH BASIN SEDIMENT BARRIER EA 13 l{)". t5D 5' Ks-. ct>
29 WOOD FIBER BLANKET SY 50 ,,~. I L( /D 1.01)
30 SEED MIXTURE 500 AC 1 ~:J2JJ . '-<<L ~Oll . I~/)
31 SODDING, LAWN & BOULEVARD SY 1600 l.eLL ~n81 ctL
O:\PROJ\ADDEN 1 02074 5B
32 DUST CONTROL WATER MGAL 35 /7. r9J 515-. (J)
33 PAVEMENT STRIPING, 4" EQUIV. WIDTH LF 6225 . 4!J --2,3/J~. 1tJ
34 TRAFFIC CONTROL LS 1 ~ . ctl -!:!. gJO. tJ)
35 CLASS 5 GRADATION TEST EA 2 fy 9. 5<::; i.::8..J 0
36 CLASS 5 PROCTOR TEST EA 1 CfD. q,~ . 'i..P.95
37 CLASS 5 DENSITY- INPLACE EA 3 31.Ll.e)' J / ~ . ~3,~
38 CONCRETE TESTING EA 4 / IL 5. 35"" IR & 3 . f./ /)
39 BITUMINOUS AIR VOIDS EA 6 W . 1JL.. '1()(c. ~
40 BITUMINOUS CORE DENSITY EA 6 / 6:~. 1t)' ~().1 _ ..~
41 SUBGRADE DENSITY-INPLACE EA 4 37.4.c) I Lie; . XL
T SCHEDULE 3.0 PIKE LAKE TRAIL (STREET) - TOTAL
SCHEDULE 4.0 PIKE LAKE TRAIL (TRUNK STORM SEWER)
1 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF
2 RANDOM RIP RAP CLASS III CY
3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 48-4020 EA
4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 60-4020 EA
5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 84-4020 (SUMP) EA
6 CONSTRUCT DRAINAGE STRUCTURE, DESIGN SPECIAL EA
7 CONNECT TO EXISTING STORM SEWER MANHOLE EA
8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF
9 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF
10 18" RC PIPE SEWER, DESIGN 3006 CLASS III LF
11 21" RC PIPE SEWER, DESIGN 3006 CLASS III LF
12 24" RC PIPE SEWER, DESIGN 3006 CLASS III LF
13 27" RC PIPE SEWER. DESIGN 3006 CLASS III LF
14 36" RC PIPE SEWER, DESIGN 3006 CLASS III LF
15 36" RC PIPE APRON EA
16 SUBGRADE PROCTOR EA
17 SUBGRADE DENSITY - INPLACE EA
18 PIPE FOUNDATION MATERIAL CY
T SCHEDULE 4.0 PIKE LAKE TRAIL (STORM SEWER) - TOTAL
SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN)
1 CONNECT TO EXISTING WATERMAIN
2 HYDRANT WITH 6" VALVE
3 6" GATE VALVE
4 8" GATE VALVE
5 10" GATE VALVE
6 12" BUTTERFLY VALVE
7 6" DIP WATERMAIN, CLASS 52
8 8" DIP WATERMAIN, CLASS 52
9 10" DIP WATERMAIN, CLASS 52
10 12" DIP WATERMAIN, CLASS 50
11 FITTINGS
EA
EA
EA
EA
EA
EA
LF
LF
LF
LF
LBS
O:\PROJ\ADDEN 1 02074
5C
360
8.5
2
3
1
8
1
127
292
552
122
255
184
150
1
1
8
50
2
5
1
1
1
2
163
48
773
553
3150
II. {I/~
;;g.~
I.J'1~ (<1)
-'~ Cf?S. (h
Lf., .3 '75t /'J)
~c:lJ . QL
?0 . ($)
;:)L('f~J?
j~. 'l()
,1, 1, L/ U
;(q q~
3j,~i.t
:~X.~
,)/Q .31L
Q74. '6JL
7:; :(1)
Lfs · a>
1& .1<::)
7So . a>
J, 8t,J .'X '-
, (.1"7/, L/ c.f
&1f., q,
gX/_/JLI
8 7f\ . / ()
a!lD
/8.9,
~o. ~~
;),~
c-
I '.~ i
30lc ,;1.18.58
,
LI, / 9L{. (1)
'sCfn. '7S-
::J 1.9>. en
-0,J~
~~ .EL
ID. (}{)()..Cb
,
/,<)0. C>>
.~ ,D9/p. /l/a
,
?S$.l{Q.
1<. /51. L/(p
-3 I {g,5). 'I.k
~F~~/_~
'41.1 "l.J.JL
J.'-t2/,&
, cr14.l1111
7s.{J?)
3/po. ())
831. .5])
M.Cf1j .5/
I -
I / S{)() _ (1)
9 I q (1 . oS'
, 4.2J . <<I'L
13&/ .51>
>??J/.lil
-It 1~5~ #6
~J DS, tD
9/D.c::;{ 'L
1!"ILfO. ~a.t.
.Jj3V.D1..
4.341 (J)
.~r~
7~~ ' cJ)
45.0)
JLR . Fs
12 SUBGRADE PROCTOR
13 SUBGRADE DENSITY -INPLACE
14 PIPE FOUNDATION MATERIAL
EA
EA
CY
SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN) - TOTAL
SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER)
1 8" PVC SEWER SDR 35 (10-12') DEEP LF
2 4" PVC PIPE SEWER LF
3 8"X4" PVC WYE EA
4 CONNECT TO EXISTING SANITARY SEWER MANHOLE EA
5 48" DIAMETER SANITARY MANHOLE EA
6 SUBGRADE PROCTOR EA
7 SUBGRADE DENSITY - INPLACE EA
8 PIPE FOUNDATION MATERIAL CY
T SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER) - TOTAL
SCHEDULE 7.0 MUSHTOWN ROAD (STREET)
1 MOBILIZATION
2 CLEARING
3 GRUBBING
4 CLEARING
5 GRUBBING
6 COMMON EXCAVATION
7 SUBGRADE EXCAVATION
8 SALVAGE TOPSOIL AND RESPREAD
9 GEOTEXTILE FABRIC TYPE V
10 MODIFIED SELECT GRANULAR BORROW
11 AGGREGATE BASE, CLASS 5
12 3" MINUS 100% CRUSHED QUARRY LIMESTONE
13 TYPE 41A, WEAR COURSE MIXTURE
14 TYPE 31B, BASE COURSE MIXTURE
15 BITUMINOUS MATERIAL FOR TACK COAT
16 TYPE 41A, 2 1/2" BITUMINOUS PATHWAY
17 BITUMINOUS DRIVEWAY
18 ADJUST HYDRANT
19 ADJUST FRAME AND RING CASTING
20 CONCRETE CURB & GUTTER, B618
21 CONCRETE VALLEY GUTTER
22 SILT FENCE, HEAVY DUTY
23 BALE CHECK
24 CATCH BASIN SEDIMENT BARRIER
25 SODDING, LAWN & BOULEVARD
26 SEEDING MIXTURE 500
27 SEEDING MIXTURE 250
28 WOOD FIBER BLANKET
LS
AC
AC
EA
EA
CY
CY
CY
SY
CY
TON
TON
TON
TON
GAL
TON
SY
EA
EA
LF
SF
_ LF
EA
EA
SY
AC
AC
SY
O:\PROJ\ADDEN 1 02074
50
1
10
50
427
40
1
3
2
1
2
50
1
1
1
1
1
9037
650
2775
1950
3530
3425
1210
650
1025
340
150
45
2
1
4630
500
1100
30
11
10300
1.6
0.4
1600
d~.~
~ .r)[)
L/7. ?S-
? t:lJ . (}j)
I, 10 7<:; (J')
'/c:;-, dJ_
t../c;- . ()7)
/& . f?_S"
J/), 5'ITJ. fX:L
~.(.n
d : A.,-~?> . ()()
L15 . 07.L
(J..c; . Gh..
q,d.,~
~I . ?~}
'-( . S1:L
1.3~
/1. L{q
~.
~.3,~
alR.9I.P
rl,<) .lo j
1.f)1
J). . / ()
7.41
,5SD.~
/9:J t..LlL
(P.31
Lf.~o
d .xS-
8.8)
.$:> . 6l>
,. q3
2) 0 lLJ pO
,~,:J.'J. I./~()
J .14
7:; , C/)
LIS?> .Q)
~ l.j ). .S?J
.53, ~ ~f) , ;;{1
/
10, b34..2J
'-13 () f1J
Lt ? 7S-
d.~,c.0
. ~ I ,-3S() . (/)
?5 . C/)
Cf Qd7>
~.~
/ ?,JlL1. /)5:-
It) sZ1J. f1)
/
~.d..9.C/)
;
!l j d.. c::[) . Vo
rJ <;, (f!)
"/),5'. (j)
M.J LfD?i...~
1~~,~1. ~
B. , Lf81, CZ2
-'~'~ '. <;{)
'-/'4, n(jq .1)0
~ f) .3(p.<;,.1s...
J4ffi,~ <iD
J 1. 5d. L/ ,tb
do /~ J JtJ.:1. L1J
?/13. tY1>
4. "'/5. (/)
~,3 7. Ds:...
-7Do . rjJ
/ ,~ . eX)
;).q J~/S,.2L
~tfJ:) ~.L/'Io.(.
3 J 135.(J)
'tflSS. d)
., ~<Q), (j)
(i.&71 (Y)
3: ~/3. SlJL
-R OM. ~t.{
.3 . l{rJ.'f. Ch
,
29 DUST CONTROL WATER
30 TRAFFIC CONTROL
31 SUBGRADE DENSITY TEST. INPLACE
32 CLASS 5 GRADATION TEST
33 CLASS 5 PROCTOR TEST
34 CLASS 5 DENSITY TEST, INPLACE
35 CONCRETE TESTING
36 BITUMINOUS AIR VOID TEST
37 BITUMINOUS CORE DENSITY TEST
T SCHEDULE 7.0 MUSHTOWN ROAD (STREET) - TOTAL
SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER)
1 12" RCP CLASS V
2 15" RCP CLASS V
3 18" RCP CLASS III
4 24" RCP CLASS III
5 4" PERFORATED THERMOPLASTIC PIPE DRAIN
6 STORM MANHOLE 48" DIA
7 STORM MANHOLE 48" DIA WITH 3' SUMP
8 STORM MANHOLE 60" DIA WITH 3' SUMP
9 CATCH BASIN
10 18" RCP APRON
11 24" RCP APRON
12 RIPRAP CLASS III
13 SUBGRADE PROCTOR
14 SUBGRADE DENSITY - INPLACE
15 PIPE FOUNDATION MATERIAL
T SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER) - TOTAL
TOTAL CONSTRUCTION COST
SCHEDULE 1.0 FISH POINT ROAD (STREET)
SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER)
SCHEDULE 3.0 PIKE LAKE TRAIL (STREET)
SCHEDULE 4.0 PIKE LAKE TRAIL (TRUNK STORM SEWER)
SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN)
SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER)
SCHEDULE 7.0 MUSHTOWN ROAD (STREET)
SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER)
TOTAL CONSTRUCTION COST
ALTERNATE 1.0 MUSHTOWN ROAD (STREET)
1 MOBILIZATION
2 CLEARING
3 GRUBBING
O:\PROJ\ADDEN 1 02074
MGAL
LS
EA
EA
EA
EA
EA
EA
EA
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
TON
EA
EA
CY
LS
AC
AC
5E
293
28
159
44
. 1670
2
1
1
7
1
1
15
1
5
100
60
1
4
2
1
4
5
5
5
II. cD
->> ~<)D..() - cD
,~1. l..{~
iRe, . S:S
Q,j). 9~
51.4S
/uS_~
j (1 . 70
I.,.~ . 15
I, 0;)0. w
/ R. <S()(). a:L
i Ljq. 80-
/3 f.1....J D
q() . qS
/ 'I!lJ7J
o;l.~~
,S~g .o()
~t.a8 . 1:)
~11-1~1.~
~4-38 'l 143.31
a.s. ? 0 1.19 _ It fJ
~ 1. '-I..1L '1.. ~u I.L1.Y-
3 ~ .f)9 --1.t '-/41)lL
q . XS -Lid '-/1./ 9 ::P
--L-J 15. ()l) ~J'"1Sb. aL
I . SA<)" dL -1_, S!1 ~ . cf!J
;? J 3 ?5,C>fJ ~: ~'?5. a;
, t 'J.. 15.~ .~ --L5A ). ll.L
,S""A, }. It:L S;J<) . c1)
<<f$'. ("j) . 2~? s- D.L
.1R <() '-~ 11..c:;b
7,): en /}5. C1L-
4$. on f)~$'. (J)
I&.~) I Ji8S.t.JL
'-19, 383. ,/} if
;)OL/ . q)'J 9 4.{
&J. 7,,. .40
Jo~_ju Ht:)X
~6qJ.5L
~~.;:)..1
11 J II~q - 1<)
-ZLJ J 1Xl...~
Lfi J .3 ~J .;) "_
--4-0~<) 1;d08- Of
1
0.1
0.1
7. ~ (j). CD
5Dw. n-,
C;--, ('in') _ en
,
1, S-CV.aL
Soo .tV
5()/) m
4 COMMON EXCAVATION CY 1000
5 SUBGRADE EXCAVATION CY 125
6 SALVAGE AND TOPSOIL RESPREAD CY 200
7 GEOTEXTILE FABRIC TYPE V CY 300
8 MODIFIED SELECT GRANULAR BORROW CY 680
9 AGGREGATE BASE, CLASS 5 TON 700
10 3" MINUS 100% CRUSHED QUARRY LIMESTONE CY 100
11 TYPE 41A, WEAR COURSE MIXTURE TON 130
12 TYPE 31 B, BASE COURSE MIXTURE TON 200
13 BITUMINOUS MATERIAL FOR TACK COAT GAL 67
14 TYPE 41A 21/2" BITUMINOUS PATH TON 45
15 CONCRETE CURB & GUTfER, B618 LF 835
16 BALE CHECK EA 10
17 CATCH BASIN SEDIMENT BARRIER EA 4
18 SILT FENCE, HEAVY DUTY LF 100
19 SODDING, LAWN & BOULEVARD SY 320
20 SEEDING MIXTURE 500 AC 0.2
21 SEEDING MIXTURE 250 AC 0.2
22 WOOD FIBER BLANKET SY 450
23 OUST CONTROL WATER MGAL 15
24 TRAFFIC CONTROL LS 1
25 SUBGRADE DENSITY TEST, INPLACE EA 1
26 CLASS 5 GRADATION TEST EA 1
27 CLASS 5 PROCTOR TEST EA 1
28 CLASS 5 DENSITY TEST, INPLACE EA 1
29 CONCRETE TESTING EA 1
30 BITUMINOUS AIR VOID TEST EA 1
31 BITUMINOUS CORE DENSITY TEST EA 1
T ALTERNATE 1.0 MUSHTOWN ROAD (STREET) - TOTAL
ALTERNATE 2.0 MUSHTOWN ROAD (STORM SEWER)
1 12" RCP CLASS V
2 15" RCP CLASS V
3 18" RCP CLASS III
4 4" PERFORATED THERMOPLASTIC PIPE DRAIN
5 STORM MANHOLE 48" DIA
6 CATCH BASIN
7 SUBGRADE PROCTOR
8 SUBGRADE DENSITY - INPLACE
LF
LF
LF
LF
EA
EA
EA
EA
12
38
148
150
1
3
1
4
T ALTERNATE 2.0 MUSHTOWN ROAD (STORM SEWER) - TOTAL
ALIERNATE 3_0 PIKE LAKE TRAIL(STORM SEWER\
1 4" PERFORATED THERMPLASTIC PIPE DRAIN
2 RANDOM RIP RIP CLASS III
3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 48-4020
LF
CY
EA
360
8.5
4
O:\PROJ\ADDEN 1 02074
5F
54~
S.S:J
4 . ,<;/)
i . 3S-
r;J . '29
.~. ..9>
X. IS-
d~ . (fl
<L1. (-'\)
I. (') 1
31 . (f)
7.4Q
?f.5:/)
$'o.w
,~
4J~
. ? I 937. Iffi
. <,~. ~ I . &-0
, .
d .&-X'
()6 , oD
~150.CFJ
.11.4S-
& cr .<)5-
YO. c;s-
37.45"'
/ (.R~. t>~
V7. ?i:L
1.~1, . 7S-
.~,~,{gy
;)1. ()(
,~ f< . 7J-,
II . wS-
~(1:> .QL
/..,. ~?$. rtl
85.w
'SS- I c5D
II. &S'
73.~
W"7S,QlL
_-t). ~ ..<0. QL
'j()31.~
9 (D. ())
l..{ OJ. ())
~/ ItR1..2a
~ 9SJ. CD
- I
R 1)5~ Q)
c~:J5~.1(L
,~L/. CD
-1 J . /.Lq
/. L/lICI. ~
f.2 J .'J Sl/ .lS-
, ,3$. c..O
f)co . (J)
350.0/)
L: S if J . L/fl
787.5.;-
/, ()l./L/. J?
-L t:P. Q/ () . OJ-
300. Cb
I, '},<;'O . it>
. ,
.31.LJc;
~C(. 5-~"f
C;{).~
.31. tiS
Lb.~. 8S
U;. 'If)
13317,
5~. ,J./~.lt3
300.~8
I J OJ", .~
~,J ~lo . ''(3
1/ 747. ~
II t./aJ. (0
,J/i 15 .~
. RS.6D
~() . en
r "i. ()/ 8 ,& '-t-
I
4, 19i. d)
~t?!i?~. rfr~
~
5,Sln. cb
4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 60-4020 EA
5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 72-4020 (SUMP) EA
6 CONSTRUCT DRAINAGE STRUCTURE, DESIGN SPECIAL EA
7 CONNECT TO EXISTING STORM SEWER MANHOLE EA
8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF
9 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF
10 18" RC PIPE SEWER, DESIGN 3006 CLASS III LF
11 21" RC PIPE SEWER, DESIGN 3006 CLASS III LF
12 30" RC PIPE SEWER, DESIGN 3006 CLASS III LF
13 30" RC PIPE APRON EA
14 SUBGRADE PROCTOR EA
15 SUBGRADE DENSITY -INPLACE EA
16 PIPE FOUNDATION MATERIAL CY
1
1
8
1
127
292
552
439
150
1
1
8
50
T ALTERNATE 3.0 PIKE LAKE TRAIL (STORM SEWER)-TOTAL
TOTAL CONSTRUCTION COST FOR ALTERNATE
ALTERNATE 1.0 MUSHTOWN ROAD (STREET)
ALTERNATE 2.0 MUSHTOWN ROAD (STORM SEWER)
ALTERNATE 3.0 PIKE LAKE TRAIL (STORM SEWER)
TOTAL
RESPE. c. T..~. ~-~::rJ-_SU lTTED:
~- '/ -
~ j"" .,;/,./
///
/'1
SIGNATUr
!r ~ c, fA el!l:r
TITLE
4 I - 00 I} [Q.<S7 I
LICENSE NUMBER
(SEAL -IF BID IS BY A CORPORATION)
-~; Q- ,)(+
ATTEST
A~*l
,M~~~~-
~~~
;j6~
O:\PROJ\ADDEN 1 02074
5G
J.975.0)
'~\.Z2s. Q)
~ ) 'cA 15.. 0)
7 <;'Q.Jf)
dL/ __~"8
d..C}.1D-
:11_ '-IlL
f ~.o _ d.. t./
43 - '-ilL
7??~
&S.(j)
Ss-. (i)
/ UJ:>
JJ 7 ~Jl)
3,:;' 7), rJ"J
.LO, #aJ.UL
15'0.0)
, '? 6~~ . 2.lL
I), SD4.lfQ..
J{, 1..51,9 J...
-1.'3 ~1.').6t.2
&'1 :er/9. Cl.L
771 .~7
l>S. OJ
440.(}{)
8l/)..~~
14 ;}'Ib. 11L
,
5' ~;J:}. ,1rl r
L~} 0/ ($. &L/
"?YJ ()Jlt. 7~
14.~ ,~o~ . oX
I
A)DI'~ t..-G. )e.- (\eilS!r( 1 ('I J-~ lJ?:1 ~
COMPANY
-! Lt.!:i$J A.2^T~
f2.~" '~'.' O1D r;SJ?t/
~
IL r r. 4! ICjq~?
~
1~/;J.,'-faJr l/O&J>
PHONE NUMBER
k/~- Lf~~.- tj991
FAX NUMBER
TI
AMERICAN INSTITUTE (, _ ARCHITEL 15
..
I
AlA Document .A310
Bid Bond
KNOW ALL MEN BY THESE PRESEN t,:), . MCNAMARA CONTRACTING, INC.
. cH~ imM "'" IMIM Ind , !. t ." 01 I. lid~ 01 Contnaort
5001 160th Street West, Rosemount, MN 55068
as Principal, hereinafter called the Principal, and NATIONAL FIRE INSURANCE COMPANY OF HARTFORD
222 South 9 th S treet (H~ imert iuD ftUIIC and ad:, -'. Of JepI ride of Sutety)
Minneapolis, MN 55402
a corporation duly organized under the laws of the State of Connecticut
as Surety, hereinafter called the Surety, are held and firmly bound unto
O'ie~ ift~ bill nl'm~ Inoi i1ddress or I~.., tide of Ownerl
City of Prior Lake, MN
as Obligee, hereinafter called the Obligee, in the sum of
Five Percent ( 5% ) of Amount Bid . O.,Uars ($ 5% of Bid ),
for the payment of which sum weJl and truly to be made, the said Principal and the said Surety, bind
ourselves, our heirs, executors, administrators, successOrs and assigns, joindy and severally, firmly by
these presents.
W HER EAS, the Prindpal has submitted a bid for
(Here illSl!lt full name. ~dcftess met descripcion 01 projeaJ
1997 Street and Utility Improvements in the .City of Prior Lake
City Project Nos.: 97-02, 95-07, and 97-17
NO \V. THE REF 0 R E. if the Obligee sh.111 ~CCegt the bit'! of thI'! Prindoal ~nd rhl! Princio~l sh~n enter into ~ Contract
with rhp. Ohligee in ;1ccord.:ance with th~ t~5 of such birl, ~nd give sl.lch bond or bonds :u m~y be so~fi'!d in the bidding
or Contract OOCllm~nts with good ~nd slfifici.-n: surety for the faithful oeriorm~nce oi such Contnct ~nd for the prompt
p~ym!"nt of lannr ..nd m..reri,,' fllmi~h~ in .the oroS<eOJtinn th...~f. or in the ~t of thp. faii'Jre of the Princip~1 to enter
such Contract and give such bond or bonds. if t~ Princin-1i SMU oay to the Ohligee the diffp.renc~ not to exceed the penalty
hereof b~rwe~n the amount soecified in ~jd bid ;and such br~er ~mnunt for which the Obligee m~y in ~ ~ith contract
with 3norhp.r carty to ceriorm the Woric ccwp.red by ~jd bid. then this oblinrion sh~U be null and void. o~rw1se to remain
in full forc~ and effect. .
Signed and sealed this
4th
day of
August
19 97
/f~~ ? ~vx1-~
\. (Wic/1f!<sJ
~CNAMARA CONTRACTING, INC.
,,(PrinciD~J (Seal)
~~~
Kevin McNamara (Tid~J President
NATIOrl~IRE INSY~~ANY OF HARTFORD
J J \ 1) (~ure (Sea.l)
~\.--t)1 \.J'-.
D~nald R. Olson (Tide) Attorney-in-Fact
A~ ). LJ~~t
(Witnes1J
AlA OOCUMF.NT AJ10 . 810 aONO . AlA t1!) . FnRUARY 19iO EO . THE ~E;t1CA'"
INSTITUiE OF ARCHlTECiS. 1iJS N.'f. AVE.. N.W.. W".SH!NC7C~. O. C. :0006
1
WARNll"IC; Untic-!:"$~ onct~o~ng vlol'u~ u.s. c=:r:mgn~ I~ ar.d :$ s\;Olec: :0 1e-;31 e:-:~ec..;~~n.
)\,)'- it'
ADDENDUM NO. 1
TO THE PLANS, SPECIFICATIONS, AND BID PROPOSAL FOR
1997 STREET AND UTILITY CONSTRUCTION FOR
THE CITY OF PRIOR LAKE'S FOLLOWING PROJECTS;
1) S.A.P.201-105-06 Fish Point Road - From Cardinal Ridge Trail to Victoria
Curve
2) Mushtown Road from Station 8+60 to Station 36+95
3) S.A.P.201-114-03 Pike Lake Trail- From County Road 42 to Knob Hill
Development
Dat~~d May 1997
TO ALL BIDDERS: The above titled plans, spt:cifications, and contract documents are hereby
revised in accordance with the items set forth herein.
Receipt of this addendum must be acknowledged by entering "Addendum No.1" in the space
provided on page 5 of the Bid.
This addendum to the plans and specifications is hereby made a part of the contract documents
for the above-entitled project, to the same extent as though it were originally contained therein.
All bidders are expected to thoroughly examine each item enumerated herein, regardless of its
apparent application(s) and shall be held responsible for furnishing all labor and materials
required in the division of the work that the items indicate. Items herein shall take precedence
over any clauses, which they modify in the contract documents or portions of plans and
specifications, which they modify or supplement.
A. BID SCHEDULE
ChanQe:
The Bidder shall submit his/her bid on the revised Bid Schedule that is attached to this
Addendum No. I. The 12"watermain on the bid schedules have been changed from Class 52 to
Special Class 50 to reflect the Section 3400.2AI of the watermain General Requirement no PVC
watermain is allowed.
Add:
The City of Prior Lake is planning to install a trunk storm sewer on Pike Lake Trail. This
requires the pipe size increases as revised on the Bid Schedule 4.0 Pike Lake Trail (trunk storm
sewer svstem).
The Contractor shall be required to utilize the revised bid schedules attached to Addendum No.1
to submit his bid, to ensure that the proper pipe sizes and quantities are bid. The storm sewer
trunk system shall become a part of the base bid for the project.
ADNI-800.810
Alternate 3.0 Pike Lake Trail (storm sewer) has been added to the revised bid schedule. This bid
schedule is to be considered a alternative bid. This schedule reflects the original stonn sewer
system. This alternate bid is based upon the State Aid approval. The City reserves the right to
select the storm sewer trunk system as bid on the revised schedule 4.0 or to select the original
State Aid approved storm sewer on revised Alternate 3.0. The City will negotiate with the office
of State Aid to determine State Aid participation based upon the percentage (%) of flow in the
storm sewer system. All trunk storm sewer oversizing is considered to be No-State-Aid funded
by the City; storm water management utility.
The receipt of this Addendum No. 1 shall also be acknowledged by the Contractor by entering
"Addendum No.1, dated July 26, 1997, in Section 0 of the Agreement Form on Page 9."
B. SPECIFICATIONS
Section 2500 - Storm Draina1le
Specific Requirements shall be modified as outlined herein by Addendum No.1.
2500.1 Descriotion
This work shall include the installation of 12" to 36" reinforced concrete pipe (Rep) drain pipe,
aprons, catch basins, manholes, and sump manhole construction, and connection into existing
systems as outlined in the revised plans, specifications, and bid schedules per Addendum No.1.
Section 3400 Watermain Specifics
3400.2
All 12" larger Ductile --- Pipe shall meet the requirements of Special Class 50 as provided for a
Section 34000.2.A1ofthe General Requirements. PVC Watermain shall not be allowed.
c. H.EVISED BID SCHEDULE
The bid schedule in the original specifications manual shall be modified as outlined herein
"Addendum No.1". The Contractor shall be required to submit his bid on the revised bid
schedule that is attached to this Addendum No. 1.
The following modifications have been made to the bid schedule;
i)
Schedule 4.0 Pike Lake Trail (storm sewer) has been revised to state "Schedule
4.0 Pike Lake Trail (trunk storm sewer system)" and various size pipes have been
added or deleted to match the revised plans for the trunk storm sewer system.
This scheduled is a part of the base bid.
ii)
Alternate 3.0 Pike Lake Trail (Storm Sewer System) Alternative Bid has been
added to the revised bid schedule. The bid schedule matches the original section
4.0 which is the State Aid approvf:d storm sewer system.
ADNI-800.810
2
iii) Schedule 5.0 watermain has been modified to require Class 50 for 12" and larger
watermains.
D. REVISED PLAN SHEETS
Addendum No.1 has been prepared to provide for a trunk storm sewer system on Pike
Lake Trail. The original plan sheets 2 of 13 and 6 of 13 have been revised to reflect the
City's proposed trunk storm sewer. Enclosed with Addendum No.1 are plan sheets 2R
of 13 and 6R of 13. The Bidders are advised to insert these revised plan sheets into their
plans for Pike Lake Trail to reflect this j~ddendum No.1.
i) Sheet 2R/13 - has been modified to reflect the trunk storm sewer system. These
modifications include revisions in; pipe sizes, manhole sizes, estimated quantities
per pIpe SIze.
ii) Sheet 6R/13 has been modified to reflect the trunk storm sewer system. These
revisions begin with the proposed 21" stub out at station 6+05, A TMH3 and
continue northward on Pike Lake Trail to County Road 42 (Station 0+70). The
revisions also include the upsizing of the Rep between STMH5 and STMH6,
including the apron with exits STMH6 to the East of Pike Lake Trail.
The revisions related to large storm sewer trunk sizes to convey the addition
storm water runoff being delivered by the new 21" stub, due to commercial
development of the Wensman property to the west of Pike Lake Trail. The
inserts, grades, and elevations of the storm sewer system have been revised per
the final hydraulic design of the trunk system.
iii) The Contractor should retain the original sheets 2/13 and 6/13 by marking them as
alternate bid per schedule 4.1.
I hereby certify that these Plans and Specifications were prepared by me or under my direct
supervision and that I am duly registered Professional Engineer under laws of the State of
Minnesota.
J:LJ {efLI
Thomas J. K~nski, P.E.
Reg. No. 16798
7/ufr7
Date ' -
Issue Date: July 26, 1997
ADN 1-800.8 I 0 3
REVISED
BID SCHEDULE:
ADDENDUM NO.1
FISHPOINT ROAD SAP 201-105-06
PIKE LAKE ROAD SAP 201-114-03
MUSHTOWN ROAD
CITY OF PRIOR LAKE, MINNESOTA
. ... .. - --- ""-.---
SCHEDULE 1.0 FISH POINT ROAD (STREET)
1 MOBILIZATION
2 COMMON EXCAVATION
3 SUBGRADE EXCAVATION
4 TOPSOIL BORROW
5 SUBGRADE PREPARATION
6 GEOTEXTILE FABRIC TYPE V
7 AGGREGATE BASE, CLASS 5
8 3" MINUS 100% CRUSHED QUARRY LIMESTONE
9 TYPE 41A, 21/2" BITUMINOUS PATHWAY
10 TYPE 41A, WEAR COURSE MIXTURE
11 TYPE 31B, BASE COURSE MIXTURE
12 BITUMINOUS MATERIAL FOR TACK COAT
13 ADJUST GATE VALVE
14 ADJUST FRAME AND RING CASTING
15 4" CONCRETE WALK
16 CONCRETE CROSSWALK SPECIAL
17 CONCRETE CURB & GLJ I II::R, B618
18 CONCRETE PEDESTRIAN RAMP
19 CONCRETE TRIANGULAR VALLEY GUTTER
20 CONCRETE VALLEY GUTTER
21 PERMANENT BARRICADE
22 PAVEMENT STRIPING, 4" EQUIV. WIDTH
23 FURNISH & INSTALL SIGN PANELS, TYPE C
24 BALE CHECK
25 SILT FENCE, HEAVY DUTY
26 CATCH BASIN SEDIMENT BARRIER
27 DUST CONTROL WATER
28 SEED MIXTURE 500
29 SODDING, LAWN & BOULEVARD
30 WOOD FIBER BLANKET TYPE REGULAR
31 TRAFFIC CONTROL
32 SUBGRADE DENSITY TEST, INPLACE
33 CLASS 5 GRADATION TEST
34 CLASS 5 PROCTOR TEST
35 CLASS 5 DENSITY TEST, INPLACE
36 CONCRETE TESTING
37 BITUMINOUS AIR VOID TEST
38 BITUMINOUS CORE DENSITY TEST
LS
CY
CY
CY
RDSTA
SY
TON
TON
TON
TON
TON
GAL
EA
EA
SF
SF
LF
EA
SF
LF
EA
LF
SF
EA
LF
EA
MGAL
AC
SY
SY
LS
EA
EA
EA
EA
EA
EA
EA
T SCHEDULE 1.0 FISH POINT ROAD (STREET) - TOTAL
O:\PROJ\ADDEN 1 02074
SA
1 ,,*. (}oo,oo 1/. o<<J.O()
1105 ~.oo 5,,"J, So 00
500 b,{O ,.. 1.50.00
1066 '1...00 1. %'2, . ()()
12 t15,C() l, r-OO. 00
1500 1.00 I, S' 00.00
3850 1. Z,? 1-1. '112.50
930 ';',t'1 'L!12. .50
300 4'7.,,00 11.. ~.oo
700 zf. i'o /1, /50..00
1410 2, I , CX'> ~q~ hIO.()tJ
220 1,50 ~~o.oo
4 IOO,cc tJOO.(X)
8 11:7$.00 I. ~'lO.OO
5786 y.. fA. 1.70 ff.,....~ 1,0116.1,0
360 4:&J -L ~/'l.OO
4600 ~,1/) 2-fJ? .51.fJ. 00
8 I tfo, ()() I b1,.P.&o
150 ~,t? 7~1. ~O
75 J 1),.)'0 ~t.~
2 ~t.~lO ,~O.OO
5000 .. <50 t 5'00.00
, -
102 2~.DD t.., gt.Il,..eo
30 15: CO L/~O.O()
525 Z,~ l.tI" .~O
17 125,(;0 1..f 2~ tV
60 ~/5,oo Zt;,f!V I
'10D-00
1.1 IJ~/ro It(}O.OO
2350 1,,{D -!100.00
1825 1.00 --t.Jtc. Gb
1 11 S"CO,oo /-,~oo,.oo
2 55,fX) 110100
2 55: CO lID, 00
1 100, a? !OO,.oo
3 SS,4:) 16~.Oo
9 75,<<) 61t,oo
6 I 00.tt) 600-00
6 is,ci) l~o.oO
ISU~'h:7o
SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER)
1 12" RC PIPE SEWER DESIGN 3006 CLASS V LF 480 t3- 75 IUJ()o.~
2 15" RC PIPE SEWER DESIGN 3006 CLASS V LF 870 -z,5,z,S 1./.!l!iJ. So
3 18" RC PIPE SEWER DESIGN 3006 CLASS III LF 70 'Z, 7. r;o I P)'10.00
4 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 200 Ie, DO 'tOOO .00
5 CONNECT TO EXISTING MANHOLE EA 1 500,00 1:)() 0.00
6 CONNECT TO EXISTING PIPE EA 1 tf7~tC '11 (. 00
7 CONST DRAINAGE STRUCTURE, DESIGN 48-4020 EA 9 I, t6tJ..tKJ 't q.t;oaQ?
8 CaNST DRAINAGE STRUCTURE, DESIGN SPECIAL EA 9 1~u> 1 c.l1..~ . 00
9 SUBGRADEPROCTOR EA 1 1f,oo t;;~.CO
10 SUBGRADE DENSITY - INPLACE EA 8 'f{).(JO ~ 1.-0 - O()
T SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER) - TOT.AL 'i~f/'.~o
SCHEDULE 3.0 PIKE LAKE TRAIL (STREET)
1 MOBILIZATION LS 1 ~/()OO,OO 3,oao"aJ
2 CLEARING AC 0.9 1..,4"ro,tX) 2/1~..00
3 GRUBBING AC 0.9 1..d6D. ro I) Its. 00
4 CLEARING EA 28 I ~O,D() t too.. Q:)
5 GRUBBING EA 28 110,00 ~,021o-~
6 SALVAGE AND REINSTALL CMP LF 30 15,(,X) tj)'(}.OO
7 REMOVE BITUMINOUS SURFACE SY 280 3,00 Bcfc.oo
8 COMMON EXCAVATION CY 4960 ;,1D -11. 3~b.Q:)
9 SUBGRADE EXCAVATION CY 500 ~,fX) 15,C(}.00
10 SALVAGE TOPSOIL RESPREAD CY 1080 ~,?O 1-.100.00
11 MODIFIED SELECT GRANULAR BORROW CY 1920 1.00 -1 'i._ tfc. Q?
12 GEOTEXTILE FABRIC TYPE V SY 1500 1.00 I, (00. ~
13 AGGREGATE BASE, CLASS 5 TON 4075 1, 2tJ 1W?J..1~
14 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 930 1. 'I? 11.d1.50
15 3" BITUMINOUS DRIVEWAY RESTORATION SY 85 41.100 ~~1o. 00
16 TYPE 41A, WEARING COURSE MIXTURE TON 550 z,t7 ,(J{) 13,1>(). OC
17 TYPE 31 B, BASE COURSE MIXTURE TON 900 ~1" IX) 111. ~..oo
18 BIT. MATERIAL FOR TACK COAT GAL 230 /, 1)0 ~<I~ 00
19 MODULAR BLOCK RETAINING WALL SF 6000 i4,30 B>.~(.l. 00
20 ADUST FRAME AND RING CASTING EA 3 /60,0{) tlgo"ey:J
21 4" CONCRETE WALK SF 6400 I" 75' 1" icc..Q:J
22 CONCRETE CURB AND GUTTER, DESIGN B618 LF 2700 t,,'30 11.0((),.oo
23 CONCRETE DRIVEWAY PAVEMENT SY 30 z,8,0t> 'iJ t{c. 00
24 CONCRETE PEDESTRIAN RAMP EA 2 ltfo,c() 3~. trJ
25 TRAFFIC BARRIER DESIGN A8307 LF 570 /3, fX) 1!JjO.oo
26 FURNISH & INSTALL SIGN PANELS, TYPE C SF 103 1..3,00 1. ?'(l; ~ 0:>
27 SIL T FENCE, HEAVY DUTY LF 1200 1,,1, 3,300..00
28 CATCH BASIN SEDIMENT BARRIER EA 13 11-5, cr:2- I, {,1$. CD
29 WOOD FIBER BLANKET SY 50 ~,to /5o.()C1
30 SEED MIXTURE 500 AC 1 5'00 , b() fro. 00
31 SODDING. LAWN & BOULEVARD SY 1600 t.. ,d) 1U'o..eo
O:\PROJ\ADDEN 1 02074 58
32 DUST CONTROL WATER MGAL 35 1,0,00
33 PAVEMENT STRIPING, 4" EQUIV. WIDTH LF 6225 .4~
34 TRAFFIC CONTROL LS 1 >5.00
35 CLASS 5 GRADATION TEST EA 2 >5,00
36 CLASS 5 PROCTOR TEST EA 1 l' 00. 00
37 CLASS 5 DENSITY-INPLACE EA 3 55, ctJ
38 CONCRETE TESTING EA 4 7). Of)
39 BITUMINOUS AIR VOIDS EA 6 100)01)
40 BITUMINOUS CORE DENSITY EA 6 1.6,01)
41 SUBGRADE DENSITY -I NPLACE EA 4 ~~a;
T SCHEDULE 3.0 PIKE LAKE TRAIL (STREET) - TOTAL
SCHEDULE 4.0 PIKE LAKE TRAIL (TRUNK STORM SEWER)
1 4" PERFORATED THERMOPLASTIC PIPE DRAIN LF 360 Q,5D
2 RANDOM RIP RAP CLASS III CY 8.5 53,00
3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 48-4020 EA 2 /O50,lO
4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 60-4020 EA 3 I q..'iO.OO
5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 84-4020 (SUMP) EA 1 t4 {)(),IX)
6 CONSTRUCT DRAINAGE STRUCTURE, DESIGN SPECIAL EA 8 </1.5:cv
7 CONNECT TO EXISTING STORM SEWER MANHOLE EA 1 t.f 15;a;J
8 12" RC PIPE SEWER, DESIGN 3006 CLASS V LF 127 "1-3dXJ
9 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 292 Zt/, ~O
10 18" RC PIPE SEWER, DESIGN 3006 CLASS III LF 552 U,30
11 21" RC PIPE SEWER, DESIGN 3006 CLASS III LF 122 ZS,5O
12 24" RC PIPE SEWER, DESIGN 3006 CLASS III LF 255 ~(), 10
13 27" RC PIPE SEWER, DESIGN 3006 CLASS III LF 184 ~~,W
14 36" RC PIPE SEWER, DESIGN 3006 CLASS III LF 150 So,50
15 36" RC PIPE APRON EA 1 /z5o,a?
16 SUBGRADE PROCTOR EA 1 io,tO
17 SUBGRADE DENSITY - INPLACE EA 8 ~i,m
18 PIPE FOUNDATION MATERIAL CY 50 13,7tJ
T SCHEDULE 4.0 PIKE LAKE TRAIL (STORM SEWER) - TOTAL
SCHEDULE 5.0 PIKE LAKE TRAIL (WA TERMAIN)
1 CONNECT TO EXISTING WATERMAIN
2 HYDRANT WITH 6" VALVE
3 6" GATE VALVE
4 8" GATE VALVE
5 10" GATE VALVE
6 12" BUTTERFLY VALVE
7 6" DIP WATERMAIN, CLASS 52
8 8" DIP WATERMAIN, CLASS 52
9 10" DIP WATERMAIN, CLASS 52
10 12" DIP WATERMAIN, CLASS 50
11 FITTINGS
EA
EA
EA
EA
EA
EA
LF
LF
LF
LF
LBS
2 t/SO,r,;p
5 I Ll50.cn
1 tJ..55.oo
1 ~
1 ~ tf{;, ltL
2 775,[D
f.J- ' -
163~, Ib,50-/-fM;tJ
48 /I/,u>
773 U.8o
553 1,3/30
3150 I,~~
O:\PROJ\ADDEN 102074
518
700 C\?
2.. lbo', '2..)
5~.0()
Ilo-Q.J
/fXJ.eo
16~,Ob
~..oo
6t:;o,oo
Iso,~
~1A,,00
tbG,Iu'.. r;o
~.oo
q~l,o
~ (lX'~ (X:J
Cj, lflo. 00
1., L/Oo~ ()O
'>600.. 00
'tJ~. 00
1-,tit/.DO
utJ5'. f:c
!r/,5/7.60
3@.(XJ
1, 12h..~o
~b
1,~1t:co
!/L5o.()o
80.00
?Jotf-. ()O
b~.OO
12.-z..~( ..~
'f6o..00
8,1{o..oo
I.f ~~ Of)
br>c .00
gf/c.oo
I.S~o.ro
~b~.}O
'11.1. {,o
16,8~/. Yb
/2..ssq. 'fa
'I. S9Z.G"o
12 SUBGRADE PROCTOR
13 SUBGRADE DENSITY - INPLACE
14 PIPE FOUNDATION MATERIAL
SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN) - TOTAL
SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER)
1 8" PVC SEWER SDR 35 (10-12') DEEP
2 4" PVC PIPE SEWER
3 8"X4" PVC WYE
4 CONNECT TO EXISTING SANITARY SEWER MANHOLE
5 48" DIAMETER SANITARY MANHOLE
6 SUBGRADE PROCTOR
7 SUBGRADE DENSITY - INPLACE
8 PIPE FOUNDATION MATERIAL
T SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER) - TOTAL
EA
EA
CY
1
10
50
80, co
40, 00
I tJ.,OO
/.kJ2n
g,/{O
11/,00
r;(20.~
~.4 t 2AxJ
gO.a?
'-/-0. Db
1'1;00
20..~
'/oO-(X)
7oo~oo
'5 1" qA.~ qo
~g~~Cb
~t~~
ztt,(K)
/5'00.00
2.g5a,a?
tIJ..Ct!J
8D~ Q::J
1OO-a?
It, tftj.OO
SCHEDULE 7.0 MUSHTOWN ROAD (STREET)
1 MOBILIZATION LS 1 .3, ~,DO 3,S"iXJ,00
2 CLEARING AC 1 '3,~,co 3.00tJ-(b
3 GRUBBING AC 1 L7?o,lX) /1Sc. CXJ
4 CLEARING EA 1 400 iCO tfoo..OO
5 GRUBBING EA 1 ~5"f)/ro tSD.re
6 COMMON EXCA VA TION CY 9037 1".)0 ~~,~'1.50
7 SUBGRADE EXCAVATION CY 650 If, V5 2.,1/'t. .~o
.
8 SALVAGE TOPSOIL AND RESPREAD CY 2775 1,,'1, tf, 3S6. tS
9 GEOTEXTILE FABRIC TYPE V SY 1950 /,00 I. 'IS().ro
10 MODIFIED SELECT GRANULAR BORROW CY 3530 -g .00 1,p, ,*.00
11 AGGREGATE BASE, CLASS 5 TON 3425 7.tsS 1.'1 : g:;(. ~
12 3" MINUS 100% CRUSHED QUARRY LIMESTONE TON 1210 1j1~ c;. 'J11. S" 0
13 TYPE 41A, WEAR COURSE MIXTURE TON 650 z.;,fX) t,,'tS()~CV
14 TYPE 31B, BASE COURSE MIXTURE TON 1025 't-/; 00 ZI. 5,.S.00
15 BITUMINOUS MATERIAL FOR TACK COAT GAL 340 /.10 ~/o.OtJ
16 TYPE 41A, 21/2" BITUMINOUS PATHWAY TON 150 1./-,,", CD '~O..oo
17 BITUMINOUS DRIVEWAY SY 45 q,(;O . Qo5'.OO
18 ADJUST HYDRANT EA 2 '2.7,5,00 t{~O.oo
19 ADJUST FRAME AND RING CASTING EA 1 'J.. fo, CO l$C.oo
20 CONCRETE CURB & GUTTER, B618 LF 4630 v,I5 ~. 5'0
21 CONCRETE VALLEY GUTTER SF 500 4,'W t,foo-oo
22 SILT FENCE, HEAVY DUTY . LF 1100 'i, 7~ ~) O'Z.~. CO
23 BALE CHECK EA 30 I!i. C{L t/SO.OO
24 CATCH BASIN SEDIMENT BARRIER EA 11 I z.~OO I, ?J7~.O()
25 SODDING, LAWN & BOULEVARD SY 10300 2.,00 z.o.. boo. 00
26 SEEDING MIXTURE 500 AC 1.6 J I /)()O ,()() I, bOO. 00
27 SEEDING MIXTURE 250 AC 0.4 I d)(XJd::() <(00.. 00
28 WOOD FIBER BLANKET SY 1600 1,75 1, ~oo_w
O:\PROJ\ADDEN 1 02074 5D
LF
LF
EA
EA
EA
EA
EA
CY
427
40
1
3
2
1
2
50
29 DUST CONTROL WATER
30 TRAFFIC CONTROL
31 SUBGRADE DENSITYTEST,INPLACE
32 CLASS 5 GRADATION TEST
33 CLASS 5 PROCTOR TEST
34 CLASS 5 DENSITY TEST, INPLACE
35 CONCRETE TESTING
36 BITUMINOUS AIR VOID TEST
37 BITUMINOUS CORE DENSITY TEST
T SCHEDULE 7.0 MUSHTOWN ROAD (STREET)- TOTAL
SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER)
1 12" RCP CLASS V
2 15" RCP CLASS V
3 18" RCP CLASS III
4 24" RCP CLASS III
5 4" PERFORATED THERMOPLASTIC PIPE DRAIN
6 STORM MANHOLE 48" DIA
7 STORM MANHOLE 48" DIA WITH 3' SUMP
8 STORM MANHOLE 60" DIA WITH 3' SUMP
9 CATCH BASIN
10 18" RCP APRON
11 24" RCP APRON
12 RIPRAP CLASS 1\1
13 SUBGRADE PROCTOR
14 SUBGRADE DENSITY - INPLACE
15 PIPE FOUNDATION MATERIAL
T SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER) - TOTAL
TOTAL CONSTRUCTION COST
SCHEDULE 1.0 FISH POINT ROAD (STREET)
SCHEDULE 2.0 FISH POINT ROAD (STORM SEWER)
SCHEDULE 3.0 PIKE LAKE TRAIL (STREET)
SCHEDULE 4.0 PIKE LAKE TRAIL (TRUNK STORM SEWER)
SCHEDULE 5.0 PIKE LAKE TRAIL (WATERMAIN)
SCHEDULE 6.0 PIKE LAKE TRAIL (SANITARY SEWER)
SCHEDULE 7.0 MUSHTOWN ROAD (STREET)
SCHEDULE 8.0 MUSHTOWN ROAD (STORM SEWER)
TOTAL CONSTRUCTION COST
ALTERNATE 1.0 MUSHTOWN ROAD (STREET)
1 MOBILIZATION
2 CLEARING
3 GRUBBING
O:\PROJ\ADDEN 1 02074
MGAL 60 V,.fl'-' 10. OD ftto, 00
~,
LS 1 SS.a> 5~.~
EA 4 S-S,()() 2.i.o, Gb
EA 2 {COLa:> 1.&0 r 00
EA 1 5S,lO 5G.a>
EA 4 7~.Cb 3oo..co
EA 5 /(;D,eo SOo.dJ
EA 5 S'O. ce 1$0.00
EA 5 Z). 00 11-{.OO
1.1tl~1l/~~o
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
TON
EA
EA
CY
~, ~fd:)
Z!7,CO
u,~o
10,80
'f,fo
/.OIJO,d)
I,WD, a?
1,150,00
g lio,(()
5tf(J,f>>
11.5;(0
55,0()
8o,tXJ
tft;,tf)
I '1-, ()()
293
28
159
44
1670
2
1
1
7
1
1
15
1
5
100
LS
AC
AC
1df<<;. fX>
~,bt:X>DCL
1.,.oC() ,00
1
0.1
0.1
5E
6,9/l{. go
100 .00
'/.t." f I fD
/'3~5.t.o
~ 9>6>. tc
1-,000,. Q:)
J/}.()o.CKJ
l ~S'o.oo
5. 'bfjD. Do
,C/o. a!)
115.00
AtS.f70
&J,. t'O
'J"OO-~
f c/oo.D::J
tk) 'C//6:1_o
/B3q~8~10
5~.~/~.~O
Ublt6..~o
1t.~ 1.&/, 'fJ
5" ,5'4.'10
Ii, tf t~. Do
1'2-.~'Lq~~o
'13. 'lit6..to
gq1. O~1.qo
1..//..00. co
~.()O
w..Gt>
4 COMMON EXCAVATION
5 SUBGRADE EXCAVATION
6 SALVAGE AND TOPSOIL RESPREAD
7 GEOTEXTILE FABRIC TYPE V
8 MODIFIED SELECT GRANULAR BORROW
9 AGGREGATE BASE, CLASS 5
10 3" MINUS 100% CRUSHED QUARRY LIMESTONE
11 TYPE 41A, WEAR COURSE MIXTURE
12 TYPE 31B, BASE COURSE MIXTURE
13 BITUMINOUS MATERIAL FOR TACK COAT
14 TYPE 41A 21/2" BITUMINOUS PATH
15 CONCRETE CURB & GUTTER, B618
16 BALE CHECK
17 CATCH BASIN SEDIMENT BARRIER
18 SILT FENCE, HEAVY DUTY
19 SODDING, LAWN & BOULEVARD
20 SEEDING MIXTURE 500
21 SEEDING MIXTURE 250
22 WOOD FIBER BLANKET
23 DUST CONTROL WATER
24 TRAFFIC CONTROL
25 SUBGRADE DENSITY TEST, INPLACE
26 CLASS 5 GRADATION TEST
27 CLASS 5 PROCTOR TEST
28 CLASS 5 DENSITY TEST, INPLACE
29 CONCRETE TESTING
30 BITUMINOUS AIR VOID TEST
31 BITUMINOUS CORE DENSITY TEST
T ALTERNATE 1.0 MUSHTOWN ROAD (STREET) - TOTAL
ALTERNATE 2.0 MUSHTOWN ROAD (STORM SEWER)
1 12" RCP CLASS V
2 15" RCP CLASS V
3 18" RCP CLASS III
4 4" PERFORATED THERMOPLASTIC PIPE DRAIN
5 STORM MANHOLE 48" DIA
6 CATCH BASIN
7 SUBGRADE PROCTOR
8 SUBGRADE DENSITY - INPLACE
T ALTERNATE 2.0 MUSHTOWN ROAD (STORM SEWER) - TOTAL
AlIERNA TE 3.0 PIKE LAKE TRAIL (STORM SEWERl
1 4" PERFORATED THERMPLASTIC PIPE DRAIN
2 RANDOM RIP RIP CLASS III
3 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 48-4020
O:\PROJ\ADDEN 1 02074
CY 1000 1.bi:1o Lf. (bo~ 00
CY 125 ~(JO 15o.()O
CY 200 ~,~(./ 1oo.()O
CY 300 L.l2o ~D..<<>
CY 680 ;,'7D ~/oo, Oi)
TON 700 -g, tXJ '-600. 00
CY 100 q,oo qct>..e>>
TON 130 'Z.8.. 7'7 ~ 1!J1. (0
TON 200 2.1;" ro ~ODtJ..Oo
GAL 67 ).,00 I~oo
TON 45 55,00 'J-,Y1S'.00
LF 835 1, ?-5 6.1?J1.2.5
EA 10 ib ..CJ:) W.CD
EA 4 i 'Z5,oo 51JO. CO
LF 100 1,50 150.00
SY 320 giOO '160. O(J
AC 0.2 t500 ,GtL. ~..OO
AC 0.2 L,5~/t:O ~". ~
SY 450 1,5/J 61~Q:J
MGAL 15 2-00,1:0 ~ ,00:>.. Q?
LS 1 .5S.Q) 5~ .. OCJ
EA 1 b5.lO ,~. ()O
EA 1 l:J~ ,00 t,~ CO
EA 1 7S,,(X;L 7s.oo
EA 1 75-<2CL 1s.co
EA 1 '7<,a:L 75-00 .
EA 1 7S,m 15.00
EA 1 7 t;, CO 1~'co
Cf4) /1g-7 ~
LF
LF
LF
LF
EA
EA
EA
EA
12
38
148
150
1
3
1
4
LF
CY
EA
360
8.5
4
SF
t3/w
Z5,(X)
U,5"o
Q,50
J~ 0tJ0,d.J
150,~
ra,ro
tfo,co
2.03. 2.l>
tf9J..oo
~'i 1.'L.(k)
7 Y'J~.t'Jt)
IfJ()o..aJ
i5~()..oo
Bo..cc>
I {,t)..()O
10, ?J1o.'to
q,5q
5$",00
/,otS',ob
3 t/ 'to- 00
rJ('1,~o
1/100.00
- -- -. -.... --.-..
4 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 60-4020
5 CONSTRUCT DRAINAGE STRUCTURE, DESIGN 72-4020 (SUMP)
6 CONSTRUCT DRAINAGE STRUCTURE, DESIGN SPECIAL
7 CONNECT TO EXISTING STORM SEWER MANHOLE
8 12" RC PIPE SEWER, DESIGN 3006 CLASS V
9 15" RC PIPE SEWER, DESIGN 3006 CLASS V
10 18" RC PIPE SEWER, DESIGN 3006 CLASS III
11 21" RC PIPE SEWER, DESIGN 3006 CLASS III
12 30" RC PIPE SEWER, DESIGN 3006 CLASS 11/
13 30" RC PIPE APRON
14 SUBGRADE PROCTOR
15 SUBGRADE DENSITY - INPLACE
16 PIPE FOUNDATION MATERIAL
T ALTERNATE 3.0 PIKE LAKE TRAIL (STORM SEWER)--TOTAL
TOTAL CONSTRUCTION COST FOR ALTERNATE
ALTERNATE 1.0 MUSHTOWN ROAD (STREET)
ALTERNATE 2.0 MUSHTOWN ROAD (STORM SEWER)
ALTERNATE 3.0 PIKE LAKE TRAIL (STORM SEWER)
TOTAL.
RESPECTFULL Y SUBMITTED:
..
~WW1 fvt1,;Vt~
SIGNATURE
f,w ideMt
hiuJJ I tyt
Q'-1109Jo G
TITLE
tiN IlJ #
1~'J-~6'~
LICENSE NUMBER
(~Q~ffi
{/ -'
ATTEST
O:\PROJ\ADDEN 1 02074
EA 1 I, s'CY>..~ I~~oo
EA 1 i,LJ.fJlJl~ -1.l/00. 00
EA 8 850, DO 6?J(XJ.00
EA 1 i.J75,a? '11~. ro
LF 127 1,7100 '2.."11.1 .00
LF 292 VI, 50 115<</. 00
LF 552 tft" 30 fcf.~{7.6o
LF 439 tB,St; /2. _ ~II. ~{J
LF 150 'II, tv './'50./:>0
EA 1 'f 50,,00 950. Do
EA 1 '0;00 f30.(XJ
EA 8 tJO,D2- 'fzO.OO
CY 50 14, DO tOO.OO
(ff. "",60
qq, 17S.1~
IO,?J1o.lO
bY) Y6f,,6o
II(lO/~~~
WuYlam a Vt<. ~nfradll1'11iJc
COMPANY 0
~OO{ -/~o+t;t I]tv;,d w~".
{0serntVl1t !mYJ. 5~
ADDRESS
B ~tf., 97
DATE
tf 71--1/11&
PHONE NUMBER
~1, 2-1/11,
FAX NUMBER
5G