HomeMy WebLinkAboutCorrespondence file- 95-07 September 22, 1999 Resident 4403 Pondview Trail Prior Lake, MN 55372 Dear Resident: As part of the past Mushtown Road improvements there is one remaining item that needs to be constructed to complete the project. There is a wooden baffled weir that is to be installed at the end of the culvert on the west side of your driveway. This wooden weir is a Watershed District permit requirement. I would like to meet with you onsite to review the weir design and receive your input. Please call me at 447-9833 and let me know what time is convenient for you. Sincerely, ~-1.,~- Lani L;;:hty~ ~ Water Resources Coordinator 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 LEJ JJ:.1\.WD.DOC AN EQUAL OPPORTUNIlY EMPLOYER .. .. III I II II I I l" - , 1-.. I ... r A I. I r ,. I I '\" _ '\ -,....... _ I" I A III I n I I I '\ I 1_ '\ "JLl-n August 14, 1997 McNamara Contracting, Inc. Al..lN: Kevin McNamara 5001 160th Street West Rosemount, MN 55068 RE: PRE-CONSTRUCTION MEETING FOR 1997 IMPROVEMENT PROJECTS FISH POINT ROAD (PROJECT 97-02), MUSHTOWN ROAD (PROJECT 95-07) AND PIKE LAKE TRAIL (PROJECT 97-1 7) Dear Mr McNamara: We have scheduled the pre-construction meetings for the above mentioned projects for Friday, August22, 1997 at the Prior Lake City Hall at the following times: 10:00 am - Fish Point Road 10:30 am - Mushtown Road 11: 00 am - Pike Lake Trail We look forward to seeing you at the meeting. If you have any questions, please call me or Jeff Evens. Sincerely, ~~~ I. Greg IlH<a City Engineer CITY OF PRIOR LAKE Enclosure 16200PDagl18\(9M~RpiW81\~~.q.~or Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER -Qwarc =i. Green Com Jany . CONSULTING ENGINEERS IS~ CO~SJ:L TUG E.\GI\EFJIS Formerly MSA Consulting Engineers July 15, 1997 File: 102074M Paul Jubert Northern States Power 5309 W. 70th St. Edina, Mn 55349 Re: Pike Lake Trail, Fish Point Road, Mushtown Road Dear Mr. Jubert: I am enclosing copies of our Pike Lake Trail, Fish Point Road, Mushtown Road construction plans for your review. These projects are scheduled for construction this year with an approximate starting date of August 25, 1997. Please call me with questions or comments. Sincerely, Howard R. Green Company Joe Longtin JL:tw Enclosures cc:G....",fOIy Engineer, City of Prior Lake 074-1505.jul O:\PROJ\ 10207 4m\07 4-1505.jul.doc 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 I REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES FOR PIKE LAKElKAIL AND MUSHTOWN ROAD Introduction The City of Prior Lake is interested in receiving proposals for engineering services necessary for the design and preparation of plans and specifications for Mushtown Road and Pike Lake Trail. A feasibility report has been prepared for these projects and is enclosed. A Public Hearing on these projects is scheduled for April 7, 1997. At this meeting we will be asking the City Council to consider these projects and authorize the preparation of plans and specifications and engineering services. Scone of Services The project will be divided into two phases, Engineering Design, and Bidding. City records and information will be made available during all phases. During the Engineering Design phase, the proposer shall: 1. Perform all necessary preliminary surveying including but not limited to horizontal and vertical control, existing topography, cross sections, etc. 2. Prepare street and storm sewer construction plans and specifications. All plans shall be compatible with AutoCad version 13 in Widows 95. All specifications shall be compatible the Word 6.0 with Windows 95. 3. Prepare construction cost estimates based upon completed plans. 4. Provide a floppy disk (3 1/2") of all data and AutoCad drawings. During the bidding phase the proposer shall: 1. Prepare bid documents for public bidding process. 2. Submit and obtain approval of the plans and specifications from all required agencies. 3. Prepare the advertisement of bids, duplication and distribution of plans and specifications to bidders and respond to bidder inquiries. Attend the bid opening. All costs will be borne by the proposer. 4. Receive, analyze, and tabulate bids and make recommendations to the City for award ofbid(s). 5. Ensure proper contract execution to include insurance, bonds, etc.. required by the contract specifications. ProDosal Contents Two copies of the proposal shall be received no later than 4:00 p.m. on Thursday, March 27, 1997. Submittals shall be addressed to: Greg Ilkka, P.E. Director of Public Works/City Engineer City of Prior Lake 16200 Eagle Creek Ave. Prior Lake, MN 55372-1714 Submittals are to be delivered in a sealed envelope marked "Proposal Mushtown Road and Pike Lake Trail". Respondents shall bear all costs and risks associated with preparing and submitting responses to this request for proposals. Proposals submitted for the City's consideration are required to include, but not necessarily be limited to, the information requested in the format outlined below: A. Project Understanding - A narrative which presents the firm's understanding of the project requirements and any ideas the firm may have regarding specific aspects of the project. B. Organization - Provide background of the firm with particular emphasis on its experience with projects of similar nature. C. Detailed Work Plan - A detailed work plan identifying the work tasks to be accomplished and the budget hours to be expended on each task of the two phases. The detailed work plan is to include: The firm's overall approach to the project in general- terms, including a discussion of the project management philosophy of the firm and how it relates to the specific needs of the project, a detailed approach to each phase of the project, including a discussion of the tasks to be performed and; an identification of any disciplines that the firm intends to utilize. D. A detailed project schedule including: identification of key tasks required to complete the project, expected starting dates, milestone dates, and completion dates should be identified. E. Compensation - Compensation shall be classified into two categories. Engineering Design , and Bidding shall be those provided at a schedule of hourly rates and proposed with a not-to-exceed maximum project amount. An estimate of the hours required and project budget should be presented. . The City reserves the right to reject any or all proposals at the full discretion of the City. - aware ~. Green Com Jany . CONSULTING ENGINEERS :\ISk I fO\~n1UC EXCIXtIBS Formerly MSA Consulting Engineers July 7, 1997 File: 102-074-20 . Mr. Greg 1.lkka City Engineer City of Prior Lake 4629 Dakota Street SE . Prior Lake, MN 55372 RE: PUBLIC INPUT MEETING FOR 1997 STREET IMPROVEMENT PROJECTS MUSHTOWN ROAD 102-073-20 PIKE LAKE TRAIL . 102-074-20 FISHPOINT ROAD 102-071-20 Dear Mr. IIkka: This letter is intended to summarize the public input meetings that were held on Monday, June 30, 1997, regarding the above-referenced projects. Attached is a copy of the attendance sign-up sheet for the meeting on Mushtown Road and Pike lake Trail held from 4:00 p.m., to 7:00 p.m., at the fire station. The following summarizes the comments received: A) Pike Lake Trail · Request from church for a set of the Plans. . . Sprinkling may be necessary in new church addition for sanctuary. Modify plans to provide 6" ductile watermain, not 2" copper. . Questions were ra;sed by church regarding their assessments for this project, answered by City staff. The church also requested consideration for credits relating to existing sanitary sewer. City staff reviewed policies on standard. rates for sewer charges. . The curb cut for Mr. Wensman's property should match the proposed Development Plan. Can be adjusted in the field as.needed. . Wensman Development Plan may include future street with utility stubs at south end of project. This will need to be adjusted when City approval is granted on the plat. . Mr. Verling indicated an interest in hooking into sanitary sewer service as soon as possible to eliminate existing holding tank. He will need a permit from the City. He also requested the City to provide information relating to his costs related to the permit for sewer service. 1326 Energy Park Drive · St.Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free.800/888-2923 Mr. Greg IIkka July?, 1997 Page Two B. Mushtown Road . Nearby resident-asked about construction traffic and dust control. Requirements on these issues are in the-Specifications. . 2nd.drivewayrequested by property owner (24' width). Just west of existing wetland -0- to fit into his development plans (Station 15+25 approximately). . Field Inspector to verify driveway locations with all property Owners on project before curb construction. _ _ . . Discussed potential, development plans with property owner needing three driveways to south. Copy of Preliminary Development Plan shown by Owner. Also discuss his interest in excess fill from street project. . Residents asked about driveway repairs. They are to be in kind (i.e. bituminous driveway repaired with bituminous, gravel driveway repaired with aggregate surface). - c. Fishpoint Road - Private meeting with Developer representative at 2:30 p.m., on June 30,1997 - . Developer expressed interest in excess material from Mushtown project for slopes on his . project. . City should verify grades on existing curb - and gutter in Cardinal Ridge, as it will be constructed in the Development before this project. . Developer requested invitation to preconstruction meeting. . NSP will have utility conduits to place. These comments will be addressed as the project proceeds toward construction. Feel free to contact me if you have any questions. Sincerely, ZGre~ Thomas ~nSki. P.E'. .. T JK: pd Attachment . cc: Craig Ebeling, P.E. File 074-0709.jul - aware =i. Green Cam'Jany CONSULTING ENGINEERS S;0t{ . (1(.) .., s4ee--r . -:J--;v+v / ,It Q.l.r JA/ ~ (. I'hlt, ~A J , i :3019 7 ::'is<iJ{?;.vf /J) lPitlS/llilv-c/ x{l , ,,} / / _I r I ' -1- f/ llu- t... /fh1!. -/ /"" I" / :( .....- ---- ( = //;'/1#1 g;_~_._~__ A-! j'~5So,_.,,",,_.~ P;{,,v--t- · .~ ,KAI-()t-('</~<i . /-lJUd'U"; C/~/I.'A; ~.'w~~ &/2-- ~~ ~JK'.1 JfE-~1? 8 IA..JE/lJShlT/VAJ WZ3:A7~J ~~~~ '-/2..- 4~.s- //7~ -- I ~ - L u #oJ P rs <.. 6l..~ [15 L~. t-V\u So. H - To \o..l W ~\2:0 t. \'- - 440 - Co "Z- ~~ - - / IJ~SU{aLA cJ-h-me~ @--It;?<rl/''J9 17~9 7Or-oAfo Ave.. 50! ro ,,..- !f f/?- ?~fi5" . '/7.Z,h> ..~;"7~ (W '.' ....~st:.7-s:-e/3>. /' ,'0 . ~ op,'. 'SJ- .. .-'. .:. --: 'f</f~ /.9/ j> .-:- . -. -.' /tJ.2d~ 711' - .....tf!7' -- . ".' P-~b-:-?/~fL _ __ e:1'~>2 ~~ /~~-D~_ ~,,"~~tP -. ....b~A-;'j.9 <~ 'l/~ ~ ~ ~j' ~ /~J/o _ ,;;ce ~ 11t<_:r/ --- </'?~ -O~930 . -mtitu~/~~)?3~U/L/-J~ 44s--h~cfO \ A' ~~~ rl{p.Jjp ~.(>rL 11~- -. -..' 44#7-fMb11Z -- J. A/ #A,,,,/"r/(. . /,Off) .6(vj('W-r+" ((]~-.-d/ .. {/17:.. rj/S- 3 ('- @ 1991 Franklin International Institute. Inc. White #3703 Yellow #3761 Green #3762 Pink #3763 Blue #3764 Ulac #3767 Rainbow #3;00 June 24, 1997 RE: Informational Open House Mushtown Road Improvements Project 95-07 Dear Property Owner: An Informational Ooen House regarding upcoming improvements to Mushtown Road from the south edge of Maple Acres to 500 feet south of Ridgewood Court is scheduled for Monday, June 30th, 1997 between 4:00 p.m. and 7:00 p.m. at the Fire Station at 16776 Fish Point Road. Representatives from the City of Prior Lake Engineering Department will have preliminary drawings available for review and will be available to answer questions. Construction is slated for late summer and fall. This Informational Open House is intended to provide a better understanding of the proposed improvements. Please note that this is not a Public Hearing. If you have questions concerning the project, please call me at 447-4230. Sincerely, ~~ Greg Ilkka Public Works Director CITY OF PRIOR LAKE G:\PROJECTS\MUSH\INFOMTG.DOC 16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ~ubmitted Proposals for the Mushtown Road I Pike lake Trail Project MSA $26,400 $4,000 $30,400 Pioneer $46,200 $3,000 $49,200 Reike Carroll Muller Associates, Inc $27,480 $2,020+ ($400 mileage) $29,900 ~ O~ ~ 0'9 \\~ ~G liSt CONSULTING ENGINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888- 2923 Fax: 612-644-9446 CIVIL ENGINEERING ENVIRONMENTAL MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/ MECHANICAL ENGINEERING HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR lAKE ST. PAUL W ASECA ...-- \ r-- \ \ -e- '1 ~ ..07 April 18, 1997 File: 102-073-53 Mr. Greg Ilkk:a City of Prior Lake 16200 Eagle Creek Avenue SE Prior Lake, MN 55372 RE: PREPARATION OF EASEMENTS FOR PIKE LAKE TRAIL AND MUSHTOWN ROAD PROJECTS Dear Mr. Ilkka: We have reviewed the easement needs for both the proposed Pike Lake Trail and the Mushtown Road projects and have prepared the following breakdown: 'pike Lake Trail (2 easements) . Research at County Prepare Easement Descriptions Prepare Easement Exhibits Stake Easements for Viewing $130.00 290.00 130.00 320.00 . . . Mushtown Road . Six Easements Within City Limits Research at the County Prepare Easement Descriptions Prepare Easement Exhibits Project Meeting Stake Easements for Viewing $260.00 945.00 390.00 280.00 720.00 . Six Easements Within Township Limits Research at County Prepare easement Description Prepare Easement Exhibits Stake Easements for Viewing $260.00 945.00 390.00 240.00 An Equal Opportunity Employer /' "-- 811"'-\1 - 0 -- \7 .:1 - Mr. Greg Ilkka April 18, 1997 Page Two The above estimates would be billed hourly for only the items authorized by the City. If you have any questions about the above estimates, please contact our office. Yours truly, MSA, CONSULTING ENGINEERS t~{f~ FSK:tw 073-1804. apr tc. - 1'{7Y't .KI1":) 1ft ,,/,>~~ .1 ' C J " GJ; /'r,.,A -- 'rAf~ J lISl I ~ONSULH1~G ENGINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888- 2923 Fax: 612-644-9446 CIVIL ENGINEERING: ENVIRONMENTAL MUNICIPAL PlANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/ MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL W ASECA ~ s- 0 7 March 27, 1997 File: 900-252-00 Mr. Greg Ilkka Director of Public Works City of Prior Lake 16200 Eagle Creek Avenue SE Prior Lake, MN 55362-1714 RE: PIKE LAKE TRAIL AND MUSHTOWN ROAD IMPROVEMENTS Dear Mr. Ilkka: Thank you very much for the opportunity to be considered for this work. We are submitting the following narrative and supporting information in response to your Request For Proposals (RFP). We believe that our experience in Prior Lake, and the investigation that we have made in regard to these particular projects, allow us to completely understand the work that will be entailed to successfully complete the projects in partnership with your staff. As directed in the RFP, we will organize our discussions and proposals in the format specified. A. Project Understanding We perceive these street segments to have much in common with others we have done in Prior Lake and other settings. They are both existing rural sections that we will be converting to improved urban sections. Both segments will include provisions for mixed modal uses, with sidewalks and bituminous trails. While the design should be fairly straightforward, no two projects are exactly alike, and both of these segments present some challenges unique to their settings. Both will involve coordinating street work with pipe work. In addition to the storm sewer that will be constructed with the streets, sanitary sewer will be extended to Embassy Circle by others on the Pike Lake Trail segment. This means that we will need to not only coordinate the construction scheduling on this work, but also make sure that adequate provisions are made by those others for acquiring proper trench density and exact locations of the constructed facilities. This will be particularly important here since our contract will also be for extending watermain along the same corridor. The utility issues on Mushtown Road are much less significant, but there will still be a need for coordinating with adjacent developers and the Township representatives. We will want to make sure we fully understand the right-of-way that the Township presently has. If additional action is necessary on right-of-way, this will really put our schedule at risk. 9OO/252-2602.mar An Equal Opportunity Employer Mr. Greg Ilkka March 27, 1997 Page Two The N ationallnventory shows wetlands in the area of Mushtown Road. Although we do not necessarily see their presence as a major stumbling block to implementing the project, we believe that early on in the process we need to delineate them and to do enough detail design to quantify any encroachments. It seems unlikely at this point that major mitigation will be necessary, but we need to lay that issue to rest very soon in the process and to get any permit applications submitted as soon as possible. Processing time on the permit applications poses a threat to the very aggressive schedule that we are working toward. It is conceivable that we will be working with several agencies in this regard, including the Minnesota Pollution Control Agency, the Minnesota Depalllllent of Natural Resources, the Prior Lake/Spring Lake Watershed District, and the U.S. Corps of Engineers. The wetlands in the vicinity also raise our concerns slightly about soils in the area. We are very pleased that the feasibility report recognizes this possibility by including an allowance for subcutting and for the possible usage of lateral drain tile. Design on the Pike Lake Trail segment will need to be very senSItIve to minimizing slope and vegetation disruption. Fortunately, the report recognizes the need for retaining walls. We will also need to define how we will handle the slopes in more detail, early on in the process, to identify possible needs for additional right-of-way. If additional right-of-way is needed, this also puts our aggressive schedule at risk. Since both segments are existing traveled roadways, maintenance of traffic will be a concern. We will need to devise appropriate temporary measures for keeping local access in place to the maximum extent possible and practical. This will be particularly of concern on Pike Lake Trail since the ongoing work on CSAH 21 and CSAH 42 will influence travel patterns in the area. We will need to coordinate very closely with the Scott County Highway Department in this regard. Aside from these special considerations, we will need to implement the preparation of the plans and specifications following City standards . We are very familiar with City standards and procedures, so we are confident that we can complete the design and bidding process very successfully for the City. MSA will provide the plans and specifications in compatible formats. B. Organization Pursuant to our conversation of yesterday, we will not clutter this submittal with a long discussion of our experience. As you know, I am the designated principal- in-charge for Prior Lake and will have an active role in the work. Tom Kaldunski will be our project manager . We have a good group of support people who have 900/252-2602. mar Mr. Greg Ilkka March 27, 1997 Page Three completed many projects in Prior Lake and other similar cities. The Statement of Qualifications that we recently submitted discusses our experience in some detail. We would be happy to supplement that information if you feel it is necessary. c. Detailed Work Plan We have attached a detailed listing of the various work tasks that we see in the project and the hours that we estimate it will take us to complete them. This is the same list that we used on the Fish Point Road submittal. It provides a lot of detail as to the steps which we think are critical to any project, including this one. In general, our approach is to foster good communication throughout the process. We appoint one person to be our primary contact for a client. That person is responsible for making it easy for the client to get the information they need. Sometimes that means getting information themselves, or it involves facilitating direct contact with other MSA staff members. There are always back- up personnel familiar with Prior Lake. The primary contact person needs to make sure that the best arrangements are made for keeping the information flow successful. I am the primary contact person for Prior Lake on all projects. MSA has become very adept at communications with affected residents during design and construction phases of the projects. We envision our role here as assisting the City staff in supplemental meetings with land owners, since the preliminary hearing process will be complete when we become involved with the work. We have communication specialists who work with our engineers on these kinds of effort. We have previously discussed several design issues under Section A. We will give careful attention to these design issues. We have recently implemented a strengthened QA/QC process. That process involves coordination with City staff at appropriate intervals throughout the design process. It also provides for internal quality initiatives involving peer review engineers and construction inspectors for constructablility reviews. Dave Thompson will be valuable here because of his familiarity with the City and its standards. Because of the potential wetlands issues, we expect that Dave Nyberg, our water resources engineer, will also be heavily involved. Tom Kaldunski has served as the LGU representative in Farmington and he will assist with wetland issues. We believe we have all of the necessary disciplines in-house necessary to do the work. We do not envision the need to partner with any outside companies. Assuming there are not any unforeseen factors which delay the construction bid solicitation process, we envision that we will be bidding the work in a time of 900/252-2602. mar Mr. Greg Ilkka March 27, 1997 Page Four year that is not always conducive to competitive bidding. Because of that, we foresee that we may need to make special efforts to attract the interest of qualified construction contractors . We will also need to make sure we do a good job of bidder question follow-up. We may need to "sell" this job a little. Additionally, we will need to carefully scrutinize the bids that are submitted to make sure the bidders are qualified and can do our work, and that the prices bid are the best we can get. MSA has the necessary experience to ensure proper contract administration. D. Schedule The feasibility report lays out the general schedule requirements. We will work within them to the greatest extent possible. Although the schedule is very tight, we can complete the plans and specifications by the June target date. The concern will be that unforeseen right-of-way or permitting issues delay the construction bid target date. We have attached a more detailed Gantt Chart to further clarify our intent. E. Compensation The attached spreadsheet sets forth the time estimates that we have made for the various work tasks along with the hourly rates used to establish them. We think that those estimates are aggressive. In summary we propose to complete the Design Phase for a total cost to the City not to exceed $26,400. We propose to complete the Bidding Phase for a total cost to the City not to exceed $4,000. This figure does not include permit and advertising fees which we would pass through to the City at no mark-up. It does, however, include all costs for plans and specs reproduction and distribution. Once again, we thank you very much for the opportunity to be considered for your work. We believe that MSA has served the City well in the past, and we believe that we can and will do better in the future. Sincerely, M~A, C~~INEERS ~~ling, P.E. Manager of Operations CLE:tw Attachments 9OO/252-2602.mar REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES FOR PIKE LAKE TRAIL AND MUSHTOWN ROAD Introduction The City of Prior Lake is interested in receiving proposals for engineering services necessary for the design and preparation of plans and specifications for Mushtown Road and Pike Lake Trail. A feasibility report has been prepared for these projects and is enclosed. A Public Hearing on these projects is scheduled for April 7, 1997. At this meeting we will be asking the City Council to consider these projects and authorize the preparation of plans and specifications and engineering services. SCODe of Services The project will be divided into two phases, Engineering Design, and Bidding. City records and information will be made available during all phases. During the Engineering Design phase, the proposer shall: I. Perform all necessary preliminary surveying including but not limited to horizontal and vertical control, existing topography, cross sections, etc. 2. Prepare street and storm sewer construction plans and specifications. All plans shall be compatible with AutoCad version 13 in Widows 95. All specifications shall be compatible the Word 6.0 with Windows 95. 3. Prepare construction cost estimates based upon completed plans. 4. Provide a floppy disk (3 1/2") of all data and AutoCad drawings. During the bidding phase the proposer shall: 1. Prepare bid documents for public bidding process. 2. Submit and obtain approval of the plans and specifications from all required agencies. 3. Prepare the advertisement of bids, duplication and distribution of plans and specifications to bidders and respond to bidder inquiries. Attend the bid opening. All costs will be borne by the proposer. 4. Receive, analyze, and tabulate bids and make recommendations to the City for award ofbid(s). 5. Ensure proper contract execution to include insurance, bonds, etc. required by the contract specifications. ProDosal Contents Two copies of the proposal shall be received no later than 4:00 p.m. on Thursday, March 27, 1997. Submittals shall be addressed to: ,- REClJRD OF TELEPHCJNE CALL ~ f DA TE t> - 15. %. TillE ~ ~"~~'M RE: 1;>'.''', T" .... . ".'~'r(~~~J PROJECT TO :fo '\ w\... \JJ R, ~ ~Q..f"h cr Mo..r- i 'yY\.. FROM L.\A.~ 0 h.e('-~ ...J PHONE 4~O ~q~ OF -P_L - OF '7 52 ~ M lLsk +t:lwn. RJ., SUBJECT DISCUSSED '5"4 R.~/~ . ~ ~ D"~ ~ l~ :5'~ ~ 5'"~ ~~~~ ~~ ~ 1N'~ 3RO .t~&b , :r~~ ~ ~~ ~. S~ ~ '. ~ ~ ~. ~~~~~~~ ~ ~ ~ ~ ~.~ :>~ ~ e~ ~ ~k ~ ~~M~~~:~, ~ ~ o..t_A~ ~ It! ;t; ~ ~ ~~ 1)j~~ . CL: Frd.. ~<.. fJoy es o THIS RECORD TO BE RETAINED ON FILE ( \. ~ FAX~O. 81~~449448 P.Ol/0l JUL- 3-95 MON 17:19 MSf~1NSULTING ENGINEERS- j--=: ' -- ~ISl-ji __.___.__.__J IO\SlLTI\t~ nla\lUL'\ 1326 Energy Pork Dri....e 51 Paul MN 55108 612.64.4.~J89 1.800888- 2923 Fax: 612'6J.4.94.46 CIVil ENGi~~EERING-. a"VIRONMEN~ Al Ml1~I!ClP.I\L PlJ>,t~NI~~G SCUD VJASIE mumJRAl SU R', EYING T~.AFfK :R.t..NSPORTA liON me TRICAL/ MtCHANI(AL i::NGi~:tERiNG 'rll/AC :lOWER !)iSTRiBUTiON Sc..:..DA s'{~ Tc'^ CONTROL~ OFFICES IN MINNEAPOLIS PRIOR LAKE ST PAUL W ASECA DATE: ~\)L..~ b ~-S PROJECT NO.: \o'L-cnm- IrQ FAX TO: jOw0 JJ \~ COMPANY: W-\~ L~~ FAX NO.:~--!:l-4~4S FAX FROM:~u....... ~Ct'v2k._ RE: M\J':J ~' [owN ~ ~ \ '-'1~V/\ ~V~~~ ~ ~ ~ ~v\e^~ \JJf~~~ ~t)U ~B:S't.\ c:N 1\\-10 ~~O..1e;Jr: J:-, fE?p,VL CPt. L I t\'f\O 1<6~7ft~\::JS ~ ~ P~Le f12.el~ ~~Pe<- ~ ~ ^.~ ~~~ ~-r\\QN) f~0J\. SD\~ t3/~-u...)t~oW ~ :N-- 'l1\-\~ ~t.)L.D b'2j ta->f1fr~\)l~ )N \3Jf'1.--Vi>t7\\~.~ \ t~~e- j\:)~~ S<'-t:f\;:.~ ~ ~y:-r-c~~<< a=- s ~^' ~\~~'. --r1\-.e: DB/~WfB{(~~'''' ~.m::::~ \JA '0l. ~ t\'\;)~ ~ \ ,~at ~t..hY\f;J6 90"t \b tCt3f\ \E~ '\L... \A-~~ - ~~ \S ~Pf'\ \...,,~~ t~'f?- y'('(:)~ ~\. lJet~::)-r -to ~~(2~<:>,-^"':) F-.uY'-... ~. y~.) blt~'I(t'\, C\Nt:>'f ~~~(, W\\...L be. 'N~. 'L, r-~R- ~ ~~.:t.~.~~l1~J \~::::'l\{\~~~ ON \APd~~ Jv\.-'i 5 ~c D\'\-G c::DU'L--'b ~~\~Co &~-K '\0 I~ ~~-r ''''~O 'tc0 \-~f,~' I l' S-o 1 I PAGES: . (This include~ transmittal page) \ 4 (If you are experiencing problems, please contact our receptionist at 644-4389) c: \forms \msa - fax. for ;: - .;. ~. L.J E D 0 :0:: : 4 ::.:: t.! E':::: E ~ ~E: F: I ~.~ k C I) t.~ :=. T 1..=:. 1 .::: -+ ...1 7 5 I.) ::. .;:. P.Ct2 AK LAND ANY LLC ==--.,;;=====::..:::...: =_7:~-===~~==__-.,;,_ ::----:.==-:--. ----~===:.=._:=.~==.___ :.:====:-====~~~__~;='=_=....:~: .:.-=..;,;...:;.;;..........;;;..._-=.=-=--= ::;:I:t=---.;~..:.=.::--:~~--=:&.;....,,;.~;._.~ _:- ~_~.~":= ~ _~ 7/5/95 f.r O~ =\'f cr. tJ - 0 1 City of Prior Lake This is a letter regarding Mushtown Road and Brink Land Company's Wood ridge Estates Third Addition. Brink Land will be responsible to pay a minimum of $50,000.00 dollars or 1/2 of the cost of the improvement, whichever is greater if the City takes over the Mushtown Road project. We are requesting that we are allowed to construct the final plat of Woodridge Estates Third Addition this year without construction of Mushtown Road and barricade the two ends which connect to Mushtown Road until the City completes the road. Brink Land Company also requests that the City of Prior Lake improve Mushtown Road and that the project be incorporated into the 1996 CIP. Brink Land Conlpany would provide a Letter of Credit for it's share of the cost for improvement of Mushtown Road, ($50,000.00 or 1/2 of the cost, whichever is greater). The letter of Credit would be given to the City at the time the Developer's Agreement for Woodridge EstatesThird Addition was executed. If you have questions please contact me directly at 447-5058. Sincerely I John Mesenbrink Brink Land Company LLC 7765175th Street East Prior Lake, MN 55372 . Phone (612) 447-5058 fax (612) 447-5036