As part of the past Mushtown Road improvements there is one remaining item that needs
to be constructed to complete the project. There is a wooden baffled weir that is to be
installed at the end of the culvert on the west side of your driveway.
This wooden weir is a Watershed District permit requirement. I would like to meet with you
onsite to review the weir design and receive your input. Please call me at 447-9833 and
let me know what time is convenient for you.
Sincerely,
~-1.,~-
Lani L;;:hty~ ~
Water Resources Coordinator
16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
LEJ JJ:.1\.WD.DOC AN EQUAL OPPORTUNIlY EMPLOYER
.. .. III I II II I I l" - , 1-.. I ... r A I. I r ,. I I '\" _ '\ -,....... _ I" I A III I n I I I '\ I 1_ '\ "JLl-n
August 14, 1997
McNamara Contracting, Inc.
Al..lN: Kevin McNamara
5001 160th Street West
Rosemount, MN 55068
RE: PRE-CONSTRUCTION MEETING FOR 1997 IMPROVEMENT PROJECTS
FISH POINT ROAD (PROJECT 97-02), MUSHTOWN ROAD (PROJECT 95-07) AND
PIKE LAKE TRAIL (PROJECT 97-1 7)
Dear Mr McNamara:
We have scheduled the pre-construction meetings for the above mentioned projects for Friday,
August22, 1997 at the Prior Lake City Hall at the following times:
10:00 am - Fish Point Road
10:30 am - Mushtown Road
11: 00 am - Pike Lake Trail
We look forward to seeing you at the meeting. If you have any questions, please call me or Jeff
Evens.
Sincerely,
~~~
I.
Greg IlH<a
City Engineer
CITY OF PRIOR LAKE
Enclosure
16200PDagl18\(9M~RpiW81\~~.q.~or Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
-Qwarc =i. Green Com Jany
. CONSULTING ENGINEERS
IS~
CO~SJ:L TUG E.\GI\EFJIS
Formerly MSA
Consulting Engineers
July 15, 1997
File: 102074M
Paul Jubert
Northern States Power
5309 W. 70th St.
Edina, Mn 55349
Re: Pike Lake Trail, Fish Point Road, Mushtown Road
Dear Mr. Jubert:
I am enclosing copies of our Pike Lake Trail, Fish Point Road, Mushtown Road construction plans
for your review. These projects are scheduled for construction this year with an approximate
starting date of August 25, 1997.
Please call me with questions or comments.
Sincerely,
Howard R. Green Company
Joe Longtin
JL:tw
Enclosures
cc:G....",fOIy Engineer, City of Prior Lake
074-1505.jul
O:\PROJ\ 10207 4m\07 4-1505.jul.doc
1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923
I REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES FOR
PIKE LAKElKAIL AND MUSHTOWN ROAD
Introduction
The City of Prior Lake is interested in receiving proposals for engineering services
necessary for the design and preparation of plans and specifications for Mushtown Road
and Pike Lake Trail. A feasibility report has been prepared for these projects and is
enclosed. A Public Hearing on these projects is scheduled for April 7, 1997. At this
meeting we will be asking the City Council to consider these projects and authorize the
preparation of plans and specifications and engineering services.
Scone of Services
The project will be divided into two phases, Engineering Design, and Bidding. City
records and information will be made available during all phases.
During the Engineering Design phase, the proposer shall:
1. Perform all necessary preliminary surveying including but not limited to horizontal
and vertical control, existing topography, cross sections, etc.
2. Prepare street and storm sewer construction plans and specifications. All plans shall
be compatible with AutoCad version 13 in Widows 95. All specifications shall be
compatible the Word 6.0 with Windows 95.
3. Prepare construction cost estimates based upon completed plans.
4. Provide a floppy disk (3 1/2") of all data and AutoCad drawings.
During the bidding phase the proposer shall:
1. Prepare bid documents for public bidding process.
2. Submit and obtain approval of the plans and specifications from all required agencies.
3. Prepare the advertisement of bids, duplication and distribution of plans and
specifications to bidders and respond to bidder inquiries. Attend the bid opening. All
costs will be borne by the proposer.
4. Receive, analyze, and tabulate bids and make recommendations to the City for award
ofbid(s).
5. Ensure proper contract execution to include insurance, bonds, etc.. required by the
contract specifications.
ProDosal Contents
Two copies of the proposal shall be received no later than 4:00 p.m. on Thursday, March
27, 1997. Submittals shall be addressed to:
Greg Ilkka, P.E.
Director of Public Works/City Engineer
City of Prior Lake
16200 Eagle Creek Ave.
Prior Lake, MN 55372-1714
Submittals are to be delivered in a sealed envelope marked "Proposal Mushtown Road
and Pike Lake Trail". Respondents shall bear all costs and risks associated with preparing
and submitting responses to this request for proposals.
Proposals submitted for the City's consideration are required to include, but not
necessarily be limited to, the information requested in the format outlined below:
A. Project Understanding - A narrative which presents the firm's understanding of the
project requirements and any ideas the firm may have regarding specific aspects of
the project.
B. Organization - Provide background of the firm with particular emphasis on its
experience with projects of similar nature.
C. Detailed Work Plan - A detailed work plan identifying the work tasks to be
accomplished and the budget hours to be expended on each task of the two phases.
The detailed work plan is to include: The firm's overall approach to the project in
general- terms, including a discussion of the project management philosophy of the
firm and how it relates to the specific needs of the project, a detailed approach to each
phase of the project, including a discussion of the tasks to be performed and; an
identification of any disciplines that the firm intends to utilize.
D. A detailed project schedule including: identification of key tasks required to complete
the project, expected starting dates, milestone dates, and completion dates should be
identified.
E. Compensation - Compensation shall be classified into two categories. Engineering
Design , and Bidding shall be those provided at a schedule of hourly rates and
proposed with a not-to-exceed maximum project amount. An estimate of the hours
required and project budget should be presented. .
The City reserves the right to reject any or all proposals at the full discretion of the City.
- aware ~. Green Com Jany
. CONSULTING ENGINEERS
:\ISk
I
fO\~n1UC EXCIXtIBS
Formerly MSA
Consulting Engineers
July 7, 1997
File: 102-074-20 .
Mr. Greg 1.lkka
City Engineer
City of Prior Lake
4629 Dakota Street SE .
Prior Lake, MN 55372
RE: PUBLIC INPUT MEETING FOR 1997 STREET IMPROVEMENT PROJECTS
MUSHTOWN ROAD 102-073-20
PIKE LAKE TRAIL . 102-074-20
FISHPOINT ROAD 102-071-20
Dear Mr. IIkka:
This letter is intended to summarize the public input meetings that were held on Monday,
June 30, 1997, regarding the above-referenced projects. Attached is a copy of the attendance
sign-up sheet for the meeting on Mushtown Road and Pike lake Trail held from 4:00 p.m., to
7:00 p.m., at the fire station.
The following summarizes the comments received:
A) Pike Lake Trail
· Request from church for a set of the Plans.
. . Sprinkling may be necessary in new church addition for sanctuary. Modify plans to provide
6" ductile watermain, not 2" copper.
. Questions were ra;sed by church regarding their assessments for this project, answered
by City staff. The church also requested consideration for credits relating to existing
sanitary sewer. City staff reviewed policies on standard. rates for sewer charges.
. The curb cut for Mr. Wensman's property should match the proposed Development Plan.
Can be adjusted in the field as.needed.
. Wensman Development Plan may include future street with utility stubs at south end of
project. This will need to be adjusted when City approval is granted on the plat.
. Mr. Verling indicated an interest in hooking into sanitary sewer service as soon as possible
to eliminate existing holding tank. He will need a permit from the City. He also requested
the City to provide information relating to his costs related to the permit for sewer service.
1326 Energy Park Drive · St.Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free.800/888-2923
Mr. Greg IIkka
July?, 1997
Page Two
B. Mushtown Road
. Nearby resident-asked about construction traffic and dust control. Requirements on these
issues are in the-Specifications.
. 2nd.drivewayrequested by property owner (24' width). Just west of existing wetland -0-
to fit into his development plans (Station 15+25 approximately).
. Field Inspector to verify driveway locations with all property Owners on project before curb
construction. _ _ .
. Discussed potential, development plans with property owner needing three driveways to
south. Copy of Preliminary Development Plan shown by Owner. Also discuss his interest
in excess fill from street project.
. Residents asked about driveway repairs. They are to be in kind (i.e. bituminous driveway
repaired with bituminous, gravel driveway repaired with aggregate surface). -
c. Fishpoint Road - Private meeting with Developer representative at 2:30 p.m., on
June 30,1997 -
. Developer expressed interest in excess material from Mushtown project for slopes on his .
project.
. City should verify grades on existing curb - and gutter in Cardinal Ridge, as it will be
constructed in the Development before this project.
. Developer requested invitation to preconstruction meeting.
. NSP will have utility conduits to place.
These comments will be addressed as the project proceeds toward construction. Feel free to
contact me if you have any questions.
Sincerely,
ZGre~
Thomas ~nSki. P.E'. ..
T JK: pd
Attachment
. cc: Craig Ebeling, P.E.
File
074-0709.jul
- aware =i. Green Cam'Jany
CONSULTING ENGINEERS
S;0t{ . (1(.) .., s4ee--r .
-:J--;v+v / ,It Q.l.r JA/ ~ (. I'hlt,
~A J
,
i :3019 7
::'is<iJ{?;.vf /J) lPitlS/llilv-c/ x{l
, ,,} / / _I r I '
-1- f/ llu- t... /fh1!. -/ /"" I" /
:( .....-
----
(
= //;'/1#1 g;_~_._~__ A-! j'~5So,_.,,",,_.~ P;{,,v--t- ·
.~ ,KAI-()t-('</~<i . /-lJUd'U"; C/~/I.'A; ~.'w~~ &/2-- ~~ ~JK'.1
JfE-~1? 8 IA..JE/lJShlT/VAJ WZ3:A7~J ~~~~ '-/2..- 4~.s- //7~
-- I ~ - L u #oJ P rs <.. 6l..~ [15 L~. t-V\u So. H - To \o..l W ~\2:0 t. \'- - 440 - Co "Z- ~~
- - /
IJ~SU{aLA cJ-h-me~ @--It;?<rl/''J9
17~9 7Or-oAfo Ave.. 50! ro ,,..- !f f/?- ?~fi5"
. '/7.Z,h> ..~;"7~ (W '.' ....~st:.7-s:-e/3>.
/' ,'0 . ~ op,'. 'SJ- .. .-'. .:. --: 'f</f~ /.9/ j> .-:- .
-. -.' /tJ.2d~ 711' - .....tf!7' -- . ".' P-~b-:-?/~fL
_ __ e:1'~>2 ~~ /~~-D~_ ~,,"~~tP -. ....b~A-;'j.9 <~
'l/~ ~ ~ ~j' ~ /~J/o _ ,;;ce ~ 11t<_:r/ --- </'?~ -O~930 .
-mtitu~/~~)?3~U/L/-J~ 44s--h~cfO
\ A' ~~~ rl{p.Jjp ~.(>rL 11~- -. -..' 44#7-fMb11Z
-- J. A/ #A,,,,/"r/(. . /,Off) .6(vj('W-r+" ((]~-.-d/ .. {/17:.. rj/S- 3
('-
@ 1991 Franklin International Institute. Inc. White #3703 Yellow #3761 Green #3762 Pink #3763 Blue #3764 Ulac #3767 Rainbow #3;00
June 24, 1997
RE: Informational Open House
Mushtown Road Improvements Project 95-07
Dear Property Owner:
An Informational Ooen House regarding upcoming improvements to Mushtown Road
from the south edge of Maple Acres to 500 feet south of Ridgewood Court is scheduled
for Monday, June 30th, 1997 between 4:00 p.m. and 7:00 p.m. at the Fire Station at
16776 Fish Point Road. Representatives from the City of Prior Lake Engineering
Department will have preliminary drawings available for review and will be available to
answer questions. Construction is slated for late summer and fall.
This Informational Open House is intended to provide a better understanding of the
proposed improvements. Please note that this is not a Public Hearing.
If you have questions concerning the project, please call me at 447-4230.
Sincerely,
~~
Greg Ilkka
Public Works Director
CITY OF PRIOR LAKE
G:\PROJECTS\MUSH\INFOMTG.DOC
16200 Eagle Creek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
~ubmitted Proposals for the Mushtown Road I
Pike lake Trail Project
MSA
$26,400
$4,000 $30,400
Pioneer
$46,200
$3,000 $49,200
Reike Carroll Muller Associates, Inc
$27,480
$2,020+ ($400 mileage) $29,900
~
O~
~
0'9
\\~
~G
liSt
CONSULTING ENGINEERS
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
1-800-888- 2923
Fax: 612-644-9446
CIVIL ENGINEERING
ENVIRONMENTAL
MUNICIPAL
PLANNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
ELECTRICAL/ MECHANICAL
ENGINEERING
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
OFFICES IN:
MINNEAPOLIS
PRIOR lAKE
ST. PAUL
W ASECA
...-- \
r-- \ \ -e-
'1 ~ ..07
April 18, 1997
File: 102-073-53
Mr. Greg Ilkk:a
City of Prior Lake
16200 Eagle Creek Avenue SE
Prior Lake, MN 55372
RE: PREPARATION OF EASEMENTS FOR PIKE LAKE TRAIL AND
MUSHTOWN ROAD PROJECTS
Dear Mr. Ilkka:
We have reviewed the easement needs for both the proposed Pike Lake Trail and the
Mushtown Road projects and have prepared the following breakdown:
'pike Lake Trail (2 easements)
.
Research at County
Prepare Easement Descriptions
Prepare Easement Exhibits
Stake Easements for Viewing
$130.00
290.00
130.00
320.00
.
.
.
Mushtown Road
.
Six Easements Within City Limits
Research at the County
Prepare Easement Descriptions
Prepare Easement Exhibits
Project Meeting
Stake Easements for Viewing
$260.00
945.00
390.00
280.00
720.00
.
Six Easements Within Township Limits
Research at County
Prepare easement Description
Prepare Easement Exhibits
Stake Easements for Viewing
$260.00
945.00
390.00
240.00
An Equal Opportunity Employer
/'
"--
811"'-\1
- 0 -- \7
.:1
-
Mr. Greg Ilkka
April 18, 1997
Page Two
The above estimates would be billed hourly for only the items authorized by the City.
If you have any questions about the above estimates, please contact our office.
Yours truly,
MSA, CONSULTING ENGINEERS
t~{f~
FSK:tw
073-1804. apr
tc. - 1'{7Y't .KI1":) 1ft ,,/,>~~ .1 '
C J " GJ; /'r,.,A
-- 'rAf~ J
lISl
I
~ONSULH1~G ENGINEERS
1326 Energy Park Drive
St. Paul, MN 55108
612-644-4389
1-800-888- 2923
Fax: 612-644-9446
CIVIL ENGINEERING:
ENVIRONMENTAL
MUNICIPAL
PlANNING
SOLID WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
ELECTRICAL/ MECHANICAL
ENGINEERING:
HVAC
POWER DISTRIBUTION
SCADA
SYSTEM CONTROLS
OFFICES IN:
MINNEAPOLIS
PRIOR LAKE
ST. PAUL
W ASECA
~ s- 0 7
March 27, 1997
File: 900-252-00
Mr. Greg Ilkka
Director of Public Works
City of Prior Lake
16200 Eagle Creek Avenue SE
Prior Lake, MN 55362-1714
RE: PIKE LAKE TRAIL AND MUSHTOWN ROAD IMPROVEMENTS
Dear Mr. Ilkka:
Thank you very much for the opportunity to be considered for this work. We are
submitting the following narrative and supporting information in response to your
Request For Proposals (RFP).
We believe that our experience in Prior Lake, and the investigation that we have made
in regard to these particular projects, allow us to completely understand the work that
will be entailed to successfully complete the projects in partnership with your staff. As
directed in the RFP, we will organize our discussions and proposals in the format
specified.
A.
Project Understanding
We perceive these street segments to have much in common with others we have
done in Prior Lake and other settings. They are both existing rural sections that
we will be converting to improved urban sections. Both segments will include
provisions for mixed modal uses, with sidewalks and bituminous trails. While the
design should be fairly straightforward, no two projects are exactly alike, and
both of these segments present some challenges unique to their settings.
Both will involve coordinating street work with pipe work. In addition to the
storm sewer that will be constructed with the streets, sanitary sewer will be
extended to Embassy Circle by others on the Pike Lake Trail segment. This
means that we will need to not only coordinate the construction scheduling on this
work, but also make sure that adequate provisions are made by those others for
acquiring proper trench density and exact locations of the constructed facilities.
This will be particularly important here since our contract will also be for
extending watermain along the same corridor. The utility issues on Mushtown
Road are much less significant, but there will still be a need for coordinating with
adjacent developers and the Township representatives. We will want to make sure
we fully understand the right-of-way that the Township presently has. If
additional action is necessary on right-of-way, this will really put our schedule
at risk.
9OO/252-2602.mar
An Equal Opportunity Employer
Mr. Greg Ilkka
March 27, 1997
Page Two
The N ationallnventory shows wetlands in the area of Mushtown Road. Although
we do not necessarily see their presence as a major stumbling block to
implementing the project, we believe that early on in the process we need to
delineate them and to do enough detail design to quantify any encroachments. It
seems unlikely at this point that major mitigation will be necessary, but we need
to lay that issue to rest very soon in the process and to get any permit applications
submitted as soon as possible. Processing time on the permit applications poses
a threat to the very aggressive schedule that we are working toward. It is
conceivable that we will be working with several agencies in this regard,
including the Minnesota Pollution Control Agency, the Minnesota Depalllllent of
Natural Resources, the Prior Lake/Spring Lake Watershed District, and the U.S.
Corps of Engineers. The wetlands in the vicinity also raise our concerns slightly
about soils in the area. We are very pleased that the feasibility report recognizes
this possibility by including an allowance for subcutting and for the possible
usage of lateral drain tile.
Design on the Pike Lake Trail segment will need to be very senSItIve to
minimizing slope and vegetation disruption. Fortunately, the report recognizes
the need for retaining walls. We will also need to define how we will handle the
slopes in more detail, early on in the process, to identify possible needs for
additional right-of-way. If additional right-of-way is needed, this also puts our
aggressive schedule at risk.
Since both segments are existing traveled roadways, maintenance of traffic will
be a concern. We will need to devise appropriate temporary measures for keeping
local access in place to the maximum extent possible and practical. This will be
particularly of concern on Pike Lake Trail since the ongoing work on CSAH 21
and CSAH 42 will influence travel patterns in the area. We will need to
coordinate very closely with the Scott County Highway Department in this
regard.
Aside from these special considerations, we will need to implement the
preparation of the plans and specifications following City standards . We are very
familiar with City standards and procedures, so we are confident that we can
complete the design and bidding process very successfully for the City. MSA
will provide the plans and specifications in compatible formats.
B. Organization
Pursuant to our conversation of yesterday, we will not clutter this submittal with
a long discussion of our experience. As you know, I am the designated principal-
in-charge for Prior Lake and will have an active role in the work. Tom Kaldunski
will be our project manager . We have a good group of support people who have
900/252-2602. mar
Mr. Greg Ilkka
March 27, 1997
Page Three
completed many projects in Prior Lake and other similar cities. The Statement of
Qualifications that we recently submitted discusses our experience in some detail.
We would be happy to supplement that information if you feel it is necessary.
c. Detailed Work Plan
We have attached a detailed listing of the various work tasks that we see in the
project and the hours that we estimate it will take us to complete them. This is the
same list that we used on the Fish Point Road submittal. It provides a lot of
detail as to the steps which we think are critical to any project, including this one.
In general, our approach is to foster good communication throughout the process.
We appoint one person to be our primary contact for a client. That person is
responsible for making it easy for the client to get the information they need.
Sometimes that means getting information themselves, or it involves facilitating
direct contact with other MSA staff members. There are always back- up
personnel familiar with Prior Lake. The primary contact person needs to make
sure that the best arrangements are made for keeping the information flow
successful. I am the primary contact person for Prior Lake on all projects.
MSA has become very adept at communications with affected residents during
design and construction phases of the projects. We envision our role here as
assisting the City staff in supplemental meetings with land owners, since the
preliminary hearing process will be complete when we become involved with the
work. We have communication specialists who work with our engineers on these
kinds of effort.
We have previously discussed several design issues under Section A. We will
give careful attention to these design issues. We have recently implemented a
strengthened QA/QC process. That process involves coordination with City staff
at appropriate intervals throughout the design process. It also provides for
internal quality initiatives involving peer review engineers and construction
inspectors for constructablility reviews. Dave Thompson will be valuable here
because of his familiarity with the City and its standards. Because of the potential
wetlands issues, we expect that Dave Nyberg, our water resources engineer, will
also be heavily involved. Tom Kaldunski has served as the LGU representative
in Farmington and he will assist with wetland issues. We believe we have all of
the necessary disciplines in-house necessary to do the work. We do not envision
the need to partner with any outside companies.
Assuming there are not any unforeseen factors which delay the construction bid
solicitation process, we envision that we will be bidding the work in a time of
900/252-2602. mar
Mr. Greg Ilkka
March 27, 1997
Page Four
year that is not always conducive to competitive bidding. Because of that, we
foresee that we may need to make special efforts to attract the interest of
qualified construction contractors . We will also need to make sure we do a good
job of bidder question follow-up. We may need to "sell" this job a little.
Additionally, we will need to carefully scrutinize the bids that are submitted to
make sure the bidders are qualified and can do our work, and that the prices bid
are the best we can get. MSA has the necessary experience to ensure proper
contract administration.
D. Schedule
The feasibility report lays out the general schedule requirements. We will work
within them to the greatest extent possible. Although the schedule is very tight,
we can complete the plans and specifications by the June target date. The concern
will be that unforeseen right-of-way or permitting issues delay the construction
bid target date. We have attached a more detailed Gantt Chart to further clarify
our intent.
E. Compensation
The attached spreadsheet sets forth the time estimates that we have made for the
various work tasks along with the hourly rates used to establish them. We think
that those estimates are aggressive. In summary we propose to complete the
Design Phase for a total cost to the City not to exceed $26,400. We propose to
complete the Bidding Phase for a total cost to the City not to exceed $4,000. This
figure does not include permit and advertising fees which we would pass through
to the City at no mark-up. It does, however, include all costs for plans and specs
reproduction and distribution.
Once again, we thank you very much for the opportunity to be considered for your work.
We believe that MSA has served the City well in the past, and we believe that we can
and will do better in the future.
Sincerely,
M~A, C~~INEERS
~~ling, P.E.
Manager of Operations
CLE:tw
Attachments
9OO/252-2602.mar
REQUEST FOR PROPOSAL FOR ENGINEERING DESIGN SERVICES FOR
PIKE LAKE TRAIL AND MUSHTOWN ROAD
Introduction
The City of Prior Lake is interested in receiving proposals for engineering services
necessary for the design and preparation of plans and specifications for Mushtown Road
and Pike Lake Trail. A feasibility report has been prepared for these projects and is
enclosed. A Public Hearing on these projects is scheduled for April 7, 1997. At this
meeting we will be asking the City Council to consider these projects and authorize the
preparation of plans and specifications and engineering services.
SCODe of Services
The project will be divided into two phases, Engineering Design, and Bidding. City
records and information will be made available during all phases.
During the Engineering Design phase, the proposer shall:
I. Perform all necessary preliminary surveying including but not limited to horizontal
and vertical control, existing topography, cross sections, etc.
2. Prepare street and storm sewer construction plans and specifications. All plans shall
be compatible with AutoCad version 13 in Widows 95. All specifications shall be
compatible the Word 6.0 with Windows 95.
3. Prepare construction cost estimates based upon completed plans.
4. Provide a floppy disk (3 1/2") of all data and AutoCad drawings.
During the bidding phase the proposer shall:
1. Prepare bid documents for public bidding process.
2. Submit and obtain approval of the plans and specifications from all required agencies.
3. Prepare the advertisement of bids, duplication and distribution of plans and
specifications to bidders and respond to bidder inquiries. Attend the bid opening. All
costs will be borne by the proposer.
4. Receive, analyze, and tabulate bids and make recommendations to the City for award
ofbid(s).
5. Ensure proper contract execution to include insurance, bonds, etc. required by the
contract specifications.
ProDosal Contents
Two copies of the proposal shall be received no later than 4:00 p.m. on Thursday, March
27, 1997. Submittals shall be addressed to:
,-
REClJRD OF TELEPHCJNE CALL
~
f
DA TE t> - 15. %. TillE
~ ~"~~'M
RE: 1;>'.''', T" .... . ".'~'r(~~~J
PROJECT
TO :fo '\ w\... \JJ
R, ~ ~Q..f"h cr Mo..r- i 'yY\..
FROM L.\A.~ 0 h.e('-~
...J
PHONE 4~O ~q~
OF -P_L -
OF '7 52 ~ M lLsk +t:lwn. RJ.,
SUBJECT DISCUSSED
'5"4 R.~/~ . ~ ~ D"~ ~
l~ :5'~ ~
5'"~ ~~~~ ~~ ~
1N'~ 3RO .t~&b ,
:r~~ ~ ~~
~. S~ ~ '. ~
~ ~.
~~~~~~~
~ ~ ~ ~ ~.~ :>~ ~
e~ ~ ~k ~
~~M~~~:~,
~ ~ o..t_A~ ~ It! ;t;
~ ~ ~~ 1)j~~
.
CL: Frd.. ~<.. fJoy es
o THIS RECORD TO BE RETAINED ON FILE
(
\.
~
FAX~O. 81~~449448
P.Ol/0l
JUL- 3-95 MON 17:19
MSf~1NSULTING ENGINEERS-
j--=: '
--
~ISl-ji
__.___.__.__J
IO\SlLTI\t~ nla\lUL'\
1326 Energy Pork Dri....e
51 Paul MN 55108
612.64.4.~J89
1.800888- 2923
Fax: 612'6J.4.94.46
CIVil ENGi~~EERING-.
a"VIRONMEN~ Al
Ml1~I!ClP.I\L
PlJ>,t~NI~~G
SCUD VJASIE
mumJRAl
SU R', EYING
T~.AFfK
:R.t..NSPORTA liON
me TRICAL/ MtCHANI(AL
i::NGi~:tERiNG
'rll/AC
:lOWER !)iSTRiBUTiON
Sc..:..DA
s'{~ Tc'^ CONTROL~
OFFICES IN
MINNEAPOLIS
PRIOR LAKE
ST PAUL
W ASECA
DATE: ~\)L..~ b ~-S
PROJECT NO.: \o'L-cnm- IrQ
FAX TO: jOw0 JJ \~
COMPANY: W-\~ L~~ FAX NO.:~--!:l-4~4S
FAX FROM:~u....... ~Ct'v2k._
RE: M\J':J ~' [owN ~ ~
\
'-'1~V/\ ~V~~~ ~ ~ ~ ~v\e^~ \JJf~~~
~t)U ~B:S't.\ c:N 1\\-10 ~~O..1e;Jr: J:-, fE?p,VL
CPt. L I t\'f\O 1<6~7ft~\::JS ~ ~ P~Le f12.el~
~~Pe<- ~ ~ ^.~ ~~~
~-r\\QN) f~0J\. SD\~ t3/~-u...)t~oW ~
:N-- 'l1\-\~ ~t.)L.D b'2j ta->f1fr~\)l~ )N
\3Jf'1.--Vi>t7\\~.~ \ t~~e- j\:)~~ S<'-t:f\;:.~ ~
~y:-r-c~~<< a=- s ~^' ~\~~'. --r1\-.e:
DB/~WfB{(~~'''' ~.m::::~ \JA '0l. ~ t\'\;)~ ~ \ ,~at
~t..hY\f;J6 90"t \b tCt3f\ \E~ '\L... \A-~~ - ~~
\S ~Pf'\ \...,,~~ t~'f?- y'('(:)~ ~\. lJet~::)-r
-to ~~(2~<:>,-^"':) F-.uY'-... ~. y~.) blt~'I(t'\,
C\Nt:>'f ~~~(, W\\...L be. 'N~. 'L, r-~R-
~ ~~.:t.~.~~l1~J \~::::'l\{\~~~ ON \APd~~
Jv\.-'i 5 ~c D\'\-G c::DU'L--'b ~~\~Co &~-K
'\0 I~ ~~-r ''''~O 'tc0 \-~f,~' I
l' S-o 1
I
PAGES:
. (This include~ transmittal page)
\
4
(If you are experiencing problems, please contact our receptionist at 644-4389)
c: \forms \msa - fax. for
;: - .;. ~. L.J E D 0 :0:: : 4 ::.:: t.! E':::: E ~ ~E: F: I ~.~ k C I) t.~ :=. T
1..=:. 1 .::: -+ ...1 7 5 I.) ::. .;:.
P.Ct2
AK LAND
ANY LLC
==--.,;;=====::..:::...: =_7:~-===~~==__-.,;,_ ::----:.==-:--. ----~===:.=._:=.~==.___ :.:====:-====~~~__~;='=_=....:~: .:.-=..;,;...:;.;;..........;;;..._-=.=-=--= ::;:I:t=---.;~..:.=.::--:~~--=:&.;....,,;.~;._.~ _:- ~_~.~":= ~ _~
7/5/95
f.r O~ =\'f cr. tJ - 0 1
City of Prior Lake
This is a letter regarding Mushtown Road and Brink Land Company's
Wood ridge Estates Third Addition.
Brink Land will be responsible to pay a minimum of $50,000.00 dollars
or 1/2 of the cost of the improvement, whichever is greater if the City
takes over the Mushtown Road project. We are requesting that we are
allowed to construct the final plat of Woodridge Estates Third Addition
this year without construction of Mushtown Road and barricade the two
ends which connect to Mushtown Road until the City completes the
road.
Brink Land Company also requests that the City of Prior Lake improve
Mushtown Road and that the project be incorporated into the 1996
CIP. Brink Land Conlpany would provide a Letter of Credit for it's
share of the cost for improvement of Mushtown Road, ($50,000.00 or
1/2 of the cost, whichever is greater). The letter of Credit would be
given to the City at the time the Developer's Agreement for Woodridge
EstatesThird Addition was executed.
If you have questions please contact me directly at 447-5058.
Sincerely I
John Mesenbrink
Brink Land Company LLC