HomeMy WebLinkAbout10A - Deerfield Ind. Park
CITY COUNCIL AGENDA REPORT
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
MEETING DATE:
AGENDA #:
PREPARED BY:
APRIL 19, 2004
lOA
JANE KANSIER, PLANNING COORDINATOR
AGENDA ITEM:
CONSIDER APPROVAL OF A RESOLUTION APPROVING
THE PRELIMINARY PLAT TO BE KNOWN AS DEERFIELD
INDUSTRIAL PARK
DISCUSSION:
History: Deerfield Development has applied for a Preliminary Plat for
the property located east of Fish Point Road, on the east side of the
Deerfield Development and south of Cottonwood Lane and Adelmann
Street. The preliminary plat consists of 60.93 acres to be subdivided
into 6 outlots for future development.
On March 17, 2003, the City Council approved an amendment to the
Comprehensive Land Use Plan Map redesignating 6.14 acres of this
site as C-CC (General Business) and 13.35 acres as I-PI (Planned
Industrial). On May 5, 2003, the Council also approved and
amendment to the Comprehensive Plan Land Use Map redesignating
4.25 acres to R-HD (High Density Residential). These amendments
were subsequently approved by the Metropolitan Council. On July 7,
2003, the City Council adopted an ordinance rezoning the property
consistent with the Comprehensive Plan Amendment. The property is
now zoned R-4 (High Density Residential), C-4 (General Business), C-
5 (Business Office Park) and 1-1 (Industrial).
Under State Statutes, the size of this development triggered the
preparation of an Environmental Assessment Worksheet (EA W). The
City hired a consultant to prepare the EA W. The EA W was published
and mailed to all of the necessary parties in November, 2003. The 2
potential impacts identified by the EA W included storm water and
traffic. The City Council reviewed these impacts and determined there
are measures that can be taken by the developer to mitigate the
potential impacts. On January 20, 2004, the City Council reviewed the
EA W and determined there was no need for further environmental
review, because all potential impacts were mitigated.
Current Circumstances: The Planning Commission held a public
hearing on April 12, 2004 to consider this application. Mr.
1:\03 files\03 subdivisions\03 prelim plat\deerfiel~._<lp<n8rl~lt~..~
Page 1
Phone 952.447.4230 / Fax 952.447.4245
Mesenbrink was present at the hearing, but chose not to speak on the
record. Since the hearing, he has submitted the attached information
packet asking that it be shared with the City Council. If the Council
waives the fee as requested, then the veracity of the EA W may be
impacted and additional environmental work may be required,
including the possibility of an Environmental Impact Statement (EIS).
The Planning Commission recommended approval of the preliminary
plat, without the benefit of this information.
Total Site Area: The total site consists of approximately 60 acres.
TOPo2raphy: Most of the site drains towards a wetland on the west
side of the site. A small portion of the site drains towards the wetland
along the east boundary.
Vef,!etation: This property is primarily vacant pasture. There are
existing trees located on the west side of the site.
Wetlands: The site is subject to the provisions of the State Wetland
Conservation Act. Prior to any grading on the site, the developer must
submit a wetland mitigation plan for approval by the City Council.
Access: Access to this property is presently from CSAH 87 along the
east property line. There is also an easement on the private streets in
the Deerfield development on the south side of the site that provides
access to the 4.25 acre parcel. This private street and easement will be
platted as part of Deer field 12th.
Adjacent Land Use and Zoninf,!: To the north of this property is the
Norex property, zoned C-5 (Business Office Park). West and south of
this property is the Deerfield development, zoned R-2. To the east is
an industrial building, zoned 1-1 (Rural Industrial) on the Scott County
Zoning Map.
PROPOSED PLAN:
Lots: The preliminary plat consists of 60.93 acres to be subdivided
into 6 outlots. Outlot A is zoned C-4 (General Business) and is
intended for future commercial uses. Outlots B and D are zoned C-5
(Business Office Park), and are intended for future business office park
uses. Outlot C is zoned R-4 (High Density Residential) and is
intended for future residential use. Outlot E is zoned 1-1 (Industrial)
and is intended for future industrial development. Outlot F is
primarily wetland area, located south and west of the rest of the
preliminary plat. This outlot is zoned A (Agricultural).
There are no specific development plans for any of the lots. In order to
be developed, the outlots must be platted as lots.
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc
Page 2
Streets: This plan proposes three new public streets. Adelmann Street
is extended 2,700 feet from CSAH 87 to the north boundary of this
property. As proposed, Adelmann Street is designed with an 80' wide
right-of-way and a 36' wide surface. In order to connect this new
street with the existing Adelmann Street, an additional 300' of street
must be constructed over City property from Cottonwood Lane to the
north boundary of the Deerfield property.
The second street is a 260' long cul-de-sac located on the south side of
Adelmann Street. This cul-de-sac is designed with a 66' wide right-of
way and a 32' wide surface. This street serves land zoned 1-1. The
City Engineer notes that the design of the cul-de-sac must be reviewed
in order to ensure there is enough room for trucks to turn around in the
cul-de-sac.
The third new street is a connection between Adelmann Street and the
property in the northeast comer of this site (Prior Lake Blacktop
property). This street is also designed with a 66' wide right-of-way
and a 32' wide surface. The preliminary plans indicate this street will
be constructed in the future. The staff believes this connection should
be constructed with the other public improvements in the Deerfield
Industrial Park.
SidewalkslTrails: There are no sidewalks or trails proposed as part of
this development.
Parks: There are no parks identified within this site. The developer
has proposed to dedicate Outlot F to meet the parkland dedication
requirements. This outlot is primarily wetland, but there is an island
located at the southeast comer. The staffhas some concerns about the
use of this area for park, due mainly to the fact that there is no access
to the island from either this plat or through property in the City limits.
The staff will continue to investigate this proposal. In lieu of land,
however, parkland dedication requirements for this site will be
satisfied by a cash dedication. The amount of cash dedication is based
on the net acreage multiplied by $5,000.00 per acre. In this case, the
4.25 acres zoned residential will be removed from the net acreage.
The parkland dedication for the 4.25 acres will be determined on a per
unit basis at the time of development.
Sanitary Sewer and Water Main: Sanitary sewer and water main
will be extended from the existing utilities located at Adelmann Street
and Cottonwood Lane. These utilities must be extended across City
land to the Deerfield property.
Storm Sewer: This plan is designed to direct stormwater runoff to a
series of NURP ponds throughout the site. The Engineering
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc Page 3
.........'....,.",.... ., ....'"~"','...._,~,.*,. e_"~"".,,'~' O_~" ,_.._...... .~..~"____...'~',""_,,'m.. ..,.,.. ____'_A'__~_""'~..__.,.....~.___ .,~.
Department has reviewed the stormwater management plan submitted
by the developer. The plan will require some additional calculations
prior to grading the site.
Wetlands: There are approximately 3.5 acres of wetland scattered
throughout this site. The applicant has requested an exemption for
about 1.7 acres of these wetlands, based on past history of drainage
and other incidental recreation of these wetlands. This exemption has
been approved by the Technical Evaluation Panel. Of the remaining
wetlands, slightly less than 1 acre is proposed to be impacted by roads
and fillings. The applicant is proposing to mitigate these impacts on
site and by use of wetland credits. Prior to any grading on the site, the
City Council must approve a wetland mitigation plan.
Tree Replacement: The developer has submitted a Tree Preservation
Plan which identifies 943 caliper inches of significant trees on the site.
The plan indicates that 281 caliper inches, or 30%, will be removed for
site development. The Zoning Ordinance allows a total of 25% of the
caliper inches of significant trees to be removed for the development
of roads, utilities and drainageways. The ordinance also allows an
additional 25% of the significant caliper inches to be removed for
building pads and driveways. The plan submitted by the developer
does not include a breakdown of what will be removed for initial
development and for building site development. The plan must be
revised to include this breakdown, and, if necessary, a tree replacement
plan must be submitted.
Landscape Plan: The Subdivision Ordinance requires two
subdivision trees per lot. As each lot is developed, additional
landscaping may be required to meet other provisions of the Zoning
Ordinance. These plans will be required at the building permit stage.
The developer has not submitted a landscaping plan for this project.
Lots: The preliminary plat consists of 12.25 acres to be subdivided
into 25 lots for single family residential development, and 1 outlot.
The proposed lot areas range from 11,997 square feet to over 21,000
square feet (net area).
Finance/Assessment Fee Review: This development is subject to a
collector street fee, a storm water management fee, a parkland
dedication fee, and a trunk sewer and water charge in addition to the
escrow amount for the CSAH 21 improvements. These fees are
outlined in the attached memorandum from the Finance Director. Fees
are collected as part of the Development Contract, and are only
collected on platted lots, not outlots. If the final plat consists only of
outlots, as shown on the preliminary plat, no fees would be collected
on these outlots until they are replatted as lots. The fees collected at
that time will be those in effect at the time each outlot is replatted.
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc
Page 4
"'_'_~'''''.+<..''e,_'''', _~_..N,.__".,__..h._'" ,......",....... .....',,~~">._._ ,.,.. ",'_,'<. _, ,"'".._........~...~,"_"'.._.~___---..'-"
EA W Findin2s: The major issues identified in the EA W and in the
comments submitted pertain to the runoff generated by this
development, specifically, the impact on Markley Lake, and the
impacts of the traffic generated by the development.
The infrastructure needs, storm water management needs and wetland
mitigation were all analyzed and determined based on the maximum
build-out of the site, per the City of Prior Lake Zoning Ordinance.
Any further subdividing of the project site would not create any
additional infrastructure needs, impervious surfaces or additional
storm water management needs. Therefore, all cumulative impacts
have been analyzed.
The storm water management of the project site has been designed to
hold any runoff to levels consistent with predevelopment. The storm
water management plan and the site drainage plan for the site meet or
exceed the requirements of the City of Prior Lake including:
· Storage capacity to accommodate all runoff from the I-year, 24-
hour rainfall event and have capacity to infiltrate all runoff from
said event within 72 hours.
· No increase in runoff volume from the site for the 100-year event.
· All runoff treated prior to discharge into infiltration area.
· Utilize conservation infiltration rates in the design that will reflect
infiltration rate reductions over the lifetime of the basin.
· The Developer and City will enter into a monitoring agreement and
implement a monitoring program to demonstrate that the
infiltration basins continue to provide adequate infiltration capacity
in the future, monitoring results will be submitted and reviewed
annually by the City, and the Developer will enter into a
maintenance agreement with the City that outlines their
responsibilities for monitoring and maintenance with regard to the
operation of the storm water management system.
These provisions are required of all development within the Markley
Lake drainage area prior to final approval.
The other major issue identified by the EA W is the impact of the
traffic generated by the development. The EA W has determined the
potential traffic generated as a result of this development will impact
the turning movements on CSAH 21. Specifically, the turning
movements from CSAH 21 onto CSAH 87 as a result of this
development will pose safety issues and generate the need for a left-
turn lane at this location. Scott County was provided the opportunity
to review both the EA W and the preliminary plat. In a letter dated
January 7, 2004, the Scott County Highway Department notes the turn
lane is necessary to alleviate the safety impacts. In order to mitigate
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc
Page 5
this impact, the developer will be required to escrow funds for the
construction of left-turn lane at CSAH 21 and CSAH 87. This was
included as part of the City Council findings for the negative
declaration on the need for additional environmental review.
However, the County does not feel the developer should be responsible
for the full cost of this improvement. Scott County is therefore
requesting the developer place in escrow $125,000 for this
improvement. This amount is equal to one-half the cost of the
improvement. The escrow will be collected as part of the development
contract.
This project is also subject to permit review and approval from several
other agencies, including the Minnesota Pollution Control Agency,
Scott County Highway Department and the Minnesota Department of
Health. These permits will assess the impacts of the project based on
current statutes. These permits will only be issued after a negative
declaration on the EA W, and after City approval of the development.
The Issues: In general, the proposed preliminary plat meets the
standards of the Subdivision Ordinance and Zoning Ordinance. The
issues raised by the EA W are addressed in both the plat and the
development contract. Any changes to either document could
necessitate an EIS. In addition to the issues raised by the EA W, there
are some engineering and ordinance requirements which still must be
addressed prior to approval of this preliminary plat.
The first issue is the extension of Adelmann Street, sewer and water
across City property from Cottonwood Lane to the north property line
of the Deerfield property. The City developed the Waterfront Passage
Business Park in 1993. Even though the City's Subdivision Ordinance
required the extension of streets and utilities to the adjacent property
boundary, the City chose not to extend Adelmann to the south at that
time, probably because the property was not within the City limits.
In 1998, the developer discussed the options for extending Adelmann
to the Deerfield property boundary with the City Council. The
Council at that time agreed to pay 50% of the cost of the construction
of this infrastructure, up to $38,036.00.
In order to build the Deerfield Industrial Park, Adelmann Street, and
the corresponding utilities must be extended across City property. The
City staff believes this extension should be completed with this
development, and the City should participate in the cost. The level of
City participation is ultimately determined by the City Council.
Conclusion: The Planning Commission concluded the proposal met
the requirements for a preliminary plat, subject to the following
conditions:
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc
Page 6
1. Adelmann Street and the corresponding utilities must be extended
across City property to the north property boundary as part of this
development.
2. The minimum right-ofway dedication for CSAH 87 must be 60'
from the centerline. Left and right turn lanes must also be
constructed on CSAH 87.
3. The developer must provide $125,000 for the construction of a left
turn lane on CSAH 87. This amount will be placed in escrow as
part of the development contract with the final plat.
4. A wetland mitigation plan must be approved by the City Council
prior to any grading on the site.
5. The developer must submit revised stormwater runoff calculations
to the City for review and approval prior to any grading on the
site.
6. Revise the Tree Preservation Plan to include a breakdown of the
percentage of caliper inches removed for roads, utilities and
drainageways, and for building pads and driveways, and if
necessary, submit a tree replacement plan. This work must be
completed prior to any grading on the site.
7. Provide a landscaping plan for the subdivision trees with the final
plat application. Separate landscaping plans will be required as
part of the development application for each individual lot.
8. Submit all of the necessary permits and approvals from other
agencies, including Minnesota Department of Health review for
wa term a ins, MPCA permits for sanitary sewer, and Scott County
permits for construction activity in the Scott County right-of-way.
9. The following comments in the memorandum from Larry Poppler,
Assistant City Engineer, dated Apri/5, 2004 (see attached) must be
addressed as part of the final plat application:
General
(a) Provide a geotechnical report and pavement section
calculations.
b) Design plans shall follow the requirements of the Public Works
Design Manual.
c) Plan sheets should be sized to be 22" x 34".
d) The line types are too similar to each other. Revise line types.
Utilities
e) A 12" watermain located at the north end of Deerfield 12th
must be connected to the watermain on Adelmann Street.
f) Use 8" sanitary sewer stubs out of manholes.
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc
Page 7
g) Provide sewer and water to the lot at the northeast corner
(RLS 98).
h) Use environmental manholes, 3' sumps, at the last structure
which is road accessible prior to discharge into any water
body.
i) Use RCP for all storm sewer, since it is future parking is not
yet determined.
j) Show gate valves at Adelmann and CSAH 87.
k) Provide 8" watermain to the property to the northeast.
I) Provide water service to the property south of the Prior Lake
Maintenance Center.
Streets
m) Provide a 36' wide street width face of curb to face of curb and
80 feet of right of way.
n) Show typical section for the roadway, including B618 curb and
gutter, right of way line, and trail. The thickness of the
pavement section may need to be increased due to the proposed
commercial loading.
0) Build roadway to property in northeast corner (RLS 98).
p) Check cul-de-sac dimensions. Larger cul-de-sacs may be
necessary to accommodate trucking. Show radii for cul-de-
sacs.
q) Show trail or sidewalk on the south side of Adelmann.
r) Show drainage and utility easement for the wetland adjacent
C-5.
Wetland Plan Comments
s) Wetlands E, F, and H were determined to be exempt per the
Wetland Conservation Act Notice of Decision dated October
16, 2003. However, Wetlands E and F are exempt provided
that the drain tile within these wetlands is maintained. Based
on these plans, it does not appear that they are maintaining the
drain tile. If this is the case, the fill would not be allowed
under the exemption permit.
t) Wetland fill of non-exempt wetlands is proposed on the plans.
A sequencing discussion, including avoidance and
minimization alternatives, needs to be completed along with a
Replacement Plan Application. Based simply on the plans, it
appears that much of the wetland impact could be avoided or
minimized.
u) We have concerns that the 12-foot deep NURP pond (Pond II)
has the potential to drain the existing adjacent Wetland G and
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc
Page 8
FISCAL IMPACT:
ALTERNATIVES:
a portion of Wetland D. Information regarding this potential
needs to be included in the permit application.
v) Wetland replacement is not shown on the plans. A replacement
plan application needs to be developed discussing wetland
mitigation.
w) A 30-foot buffer around the existing wetlands needs to be
shown on the plans in conformance with City Standards.
x) Show elevations of the existing wetlands.
Hydrologic/Hydraulic, Water Quality, and Grading Comments
y) Please specify that slopes greater than 4:1 shall have erosion
control blanket installed immediately after finished grading.
Maximum grades of 4: 1 are required in maintained areas.
Provide note stating the benchmarks for the site.
z) A rock construction entrance must be installed on the site
during construction. Show location on the plan.
aa) Please include a storm sewer profile with the final plan.
bb) Skimmer structures shall be installed at the outlet of all NURP
ponds. Please include details of these structures with the plan.
cc) All NURP ponds shall have a defined EOF that has been
protected against erosion.
dd) Maintenance hard surface access routes shall be defined for all
treatment ponds.
ee) The erosion control fence should be extended to the north of
block 1 lot 1.
ff) Grading plan incomplete for the northeast corner of outlot B.
gg) Show calculations for a infiltration / storage system that has
the storage capacity to accommodate at least all runoff from 1
year 24 hour rainfall event. This system should also have the
capacity to infiltrate all runoff from the 1 year runoff event
within 72 hours. Show that the infiltration rates proposed are
consistent with the soil types.
hh) NURP Pond II shall be a minimum of one foot higher than the
HWL of the pond (show contour / spot elevation)
Bud/{et Impact: The construction of new dwellings will provide
additional tax base to the City.
The City Council has three alternatives:
1. Adopt a resolution approving the Preliminary Plat for this
development subject to the listed conditions with the finding that
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc
Page 9
RECOMMENDED
MOTION:
REVIEWED BY:
the preliminary plat is consistent with the intent and purpose of the
Zoning and Subdivision Ordinances.
2. Deny the Preliminary Plat on the basis it is inconsistent with the
purpose and intent of the Zoning and Subdivision Ordinances
and/or the Comprehensive Plan. In this case, the Council should
direct the staff to prepare a resolution with findings of fact for the
denial of this request.
3. Defer consideration of this item for specific reasons, and to a
specific date.
Staff recommends Alternative #1.
A motion and second to approve a resolution approving the Preliminary
Plat to be known as D rfield Industrial Park, subj ect to the listed
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\deerfield cc.doc
Page 10
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
RESOLUTION 04-XX
RESOLUTION OF THE PRIOR lAKE CITY COUNCil APPROVING THE PRELIMINARY PLAT OF
"DEERFIElD INDUSTRIAL PARK" SUBJECT TO THE CONDITIONS OUTLINED HEREIN.
MOTION BY:
SECOND BY:
WHEREAS: The Prior Lake Planning Commission conducted a public hearing on October 13, 2003 to consider
an application from Deerfield Development for the preliminary plat of Deerfield Industrial Park; and
WHEREAS: Notice of the public hearing on said preliminary plat has been duly published and posted in
accordance with the applicable Minnesota Statutes and Prior Lake Ordinances; and
WHEREAS: All persons interested in this issue were afforded the opportunity to present their views and
objections related to the preliminary plat of Deerfield Industrial Park for the record at the Planning
Commission hearing; and
WHEREAS: The Planning Commission and City Council have reviewed the preliminary plat according to the
applicable provisions of the Prior Lake Zoning and Subdivision Ordinances and found said
preliminary plat to be consistent with the provisions of said ordinances; and
WHEREAS The Prior Lake City Council considered an application for preliminary plat approval of Deerfield
Industrial Park on April 19, 2004; and
WHEREAS: The City Council finds the preliminary plat of Deerfield Industrial Park to be consistent with the
provisions of the Zoning and Subdivision Ordinance, subject to the listed conditions.
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCil OF THE CITY OF PRIOR lAKE,
MINNESOTA:
A. The above recitals are incorporated herein as if fully set forth.
B. The preliminary plat of Deerfield Industrial Park is approved subject to the following conditions:
1) Adelmann Street and the corresponding utilities must be extended across City property to the north
property boundary as part of this development.
2) The minimum right-of-way dedication for CSAH 87 must be 60' from the centerline. Left and right turn
lanes must also be constructed on CSAH 87.
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\platres.doc
www.cityofpriorlake.com
Page 1
Phone 952.447.4230 / Fax 952.447.4245
3) The developer must provide $125,000 for the construction of a left turn lane on CSAH 87. This amount
will be placed in escrow as part of the development contract with the final plat.
4) A wetland mitigation plan must be approved by the City Council prior to any grading on the site.
5) The developer must submit revised stormwater runoff calculations to the City for review and approval
prior to any grading on the site.
6) Revise the Tree Preservation Plan to include a breakdown of the percentage of caliper inches removed
for roads, utilities and drainageways, and for building pads and driveways, and if necessary, submit a
tree replacement plan. This work must be completed prior to any grading on the site.
7) Provide a landscaping plan for the subdivision trees with the final plat application. Separate landscaping
plans will be required as part of the development application for each individual lot.
8) Submit all of the necessary permits and approvals from other agencies, including Minnesota Department
of Health review for watermains, MPCA permits for sanitary sewer, and Scott County permits for
construction activity in the Scott County right-of-way.
9) The following comments in the memorandum from Larry Poppler, Assistant City Engineer, dated April 5,
2004 (see attached) must be addressed as part of the final plat application:
General
a. Provide a geotechnical report and pavement section calculations.
b. Design plans shall follow the requirements of the Public Works Design Manual.
c. Plan sheets should be sized to be 22" x 34".
d. The line types are too similar to each other. Revise line types.
Utilities
e. A 12" watermain located at the north end of Deerfield 12th must be connected to the watermain
on Adelmann Street.
f. Use 8" sanitary sewer stubs out of manholes.
g. Provide sewer and water to the lot at the northeast corner (RLS 98).
h. Use environmental manholes, 3' sumps, at the last structure which is road accessible prior to
discharge into any water body.
i. Use RCP for all storm sewer, since it is future parking is not yet determined.
j. Show gate valves at Adelmann and CSAH 87.
k. Provide 8" watermain to the property to the northeast.
I. Provide water service to the property south of the Prior Lake Maintenance Center.
Streets
m. Provide a 36' wide street width face of curb to face of curb and 80 feet of right of way.
n. Show typical section for the roadway, including 8618 curb and gutter, right of way line, and trail.
The thickness of the pavement section may need to be increased due to the proposed
commercial loading.
1:\03 fi1es\03 subdivisions\03 prelim plat\deerfield indus park\platres.doc
Page 2
o. Build roadway to property in northeast corner (RLS 98).
p. Check cul-de-sac dimensions. Larger cul-de-sacs may be necessary to accommodate trucking.
Show radii for cul-de-sacs.
q. Show trail or sidewalk on the south side of Adelmann.
r. Show drainage and utility easement for the wetland adjacent C-5.
Wetland Plan Comments
s. Wetlands E, F, and H were determined to be exempt per the Wetland Conservation Act Notice of
Decision dated October 16, 2003. However, Wetlands E and F are exempt provided that the drain
tile within these wetlands is maintained. Based on these plans, it does not appear that they are
maintaining the drain tile. If this is the case, the fill would not be allowed under the exemption
permit.
t. Wetland fill of non-exempt wetlands is proposed on the plans. A sequencing discussion,
including avoidance and minimization alternatives, needs to be completed along with a
Replacement Plan Application. Based simply on the plans, it appears that much of the wetland
impact could be avoided or minimized.
u. We have concerns that the 12-foot deep NURP pond (Pond II) has the potential to drain the
existing adjacent Wetland G and a portion of Wetland D. Information regarding this potential
needs to be included in the permit application.
v. Wetland replacement is not shown on the plans. A replacement plan application needs to be
developed discussing wetland mitigation.
w. A 3D-foot butter around the existing wetlands needs to be shown on the plans in conformance
with City Standards.
x. Show elevations of the existing wetlands.
Hydroloaic/Hydraulic, Water Quality, and Gradina Comments
y. Please specify that slopes greater than 4:1 shall have erosion control blanket installed
immediately after finished grading. Maximum grades of 4:1 are required in maintained areas.
Provide note stating the benchmarks for the site.
z. A rock construction entrance must be installed on the site during construction. Show location on
the plan.
aa. Please include a storm sewer profile with the final plan.
bb. Skimmer structures shall be installed at the outlet of all NURP ponds. Please include details of
these structures with the plan.
cc. All NURP ponds shall have a defined EOF that has been protected against erosion.
dd. Maintenance hard surface access routes shall be defined for all treatment ponds.
ee, The erosion control fence should be extended to the north of block 1 lot 1.
ft. Grading plan incomplete for the northeast corner of outlot B.
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\platres.doc
Page 3
gg. Show calculations for a infiltration I storage system that has the storage capacity to
accommodate at least all runoff from 1 year 24 hour rainfall event. This system should also have
the capacity to infiltrate all runoff from the 1 year runoff event within 72 hours. Show that the
infiltration rates proposed are consistent with the soil types.
hh. NURP Pond" shall be a minimum of one foot higher than the HWL of the pond (show contour I
spot elevation)
Passed and adopted this 19th day of April, 2004.
Haugen Haugen
Blomberg Blomberg
LeMair LeMair
Petersen Petersen
Zieska Zieska
YES NO
{Seal} Frank Boyles, City Manager
1:\03 files\03 subdivisions\03 prelim plat\deerfield indus park\platres.doc
Page 4
.,..,..._,_.-.;,~.,.~.' >,...,'...._'--...-"-...,.'._~,~,..,".,.~...._......
caBlE GEEk
r rY2 ~.\.).J..'j\
_.Al- ~~ . \ 1h.:..~
- r c~pJ.V
<j)e,vf,L. I
rm1:~&-~~~ _~"l'
Ii L, 'i ;
I t I (' I '
lih\, R 4m
I Ii \ \\.
U Ui
" .
~J
April 14, 2004
City of Prior Lake
16200 Eagle Creek Blvd. SE
Prior Lake, MN 55372
To Whon1 It May Concern:
This letter is to let our feelings known on the fee of $125,000 for the possible upgrade of
the intersection of CR21 & CR87 regarding our possible development of the Deerfield
Industrial Park. We have no problems doing the upgrades on CR 87 and Adelmann
Street per county specifications supplied to our engineers, Rehder & Associates, to be
installed at the time of cOlmection to Adelmann Street.
Regarding the $125,000 fee for CR 21 & CR 87, we feel the fee is unfair for a few
reasons. The study that was done was based on an assumed number of tenants in our
park which could probably never be reached. The fee is paid only by Eagle Creek
Development but the road and intersection is used by the City of Prior Lake with the
extension of Adelmann Street from its own industrial park and the ten acres the city is
annexing only has access through Adelmann to CR 87. There was no mention of a fee
from them. Also we do not know of any other individuals along CR 21 that were charged
fees for upgrading that county road. There also is a collection street fee that we pay as
part of our final plat. Why can't a portion of that be used if the city feels this fee should
be paid?
Regarding the park dedication fee, we propose to exchange land in lieu of monetary
payment for the fee in which there was support from the public and plmming commission
at the April 1 ih meeting. .
7765 East ~ 7,S[~ St~eet · F'....cr La~\2. \!:r-l :~~2:-: )
-, ......-,.....
-'......C:-2 -:.:.~..~- -,-, '!-.-.
) - '-~~ ,;-,: ..= . "~'~ ~ . 5:~:-= 6
EagLE C~EEk
, rp-c~1f
- r ",1:%":.)"-" . "~
'])e-O~ I
Attached for your review is a breakdown of the fees the City of Prior Lake proposes to
assess Eagle Creek Development for the industrial park project. Also enclosed is a
drawing of the changes the county is proposing for the CR 87 & Adelmann Street
intersection.
These are all essential to making the industrial park a viable project. If you have any
questions, please contact me at (52) 447-5058.
-~'
.....- '- ....,(...'"
......,J _...:;:....:.:;t
-Str ..~tr26t l <-~;{:,r '_2:(3.
i:~: "": ..:..
=:, ;-, ': ;-'2.;'52 ~...l.l7 - .S()f:8 · .="3.:~?5= .~--tJ. -.,::C'-26,
-'''''''''''0,_,.......",,_..,....__,., " ..__~....~."~....,.,~....,..,..,'._
..0.--, .,,'
.T--<--'. - !! ,I. r.--r-r----rr--l--r~.-r-:--r-r-',;----t---r- .
I : I I : I ; : ' : I : I Ii, !
I 'I I" ~ i i .1 ! ' I i---l
-- I -H, I 'I' .! I, ~I "-" :,. t I, I' ,-+, .'!
Ii' , ! i :: --r Ii! ; : , I I ~
I I ! I ; : I I , : 1"""--1 'f~-r -i~-"" ,;,
, I I I , I I I ' ~" I; ,
1++11: I +-i~--+-+---r-+--~-+~'-fi
. . ! : : .' I ; iI, ! 'tl
t,' II!ii;----t- ;.
I I H-i I I; i: i' i i
R II TI -r-! I I - \-11..' r~"
I ,,!! i I r I
1 I , ! ! 1 I ,jf--''-- / I I ~
- I, ! 'I I, TI / J' ~,.
i W I I AI ~
j , I 11 ~ '17J~ ~
I It! I 1.,1 /f I -t+~
'.i' I I i I J it1 I !,~}\
I i I 1..'-1 :;::~
I I ., I ! J. ~~ '0"
I !!!~ ''''- I
: ! I ! t _,) I"""" /'
I ~ ~~
.. ~~ I , I
~~I~~ ~r.
I
--
I
"'
!
I
I
I
i
1
I
!
!
I
I
i
""
-~rI
ll'
"j
!
, tot
.~
~~
1\
...
I
!
I f--t1 ~
T "--1 I
'I ,
I I .,
I ".
H ~I :t-n
ni-Ij-I-f
! I / I
I
I
! i
I , I
I !,
, l-+t
-+
, I
I
I I I
----r--tI
I
i
.1
I
I I I'~"", i
i~ I II
r! I I ~
! I i I 0
I ' I I I -;:.. 1/
I i il V
V
.
1: ! I / "'"
! I '" I
I 17 \ I
;r i --r-t- ~ I I\~T
I I ! v ! \;,;.
'1 I i 1i1 i
:j 1 T \ "_~
I !: I 1;' I I I
n I ~ I \ I
~ I I --... ~ _.~" ..-- -f..-- _h.. --.- ___
I~
I~
~
lQ
;1
!
Ii
N
,
,
,
v~
I
~
Nor ~ 0 (" Il". L.
,
I
1
I
!
I
I
!
I
i
n.'
I
, II
I I. I
I
lit.
I J
~ I 'i
/~' I
/ ~'----~-
, \"
/.
./
:it
(}.
'+
.....
~,.
I
I
I
..
..
fA
-::
I
i
!
I
I
!
r I
I I
i
! I
4
I !
i i
I
I
I
t
I
I
I
-+
;
1
!
I
i I
I I
I I
I I I I ,! I I
I. "i. I I I !! I !!!
l' -- i I I ; I I! I i -! i
~ I !! TI I! i :
I :} I T I I I I I I 1 I I
->--. I :: , I I I
.:4 ~ ! i ,I i II I ! !: i
~ ~ i I !,' +- ! I I
I -:. I ,'I --r-+---j---"-:-'~-
g f ! J~-_. ! i _~ ! ! !_-_J_-_
~ ~ ! l ' i: i;!',
h~__"_ ~--' --~--~---~" ,~-~._---_.~____L_~----r--'-'----
i
I '-' I I
~! !
-1 I ' '~ . I i
I I I I ,'" ,', ,i i
I !: I , i I ! I
-Til~l~~~lll!! I
~ I i & !~ In P.- Iii Ii!
I 111 ~ IY-' ~ ~ ! I, I, Ii I ,. )~.
~: ~!.J~el I I
'Ii ill, Itr-r if !-! I !, I! I ;
, . !~--+~-+f---+. i ! i I.
- I I :, ~;~ ! !: I, I I I! !, It! ';\ I
'4--~_ ~ ~ .-- ,. I I ; I 6 I
I : ~~ ~ '--t- I I I; :A i
! : : 110 it'''P! I !: i ,- ,
--1---__ ' !f,'" i--r1\-~,.c.- : I I I : ! i J _ -Et
I I I !-= ~ ,~ ,"; : I I I I i ~ 'f
+~ ' .~ r- ;-+ i~: : : : + -1 ~
-1-.L------.-------.~____-_L---. _______;_h____~_~__ j ~
4-_l_~"" J_ -~_u__ 'J:'._ _
-oJ
I
I
I
!
oS'
.~
I
, ,
-.--.. - .----.-.... -.-.-.-.--....--.------..----- .-.... - ._.._...:..--.__._.._-_.._~.-:-....---~_. --
, .
INTEROFFICE lVIEMORANDUM
TO:
FROM:
RE:
DATE:
PLANNING/ENGINEERING
Ralph Teschner, Finance Director
DEERFIELD INDUSTRIAL PARK - preliminary plai
(assessment/fee review) .
June 2, 2003
A 60.93 parcel (PIN" #25912 001 0) in Section 12-114-22 is proposed to be developed' into an
industrial office park. The property currently is NOT served with mumcipal sewer and water
utilities.
At the time municipal utilities become available the subdivision will be subject to the following
,~ity charges:
Park Dedication Fee
Collector Street Fee
Stormwater Management Fee'
Trunk Sewer'& Water Fee
$2670.00/unit (R-4)/5000.00/acre (C-5)
$1500.00/ acre
$4856.00 (R-4)/$6092.00/acre (C-5)
$3500.00/acre
. Park Dedication:
R-4 units @ $2670.00/unit = subject to number of units
56.2-1 acres @ $5000.00/ac = $281,050.00
. .
Collector Street Fee:
60.46 acres @ $1500.00/ac = $90,690.00
Storm Water Mana2ement Fee:
4.25 acres @ $4856.00/ac = $20,638.00
56.21 acres @ $6092.00/ac = $342,431.0q
Trunk Sewer & Water Char2e:
60.46 acres @ $3500.00/ac = ~211,610.00
Assuming the initial net lot area of the fInal plat does not change, the above referenced storm
water, collector street, trunk and lateral sewer and water charges would be determined and
collected within the context of a developer's agreement for the construction of utility
improvements at the time of fmal plat approval.
. There are no other outstanding special assessments currently certified against the property. Also,
the tax status of the property is current with no outstanding delinquencies.
16200 Eagle Creek Ave. S.E.. Prior Lake. Minnesotcl .55372-1714 / Ph. (952) 447-4230 / Fax (952) 447-4245
LOCATION rv1AP FOR
DEERFIELD INDUSTRIAL PARK
PRELl MI NARY PLAT
(f
'-.........~--....
Location of
Deerfield: Industrial. Park
1000
o
1000 Feet
I
N
+
._..-<...-,. '... ',' ,-- -,,, ,- "_~'" .-',....".._ -, ...,.."".,._. -.,..~_q..~ "-"_',,~"'...w-~""~'''>__'_____
o
CD
CD
-u:;
m92..
==~
3-
--:J
::J~
Ole
~~
-u ::J_
-0)
Ol-
r-+-u
Q)
..,
"
c
w
~
N
.. Z
~
.S
.t ~
~ .1J
! f~
. a
t t~
~J ~.t
e!l e~
J: 13
i
Ihl J-'! .1
II z!{~,~,O!~il
/! l.J,i~J~~ 1
~ j~U-'!II!-
~ -j.l!IJ~~u
~ '~!ijl!H
f zil11101z
'---- Hj~H~-!f.!!
--~:.::;.- u~fh;J I
~-
.. ~
Iii il-
Ut j.l!I
fh 2j ~ tli
pJ.'! i ~ I~i~ I
sUj .. ~ l~i
hi i' 1 '5..
>>o.-.~ t' -:I!~-
ii!: .. ~ J!id
r~: i; ;1111
JS'll II i ",:1.::.
--~~>:.~
"'- -(I1W_.:r_
cS j
.s "
~I! ;
... I ...
.5l . ~
a ~ J -
~'! .
~ 6 i
S If
" ~ j
i J
It I
I ,,~ j-'!
J~.!:t:! !il_f~
ulJ;l..~lej
l~~J;-~lll..i
- j.3~__ ..~z
lh nH ~h
1 h~~ll~ihJ
IU:!I ~ict!
I "!~lj s
l~~lt~1 !!!
htlhJ~~lfJ
llJh~lblh .
~
oX
/:t~ 1~.
- -/- -f";--
lr/. . ~~ /1- ~'
t J~ J I Q::"t I J..
l~ HJ /' I oS' I 0:.. .:}'
~1lij I ~:~ I O\!_
i:! J~ · I 1... I ."J;
j II'" ~1- J.. .{:Y
11'~1
.s:-
I ~"t /
I ~ j/--",,__ ....,.
I ~.), (:~>--"""
~"t I~' I
I ~ / '- ,/
1<:) \' I
j.l,(
I 1// \~ '
/ 9'J"t :/ " .<t' / ,-
:!~'_____~~; ; I I
/, "
~
~
.....J
:s
~~
t;~
ct-.J
~~
.Ii
.1; :3
l~
~
ffi
Q
I
I
y;
I 1\
/ ~-:
J' \ \ I'
r..... \ ...
, r-
,,,.''' ....1
_t:;
" .
- - -\ .
('':'"
I 'r:--
'1 ~-L~---;
_ -.".:' ' r-
~ ',\ 1(--
" ,,',\' \" ~'II
", \ \,
o~
C{)
\
\
\
\
,
\
\
\
\
\
#-.
I ,
l....._~/ / '"
......., I I
I '
/ I
/~____b~\
r ".. I,
\ \" CJ/ :
~ " \ \ : t
I
I "
\ ,
\ ---,
" \'U
\\ ,:
, I /
I / I
I / /
__:~//I//
-- ,
, I
~~1_1
I
I
I
"
,--,
\ \
'- -'
....--------
~-.
rtnJ ff
J!!i~ill\
!f'u1J
I 1~&J.
J~"CCI
~ 1IIIi.l
~111 1 l
;! J I j
i IMilll
itJ1'lil
fl ltf'
l!~dJ.J
.:;--
:~;
I'
a
,
thh ~ 1 !Ill ~,,' U)
:!ul.\i~~ J:!"i~ lilj~~ :---
I Zth(l~"m& ubi]'Ia1ml::'>
~ :~H~litI Hj~!j!~hI UJ
~ ~ . j'l'lH &Aj ~~lhH
i I!Hifi'l 1 IJ~hl~i!'1 CC
~ J~~ill'1 t J JH1~~ii~t J
'IJk'fl!" 'a~~lt~i~a!"
ilh~i~lfJ i t'li' '~-f.
dd!u ~j!h;dd I
- Z
.' c .
Jt II
; .jJ
- l f
I ~.. 9
. a
I ~ t. t:
ell 'a~ 'at
R ~i ~5
J_ )3
(~)
~::
~-,...
:. :,'
~~~
::; A,'
, .
I
%' I
r
I
of'
cJ
~]. .s :
i!~ j 1 ! I
II~ iJ a I, ~
i-~ J - !. ~
f!; i Ii i ~ I ~
{Iii i V Ihs, ~ j ~ i
~ J 1 ~ -Ii ~ I !
i..1 t c ~l ~~ S I J
{il i! dil ,,~i
!;~ l! iH!! I
~ ~
I
~ _...--1.
.....J ':)
S -_I
15~ -,~ 0
......
l~ -.~:.
~~ ())
.; ,"-
-""" i 1
.1;9
l~ .....
(.')
I~
ffi --. ~I
-'- ji
......
~ Ii
J:!
,~...~ II
I...:~ fil \ I I
:z I .........
gR........ ............
~ I ......... I
; : ;~:;;;;; ;.:::: ~~::::::'. ,',: & ~h~~~~~
_ .I.u..!:.
~ I ............
I . ..............
i ! :~~~~:;;;~:~~~~::::::=:~::;~::::::::::::::
_ _". _;""",,!i;iUnUIUilU'::
I V
I rJiO. I
I ~ I
I () I
I ~ /
/ (j /
i .I
i ~ ./
,I ~ll
i 0 ,/
I ~ /
i """ '
I Q;)~l
" ~ "
/ I
/
I
I
,.'
"
'\" ;'
;t
;;~
(, "
):: '
/1\
i ;. "-~-'.
'<~~\\. ':"
,,,,,",'! .
..
i I i
1111. Ii
a Ii I .
S h~ 11111
., I I
i I I I
il!!I!1
~ i r I I .!
8 I I
~! a I !
f'
a
f-
a
~
I ~ i II
! lInn
'i'l .
f I I I
1 h I. If
'iB :{I .1
hu I II
Hli ~!!
.ullI1~
fUJlhPI
i'1Jjtl fl.t
~ I;;I~ _If!1
Idtll!kt~,1
~! i.l II t 1
Ihll!I! II!
, ,~tl ~~t
e ee ee e
~r
11
It
Ji
Jf
I!!
,f I
.Jj
~ ; II
!it
IrJ
Ji
88
!I ! I I :ill
I Ill!l!iill I! I Illl!!!!I!
~ Illi!llllilll!'!!!!!I!!~!I'!'~
1 t I DO [J t t t ! I : II -II I : i I I I ! .
.'~I~J . ii: '
I
~~
~~
~~
U
~~
~ill
~i
~
~~
fit
~
!...
I
I
I
I
i
-....-.L._._
r ,J(:~t~1151
,-
.....:-'
~~.'
-z____
1')1 ~
I ~ I
L:
r~-j ~
"'"
=
=
('-J
('..J
.
.1 !i
..~Il jt ~
lhJ I
~!IL
..~J!i i
~J U ~
. I
~r
;i
it
,l
100
-J
S
~~
o~
cs:-.J
~~
0--
.5
.SQ
~cj
o.:G:
E5
~
z
~
~
,;-,,-
I,' I
r - -/- -f ~ '
j~-J - -1,:;- j- q~
)1 I I ..:~., / "', --
:11 I,;ll '. I
I;] I / :~..' / /'. 1- I
j!l I ,/ I ..::.. .:.;" I
1/ <""~;I- I /.. c. ' l.
.>:-' "
11 /" I J I., ·
/ ..i~?~
/ :(' /
I I~l 1..
.},' j.
/ ,:..' I
/ (t'/: "
/ ...lY,'{ I;
~. f .~(' \ tJo I. ,
,. " \ I ~I I,
,"'- ~ :.': r
,;," . ~I I
II (l
t .
\ \ .
i -, \..
1\
\ \
\ \
\ ":':
. ~,' ~ \ ,
I' : :,:
.' .....,
,r-
~~ ~
~, ~
I....:. .
(~..\
. \
I
1-., :
,
i
\
'~),' ,
,
. ,.
~:~ '0'
f..
/' .
\
\
~ I
1/
f-.'
I' \,. ~
, .
:CX3jW"J
! I
~U
I-~
0:
i::!~
::l:l
o~
~,
\ n~
,
I
,
DATE: April 5, 2004
TO: Jane Kansier, Planning Coordinator
FROM: Larry Poppler, Assistant City Engineer
cc: Bud Osmundson, Public Works Director
RE: Deerfield Industrial (City Project #03-40)
The Engineering Department has reviewed the Preliminary Plat for the subject project
and we have the following comments:
General
1. Provide a geotechnical report and pavement section calculations.
2. Design plans shall follow the requirements of the Public Works Design Manual.
3. Plan sheets should be sized to be 22" x 34".
4. The line types are too similar to each other. Revise line types.
Utilities
1. A 12" watermain located at the north end of Deerfield 12th must be connected to
the watermain on Adelmann Street.
2. Use 8" sanitary sewer stubs out of manholes.
3. Provide sewer and water to the lot at the northeast corner (RLS 98).
4. Use environmental manholes, 3' sumps, at the last structure which is road
accessible prior to discharge into any water body.
5. Use RCP for all storm sewer, since it is future parking is not yet determined.
6. Show gate valves at Adelmann and CSAH 87.
7. Provide 8" watermain to the property to the northeast.
8. Provide water service to the property south of the Prior Lake Maintenance
Center.
Streets
1. Provide a 36' wide street width face of curb to face of curb and 80 feet of right of
way.
L:\03 Files\03 Subdivisions\03 Prelim Plat\Deerfield Indus Park\review3 040504.DOC
"..-..,.. '..-..,_.,,_. ....".,.,,~-'~.,."'-'...'~~-"............---
2. Show typical section for the roadway, including B618 curb and gutter, right of way
line, and trail. The thickness of the pavement section may need to be increased
due to the proposed commercial loading. .
3. Build roadway to property in northeast corner (RLS 98).
4. Check cul-de-sac dimensions. Larger cul-de-sacs may be necessary to
accommodate trucking. Show radii for cul-de-sacs.
5. Show trail or sidewalk on the south side of Adelmann.
6. Show drainage and utility easement for the wetland adjacent C-5.
Wetland Plan Comments
1. Wetlands E, F, and H were determined to be exempt per the Wetland
Conservation Act Notice of Decision dated October 16, 2003. However, Wetlands
E and F are exempt provided that the drain tile within these wetlands is
maintained. Based on these plans, it does not appear that they are maintaining
the drain tile. If this is the case, the fill would not be allowed under the exemption
permit.
2. Wetland fill of non-exempt wetlands is proposed on the plans. A sequencing
discussion, including avoidance and minimization alternatives, needs to be
completed along with a Replacement Plan Application. Based simply on the
plans, it appears that much of the wetland impact could be avoided or minimized.
3. We have concerns that the 12-foot deep NURP pond (Pond II) has the potential
to drain the existing adjacent Wetland G and a portion of Wetland D. Information
regarding this potential needs to be included in the permit application.
4. Wetland replacement is not shown on the plans. A replacement plan application
needs to be developed discussing wetland mitigation.
5. A 30-foot buffer around the existing wetlands needs to be shown on the plans in
conformance with City Standards.
6. Show elevations of the existing wetlands.
Hydrologic/Hydraulic, Water Quality, and Grading Comments
1. Please specify that slopes greater than 4: 1 shall have erosion control blanket
installed immediately after finished grading. Maximum grades of 4: 1 are required
in maintained areas. Provide note stating the benchmarks for the site.
2. A rock construction entrance must be installed on the site during construction.
Show location on the plan.
3. Please include a storm sewer profile with the final plan.
2
4. Skimmer structures shall be installed at the outlet of all NURP ponds. Please
include details of these structures with the plan.
5. All NURP ponds shall have a defined EOF that has been protected against
erosion.
6. Maintenance hard surface access routes shall be defined for all treatment ponds.
7. The erosion control fence should be extended to the north of block 1 lot 1.
8. Grading plan incomplete for the northeast corner of outlot B.
9. Show calculations for a infiltration / storage system that has the storage capacity
to accommodate at least all runoff from 1 year 24 hour rainfall event. This system
should also have the capacity to infiltrate all runoff from the 1 year runoff event
within 72 hours. Show that the infiltration rates proposed are consistent with the
soil types.
10. NURP Pond II shall be a minimum of one foot higher than the HWL of the pond
(show contour / spot elevation)
11. Replace detail 5/C2 with the City of Prior Lake standard plate #410.
12. Drainage areas for NURP Pond calculations do not match areas in the model.
3
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
INTEROFFICE MEMORANDUM
TO:
FROM:
RE:
DATE:
PLANNING/ENGINEERING
Ralph Teschner, Finance Director
DEERFIELD INDUSTRIAL PARK - preliminary plat
(assessment/fee review)
April 7, 2004
A 60.93 parcel (PIN #25 912 001 0) in Section 12-114-22 is proposed to be developed into an
industrial office park. The property currently is NOT served with municipal sewer and water utilities.
At the time municipal utilities become available the subdivision will be subject to the following City
charges:
Park Dedication Fee
Collector Street Fee
Stormwater Management Fee
Trunk Sewer & Water Fee
$2670.00/unit (R-4)/5000.00/acre (C-5)
$ 1500.00/acre
$4856.00 (R-4)/$6092.00/acre (C-5)
$7130.00/acre
Park Dedication:
R-4 units @ $2670.00/unit = subject to number of units
56.21 acres @ $5000.00/ac = $281,050.00
Collector Street Fee:
60.46 acres @ $1500.00/ac = $90,690.00
Storm Water Mana2ement Fee:
4.25 acres @ $4856.00/ac = $20,638.00
56.21 acres @ $6092.00/ac = $342,431.00
Trunk Sewer & Water Char2e:
60.46 acres @ $7130.00/ac = $431,080.00
CSAH 21/87 Turn Lanes (50%)
Developer share = $125,000.00
Assuming the initial net lot area of the fmal plat does not change, the above referenced park
dedication, storm water, collector street, trunk sewer and water charges and turn lane improvement
share would collected within the context of a developer's agreement for the construction of utility
improvements at the time of fmal plat approval.
These estimated fees would be collected upon phasing of the development. The cost of the turn lanes
could be prorated based upon the phasing stages of the development as well but would be subject to a
requirement that they are fully paid at the time the CSAH 21 turn lane improvements are constructed.
www.cityofpriorlake.com
H: \SP LlTS\Deerfiel di ndustriaJ. doc
Phone 952.447.4230 / Fax 952.447.4245
SCOTT COUNTY PUBLIC WORKS DIVISION
HIGHW A Y DEPARTMENT, 600 COUNTRY TRAIL EAST. JORDAN, MN 55352-9339
(952) 496-8346 . Fax: (952) 496-8365 'www.co.scott.mn.us
LEZLlE A. VERMILLION
PUBLIC WORKS DIRECTOR
BRADLEY J. LARSON
COUNTY HIGHWAY ENGINEER
December 19, 2003
Jane Kansier
City of Prior Lake
16200 Eagle Creek Avenue
Prior Lake, MN 55372
RE: Deerfield Industrial Park EA W / Updated Plat Comments
CSAH 21 and CR 87
Dear Jane:
We have reviewed the EA W for the Deerfiela Industrial Park, and the traffic study that was completed for the
development, and offer the following comments:
General
1. The City and County are in the process of studying CSAH 21 from CSAH 82 through CR 87 to ultimately
define the future conceptual design of CSAH 21. The results of that study will have an impact on the roadway
system in the area. This study however is not expected to be complete until the summer of 2004.
2. Has the City looked at extending right-of-way to the southern property line to preserve a future local street
connection? Even though the City may not currently have plans to develop to the south, preserving options for
developing an interconnected system of local streets is critical in ultimately developing a safe and efficient
system of roadways.
3. The minimum right-of-way dedication for CR 87 shall be 60 feet from centerline. This is not reflected on the
proposed preliminary plat.
Traffic
4. A County access permit shall be required for the proposed Adelman Street onto CR 87. All other access to the
property shall be removed from the County right-of-way. A right turn lane and a left turn lane will be required
to be installed as a condition of the permit to ensure turning traffic generated by this development is safely
accommodated. A left turn lane and right turn lane on CR 87 were not mentioned in the EA W.
5. The study recommends that traffic signal control be installed at the CSAH 21/CR 87 intersection in conjunction
with the proposed development. This recommendation is based on the 2010 analysis. Just as with all County
intersections, a traffic signal here will not be installed until traffic conditions throughout the day indicate that a
signal will improve the overall operation of the intersection and the road system. This intersection will
therefore be monitored as this development adds trips to this intersection, and as traffic on CSAH 21 increases.
We would not install a signal at this location without first resolving the issue of the proximity of the 170th Street
intersection to CR 87. This issue will be dealt with as part of the CSAH 21 study currently underway. We also
would not install a signal at this location without left turn lanes being installed on CSAH 21.
C:\Documents and SettingsVane\Local Settings\Temporary Internet Files\OLK4\PLdeerfield1.doc
"'"". ...~.".,.. '""'-''''''''''''''"'--~'.'-'''--~'-
Deerfield EA W
Page 2
6. The study identified a level of service problem at the Adelman Street intersection, and recommends two options
for dealing with this issue. This intersection again will be evaluated as part of the CSAH 21 study. We do not
believe the options are limited to those recommended in the study. A full-access unsignalized intersection will
also be considered. Because the local street system here will be interconnected to both CR 87 and Fish Point
Road, traffic will have options based on traffic conditions throughout the day.
7. The study includes capacity and signal warrant analyses, but does not include any intersection safety analyses.
To safely accommodate turning traffic at the new intersection proposed on CR 87, left and right turn lanes will
need to be installed. At the CSAH 21 & CR 87 intersection, the 2010 projections show major left turning
impacts due to the development. In the am peak hour, left turns increase from 8 vehicles to 254. In the pm
peak hour, left turns increase from 46 to 136. Without left turn lanes at this intersection, these movements will
have a major impact on the safety of this intersection. We would like to work cooperatively with the City and
the developer to develop a plan for making the improvements necessary to ensure a safe intersection. It is
critical that this be done before the plat is approved and the development moves forward.
Thank you for the opportunity to comment. We look forward to meeting with you to discuss the CSAH 21 / CR 87
turn lane issues. If you have any questions, please feel free to contact me.
Sincerely,
Brian K. Sorenson, PE
Transportation Engineer
Email: Craig Jenson, County Transportation Planner
Randy Ronning, County Right-of-way Agent
Sue McDermott, City of Prior Lake
"'''''''''''_l<>>" '--,' -.. "~'_"~"''''m "h ._....,., _..-........,.,4',..,_...... ."~.qh,,,.....'..........,_
SCOTT COUNTY PUBLIC WORKS DIVISION
HIGHW A Y DEPARTMENT. 600 COUNTRY TRAIL EAST. JORDAN, MN 55352-9339
(952) 496-8346 . Fax: (952) 496-8365 'www.co.scott.mn.us
LEZLIE A. VERMILLION
PUBLIC WORKS DIRECTOR
BRADLEY J. LARSON
COUNTY HIGHWAY ENGINEER
January 7, 2003
Jane Kansier
City of Prior Lake
16200 Eagle Creek Avenue
Prior Lake, MN 55372
RE: Deerfield Industrial Park Preliminary Plat
CSAH 21 and CR 87
Dear Jane:
Thank you for meeting with us regarding our concerns with the traffic impacts related to the Deerfield Industrial
Park development. We are writing to further clarify our request noted in comment #7 of our December 19 letter for
this development.
In our December 19 letter, we noted that at the CSAH 21 & CR 87 intersection, the 2010 projections show major
left turning impacts due to the development. Without turn lanes at this intersection, these movements will have a
major impact on the safety of this intersection. We do acknowledge however that it would not be fail'to require the
developer to be responsible for the full cost of such improvements. We also feel it would be premature to design
and construct such improvements until the CSAH 21 Corridor Study is completed and its recommendations can be
incorporated into these intersection improvements.
Weare therefore requesting that the city require the developer to escrow half the amount of these improvements.
Our current estimate for constructing left and right turn lanes at this intersection is $280,000, so the escrow amount
would be $140,000. We would anticipate such improvements to be part ofa project currently in our 5-Year Capital
Improvement Program for 2008.
If you have any questions, please feel free to contact me.
Sincerely,
Brian K. Sorenson, PE
Transportation Engineer
Email: Craig Jenson, County Transportation Planner
Lezlie Vermillion, Public Works Director
Sue McDermott, City Engineer
C:\Documents and SettingsVane\Local Settings\Temporary Internet Files\OLK4\PLdeerfield-escrow.doc
Jane Kansier
From:
Sent:
To:
Cc:
Subject:
Sorenson, Brian [BSorenson@co.scott.mn.us]
Wednesday, March 17, 2004 9:53 AM
'Jane Kansier'
Jenson, Craig; IIkka, Gregory; Goblirsch, Greg
Deerfield Industrial Park
t & Lt Turn Rough
Est.xls (30...
Jane-
I'm writing to follow-up to our January 7 comment letter and to our February 20th meeting with the developer. We have
now developed a more detailed cost estimate for the intersection improvements for the CSAH 21 & CR 87 intersection that
are in part necessary due to the expected traffic impacts of the Deerfield Industrial Park development.
Our earlier cost estimate for this intersection was $280,000, however, this was a general estimate and was not specific to
the CSAH 21 & CR 87 intersection itself. Attached is a cost estimate specific to the installation of right and left turn lanes
at the CSAH 21 & CR 87 intersection which takes into account the specific items and quantities necessary to complete such
work at this particular intersection. The total estimate now comes to $250,000.
As you recall, we are requesting that the developer be required to set aside 50% ($125,000) of the intersection
improvement costs. As we indicated in our January 7 letter, this intersection improvement project should be coordinated
with the implementation of the CH 21 Study recommendations.
Please call or email me if you have any questions regarding this estimate.
Brian K. Sorenson P.E., P.T.O.E.
Transportation Engineer
Scott County Public Works
600 Country Trail East
Jordan,~~ 55352
Phone: 952-496-8060
Fax: 952-496-8365
<<Rt & Lt Turn Rough Est.xIs>>
1
CSAH 21 and Co Rd 87
INTERSECTION IMPROVEMENTS
TOTAL
SPEC. UNIT ESrO EST'O
NO. ITEM UNIT PRICE QUANT. AMOUNT
2021.501 MOBILIZATION LUMP SUM 7,500.00 1 7,500.00
2104.501 REMOVE CONCRETE CURB & GUTTER L1N FT 2.00 4,584 9,168.00
2105,501 COMMON EXCAVATION (P) CUYD 2.00 4,000 8,000.00
2123.509 DOZER HOUR 110.00 40 4,400.00
2123.601 STREET SWEEPER (WITH PICKUP BROOM) HOUR 100.00 36 3,600.00
2211,503 AGGREGATE BASE (CV) CLASS 5 MODIFIED (P) CUYD 16.00 3,276 52,410.67
2232.501 MILL BITUMINOUS SURFACE SQYD 10.00 509 5,093,33
2350.501 TYPE MV 3 WEARING COURSE MIXTURE (C) TON 32.00 476 15,246.59
2350.502 TYPE MV 3 NON WEARING COURSE MIXTURE ( C ) TON 30,00 635 19,058,23
2350.502 TYPE LV 3 NON WEARING COURSE MIXTURE (B) TON 27,50 953 26,205.07
2501/2503 STORM SEWER REVISIONS LUMP SUM 40,000.00 1 40,000.00
2521.511 3" BITUMINOUS WALK SQFT 1.30 8,261 10,739.30
2573.502 SILT FENCE HEAVY DUTY L1N FT 2,00 4,430 8,860.00
2573.520 SEDIMENT REMOVAL BACKHOE HOUR 175.00 9 1,575,00
2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 600.00 4 2,400.00
2575.501 SEEDING (P) ACRE 150,00 2.95 443.22
2575.502 SEED MIXTURE 250 POUND 3.00 207 620,51
2575,505 SODDING TYPE LAWN SQYD 2.25 14,302 32,179,13
2575,511 MULCH MATERIAL TYPE I TON 150.00 6 900,00
2575,519 DISK ANCHORING (P) ACRE 50.00 2.95 147.74
2575.532 COMMERCIAL FERTILIZER ANALYSIS 22-5-10 POUND 0,18 2,068 372,24
TOTAL $ 248,919.02
TOTAL COSTS FOR ESTIMATING PURPOSES $ 250,000.00
C:\Docurnents and Settings\JanelLocal SettingslTernporary Internet FileslOLK41Rt Lt Turn Rough Est.xls
3/17/2004