Loading...
HomeMy WebLinkAboutContract Documents December 22, 1992 Mr. Dean Pearson WESTSTAR CURB & CONCRETE, INC. Central Avenue Box 201 Watkins, MN 55389 RE: FINAL ESTIMATE PROJECT #92-11 Dear Dean: Enclosed are four (4) copies of the final estimate for Project #92-11. Please review and sign if you agree with these figures. You may retain one (1) copy for your records. If you do not agree with these figures, please call me as soon as possible as this final payment a~proval is scheduled for the January 4, 1993 city council Meet1ng. .~ 51... ncerelY~/ / . C-~.?-~ Doug Hartman Engineering Technician CITY OF PRIOR LAKE DH:jlp Enclosures 4629 Dakota St. S.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER r .1:_ -fiT r ---r -"L- - CONSTRUCTION PAYMENT VOUCHER Date: Auqust 11, 1992 Project Number: For Period Ending: Auqust 11, 1992 92-11 Estimate Voucher No. 1 Construction of Concrete Sidewalk and Appurtenant Work on Franklin Trail from the Southerly Instersection of T.H. 13 to the Northerly Intersection of T.H. 13. Class of Work For: city of Prior Lake To: West Star Curb & Concrete Central Avenue, Box 201 Watkins, MN 55389 Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 88 % com~leted as of, Auqust II, 1992 I hereby recommend payment of JhiS voucher. Project Engineer Approval : r~~ This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this.vouchen . Contractor: ;)rLSf SfAr Curb <f(bl1(~igned By !?~>1 ~ <;(-/9- 9:;2 Title: Ytlc-'?~ /!~/~ ~. Autliorized Representative A. Original Contract Amount B. Total Additions C. Total Deductions $ $ $ $ D. Total Funds Encumbered E. Total Value of Work Certified to Date F. 5.0% G. H. Less Retained Percentage Less Total Previous Payments Approved for Payment, This Report I. J. Total Payments Including This Voucher Balance Carried Forward APPROVALS Date: CITY OF for Payment Date: $~).J1L , , 54,491.80 0.00 0.00 54,491.80 $ $ $ $ $ $ 47,859.44 2,392.97 0.00 45,466.47 45,466.47 9,025.33 CONSTRUCTION PAYMENT VOUCHER Estimate Voucher No. 1 For Period Ending: Project Number: Auqust 11, 1992 92-11 Construction of Concrete Sidewalk and Appurtenant Work on Franklin Trail from the Southerly Instersection of T.H. 13 to the Northerlv Intersection of T.H. 13. Contractor: Signed By Title: Date: Auqust 11, 1992 For: city of Prior Lake To: West Star CUrb & Concrete Central Avenue! Box 201 Watkins, MN 55389 Date: CITY OF 54,491.80 0.00 0.00 54,491.80 $ $ $ $ $ $ 47,859.44 2,392.97 0.00 45,466.47 45,466.47 9,025.33 Class of Work A. original Contract Amount B. Total Additions c. Total Deductions D. Total Funds Encumbered $ $ $ $ Pursuant to our field observation, as performed in accordance with our contract, we hereby certify that the materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 88 % com~leted as of, AUQUst 11, 1992 I hereby recommend payment O.f tgis ~oUCher. project Engineer Approval: ~~. ~ U This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by this voucher. E. F. G. H. I. J. Total Value of Work Certified to Date Less Retained Percentage 5.0% Less Total Previous Payments Approved for Payment, This Report Total Payments Including This Voucher Balance Carried Forward APPROVALS Payment Authorized Representative' Date: Date: I8tiute Voucber 10. 1 -Au~U8t 11, 1992 Coutruction of Concrete Sidewalk and Appurtenaot lork on rranklin Trail fro. tbe Soutberly Intersection of T.B. 13 to tbe .ortberly Intersection of T.B. 13. COITRACTORI lest Star Curb' Concrete Central Avenue, BOI 281 Watkins, III 55389 10RK STARTEDI July 28, 1992 UUL COIIPLUIOI DUl, August 15, 1992 Bids Opened I July 1, 1992 18:88 A.II. DISCRIPTIOI SIDIIALI , DRIVBIAY !TnS, BASI BID ITIKS Rnon , DISPOSl or IIISTIIG BnUIIIIOUS DRIVIIAY RlKon , DISPOSl or UISTIIG COICRlTE CURB' GUTTER RlKon , DISPOSl or UISTIIG COICRln SIDIULI SU IIISTIIG BITUIIIIOUS DRIVIUY flVlKlIT GRUULAR BORROI rOR 4 I1CB GRUULAR CUSBIOI UIDIR 6" COICRlTE ULI BITOIIIlOUS IIIlTURI rOR DRIVIIAY PATCBIIG, TYPI 4lA IIARIIG COURn 4" COICRln IlLK I1CL. lIUL SHAPIIG , COllPACTIIG or GRUULAR CUSHIOI 6" COICRlTE IlLl COICRUI CURB' GUTTER, DISIGI B-618 SUB-TOTAL BASI BID ITUS SIDIIALI , DRIVnU ITUS, ALTERIATK BID nlKs Rnon , DISPOSl or UISTIIG COICRln CURB' GUnER 4" COICRlTE IlLI I1CLUDIIG rIlAL SHUIIG , COIlPACfIlG or GRUULAR CUSBIOI COICRITE CURB AID GUTUR, DKSIGI B-618 TOTAL ALnRUTE BID nus TOUL BASI BID nlKs GRAlD TOTAL UIIT QUAITITY uln fOTAL COST PRICK S. Y . 298 3.88 818.88 L. r. 528 5.88 2,688.00 s. r . 20 2. 50 50.88 L. r . 9U 2.88 1,800.08 TOI 15 15.88 1,125.08 TOI 44 188.88 4,488.08 S. r. 21,808 1.24 21,832.00 S. r. 2,158 2.08 4,300.00 L. r. 520 10.08 5,200.08 41,311.08 21,528 2,450 385 ." II fOTAL fO DATE QUAITITY COST 442 385 212 818 1,326.00 1,925.08 680.88 1,636.88 8." 8.U 26,694.12 4,988.88 3,858.88 41,811.12 L. r. 88 5.88 488.88 16 380.88 16 S. r . 4,118 1.24 5,914.88 4,603 5,181.12 4,603 L. r . 80 18.88 8U.08 16 160.88 16 1,114.80 6,841.12 41,011.12 54,491.88 41,859.44. :r ~. r fi. , ~' / I I I I ~. lID~~Q~Qm(? (Cma1b (& CC(j)(j)a~\1~ 0 (j)(jg (ent,.al Rue. DOH 201 Watkins, Mn. 55389 Mobile II 865-6150 Ofnte # 1-800-232-6570 ... : 11-19-92 City of Prior Lake 4629 Dakota St. S.E. Prior Lake, Mn. 55372 Dear Bruce, Enclosed is the IC-134 from Metro Paving, also bond consent forms. If there is anything more you need for final payment please let me know. I can be reached at (612) 764-9582. Sincerely,- j7~ ;?~ Dean Pearson jb Ii: '),.... , t:: C,.. kOIl Ii/Vt;f) , .,.' ~"I I'. VI f.Y!J'l r O' < If.. ~Jr~ v 9 97 / ICjcr~ ~ IQq'2-- 3~//)'~ o Project number: (: t ~+ '1 Fr C>1 (. (... of All.. q;) -II . Project location: P to- .oy ~ , Project owner: (!,:.tv, If Pr,'c.... LJ~ Address ' n' ~ ' L ((' 4 ~::l 9 L/d llJf~ Sf'f~i I {I', or OM.... Check the box that describes your Involvement In the project and fill in aI/Information requested In that CBtegory: 5537.;L Form IC.1~~ Rev, ~~\{?OOM ,; -' V:~? N () '1 I t_ ',)J ,- Company MIne W\~\tO Addreu \lt3 ~O CIIy o ",05 -e.. 0- ~ , Minnesota Department of Revenue Withholding Affidavit for Contractors This affidavit must be approved by the Minnesota Department of Revenue before the State of Minnesota or any of its subdivisions can make final payment to contractors. UInnesoIa 10 number ,;?;< began fQ\J ; hS ' '.J-nc.. . r0orthda.J~ Bfvd .... ZIp Code /}vn 5S"'37L{ Amount AI b: Tet.phone number uP IZJ L{~- '-( I? t Did you have employees work on this project? If none, explain who did the work: ~ o Sole contractor ~ Subcontractor UJ~ If you are a subcontractor, fill in the name and address of the contractor that hired you: ~ ~~, t vJ~ ~ SS ~ ~ ~ , _ _ __ _..._. l.. ____ If you subcontracted out any work on this project, all of your subcontractors must file their own IC-134 affidavits and have them certified by the Department of Revenue before you 'can file your affidavit. For each subcontractor you had. fill in the business information below. and attach a copy of each subcontractor's certified IC-134. (If you need more space, attach a separate sheet.) Address Owner/Officer CJ Prime t;;ontractor Business name I declare that all information I have filled in on thiS form is true and complete to the best of my knowledge and belief, I authorize the Department of Revenue to disclose pertinent information relating to this project, including sending copies of this form, P. to the prime contr Contr*r"s lignatur .. ... . () r if I am a subcontractor. and to any subcontractors if I am a prime contractor. and to the contracting agency, F~~ Il!9/~? Innesota Department of Revenue. Business Trust Tax Section Mail Station 6610. St. Paul, UN 55146-6610 Certificate of Compliance with Minnesota Income Tax Withholding Law Based on records of the Minnesota Department of Revenue, I certify that the contractor who has signed this certificate has fulfilled all the requirements of Minnesota Statutes 290.92 and 290.97 concerning the withholding of Minnesota income tax from wages paid to employees relating to contract services with the state of Minnesota and/or its subdivisions. lignalureol1.ecso.p.rtment'~~~... \. 0 ~ ~ .. "'1" ' ;,.... . r- .~~..' , Dille NOV 1 ? tQ~l ~.. \ EXHIBIT "I" Page: Da~e: C-35 2/88 CONSENT OF SURl:1 V COMPANY TO. FINAL .PA YMENT AlA DOCUMENT G707 OWNER 0 ARCHITECT 0 CONTRACTOR 0 SURETY 0 OTHER PROJECT : (name, address) Franklin Trail Sidewalk Project TO (Owner) r City of Prior Lake Prior Lake, MN I ARCHITECT'S PROJECT NO: CONTRACT FOR: 92-11 Fran}~lin Trail Sidewalk L CONTRACTOR: .J CONTRACT DATE: 6 July 92 Weststar Curb and Concrete Inc. Watkins, MN In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (hert insert IWM ancj Mdress of Surely Company) Old Republic Surety , SUREn' COMPANY, on . bond of (here insert IWM ancj Mdress of Contractor) West~tar Curb and Concrete Inc. Wa t}~ins, MN , CONTRACTOR, hereby approves of the final payment to the Contractor, and a8....l that final payment to the Contractor shall not rel1eve the Surety Company of any of its obligations to (here .nsert name and Mdress of 0 .J City of Prior Lake Prior Lake, MN , OWNER, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 9 day of Oc tobe r 19 92 ' Old Republic Surety Surety Company @ LYNDA 0, BEMBOOM Attest: ~~ NOTARY PUBLIC. MINNESOTA , STEARNS COUNTY (Seal): Mr Coawaiaion ElPim Junt 12, 1995 ~ \:~ ~4~ Si~re of AUthrZed ~epresentative attorney-in-fact ..., NOTE: This form is to be uted as I companion document to AlA DOCUMENT C706, CONTlACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition · Tide All. DOCUMENT VI./ · C\)NSENT OF SURETY COMPANY TO FINAL PAYMENT · APRIL '910 EDITION · AlAe e,91O. THE AMERICAN INSTITUTE OF ARCHITECTS, '735 NEW YORK AVE.. NW, WASHINCTON, O,c. 20006 EXHIBIT "I" ONE PACE EXHIBIT. tit" Page: C-38 Date: 2/88 co~ I KAl..IOR'S AN-IDA VIT OF -:PAYMENT Of DEBTS AND CLAIMS AlA Document G706 OWNER 0 ARCHITECT 0 CONTRACTOR 0 SURETY 0 OTHER TO (Owner) r-CitY of Prior Lake 4629 Dakota 5E Prior Lake, MN ARCHITECT'S PROJECT NO: I CONTRACT FOR: L -' CONTRACT DATE: 7/6/92 PROJECT: (name, address) 92-11 State of: Mn County of: Mille Lacs The undersigned, pursuant to Artide 9 of the General Conditions of the Contract for Construction, AlA Document A201, hereby certifies that, except as listed below, he has paid in full or has otherwise satisfjed all obligations for all materials and equipment furnished, tor all work, labor, and services performed, and tor all known indebtedness and daims against the Contractor tor damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner or his property might in any way be held feSpOnsibie. EXCEPTIONS: (If none, write .'None", If 1"equired by the Owner, tne Contractor snail furnish bond satisfactory to the Owner tor -each exception.) none SUPPORTING DOCUMENTS An-ACHED HERETO: CONTRACTOR: Weststar Curb & Concrete Inc Watkins, MN \. ,. Consent of Surety to Final Payment. Whenever Surety is involved, Consent of Surety is required. AlA DOCUMENT C707, CONSENT OF SURETY, may be used 10r this purpose, Indiate attachment: (yes ) (no ), The following supporting documents should be ~t- tac:hed hereto if required by the Owner: 1, Contractor's Releise..or Waiver of liens, condi- tional upon receipt of final payment. 2, Separate Releases or Waivers of Uens {I...., Sub- contractors and material and equipment sup- pliers, -to 'the extent required by the Owner, ae- ~ companied by a list thereof. Notary Public:: ) A 3. Contractor's Affidavit of Release of Liens (AlA ~_ f l' DOCUMENT ~/v6A), My Commis . 'n Expirs: AlA DOCUMSn' C1I5 · CONTRACTOIt'S AFfJOAVlT OF PAYMENT OF OI:DI,) AND CLAIMS /. APIUL '970 EDITION AlAe · ~ '910 · THE AMERICAN IN,) III '-'TE OF AROiIT!crs, '735 NEW YOR~ AVE., NW, WASHINCTON, D.C. 40..." EXHIBI'! "t II Address: ()~l /~ BY: / ~//// !/ "~.7? 7:tI2'~es/treas. Sut>>aibed and sworn to before me this' :1 day of Oc f '9 ~ 2-- ..." /;9~ LARRY MOE NOTARY PUBLIC. MINNESOTA MILLE LACS COUNTY My ~om!!i E:l:t.:. June 5. 1997 ONE PACE Lommen, Nelson, Cole & Stageberg, RA. ATIORNEYS AT LAW LEONARD T. JUSTER. HENR Y H. FEIKEMA ALVIN S. MALMON RONALD L. HASKVITZ PHILUP A. COLE * MARK N. STAGEBERG * ROGER V. STAGEBERG GLENN R. KESSEL THOMAS R. JACOBSON * JOHN M. GIBLIN · JOHN R. McBRIDE * J. CHRISroPHER CUNEO THOMASF.DOUGHERTY STACEY A. DeKALB KAY NORD HUNf RICHARD L. PLAGENS MICHAEL P. SHROYER * EHRICH L. KOCH MARGIE R. BODAS JAMES M. LOCKHART SIEPHEN C. RATIlKE 1800 IDS CENTER 80 SOU1H EIGI-m-I SI'REET . MINNEAPOUS, MINNESOTA 55402 TELEPHONE (612) 339-8131 Minnesota WATS Line 1-800-752-4297 FAX (612) 339-8064 SOU1HSIDE OFFICE PLAZA, SUITE 2A 1810 CRFSIVIEW DRNE . HUDSON, WISCONSIN 54016 TELEPHONE (715) ~17 Twin Oty Line (612) 4J(Hl()85 FAX (715) 386-8219 REPLY TO: MINNEAPOLIS OFFICE WRfI'ER'S DIRECI' DIAL NUMBER: * Certified Civil Trial Specialist · Certified Real Estate Specialist 336-9338 July 17, 1992 Mr. Bruce Loney Assistant City Engineer City of Prior Lake 4629 Dakota St. S.E. Prior Lake, MN 55372 Re: Project 92-11, West Star Curb & Concrete, Inc. Dear Bruce: JOEL w. LAVINTMAN PAUL L. DINGER. UNC S. U~ 11l.A * SHERRI D. ULLAND MARLENE S. GARVIS JD HAAS * REID R. UNDQUlST JAMES C. SEARLS JAMES R. JOHNSON TERRANCE W. MOORE UNDA G. AXELROD CRAIG D. KLAUSING MARC A. JOHANNSEN ANGELA W. AlLEN PATRICK R. McDERMO'IT ADAM~ll.)A.{ STEVEN L. lHEESFELD BARRY A. O'NEIL OF COT JNSRJ . V. OWEN NELSON JOHN P. LOMMEN (1927-1988) WYMAN SMmI (Retired) MARKSUUlVAN (Retired) I am returning to you the three signed agreements by West Star Curb & Concrete, Inc. and specification book. Yours very truly, LOMM+r: NELSON, ;I?1E & By I.' ~ . II. \ / \/ ; l)~ \.t\.l\..(.7 Glenn R. Kessel STAGEBERG, P.A. GRK:rjs Enc. Ace.... Mae As:;necy Inc. Box 459 Sl Cloud, m1 56302 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. PRODUCER COMPANIES AFFORDING COVERAGE COMPANY A LETTER GRE INSURED COMPANY B LETTER West:, Star Curb & Concrete Inc. Watkins, MN COMPANY C LETTER f~~~NY 0 COMPANY E LETTER _ll..I. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO LTR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION DATE (MMIDD/YY) DATE (MM/DD/YY) LIMITS A GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS MADE X OCCUR. OWNER'S & CONTRACTOR'S PROTo 91-178906 4/15/92 4/15/93 GENERAL AGGREGATE $ 1,000,000 PRODUCTS.COMP/OP AGG. $ 1 ,000,000 PERSONAL & ADV. INJURY $ 500,000 EACH OCCURRENCE $ 500,000 FIRE DAMAGE (Anyone fire) $ 50,000 MED. EXPENSE (Anyone person) $ r;; nnn AUTOMOBILE LIABILITY ANY AUTO ALL OWNED AUTOS X SCHEDULED AUTOS X HIRED AUTOS A X NON-OWNED AUTOS GARAGE LIABILITY COMBINED SINGLE LIMIT $1,000,000 BODILY INJURY (Per person) $ 91-178906 4/15/92 4/15/93 BODILY INJURY (Per accident) $ PROPERTY DAMAGE $ A EXCESS LIABILITY X UMBRELLA FORM OTHER THAN UMBRELLA FORM 910178906 7/15/92 4/15/93 EACH OCCURRENCE AGGREGATE $2,000,000 $2,000,000 WORKER'S COMPENSATION AND EMPLOYERS' LIABILITY STATUTORY LIMITS EACH ACCIDENT DISEASE-POLICY LIMIT $ $ DISEASE-EACH EMPLOYEE $ OTHER DESCRIPTION OF OPERA TIONS/LOCA TIONSIVEHICLES/SPECIAL ITEMS City of Prior Lake, r-1N as additional insured \lith respect to contract for 1Jroject 92-11 None of above policies v.rill be cancelled or materially changed until at least 30 notice City of Prior Lake City Hall Prior Lake, MN 5S372 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ~ MAIL....30..- DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, ~\!1 .:or " Form~. ."':"~ "'..! r I c.-' ,,'.00 l<t\ Re~ /89 Minnesota Department of Revenue Withholding Affidavit for Contractors RECE,v~n Dl:C 9 1992 CiTY OF PRiOR L#t.Kt IO\J "5 (\ tS~ This affidavit must be approved by the Minnesota Department of Revenue before the State of Minnesota or any of its subdivisions can make final payment to contractors. Did you have employees work on this project? If none, explain who did the work: 1/88S01 'Ju.I\i 19')l. , tiUju-sf CCl1J. S3)()~ ,).0 :)1 ~~3 f;L~ Project number: C f~ p~(ii f..CL f 1)10. 9~ -II Project location: p,..' b f"" L.Q. k.(. Project owner: t. ~ h., (< s P r I (.\r /....6 ~ - J A Address l.n'.... f)~j,. '/ Pr-''t-c:)/" ~e- NLtIl. "l==.'f . IIriiIIiiiiIIP fA ~ft S.s 37 :J- Check the box that describes your Involvement In the project and fil/ln all Information requested In that category: Minnesota 10 number Company name .!l!~~+Clw- C .,.....\, <4-C~dlt. J ~c., ~()}( ;).D' lJJ~4- k~ ItS Monthlyear work began Stale Zip Code S-S"J g~ Monthlyear work ended /'All. Total contract amount: Telephone number (~':;L ) Amount sliD due: 1~L( - 958 'l. Y~5 o Sole contractor o Subcontractor If you are a subcontractor, fill in the name and address of the contractor that hired you: M ~f~o !Jab< j I :r '" e., If you subcontracted out any work on this project, all of your subcontractors must file their own IC-134 affidavits and have them certified by the Department of Revenue before you can file your affidavit. For each subcontractor you had, fill in the business information below, and attach a copy of each subcontractor's certified IC-134. (If you need more space, attach a separate sheet.) Address . _ _. Owner/Officer / ~3S 0 Al..od~ ($'{uJ """.t.n ) M... .s.Q:Ll( :j J · 4-i.. (;.QIk -z.q,,(..s ~e'-r- ~ ~<-~) g Prime Contractor Business name ! ,.' I declare that all information I have filled in on this form is true and complete to the best of my knowledge and belief. I authorize the Department of Revenue to disclose pertinent information relating to this project, Including sending copies of this form, to the prime contractor if I am a subcontractor, and to any subcontractors if I am a prime contractor, and to the contracting a,gency. CoOOe~ ~ }ru- ;r44u /1-,;J.t(~9;l For certification, mail to: Minnesota Department of Revenue, Business Trust Tax Section Mail Station 6610, St. Paul, MN 55146-6610 Certificate of Compliance with Minnesota Income Tax Withholding Law Based on records of the Minnesota Department of Revenue, I certify that the contractor who has signed this certificate has fulfilled all the requirements of Minnesota Statutes 290.92 and 290.97 concerning the withholding of Minnesota income tax from wages paid to employees relating to contract services with the state of Minnesota and/or its subdivisions. _.~"-1)."'(0jJ1~,' Date NDY 3 fHt82 BID TABULATION FOR BITUMINOUS SURFACING, CONCRETE CURB AND GUTTER STORM SEWER, CONCRETE SIDEWALK, AND APPURTENANT WORK FOR THE CITY OF PRIOR LAKE, MINNESOTA PROJECT NO. 92-11 BIDS OPENED: JULY 1, 1992, 10:00 A.M. CONTRACTOR BID BOND TOTAL BASE BID TOTAL BID BASE & ALT. 1. CURB MASTERS, INC. X 51,856.00 60,067.90 2. VIC CARLSON & SONS, INC. 3. GARVEY CONSTR INC X 72,720.00 85~445.00 4. GRALEY CONCRETE 5. KNISH CONST CO INC 6. MN STATE CURB & GUTTER X 57.:r965.70 66~978.70 7. RYAN CONTRACTING INC X 47.:r999.00 56~234.00 8. WEST STAR CURB & CONCRETE X 47,:r377.00 54,491.80 ** 9. ADVANCED CONCRETE, INC X 61,937.50 71~643.50 10. I hereby certify that this is a true and correct tabulation of the bids as received on *DENOTES CORRECTED FIGURE BY: ADVERTISEMENT FOR BIDS PRIOR LAKE PARKS TRAIL SYSTEM PHASE II - FRANKLIN TRAIL SIDEWALK CITY PROJECT NO. 92-11 BIDS CLOSE JULY 1, 1992 PRIOR LAKE, MINNESOTA NOTICE IS HEREBY GIVEN that sealed proposals will be received by the City council of the City of Prior Lake, Minnesota at the Prior Lake City Hall located at 4629 Dakota Street S.E., Prior Lake, Minnesota 55372 until 10:00 A.M. on the 1st day of July, 1992, and will be publicly opened at said time and place by two or more designated officers or agents of the City of Prior Lake, said proposals for the furnishing of all labor and materials for the construction, complete in place of the following: Approximate Quantities BASE BID 4" Concrete Walk 6" Concrete Walk Remove Concrete Curb & Gutter B618 Concrete Curb & Gutter 21,750 SF 2,100 SF 520 LF 520 LF ALTERNATE BID 4" Concrete Walk Remove Concrete Curb & Gutter B618 Concrete Curb & Gutter 4,770 SF 80 LF 80 LF Proposals arriving after the designated time will be returned unopened. The Bids must be submitted on the proposal forms provided in accordance with contract documents, plans and specifications as prepared by the City of Prior Lake, 4629 Dakota Street S.E., Prior Lake, Minnesota 55372, upon deposit of twenty-five dollars deposit ($25.00) per set. The full amount of the deposit for one set only of drawings and specifications will be returned to contractors who submit a bona fide bid and who return the drawings and specifications in good condition within fifteen (15) days after the opening of bids. No bids will be considered unless sealed and filed with the City Mana~er of Prior Lake and accompanied by a cash deposit, cash1er's check, bid bond or certified check payable to the Manager of the City of Prior Lake, for five (5%) percent of the amount bid to be forfeited as liquidated damages in the event that the bid be accepted and bidder shall fail to enter promptly into a written contract and furnish the required bond. No bids may be withdrawn for a period of thirty (30) days from the date of opening of bids. The City of Prior Lake reserves the right to reject an~ or all bids. Further, the City reserves the ri~ht to accept a b1c higher than the lowest bid if, in the op1nion of the Council, the public interest will be better served. Dated: sjs David J. Unmacht City Manager City of Prior Lake, Minnesota To be published in the Construction Bulletin on May 22, 1992 and May 29, 1992. To be published in the Prior Lake American on May 25, 1992 and June 1, 1992. DOCUMENT 00300 BID PROPOSAL FORM FOR . PRIOR LAKE PARKS TRAIL SYSTEM PHASE II . CITY PROJECT NO. 92-11 FOR THE CITY OF PRIOR LAKE SCOTT COUNTY, MINNESOTA By R 1.1 AtJ CoN 1h~lril/v(/ (.:J ~. \ ) t' " 1992 () Honorable Mayor and City council City of Prior Lake, Minnesota Honorable Mayor and Council Members: We have examined the site of the Work, as defined in the Contract Documents, and are familiar with all of the Contract Documents including the Drawings and Specifications, and propose to furnish all labor, Materials, skills and facilities which are necessary for utility and street construction in accordance with the Drawings, Specifications, and Addenda Nos. t) and thereto, prepared by the City of Prior Lake Engineering Department, Prior Lake City Hall, 4629 Dakota street S.E., Prior Lake, Minnesota 55372, for the respective unit and lump sum prices set forth hereinafter. B. P. 1 '" .....,. ~ I ". ,,{. ...~ ~. .~" "" ~ . ........ '" - . 'f/ BASE BID: BID PROPOSAL FORM .ruR ' PRIOR LAKE PARKS TRAIL SYSTEM PHASE II CITY PROJECT NO. 92-11 FOR THE CITY OF PRIOR LAKE SCOTT COUNTY, MINNESOTA . FRANKLIN TRAIL CONCRETE WALK CONSTRUCTION FROM T.H. "13 TO CSAH 44 Item 1 290 S.Y. - Remove and dispose of existing bituminous driveway pavement, MnDOT 2104, price per Square Yard @ +/JA-U.- Dollars ($ 3:-) = $ 37o~ Item 2 520 L.F. - Remove and dispose of existing concrete curb and gutter, MnDOT 2104, price per Lineal Foot @ -rlt[('/ 'i/.E!)jro Dollars ($ 3~) = $ /1Zo ~ Item 3 20 S.F. - Remove and dispose of existing concrete sidewalk, MnDOT 2104, price per Square Foot @ ~o Dollars ($ d-;-) = $ .cto-:- Item 4 900 L.F. - Saw existing bituminous driveway pavement, 2104,... p. rice ~-r Lineal Foot@ ()l.iC 1 /,/0) Dollars ($ / $;) = $ MnDOT /~~ Item 5 75 Tons - Granular Borrow, MnDOT 3149, for 4 inch granular cushion under 6" concrete walk thru driveways, price per Ton @ 7 szs--:- Y-vv.- Dollars ($ ~) = $ " Item 6 44 Ton - Bituminous Mixture for Driveway Patching, MnDOT \ 2331, Type 41A Wearing Course Mixture, complete in place, price per Ton @ 6---~'1.( ~\ -- {i y.e Dollars ($ ~5:-) = $ 2 ~(pO-:- B.P. 2 Item 7 ~ 21 800 S.F. - 4" concrete walk, MnDOT 2521, complete in place including the final shaping and compacting of the granular cushion, price per Square Foot @ 4Q D"t. ~ ~ cPollars ($ ~) = $ 3oJ5ZD.-- I \ Item 8 2,150 price per .fJA> Item 9 ~0 - )/ S.F. - 6" concrete walk, MnDOT 2521, complete in Square Foot @ ~ ~~i.) -Dollars ($ '3~ Z~) = $ place, S-b74-- ~ 520 L.F. - Concrete curb and gutter, design B-618, MnDOT 2531, complete in place, price per Lineal Foot @ ,lhL { 7o;r BeUars ($ 'l~)=$ TOTAL BASE BID ITEMS 1 - 9 $ 414D'- l{7, ~~t~ ALTERNATE BID: FRANKLIN TRAIL CONCRETE WALK CONS "J,"rtUCT ION , CSAH 44 TO T.H. 13 Item 10 80 L.F. - Remove and dispose of existing gutter, MnDOT 2104, price per Lineal Foot @ -H, I-tL 4 %:> Item 11 Dollars concrete curb and ($ '3 ~) = $ 7.30 :- 4,7.70 S.F. - 4" concrete walk, MnDOT 2521, complete in place including the final shaping and compacting of the granular cushion, price per Square Foot @ ()I1e k ~()~ Dollars B.P. 3 ($ 512 \~) = $ J /55 ~ I , '._' """".' , ..' '.W~~.c""'~'..'~~7::-':5"V , '7,. .~,~~ .'. '~~~'~:"',:'5",~~;,,'''''>''\,if''. 'c;""~lr' ". 1 Item 12 80 L.F. - Co~rete curb and gutter, design B-618, MnDOT 2531, complete in place, price per Lineal Foot @ lCrJ Dollars ($ ) 0:-) = $ 600 -- TOTAL ALTERNATE BID ITEMS 10 - 12 $ ~, Z3S.ea I TOTAL BID ,$ 47. ltJ'lq:-- <B: ~ ~5.- 5bl Z34.~ , TOTAL BASE BID $ TOTAL ALTERNATE BID $ We understand the award of the contract will be based on the low bid received for the Base Bid or the total of Base Bid + Alternate Bid at the sole discretion of the Owner. The quantities stated hereinbefore are approximate only. Payment will be made for the quantities of Work ordered and actually installed complete. The provisions of MnDOT 1903 shall not apply to any items in/this Project. We aqree that the OWNER intends to give the Notice of Award for all of the Work shown in the Bid Proposal to one responsible Bidder in the best interest of the OWNER. The OWNER reserves the right to accept or reject any, or all Bids, and also the right to waive any formal defects in Bids when deemed for the best interests of the OWNER. Further, the OWNER reserves the right to accept a Bid higher than the lowest Bid, if in the opinion of the Council, the public interest will be better served. Accompanying this Bid Proposal Form is the required Bid Bond, the same bein9 subject to forfeiture according to the Minnesota Statutes 1n the event of default by the undersigned. We have examined the site of the ~ork and are acquainted with all conditions affecting the construction of the Work. Where there appears a discrepancy between the written words and numerals in a unit price bid, the OWNER reserves the right to accept and give effect to the words or numerals in the unit price bid which correspond and harmonize with the extension of the particular Item, and to disregard the words or numerals which do not correspond and harmonize with the extension of the particular Item, and to disregard the words or numerals which do not correspond and harmonize therewith. If neither the written words B.P. 4 ........;;;:;\ '. . '.f~'nM.r.'"""""t_. ... r1"F't.~' .., ~ .d~.' ,':.'#':'fi~~1"";"'''!I'f''~...... ':'" ''1l.~r, ..~~.p,i.,qo;~~,,;'[""'''~.''''~[~~,~~.'f''; .;':.":";'i~~~(;~"',"'1,.~~' "~l.':''li~Y'.l''::~;.'''''('':;'. ". , .'""'" nor the numerals in the unit price bid correspond and harmonize ~with the extension of that particular Item, the written words in the unit price bid shall govern. All Addenda shall become a part of the Bid and shall be submitted with the Bid. The COhJ.,MCTOR shall insert Addenda numbers in the space where indicated in the Bid Proposal Form. The COhJ.KACTOR shall also complete the attached Subcontractors and equipment lists. We agree that if this Bid Proposal is accepted, we will execute the Contract Documents in the form attached to the Specifications and will furnish a Bond in the full amount of the Contract Price and in the form attached to the Specifications. If we receive a Notice of Award( we will furnish Materials and construct the Work as descr1bed, on or before the Specified Completion Date in the Special Provisions. Respectively submitted, Firm Name: Q4,~-.J G"'Tt2J/</8~~' - (-I _ /J 0 Y ?:-~~~!-</() c -- tl I (.! tzl?u. s . I!) 34- ~, (!,L~ff ~(). _ r)tr'. fl.;..J, ivlh. . ;A--' N <;:)? ') 7 witness: Signed bY: Capacity: _ Address of Bidder: [>J J-~ A. f./<.~ \/ B.P. 5 "'"~, _ _. ~~,:;,~~'!~:"l~::~t:lf::;:~~~~~;,.~tij:{~';'3r,~t~~~.~~;,,:;'.~;-~;":'~i.:~I~;:~:"i,~;,~l:;"~~'C'~~.:..~"..~.::~.....l:~;:~...>;"I,~,iT.~~.':~: DOCUMENT 00300 tPROPOSAL FORM FOR PRIOR PA1U\S TRAIL SYSTEM PHASE II CITY PROJECT NO. 92-11 FOR THE CITY OF PRIOR LAKE SCO'rI' ~UUl'4 .~. i, MINNESOTA ' By ~ CDnstnJdiDr'\ :ere-, .:J1tJ,,' , 1992' Honorable Mayor and City Council City of Prior Lake, Minnesota Honorable Mayor and Council Members: We have examined the site of the Work, as defined in the Contract Documents, and are familiar with all of the Contract Documents including the Drawinqs and Specifications, and ,ropose to furnish all labor, Materials, skills and facilities w_lich are necessary for utility and street construction in accordance with the Drawings, Specifications, and Addenda Nos. and thereto, prepared by the City of Prior Lake Engineering Department, Prior Lake City Hall, 4629 Dakota street S.E., Prior Lake, Minnesota 55372, for the respective unit and lump sum prices set forth hereinafter. B.P. 1 Item 7 21(800 S.F. - 4" concrete walk, MnDOT 2521, complete in place includ1ng the final shaping and compacting of the granular cushion, price per Square Foot @ 2ft> 6,;:: Dollars ',.n1"'-- ($~" ) = $ -5~ ~""- Item 8 2,150 S.F. - 6" concrete walk, MnDOT 2521, complete in place, price per Square Foot @ <Z()O ,5r Dollars ($'r I rf)" ) - $ G"Lj S't7- ,- Item 9 520 L.F. - Concrete curb and gutter, design B-618, MnDOT 2531, complete in place, ~rice per Lineal Foot @ ~ tJl: ~,- $ L/, // t) .r.4JA' ..........- ~ ~~ L P: Dollars ($ ~",O - ) = / ' I" TOTAL BASE BID ITEMS 1 - 9 $ '1a~~,oo ALTERNATE BID: FRANKLIN TRAIL CONCRETE WALK CONSTRUCTION" CSAH 44 TO T.H. 13 Item 10 80 L.F. - Remove and dispose of existing concrete gutter, MnDOT 2104, price per Lineal Foot @ t). oV LFr Dollars ($ 30 curb and ~ ) = $/'- tP. Item 11 4,770 S.F. - 4" concrete walk, MnDOT 2521, complete in place including the final shaping and compacting of the granular cushion, price per Square Foot @ <},S'iJ sr Dollars ($ ~770 ) = $ J.J,j?,<(~/ B.P. 3 Item 12 80 L.F. - Concrete curb and gutter, design B-618, MnDOT 2531, complete in place, price per Lineal Foot @ 'b1fJ Lr. Dollars ($.1Z1) ) = $ ~,,/Il'eP TOTAL ALTERNATE BID ITEMS 10 - 12 $ 1~:l~,OD TOTAL BASE BID $ i d-~~'OO TOTAL ALTERNATE BID $ I d.,al5 10() TOTAL BID $ eS,4lf5.o0 We understand the award of the contract will be based on the low bid received for the Base Bid or the total of Base Bid + Alternate Bid at the sole discretion of the owner. The quantities stated hereinbefore are approximate only. Payment will be made for the quantities of Work ordered and actually installed complete. The provisions of MnDOT 1903 shall not apply to any items in this Project. We agree that the OWh~~ intends to give the Notice of Award for all of the Work shown in the Bid Proposal to one responsible Bidder in the best interest of the OWNER. The OWNER reserves the right to accept or reject any, or all Bids, and also the ri9ht to waive any formal defects in Bids when deemed for the best 1nterests of the OWh6~. Further, the OWNER reserves the right to accept a Bid higher than the lowest Bid, if in the opinion of the Council, the public interest will be better served. Accompanying this Bid Proposal Form is the required Bid Bond, the same beini subject to forfeiture according to the Minnesota statutes 1n the event of default by the undersigned. We have examined the site of the Work and are acquainted with all conditions affecting the construction of the Work. Where there appears a discrepancy between the written words and numerals in a unit price bid, the OWNER reserves the right to accept and give effect to the words or numerals in the unit price bid which correspond and ha~~onize with the extension of the particular Item, and to disre9ard the words or numerals which do not correspond and harmonize w1th the extension of the particular Item, and to disregard the words or numerals which do not correspond and harmonize therewith. If neither the written words B. P. 4 nor the numerals in the unit price bid correspond and harmonize with the extension of that particular Item, the written words in the unit price bid shall govern. All Addenda shall become a part of the Bid and shall be submitted with the sid. The COh~AACTOR shall insert Addenda numbers in the space where indicated in the Bid Proposal Form. The COh~KACTOR shall also complete the attached Subcontractors and equipment lists. We agree that if this Bid Proposal is accepted, we will execute the Contract Documents in the form attached to the Specifications and will furnish a Bond in the full amount of the Contract Price and in the form attached to the Specifications. If we receive a Notice of Award( we will furnish Materials and construct the Work as descr1bed, on or before the Specified Completion Date in the Special Provisions. Respectively submitted, Witness: ~~ .~~ Firm Name: ~ Construd\DVl~ a -d1-~/r Pre5ickf1 t- 100 Sfh stree.:t- t-oYt11i~)on! M 1\J556J.-'i Signed by: Capacity: Address of Bidder: B. P. 5 ~- AFFIDAVIT AND INFORMATION REQUIRED OF BIDDERS Affidavit of Non-Collusion: I hereby swear (or affirm) under the penalty for perjury: 1. That I am the Bidder (if the Bidder is an individual), a partner in the Bidding ~artnership (if the Bidder is a partnership), or an off1cer or em~loyee of the Bidding corporation having authority to s1gn on its behalf (if the Bidder is a corporation). 2. That the attached Bid or Bids have been arrived at by the Bidder independently, and have been submitted without collusion with, and without, any other vendor of Materials, supplies, equipment, or services described in the invitation to Bid, designed to limit independent Bidding or competition. 3. That the contents of the Bid or Bids have not been communicated by the Bidder or its employees or agents to any person not an employee or agent of the Bidder or its surety on any Bond furnished with the Bid or Bids, and will not be communicated to any such person prior to the official opening of the Bid or Bids; and 4. That I have fully informed mfself regarding the accuracy of the statements made in th1S affidavit. 8..,.,. PATRICIA A. PIETSCH ., J*. ~ NOTAftY PUBlIC . MINNESOTA DAKOTA COUNTY My CommI88Ion ExpIfet Nov, 4, 1988 Signed Firm Name p. # /'. 0~ CDYlstndl Of) -LJ1L. Subscribed . and sworn to before me Th~~ d~.~ ' 1992- Notary Public My commission expires on kbv. 4- , 19 'ik..... Bidders E.I. Number (Number used on Employer's Quarterly Federal Treasury Department Form 941). 41 -, "'<).1001 Tax Return, U.S. ~ DOCUMENT 00300 BID PROPOSAL FORM FOR PRIOR LAKE PARKS TRAIL SYS.1uo! PHASE II CITY PRuu~CT NO. 92-11 FOR THE CITY OF PRIOR LAKE S\"'U'~'T COUh .11', h.1t4tU~ibU".1'A By C u.~k, M~<;~s;. I xc. Xu.. \", J , 1992 ~ Honorable Mayor and City Council City of Prior Lake, Minnesota Honorable Mayor and Council Members: We have examined the site of the Work, as defined in the Contract Documents, and are familiar with all of the Contract Documents including the Drawings and Specifications, and propose to furnish all labor, Materials, skills and facilities which are necessary for utility and street construction in accordance with the Drawings, Specifications, and Addenda Nos. NOYle and thereto, prepared by the City of Prior Lake Engineering Department, Prior Lake City Hall, 4629 Dakota Street S.E., Prior Lake, Minnesota 55372, for the respective unit and lump sum prices set forth hereinafter. B. P. 1 BASE BID: BID PROPOSAL FORM FOR PRIOR LAKE PARKS TRAIL SYSTEM PHASE II CITY PROJECT NO. 92-11 FOR THE CITY OF PRIOR LAKE SCOTT COUNTY. MINNESOTA FRANKLIN TRAIL CONCRETE WALK CONSTRUCTION FROM T.H. 13 TO CSAH 44 Item 1 290 S.Y. - Remove and dispose of existing bituminous driveway pavement, MnDOT 2104, price per Square Yard @ J;,'q'l~ d.-nJ IJo!Joo ~ . Dollars ($J.OD) = $ 2,320..00 ~ Item 2 520 L.F. - Remove and dispose of existing concrete curb and gutter, MnDOT 2104, price per Lineal Foot @ Il.,.~~V\ ~ S-D/'DD'- -- Dollars ($ '3.S0) = $ L g1.D.bO Item 3 20 S.F. - Remove and dispose of existing concrete sidewalk, MnDOT 2104, price per Square Foot @ .f)vte aYtJ so!:oo --...... Dollars ($ J. SD ) = $ 3oooz> Item 4 900 L.F. - Saw existing bituminous driveway pavement, MnDOT 2104, price per Lineal Foot@ tWD ~1 sz:>jDO' - Dollars ($ '- .f;D ) = $ 2.,2Sb..OO Item 5 75 Tons - Granular Borrow, MnDOT 3149, for 4 inch granular cushion under 6" concrete walk thru driveways, price per Ton @ -ruJ~'\J~ ~""l JJo~oo ...... Dollars ($ J1...oo ) = $ <jDl).OD Item 6 44 Ton - Bituminous Mixture for Driveway Patching, MnDOT 2331, Type 41A Wearing Course Mixture, complete in place, price per Ton @ ~ : )(~ ~/~~ "'ioo-- ~ Dollars ($ bi>.DO) = $ 2,LAo..oo B.P. 2 Item 7 21 800 S.F. - 4" concrete walk, MnDOT 2521, complete in place including the final shaping and compacting of the granular cushion, price per Square Foot @ "1\Jf; () rJd If Jftap l - .Dollars ( $1.!:J..J J = $ 3;2 0 '-! to .Qo Item 8 2,150 S.F. - 6" concrete walk, MnDOT 2521, complete in place, price per Square Foot @ .QIUP ~ ~O/~-- - i>ollars ($ J. ~O ) - $ 3~ 7D.()O Item 9 520 L.F. - Concrete curb and gutter, design B-6l8, MnDOT 2531, complete in place, price per Lineal Foot @ ~)-ev~Yl d;nJ $;b/0lJ" .. Dollars ($ IJ.s;o) = $ S-.Q8D"oo TOTAL BASE BID ITEMS 1 - 9 $ ~f/256 QD ALTERNATE BID:. FRANKLIN TRAIL CONCRETE WALK CONSTRUCTION~ CSAH 44 TO T.H. 13 Item 10 80 L.F. - Remove and dispose of existing concrete curb and gutter, MnDOT 2104, price per Lineal Foot @ ~,,~e. ~""l ~hoo - Dollars ($ 5.5'0) = $ :48b..O D Item 11 4,770 S.F. - 4" concrete walk, MnDOT 2521, complete in place including the final shaping and compacting of the granular cushion, price per Square Foot @ ONe ANd It'~on -- J:)ollars ($ /.147 ) = $ _7DJJ,QD B.P. 3 Item 12 80 L.F. - Concrete curb and gutter, design B-618, MnDOT 2531, complete in place, price per Lineal Foot @ kl"'~-Yll S-oJ1DD --L------- .Dollars ($ JI,SD) = $ '12.D_DO TOTAL ALTERNATE BID ITEMS 10 - 12 $ ~ 2".9.a.. TOTAL BASE BID $ StCJ6h.Oo TOTAL ALTERNATE BID $ <;? 2) I ,'1 D TOTAL BID $ woh 1,gD We understand the award of the contract will be based on the low bid received for the Base Bid or the total of Base Bid + Alternate Bid at the sole discretion of the OWner. The quantities stated hereinbefore are approximate only. Payment will be made for the quantities of Work ordered and actually installed com~lete. The provisions of MnDOT 1903 shall not apply to any items 1n this Project. We agree that the OWNER intends to give the Notice of Award for all of the Work shown in the Bid Proposal to one responsible Bidder in the best interest of the OWNER. The OWNER reserves the right to accept or reject any, or all BidS, and also the right to waive any formal defects in Bids when deemed for the best interests of the OWNER. Further, the OWNER reserves the right to accept a Bid higher than the lowest Bid, if in the opinion of the Council, the public interest will be better served. Accompanying this Bid Proposal Form is the required Bid Bond, the same being subject to forfeiture according to the Minnesota statutes in the event of default by the undersigned. We have examined the site of the Work and are acquainted with all conditions affecting the construction of the Work. Where there appears a discrepancy between the written words and numerals in a unit price bid, the OWNER reserves the right to accept and give effect to the words or numerals in the unit price bid which correspond and harmonize with the extension of the particular Item, and to disreqard the words or numerals which do not correspond and harmonize with the extension of the )articular Item, and to disregard the words or numerals whic_l do not correspond and harmonize therewith. If neither the written words B.P. 4 nor the numerals in the unit price bid correspond and harmonize with the extension of that particular Item, the written words in the unit price bid shall govern. All Addenda shall become a part of the Bid and shall be submitted with the Bid. The COh~AACTOR shall insert Addenda numbers in the space where indicated in the Bid Proposal Form. The CONTRACTOR shall also complete the attached Subcontractors and equipment lists. We agree that if this Bid Proposal is accepted, we will execute the Contract Documents in the form attached to the Specifications and will furnish a Bond in the full amount of the Contract Price and in the form attached to the Specifications. If we receive a Notice of Awardl we will furnish Materials and construct the Work as descr bed, on or before the Soecified Completion Date in the Special Provisions. Respectively submitted, Firm Name: .-CUw~1 rt\4.,'~l.s .~(' . /LJld2l( (;J!;D;4- Witness: Signed by: Capacity: Address of Bidder: )oJ.~ )O)S!- ~, ~w~~~". Ss-oA2 B. P. 5 ~ DOCUMENT 00300 BID PROPOSAL FORM FOR PRIOR LAKE PARKS TRAIL SYSTEM PHASE II CITY PROU~~~ NO. 92-11 FOR THE CITY OF ~KIOR LAKE SCOTT COUNTY. MINNESOTA By MN STATE CURB AND GUTTER DIVISION AVR, INC. JULY 1 , 1992 Honorable Mayor and City Council City of Prior Lake, Minnesota Honorable Mayor and Council Members: We have examined the site of the Work, as defined in the Contract Documents, and are familiar with all of the Contract Documents including the Drawings and Specifications, and propose to furnish all labor, Materials, skills and facilities which are necessary for utility and street construction in accordance with the Drawings, Specifications, and Addenda Nos. and thereto, prepared by the City of Prior Lake Engineering Department, Prior Lake City Hall, 4629 Dakota Street S.E., Prior Lake, Minnesota 55372, for the respective unit and lump sum prices set forth hereinafter. B.P. 1 BASE BID: BID PROPOSAL FORM FOR PRIOR LAKE PARKS TRAIL SYSTEM PHASE II CITY PROJECT NO. 92-11 FOR THE CITY OF PRIOR LAKE SCOTT COUNTY. MINh~bOTA FRANKLIN TRAIL CONCRETE WALK CONSTRUCTION FROM T.H., 13 TO CSAH 44 Item 1 290 S.Y. - Remove and dispose of existing bituminous driveway pavement, MnDOT 2104, price per Square Yard @ Dollars ($ 5940.00 ) = $ 5940.00 Item 2 520 L.F. - Remove and dispose of existing concrete curb and gutter, MnDOT 2104, price per Lineal Foot @ Dollars ($ 3.30 ) = $ 1716.00 Item 3 20 S.F. - Remove and dispose of existing concrete sidewalk, MnDOT 2104, price per Square Foot @ Dollars ($ 1.50 ) = $ 30.00 Item 4 900 L.F. - Saw existing bituminous driveway pavement, MnDOT 2104, price per Lineal Foot@ Dollars ($ 2.66 ) = $ 2394.00 Item 5 75 Tons - Granular Borrow, MnDOT 3149, for 4 inch granular cushion under 6" concrete walk thru driveways, price per Ton @ Dollars ($ 4.10 ) = $ 307.50 Item 6 44 Ton - Bituminous Mixture for Driveway Patching, MnDOT 2331, Type 41A Wearing Course Mixture, complete in place, price per Ton @ Dollars ($ 95.40 ) = $ 4197.60 B.P. 2 Item 7 21(800 S.F. - 4" concrete walk, MnDOT 2521, complete in place includ1ng the final shaping and compacting of the granular cushion, price per Square Foot @ Dollars ($ 1.57 ) = $ 34226.00 Item 8 2,150 S.F. - 6" concrete walk, MnDOT 2521, complete in place, price per Square Foot @ Dollars ($ 2.34 ) = $ 5031.00 Item 9 520 L.F. - Concrete curb and gutter, design B-618, MnDOT 2531, complete in place, price per Lineal Foot @ Dollars ($ 7.93 ) = $ 4123.60 TOTAL BASE BID ITEMS 1 - 9 $ 57,965.70 ALTERNATE BID: FRANKLIN TRAIL CONCRETE WALK CONSTRUCTION,. CSAH 44 TO T.H. 13 Item 10 80 L.F. - Remove and dispose of existing concrete curb and gutter, MnDOT 2104, price per Lineal Foot @ Dollars ($ 3.20 ) = $ 256.00 Item 11 4,770 S.F. - 4" concrete walk, MnDOT 2521, complete in place including the final shaping and compacting of the granular cushion, price per Square Foot @ Dollars ($ 1.70 ) = $ 8109.00 B.P. 3 Item 12 80 L.F. - Concrete curb and gutter, design B-618, MnDOT 2531, complete in place, price per Lineal Foot @ .Dollars ($ 8.10 ) = $ 648 .00 TOTAL ALTERNATE BID ITEMS 10 - 12 $ 9,013.00 TOTAL BASE BID $ 57,965.70 TOTAL ALTERNATE BID $ ~l ~ Q!L. TOTAL BID $ 66,978. 70 We understand the award of the contract will be based on the low bid received for the Base Bid or the total of Base Bid + Alternate Bid at the sole discretion of the Owner. The quantities stated hereinbefore are approximate only. Payment will be made for the quantities of Work ordered and actually installed com~lete. The provisions of MnDOT 1903 shall not apply to any iteas ~ this Project. We agree that the OWNER intends to give the Notice of Award for all of the Work shown in the Bid Proposal to one responsible Bidder in the best interest of the OWNER. The OWNER reserves the right to accept or reject any, or all Bids, and also the right to waive any formal defects in Bids when deemed for the best interests of the OWNER. Further, the OWNER reserves the right to accept a Bid higher than the lowest Bid, if in the opinion of the Council, the public interest will be better served. Accompanying this Bid Proposal Form is the required Bid Bond, the same being subject to forfeiture according to the Minnesota statutes in the event of default by the undersigned. We have examined the site of the Work and are acquainted with all conditions affecting the construction of the Work. Where there appears a discrepancy between the written words and numerals in a unit price bid, the OWNER reserves the right to accept and give effect to the words or numerals in the unit price bid which correspond and harmonize with the extension of the particular Item, and to disregard the words or numerals which do not correspond and harmonize with the extension of the particular Item, and to disregard the words or numerals which do not correspond and harmonize therewith. If neither the written words B. P. 4 " DOCUMENT 00500 AGREEMENT THIS AGREEMENT, made as of the 6th day of July 1992, by and between a West star Curb & Concrete, Inc. . (name of contractor, i. e. , name of corporation, partnership, all contracting individuals and their business name), a Minnesota Corporation (name of state where incorporated or formed and whether a corporation, Minnesota general partnership, etc.), hereinafter called the "Contractor", and the City of Prior Lake, a Minnesota municipal corporation (hereinafter called the "Owner" and sometimes referred to as the "City"). RECITALS WHEREAS, Contractor has been selected by the Owner in accordance with Minnesota law to provide materials, equipment and labor necessary for construction and completion of certain improvements as set forth herein, and WHEREAS, Contractor has agreed to perform its obligations, covenants and undertakings as contained herein in consideration for payment as contained herein, NOW, THEREFORE, in consideration of the mutual promises, covenants and conditions as hereinafter set forth, the parties agree as follows: 1. The Contractor agrees to provide all the materials, equipment and labor necessary for the complete construction of all the improvements, work and/or obligations of Contractor (hereinafter referred to as "Work") as required by the drawings, specifications, exhibits, conditions, covenants and agreements as contained in the documents prepared by City of Prior Lake for Project 92-11, collectively referred to as "Contract Documents", and to do everything required by the Contract Documents previously furnished to the Contractor by the Owner and receipted for by the Contractor. 2. The Contractor agrees that the Work contemplated by the Contract Documents shall be entirely completed on or before August 15 , 1992 . 3. The Owner agrees to pay Contractor in current funds for the performance of its obligations pursuant to the Contract Documents the sum of fifty-four thousand, four-hundred, ninety-one and 80/100 Dollars ($ 54,491.80 ), subject to the addit10ns and deductions as provided for in the specifications to the Contract Documents and to make payments on account of the Contract Documents as provided for in said specifications, except as hereinafter stated: The contract sum is for the Base Bid and Alternate Bid Items. 4. The Contractor and the Owner agree that the Contract Documents, including but not limited to the specifications, drawings, standard ~eneral conditions, instructions to bidder, supplementary cond1tions, special provisions, standard utility specifications, if any, and Contractor bids, and such other ~rovisions as contained in the Contract Documents, are 1ncorporated herein by reference and are a part of this Agreement as if attached or re~eated herein. with respect to the drawings and specifications Wh1Ch are part of the Contract Documents, the Contractor and Owner agree that the following shall constitute a complete list of said drawings and specifications: Specifications: proiect 92-11 Spec~fications - all as contained in the Contract Documents. Drawings: Pro;ect 92-11* Plan Sheets 1 thru 7 - all as contained in the Contract Documents. 5. Prior to execution of this Agreement, the Contractor shall furnish to the Owner for review by the City Engineer and/or City Attorney all bid bonds, performance bonds, letters of credit, insurance certificates, evidence of insurance in final form, as required by the Contract Documents. In addition, prior to execution of this Agreement, the Contractor, if a partnership or corporation, shall furnish to the City Engineer and/or City Attorney such resolutions, opinions of counsel, or evidence of authority required to ensure that the Contractor, upon its execution of this Agreement, shall be fully bound by its terms. 6. Contractor Representations. Contractor represents and warrants that neither the execution and delivery of this Agreement, consummation of the transactions contemplated hereby, nor the fulfillment of or a compliance with the terms and conditions of this Agreement is prevented or limited by, or in conflict' with or will result in breach of, the terms, conditions or provisions of any restriction of Contractor, or evidence of indebtedness, agreement or instrument of whatever nature to which Contractor is now party or by which it is bound or will constitute a default under any of the foregoing. Contractor further represents and warrants that Contractor will cooperate with the Owner with respect to any litigation commenced with respect to the Work contemplated herein. Contractor represents and warrants that the Work will conform to all laws, regulations and ordinances of all local, state and federal government authorities. 7. Non-Discrimination. The provisions of Minnesota statutes, Section 181.59, and of Chapter 11, Title 1, of Prior Lake City Code, which relate to civil rights and discrimination and affirmative action shall be considered a part of this Agreement as though wholly set forth herein, and Contractor agrees to comply therewith. In addition, Contractor specifically agrees: a. That with conducted A~reement, w1thin the subject to respect to any and all or acts performed pursuant Contractor shall be deemed an meaning of Chapter 11 and the provisions of Chapter 11. businesses to this employer shall be b. That in the event Contractor fails to perform the aforesaid contractual provisions of Chapter 11, this Agreement may forthwith be terminated and cancelled in whole or in part by Owner and Contractor shall be liable for any costs or expense incurred by Owner in obtaining from other sources the Work and services to be rendered or ~erformed or the goods or properties to be furn1shed or delivered to Owner under this Agreement so terminated or cancelled. c. That should Owner in a proceeding brought as provided in Chapter 11 find that Contractor has engaged in discrimination in connection with this Agreement and issue a cease and desist order with respect thereto, Owner shall uphold up to 15% of the said contract price, if applicable, until such time as Owner's order has been complied with or said other contracting party has been adjudicated not guilty of such discrimination. d. That Contractor will permit access to any and all records pertaining to hiring 'and employment and to other pertinent data and records for the purpose of enablin~ Owner, its agencies or re~resentatives, to ascerta1n compliance with the prov1sions of Chapter 11 applicable to Contractor. That Chapter 11 shall be binding on contractors, subcontractors, or suppliers. 8. Assiqnment. Contractor represents and agrees for itself, its successors and assigns that Contractor has not made or created and that it will not make or create or suffer to be made or created any total or partial sale, assignment, conveyance or any trust or power to transfer in any other mode or form of or with respect to this Agreement or any part thereof or interest therein or in Contractor without the prior written approval of Owner. e. all 9. General. The terms and provisions hereof shall be upon and inure to the benefit of the representatives, successors and assigns parties hereto. b. Whenever in this A~reement it shall be required or permitted that not1ce or demand be given or served by either party to this Agreement to or on the other party, such notice shall be delivered personally or mailed by United states mail to the addresses hereinafter set forth by certified mail (return receipt requested). Such notice or demand shall be deemed timely ~iven when delivered personally or when depos1ted in the mail in accordance with the above. The address of the parties hereto are as follows, until changed by notice given as above: a. binding heirs, of the If to the Owner: City Engineer 4629 Dakota Street S.E. Prior Lake, MN. 55372 with a copy to: If to Contractor: Glenn R. Kessel, Esq. Lommen, Nelson, Cole, & Stageberg, P.A. 1100 TCF Tower Minneapolis, MN. 55402 WEST STAR CURB & CONCRETE, INC. Central Avenue Box #201 Watkins, MN 55389 with a copy to: c. Except as otherwise provided in this Agreement, the rights and remedies of the parties to this Agreement, whether provided by law or b~ this A9reement shall be cumulative, and the exerC1se by e1ther party of anyone or more of such remedies shall not preclude the exercise by it, at the same or different times, of any other such remedies for the same default or breach or of any of its remedies for any other default or breach or of any of its remedies for any other default or breach by the other party. No waiver made by either such party with respect to the performance, or manner of time thereof, or any obligation under this Agreement shall be considered a waiver of any rights of the party making the waiver with respect to the particular obligation of the other party or condition to its own obligation beyond those expressly waived in writing and to the extent thereof, or a waiver in any respect in re~ard to any other rights of the party making the wa~ver of any other obligation of the other party. Delay by a party hereto in instituting or prosecuting any cause of action or claim hereunder shall not be deemed a waiver of any rights hereunder. d. This Agreement may be amended by the ~arties hereto only by written instrument executed 1n accordance with the same procedures and formality followed for the execution of this Agreement. e. This Agreement may be simultaneously executed several counterparts, each of which shall be original and all of which shall constitute one the same instrument. in an and IN WITNESS WHEREOF, Owner and Contractor have caused this Agreement to be duly executed on the day and year first above written. Approved by the City Council JulV , 1992 . on the 6th day of CIT~_OF PRIOR 7 By I May r.~~#1 - I,/r~ s City Manager By CONTRACTOR: By ~~~ Its ~ _ ~ By Its Y:d;S :019: DOCUMENT 00610 FORM OF PAYMENT BOND KNOW ALL MEN: That we hereinafter called the Principal, and and hereinafter called the Surety, or Sureties, are firmly bound unto held and hereinafter called the OWNERS, and to such persons, firms and corporations who may furnish Materials for, or perform labor on the Work, building or improvements, contemplated in the contract hereinafter mentioned, in the sum of Dollars ($ ) for the payment whereof the principal and Surety, or Sureties, bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, the principal has by means of a written Agreement dated entered into a contract with the OWNER for a copy of which Agreement is by reference made a part hereof. NOW, THEREFORE, the conditions of this obligation are such that if the Principal shall faithfully perform the contract on his part, and satisfy all claims and demands incurred for the same and shall fully indemnify and save harmless the OWNER from all costs and damage which he may suffer by reason of failure so to do and shall fully reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any such default and shall promptlr make payment to all persons supplring labor or material for use 1n the prosecution of the Work prov1ded for in such contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. AND PROVIDED, that any alterations which may be made in the terms of the contract, or in the Work to be done under it, or the giving by the OWNER of any extension of time for the performance of the contract, or any other forebearance on the part of either the OWNER or the Principal to the other shall not in any way release the Princi~al and the Surety, or Sureties, or either or any of them, the1r heirs, executors, administrators, successors or assigns from their liability hereunder, notice to Surety, or Sureties, of any such alteration, extension or forebearance being hereby waived. This Bond is made for the use and benefit of all persons, firms, and corporations who may furnish any material or perform any labor for or on account of said Work, building or improvements and thef and each of them are hereby made Obilgees hereunder the same as 1f their own proper names were written herein as such, and they and each of them may sue herein. Signed and Sealed this day of 19 In the presence of: ) ) as to ) ) ) as to ) ) ) as to ) (SEAL) (SEAL) (SEAL) Countersigned by Attorney-in-fact DOCUMENT 00620 FORM OF PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS that (Here insert the name and address or legal title of the' CONTRACTOR) as Principal, hereinafter called CONTRACTOR, and (Here insert the legal title of Surety) as Surety, hereinafter called Surety, are held and firmly bound unto (Here insert the name and address or legal title of the OWNER) as Obligee, hereinafter called OWNER, in the amount of Dollars ($ ) for the payment hereof CONTRACTOR and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, CONTRACTOR has by written Agreement, dated 19 entered into a contract with OWNER for (Here insert full name and title) which contract is by reference made a part hereof, and is hereinafter referred to as the contract. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if CONTRACTOR shall promptly and faithfully perform said contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. a. The Surety hereby waives notice of any alteration or extension of time made by the OWNER. b. Whenever CONTRACTOR shall be, and declared by OWNER to be in default under the contract, the OWNER having performed OWNER'S obligations thereunder, the Surety may promptly remedy the default, or shall promptly: 1. Complete the contract in accordance with its terms and conditions, or 2. Obtain a Bid or Bids for submission to OWNER for completing the contract in accordance with its terms and conditions, and upon determination by OWNER and Surety of the lowest responsible Bidder, arrange for a contract between such Bidder and OWNER, and make available as Work progresses (even though there should be a default or a succession of defaults under the contract or contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract Price; but not exceeding, includin9 other costs and damages for which the Surety may be l1able hereunder, the amount set forth in the first para9raph hereof. The term "balance of the Contract Prlce" as used in this paragraph, shall mean the total amount payable by OWNER to CONTRACTOR under the contract and any Written Amendments thereto, less the amount properly paid by OWNER to CONTRACTOR. c. Any suit under this Bond must be instituted before the expiration of two (2) years from the date on which final payment under the contract falls due. d. No right of action shall accrue on this Bond to or for the use of any person or corporation other than the OWNER named herein or the heirs, executors, administrators, or successors of OWNER. SIGNED AND SEALED this day of A.D. 19 In the presence of: ( (Principal ( ( (Title ( SEAL) Witness ( SEAL) Witness ( (Surety ( ( Title ( SEAL) Countersigned by Attorney-in-fact BID TABULATION FOR BITUMINOUS SURFACING, CONCRETE CURB AND GUTTER STORM SEWER, CONCRETE SIDEWALK, AND APPURTENANT WORK FOR THE CITY OF PRIOR LAKE, MINNESOTA PROJECT NO. 92-11 BIDS OPENED: JULY 1, 1992, 10:00 A.M. CONTRACTOR BID BOND TOTAL BASE BID TOTAL BID BASE & ALT. 1. CURB MASTERS. INC. X 51.856.00 60,067.90 2. VIC CARLSON & SONS. INC. 3. GARVEY CONSTR INC X 72.720.00 85.445.00 4. GRALEY CONCRETE 5. KNISH CONST CO INC 6. MN STATE CURB & GUTTER X 57.965.70 66.978.70 7. RYAN CONTRACTING INC X 47.999.00 56.234.00 8. WEST STAR CURB & CONCRETE X 47.377.00 54,491.80 ** 9. ADVANCED CONCRETE. INC X 61.937.50 71,643.50 10. I hereby certify that this is a true and correct tabulation of the bids as received on *DENOTES CORRECTED FIGURE BY: "CELEBRATE PRIOR LAKE'S CENTENNIAL - 1991" NOTICE OF PUBLIC HEARING PUBLIC IMPROVEMENT PROJECT NO. 91-11 BITUMINOUS STREET IMPROVEMENTS, STORM SEWER, GRADING, AGGREGATE BASE, CONCRETE CURB AND GUTTER SIDEWALK, BIKEWAY AND APPURTENANT WORK IN THE CITY OF PRIOR LAKE, SCOTT COUNTY, MINNESOTA Notice is hereby 9iven that the City Council of the City of Prior Lake, Minnesota w111 meet in the Council Chambers in City Hall on Monday, the 15th day of July, 1991 at 8:00 P.M. to consider the improvement of Carriage Hill Road from 500 feet west of the Chatonka Beach Trail and Carriage Hill Road intersection to the Ferndale Avenue and Carriage Hill Road intersection by the installation of bituminous street improvements, storm sewer, grading, aggregate base, concrete curb and gutter, sidewalk, bikeway and appurtenant work. The total estimated cost of such improvement is $475,000.00. The area proposed to be assessed is every lot, piece and parcel benefitting from said improvement, whether abutting or not, within the following described areas: The northwest 1/4 of Section 25, Township 115 North, Range 22 West, Scott County, Minnesota; and the northeast 1/4 and southeast 1/4 of Section 26, Township 115 North, Range 22 West, Scott County, Minnesota. Specific property descriptions included in the description area, but not exclusive, are as follows: above The unplatted property abutting Ferndale Avenue in Section 25, The unplatted property abutting Carriage Hill Road and Pike Lake Trail in Section 26, in the City of Prior Lake, Scott County, Minnesota. The Council proposes to proceed under the authority granted by Chapter 429 M.S.A. All persons desiring to be heard with reference to the proposed improvement will be heard at this meeting. written or oral comments will be considered. Dated: June 18, 1991 By O~~r of the City Council /s/~ )~jJ~~~J~;:t Davia J. Unma t City Manager Published in the Prior Lake American, June 24, 1991 and July 1, 1991. 4629 Dakota St. S.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245 An Equal Opportunity/Affirmative Action Employer June 25, 1992 Dear Resident: On Monday, July 6, 1992, the City of Prior Lake will begin excavating for the concrete sidewalk-on Franklin Trail, north of County Road 21. Prior to this date, I will be setting stakes for the proposed alignment of the sidewalk. If you have any questions regarding the sidewalk's location, please feel free to call me at 447-4230. I can arrange to meet with you at your residence to address any concerns or comments that you may have. ~;l#~ Dou9 Hartman Eng1neering Technician CITY OF PRIOR LAKE DH:jlp 4629 Dakota St. S.E., Prior Lake, Minnesota 55372 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER C.t, .r ..... LAII ..,t Dt'ota Str.lt '.1., 'rlor Llkl, IN 11"1 'AI' ..'-.24' · T.l',~oftt' (612) ..'-.2'0.. fAX COVE. S"E~ DA TI: S~!/7Z ,e,~~ TIMI: /1 ]() hi to: 'AI . S/37rp/J~3 r~OIC: ~Ul'(/ ~ny SUaJECT: ~/ 4A?fc~ "" MESSAGE:.L? ... / /. . J / /.ljf ~,~ ./~/P4f~ ~/4(/A(2 cft1~v~ rCl/)/ /'~(~e //7 & &J/ 2z I~~J --/'7~:)/ ?~ /f9C: ~~~ ,d'o.fft(~, .~ ,~~-~ C~ 4' ~~ I~ V / ~ Number of 'Ig., S.nt (tneludlft9 Thi, '19'): 3' ~ PRIOR LAKE PARKS fRAIL SYSTEK, PHASE II, fRANKLIN fRAIL SIDEWALK CITY PROJECT 192-11 for the City of Prior Lake, Scott County, Kinnesota ERGIIEER'S ESTIHATE RST STAR COHCRETE RYAll CORTRACTIIG IRC, CURB KASTKRS IIC. ITEK URrr TOTAL nIT TOTAL URIT TOTAL URIT TOTAL RUHBKR DESCRIPTIO. URrr QUARTIfY COST PRICE COST PRICI COST PRICI COST PRICE 1. REMOVE & DISPOSE Of EXIST, BITUHIROUS PAVEKERf Sf 290 10,00 2,900,00 3,00 810.00 3,00 870.00 8,00 2,320,00 KlDOT 12104, PRICE PER SQ. YO, 2. RKKOVE & DISPOSE or EIIST, COICRETE CURB & Ll 520 5.00 2,600,00 5.00 2,600,00 3,50 1,820,00 3.50 1,820.00 GUmR, tumor 2104 PRICE PKR LIMEAL n. 3, REKOVK & DISPOSE ot EIIST. COICRETE SIDUALK SF 20 3,90 60,00 2,50 50.00 2.00 40.00 1.50 30,00 KRDOf 2104, PRICE PER SQ. fT. 1,350.00 2.5e 2,25e," 4, SAI EIIST. BITUKIIOUS DRIVEWAY PAVEMEIT, LF 900 3,99 2,180,00 2.99 1,800.00 1.5t KlDOT 2104, PRICE PER LIIEAL rT. 12,00 900,00 5, GRARULAR BORROI DDOT 3149, 4 IRCH GRAlULAR TOR 15 8.00 600,00 15,90 1,125.00 1,00 525.00 CUS8IOI ORDER 6& CalCRETE VALK THRU DRIVEWAYS, PRICK PER TOI 6, BUUKlIOUS KIXTURB lOR DRlVEiAY PATCRIRG, tumor TOR 44 75.00 3,300,00 100,00 4,400,00 65,00 2,8~0.00 60,00 2,640." 2331, fIPE 41A WEARIRG COURSE KIlTURE, COMPLEfE II PLACE, PRICE PER TOR 32,046.00 7. .- CORCRUE VALl, HHOOT 2521, COMPLETE II PLACE SF 21,800 1. 50 32,100.00 1. 24 21,032,09 1.40 30,520.00 1.41 IRC. URAL SHAPIRG & COKPACTIRG or GRARULAR CUSHIOR PRICK PER s~ n, 8, ,- COICRETE VALK, KR r 2521, COKPLETE II PLACE SF 2,156 1. 70 3,655.09 2,09 4,300.09 2,36 5,014,00 1.80 3,810.90 PRICE PER SQ. n, 1 9, CORCRETE CURB & GUTTER, DESIGH B-618, KRDOT 2531 LF 520 8.00 4,166.00 10,09 5,200.00 9,50 4,940.00 11.50 5,980.90 COKPLETE II PLACE, PRICE PER LIMEAL Foor TOTAL BASE BID - ITKKS 1 - 9 52,615,00 n ,311.00 47,999.00 51,856.90 10. REMOVE & DISPOSE OF EXIST. CORCRUE CURe & Ll 80 5.00 400.00 5,09 400.60 3,50 280.00 3.50 280.00 GUnER, KRDor 2104, PRICE PER LIHEAL lOOT 7,011.99 11. e. COHCRETE fALl, tUlDOT 2521, COMPLKn IR PLACK SF 4,170 1.50 1,155,00 1.24 5,914.80 1.50 1,155.00 1.41 lie, FIRAL SBAPIRG & COMPACTIHG or GRANULAR CUSHIOR, PRICE PER SQ. IT. 12. CORCRETE CURB & GUTTER, DESIGR 8-618, KIno! 2531, LF 80 8,00 640.00 10,00 800.00 10,00 800.00 11.50 920.00 COMPLETE II PLACK, PRICE PER L,l, TOTAL ALTERNATE BID ITEKS 10 - 12 8,195,00 7,114.80 8,235.00 8,211.90 fOrAL BASE BID 52,615,00 47 ,311.00 41,999.00 51,856.00 TOTAL ALTERRATE BID 8,195,00 7,114,80 8,235,00 8,211.90 TOTAL BID 60,879,00 54,491.80 56,234.00 60,061.90 ~__~__~~~~__~_.M_.. ----~..-~--...-...;---..-~-.--.-~-..,---__'__..n.. ._~..-'._._-'_.'- -~,-, " ~ J \ ~ ~\ ~ ( I / ~ 1/ \ 1) )ll' / I ' . /f" )~ l / ! i I r i , - ~ ~ I rf ~ ~ ,/ (\\. 1 r~ . 'V 'j ~---" ..p v .---- I -:c~ ___ i VfJn- ----, __L;?r.Lt:t^/2:__ r-p Ie? ----- / ~ 7",A-~J- i . : i.d-N!~5-_----- . I ! --L ------ (. :~'( f~N.L~J___._....~_...__._ 2-CI2~~--:-1 1.:;;0 ;?JZ'l~'il!~ ; il~~ lr _.: ~ ' , aL'l~' ~.:..~ _. ..~c. ...._... _... -.--.21..L~-.---.-L~2.t;?-----.~ --'-~7-.4!;>..L}-.e?...J.--. .-..-----.--.-- ._t/?il.f..... .... ~'~~._.__LN~____7.2'i ....... _~~(::/'W,.S;27~~J .._.+L~>:;:~C. ~) J: ~~ ___~'__~~... __._Z.?{.a....___. ---J.o ~~5?---.-1--~;.-~ ~_~_ .__._, _..___......... .. ..- ~ Z~(~.).._.._.._.....L__.___... '_h.__' 1wc.r ~~y~~iE..__._n_l9. ~~_~_a.,,~9n_J ..~8_.$f>_..__..__.. . .... ...! ~/"'- .. ~6"1 Co _ ~~.~_~. . ___i-L_.___... <l8_2_.__.. _~.!-.~~_ : Z-, ~~L. t"~__ ~ ~ d _.. -;-- C~t~t,-".i~cf:__:~~~~:_ ~~_~.. ......_(:~~....._ .._.~ h~a_.._.. ..__ ~.Lc?J2___-_~-'~/~~O.t!?"~r--."---'-"-- _'h'__ ~_'C:~~/~___ _.L.:.E__ _~?:o______ ?I6.Q._~__~ ~ . t>~J r /+for r ( I . : ~/.,-~~~_~_.~X.'h_.":Z~L______J::_L._._..___ 7;;-~ 0 .~___.L~;;7 ~~i-.._..-_.- (~_.)..- a q\)~~ : I' I . D 1>-. ~ 'I;> t./ 11 j 7 ) I ~D ~f, ::':3-; : r;"'::; ;"~</t> ') . .___..___.__.___.__.... ..__ _...-'-'...___....______..._ ,._. _"'_'_ ....-_. ---------.- -.....---._- --'r :__._1. ---..-. t-.-..------.-..------.. --z.' -. --.-- . L~~~dJ....~L.!.~i~(/Q-----~ .C>.___?:~.I?!?.__' _____~-.. 7.. 3%c) ;J,Z~______.__ ------.---.j~7~~~~.-.------ .';$&t!~:l. I (/2-L/(z.. J J- /7' ';(z) :- .---.------ .~ ...---. .....--.... ...,.... , I --_._--~._-_..._._.. .'-'-' .-. ".' .. ----. --.---.------.. r --..-- - - -- __{10L!_~L_C~_d~-.. _~~!_ /._"-.._ _ 7,..d _.lS.~._.__.___..._.._. I . +_.-...--_....-.-.~..,...~...----'-~.- J._~' (b!/~._du)_-..._~.~~-.--....----..-~7 ..?q.~._~_l' ~ '0 __ .f..~:._d~I..~.~th.L...~L_____.___'_ o. ~ ' !..~.?{:.~-.._.. ~..-.-.:?__.._-.--~---.-...--...---.----...- -~......-.-..__. .... ..--...-.-..., ......--.-'" !I') ;J,.RIYI. 4~~~--1' 1'/C2.____J.M 61 .,- 4M~ f/A-L' 8 /0 . 0 D I ! I;~~::;;=---- -I :-=~---r;~~- : I --- --~:.:~-~~~~:.-~ ----~--.- ~;;::v~_._----- ~; _ Ii:----aa~~~:::--:--.--.- un ..-.-------.-~~: 113.L1-:S'^"''1' J.Y1Lr_____. ___d. .____Q.. .s- ~~ ~__. - D ---.J --.-. ---.._t;~1-3 ) 7 ~ ~ -.--- - ----. ~~_'L_ _ _ . _ _ . . .._ _Lf-? ~o. J.L... 0.___ .... 1./ c>~__._.I_ .__._ _ a._a -_______ .a_ 7€J:1!!!!!I~L 'I:ii:_.un Q . .... _ _ .__9_.. u_. _c?_._ L--....----. ..-.-1 $ __ --eo' _...._..........__..............__.._._. ,_,_,p,~~ /."'.7')'t.'- _... .(0_; ~J~.~. ... - -- -7-t.../..~.. ..--.... ) .-.- .... ..---....-- . ....-'- --,---_.- i 7 .-.' '.1> . I II\~~ ._~ ..-.----.-- _..' ...--\..--...... ----.--..-... ! _.... __.. _.P_,_,._.' '.." ,_~_ _. _~_.__._____.......w...._._..._. ..._'_.... ._.___... _., .." -"_'_'.-.0__'.__ _."....-..'....~....._.__. - ......,"'~....---,--,-...-. I .l-r-L_ZO o fRAIL INfORMATION UNn UUT · A' 'B' 'c' HAIl TOTAL COST TOTAL COST TOrAL COST TOTAL TOTAL COST TOTAL COST ') COST 44 - 21 21 - 13 44-13 AV&, 'A' 'B' 'C' A, B, & C A, B, & C LAnnon Proposed Walk Length L,l, 2500 2540 1070 10898 6110 Proposed Walk Width feet 5 5 5 8 0 Pro)osed Walk Area Sl,lt, 12500 12700 5350 0 30550 Cur i Relonl ,1. 160 180 180 0 520 Prolosed Curb \ L,l, 160 180 180 0 520 to: driveways Kach 19 11 5 0 35 n Driveway Length L,l, 20 20 20 0 Driveway Width L,l, 5 5 5 Driveway Area 5,1, 1900 1100 500 () VALK CORSTRUCTIOR COllon Excavation C, Y. 6,30 648 659 271 0 4,083. n 4,148,67 1,747.67 1584 9,979.67 0,00 0 Relove Concrete Curb & Gutter L,f. 3,50 160 180 180 0 560,00 630.00 630,00 520 1,820,00 B618 Concrete Curb and Gutter L,1, 8,00 160 180 130 0 1,280,00 1,440,00 1,440,00 520 4,160,00 0 Relove Bitulinous Pavelent 5,Y, 3,00 464 269 122 0 1,393,33 806,67 366,67 856 2,566.67 0,00 Sawing Bitulinous Pavelent L.Y. 3,00 760 440 200 0 2,280.00 1,320.00 600.00 1400 4,200.00 0.00 0 Bitulinous Driveway Hixture Ton .50,00 32 18 . 8 1,596.55 924.32 420,15 59 2,941.01 CI. 5 Aggregate Base for Ton 10,00 51 30 13 S19.80 295.72 134,42 94 H0.94 ~) Driveways (4-) [+10t} Concrete Sidewalk (5' wide) S,l, 1.10 12500 12700 5350 21,250.00 _ 21,S90.00 9,095,00 30550 51,935,00 (Includes 4- Sand Cushion) () Sodding Sq,Yd, 1.00 3333 3387 1427 0 3,333,33 3,386.67 1,426,67 8147 8,146,67 0,00 ....~ Landscaping L,S, 500,00 1 1 0 0 500,00 500.00 0,00 2 1,000,00 0,00 :1 Easelents L,S, 500,00 1 1 1 0 500.00 500,00 500,00 3 1,500.00 0,00 Retaining'Valls L,S, 1500,00 1 1 0 0 1,500,00 1,500,00 0.00 2 3,000,00 0,00 ~J Relocating Utilities L,S, 1000,00 1 1.5 0 0 1,000.00 1,500.00 0.00 2,5 2,500,00 0.00 ~) ============================================================================================================================================================================ TOTAL COHSTRUCTIOH COST $39,787,35 $38,542.04 $16,360.56 $94,689,95 $0.00 10t CONTINGENCY $3,978.73 $3,854. 20 $1,636.06 $9,469.00 $0,00 ;.) 151 ERGIHK&RIRG $6,564,91 $6,359,44 $2,699,49 $15,623,84 $0.00 =================================================================================:= TOTAL PROJECT COST $50,330,99 $48,755.68 $20,696,11 $119,782,79 $0,00 TOTAL COST TOrAL COST TOTAL COST TOTAL COST TOTAL COST · A' 'B' 'e' A, B, & C KAII AVE,