HomeMy WebLinkAbout9A - Ring Road (Project 02-05)
16200 Eagle Creek ~J1Xu~~.\!~CIL AGENDA REPORT
Prior Lake, MN 55372-1714
DATE: June 21,2004
AGENDA #: 9A
PREPARED BY: Bud Osmundson, Director of Public Works
SUBJECT:
DISCUSSION:
Agenda app CO's 12 6-04
CONSIDER APPROVAL OF A RESOLUTION APPROVING CHANGE
ORDER NUMBERS 1 & 2 FOR THE RING ROAD PHASE 3 I FIVE HAWKS
I CSAH 23 I TH 13 INTERSECTION IMPROVEMENT PROJECT, CITY
PROJECT NO. 02-06
HISTORY: The proposed Ring Road I Five Hawks Avenue / CSAH 23 I Trunk
Highway 13 intersection improvement project (Ring Road Phase 3 is moving
along a bit ahead of schedule. All of the streets in the project should be
complete by August 31, with the new CH 23 complete by mid-July. We have
had two unexpected issues arise that the Contractor, S. M. Hentges and
Sons, has requested change orders for. The purpose of this agenda item is
to consider a resolution approving the two change orders.
CURRENT CIRCUMSTANCES:
Change Order (C.O.) NO.1 addresses the change in soil conditions found
behind the Thrift Store directly in the alignment of the new CH 23 and 170th
ITower Street. The contractor was performing a designed subcut to remove
unsuitable soils when he encountered a large area containing demolition
debris including wood materials, a junk car and parts, tires, wood logs, and
chunks of asphalt and concrete curb. This material had to be sorted and
trucked to separate land fills for proper disposal. The total of CO No. 1 is
$14,212.60 as itemized on the attached form.
Change Order NO.2 addresses two separate issues. One is the removal of
asbestos from the house in the southwest corner of CH 23 and Ring Road.
This was an unknown to us prior to the bidding of the project. The total cost
of the asbestos removal is $8,103.37 as itemized on the attached form. CO
NO.2 also addresses the trench excavation and installation of non-metallic
conduit for the various private utility companies' crossings of the streets. The
actual conduit is supplied by the utility companies, but to keep the street
construction on schedule it is important that our Contractor install the conduit
so he can continue with the work instead of waiting for the utility companies
to schedule and perform the work which would delay the project indefinitely.
The Contractors unit price is the same price we have on other projects at
$6.00 per foot. The total quantity of this item is estimated to be 1210 lineal
feet, so the total cost of this item is $7,260.00. The total cost of CO NO.2 is
$15,363.37.
www.cityofpriorlake.com
Phone 952.447.4230 / Fax 952.447.4245
The total cost of Change Orders No.'s 1 & 2 is $29,575.97. If approved, the
total contract would rise from $2,948,534.02 to $2,978,109.99.
AL TERNATIVES:
1. A motion to approve a Resolution Approving Change Orders No.'s 1 &
2 for the Ring Road Phase 3 Project, City Project No.02 - 06.
2. Table the resolution for a specific reason.
3. Deny the Resolution.
RECOMMENDED
MOTION: Staff recommends approval of both change orders. The work is necessary
and1Jes are [anable.
Agenda app CO's 12 6-04
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
RESOLUTION 04-xx
RESOLUTION APPROVING CHANGE ORDERS NO'S 1 & 2
FOR THE RING ROAD PHASE 3 PROJECT,
THE CSAH 23 I FIVE HAWKS I TH 13 INTERSECTION IMPROVEMENTS,
CITY PROJECT NO. 02-06,
MOTION BY:
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
SECOND BY:
The City has planned the new intersection of CSAH 23 (Panama Avenue) /
Five Hawks Avenue with Trunk Highway 13, City Project No. 02 - 06, and
identified this project for construction in the Capital Improvement Program
in 2003, and
City Project No. 02 - 06 was awarded to S. M. Hentges and Sons (the
Contractor) on February 17, 2004 and construction began in early April, and
The Contractor encountered construction debris performing sub cutting
operations which requires extraordinary sorting and landfilling procedures
which is proposed to be added to the contract as Change Order No.1, and;
The Contractor encountered asbestos in procedures required during the
permitting of the house demolition which requires extraordinary removal
procedures and is requested to install non-metallic conduit for private utility
crossings to keep the project on schedule, all of which is proposed to be
added to the contract as Change Order No.2.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOT A:
1. The recitals set forth above are incorporated herein.
2. That Change Orders Numbers 1 & 2 in the amount of $29,575.97, as itemized and shown on the
attached are approved and added to the Contract for City Project No. 02-06.
3. Funding for the Change Orders will be drawn from the Collector Street Fund.
Passed and adopted this 21st day of June 2004.
{ Seal }
Agenda app CO's 12 6-04
YES
NO
Blomberg Blomberg
Haugen Haugen
LeMair LeMair
Petersen Petersen
Zieska Zieska
City Manager
www.cityofpriorlake.com
Phone 952.447.4230 / Fax 952.447.4245
TH 13/CSAH 23 RING ROAD STREET & UTILITY IMPROVEMENTS
CITY OF PRIOR LAKE, CITY PROJECT NO. 02-06
S.P. NO. 7001-921S.A.P. NOS. 70-623-007/201-020-03/201-113-03/201-122-01
WSB PROJECT NO. 1283-03
APRIL 16, 2004
OWNER:
CONTRACTOR:
CITY OF PRIOR LAKE
16200 EAGLE CREEK AVENUE SE
PRIOR LAKE, MN 55372
S.M. HENTGES & SONS, INC.
650 QUAKER AVENUE
P.O. BOX 69
JORDAN, MN 55352
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION:
The excavation behind the Thrift Store has unearthed debris that cannot be disposed of as standard excavation. The Contractor is
hereby directed to legally dispose of this debris. The work will involve separating the debris from the soil, sorting the debris per the
disposal site guidelines, and hauling the debris to the site. The Change Order detail adds the new items to accomplish this work.
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
$14,212.60 NET INCREASE OF CHANGE ORDER:
1 0/31/2004
NONE
1 0/31/2004
NONE
1 0/31/2004
ORIGINAL CONTRACT PRICE:
PREVIOUS CHANGE ORDERS: N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER:
NET INCREASE/DECREASE OF THIS CHANGE ORDER:
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS:
$2,948,534.02 ORIGIN'Al SUBSTANTIAL COMPLETION DATE:
$0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS:
$2,948,534.02 SUBSTANTIAL COMPLETION DATE PRIOR TO THIS CHANGE ORDER:
$2,962,746.62 SUBSTANTIAL COMPLETION DATE WITH APPROVED CHANGE ORDERS:
APPROVED BY:
p/- ;;pJhz;
WSB & ASSOCIATES, INC.
ENGINEER
S.M. HENTGES & SONS, INC.
CONTRACTOR
APPROVED BY:
Bud Osmundson, P.E., Director of Public Works
DATE
Page 1
F:IWPWlM1283-03\EXCELICO 1CO-1
TH 13/CSAH 23 RING ROAD STREET & UTILITY IMPROVEMENTS
CITY OF PRIOR LAKE, CITY PROJECT NO. 02-06
S.P. NO. 7001-92/S.A.P. NOS. 70-623-007/201-020-03/201-113-03/201-122-01
WSB PROJECT NO. 1283-03
April 16, 2004
ADDED ITEMS
Item No. Description
Qty
Unit
Price
Extended Amount
TEMPORARY PAYMENT
BASE BID
188
189
190
191
192
193
2123.501 COMMON LABORERS
2123.610 SUPERVISOR
2123.610 BOBCAT
2123.574 2.5 CU YO FRONT-END LOADER
2123.610 HAULING
2105.607 DISPOSE OF DEBRIS
64 HR $47.41 $3,034.24
8 HR $84.89 $679.12
32 HR $98.12 $3,139.84
8 HR $131.20 $1,049.60
40 HR $80.48 $3,219.20
510 CY $6.06 $3,090.60
$14,212.60
$14,212.60
TOTAL INCREASE CHANGE ORDER NO.1
ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT
Page 1
F:\WPWIN\1283-03\EXCEL\CO 1C01 Detail
TH 13/CSAH 23 RING ROAD STREET & UTILITY IMPROVEMENTS
CITY OF PRIOR LAKE, CITY PROJECT NO. 02-06
S.P. NO. 7001-921S.A.P. NOS. 70-623-007/201-020-03/201-113-03/201-122-01
WSB PROJECT NO. 1283-03
June 14, 2004
OWNER:
CONTRACTOR:
CITY OF PRIOR LAKE
16200 EAGLE CREEK AVENUE SE
PRIOR LAKE, MN 55372
S.M. HENTGES & SONS, INC.
650 QUAKER AVENUE
P.O. BOX 69
JORDAN, MN 55352
YOU ARE DIRECTED TO MAKE THE FOllOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION:
The Contractor is hereby directed to completely remove asbestos from the building on the Bendlin parcel. Further, the Contractor shaH
instan conduit of various sizes under the proposed roadways and driveways at the lengths staked in the field and at the locations
shown on the map provided at previous construction meetings. The Change Order detail adds the new items to accomplish this work.
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT PRICE: $2,948,534.02 ORIGINAL SUBSTANTIAL COMPLETION DATE: 10/31/2004
PREVIOUS CHANGE ORDERS: $14,212.60 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $2,962,746.62 SUBSTANTIAL COMPLETION DATE PRIOR TO THIS CHANGE ORDER: 10/31/2004
NET INCREASE/DECREASE OF THIS CHANGE ORDER: $15,363.37 NET INCREASE OF CHANGE ORDER: NONE
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $2,978,109.99 SUBSTANTIAL COMPLETION DATE WITH APPROVED CHANGE ORDERS: 1 0/31/2004
APPROVED BY:
il~
't- 7
~ftvv/
WSB & ASSOCIATES, INC.
ENGINEER
S.M. HENTGES & SONS, INC.
CONTRACTOR
APPROVED BY:
Bud Osmundson, P.E., Director of Public Works
DATE
Page 1 F:IWPWlN\1283-03\EXCELICO 2CD-2
TH 13/CSAH 23 RING ROAD STREET & UTILITY IMPROVEMENTS
CITY OF PRIOR LAKE, CITY PROJECT NO. 02-06
S.P. NO. 7001-921S.A.P. NOS. 70-623-007/201-020-03/201-113-03/201-122-01
WSB PROJECT NO. 1283-03
June 14, 2004
ADDED ITEMS
Item No. Description
Qty
Unit
Price
Extended Amount
TEMPORARY PAYMENT
BASE BID
194
195
2104.601 REMOVE ASBESTOS MATERIAL
2503.603 TRENCH EXCAVATION
1
1210
LS
LF
$8,103.37
$6.00
$8,103.37
$7,260.00
TOTAL INCREASE CHANGE ORDER NO.2
$15,363.37
$15,363.37
ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT
Page 1
F:\WPWIN\1283-03\EXCEL\CO 2C02 Detail