Loading...
HomeMy WebLinkAbout09 16 2013 EDA Report 8B attachO BRIO 0 KW7N E S 6 -); ' County Highway 42 Study Land Use and Transportation Plan August 29,2013 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 WSB Tel: (763) 541-4800 • Fax: (763) 541-1700 &A ...... wsbeng.com .......... 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 WSB Tel: (763) 541-4800 • Fax: (763) 541-1700 &A ...... wsbeng.com County Road 42 Study - Land Use and Transportation Plan City of Prior Lake Introduction Prior Lake has historically been described as a small town, resort community, with development focused around Prior Lake. However, the city's location in the Twin Cities metro area has positioned it for growth pressure, due to its proximityto downtown Minneapolis (less than 20 miles), good access to the interstate and highway system, and the availability of natural and commercial amenities. Between 1980 and 2000, the City of Prior Lake more than doubled in population, from 7,000 to almost 16,000 residents (see Figure 1). The Metropolitan Council's estimated population for 2030 is 40,000 residents which, as evidenced by Figure 1, would stay on track with historical increases in population over the last 30 years. 45,000 40,000 35,000 30,000 l r 25,000 ' -- - Projected Population (Met Council) 20,000 --41--Actual Population 15,000 10,000 5,000 1980 1990 2000 2010 2020 2030 Figure 1. Population Trends- City of Prior Lake WSB & Assao,l -, In,. Introduction/ 1 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake However, the past five years have brought many adjustments in the national and regional development markets, both in the housing and commercial sectors. Regionally, the Twin Cities saw a 75 percent drop in residential housing permits between 2004 and 2008, which put a downward strain on the economy as a whole. The City of Prior Lake experienced a similar slowdown in the rapid residential growth it had experienced throughout the 1990s and 2000s (Figure 2), which resulted in an over - prediction of future housing and commercial developmentfor 2010 and beyond. It isnecessaryfor the cityto re- analyze its population and employment projections to accommodate these market corrections and to plan for the future. 900 800 700 600 500 400 _ -zi- Residential Building AL Permits -MO 700 100 _ 0 0 r-I r.l m Ln 0 as M 0 r-1 rq n 0 0 O 0 0 0 0 o v a r-1 r_1 O 0 0 v 0 Q o 0 0 0 Q 0 0 N N N N N . N N N nl fV ra N Figure 2. Annual Housing Statistics- City of Prior Lake WSB Introduction/ 2 BOONE AV S E CANDLEWOOD LN NE RYE C DOGWOOD LN REDWING DR EJAYST County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Existing Conditions Environmental As part of this study, existing natural resources and potential environmental constraints were reviewed. Data sources were broken into three categories: Parkland and Rare Natural Features, Surface Waters, and Soils and Slopes. Figure 4 summarizes the environmental data collected and analyzed The natural resources data reviewed were obtained from the following resources: • MN Department of Natural Resources (DNR) • US Fish and Wildlife Service (US FWS) • Federal Emergency Management Agency (FEMA) • City of Prior Lake • Natural Resource Conservation Service (NRCS) • MN Pollution Control Agency (PCA) The DNR's Natural Heritage Information System (NHIS) for Scott County revealed a Maple- Basswood forest located north of County Highway 42 in Section 22 of Township 115N, Range 22W. A WSB It is recommended that impacts to this area be avoided or minimized to the greatest extent practicable. The US FWS Section 7 Consultation Website was also reviewed. No Federally - listed species are present within Scott County. Existing Conditions/ 4 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Parks Pike Lake Surface Water Data on the surface waters present within the study area were obtained from the US FWS, DNR, and FEMA. The City of Prior Lake's Shoreland Ordinance was also reviewed. Various types of surface waters exist within the study area. The US FWS National Wetlands Inventory was reviewed and 104 NWI wetlands, covering 189 acres of land, exist within the study area. If impacts to these wetlands are proposed, approvals and replacement may be required through the Wetland Conservation Act and US Army Corps of Engineers. The DNR Public Waters Inventory maps were reviewed and nine PWI wetlands were identified within the study area. These wetlands comprise 104 acres of land. There is also a DNR Public Watercourse adjacent to the study area. A WSB Two parks are located within the study area. Pike Lake Nature Area is a nature area located northeast of the County Highway 42 and County Highway 21 intersection. The park covers approximately 47 acres and provides several passive recreational op- portunities. The parkwas developed with LAWCON funding, and is therefore protected under Section 6(f) of the Land and Water Conservation Act. Horkey Park at Shepard's Path is also located within the study area. It covers 15.8 acres and includes a picnic shelter, walking trail, and is a nature preserve. This Park is covered under Section 4(f) of the Department of Transportation Act. Contaminated Property The MN PCA's What's In My Neighborhood web application was used to perform a desktop review of potentially contaminated areas. Based on the results of the desktop review, there are no potentially contaminated sites within the study area. Federal Emergency Management Agency floodplain maps were reviewed and an area around Pike Lake was identified as being within the 100 -year floodplain. Impacts to 100 -year floodplain may be required to be mitigated for within the same floodplain area. The City of Prior Lake's Shoreland Ordinance was also reviewed. The Shoreland Ordinance applies to any land within 1,000 feet of a Public Water. Within the study area, this applies to Pike Lake, Jeffers Pond, Haas Lake, and Lower Prior Lake. Structures within the Shoreland Ordinance zone must be set back 75 feet from the Ordinary High Water level (as determined by the DNR) of the waterbody. In addition, no more than 30 percent of land cover within this zone may be impervious when used for residential purposes. Existing Conditions/ 6 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Soils The NRCS Soil Survey of Scott County and LIDAR (remote sensing technology) data were used to determine areas that may be difficult to develop. Soils were generally considered correctable from a development standpoint. Slopes above 18 percent were identified as areas where transportation networks may be difficult to construct. Slopes above 25 percent were identified as areas where development in general may be difficult. A WSB Land Use Study Area includes 1,105 acres of land. The existing land use is primarily agricultural and vacant land, butthere are also several hundreds of acres that are wetland, lakes, and publicly -owned parkland. The City's Comprehensive Plan, completed in 2005, guided the property in the study area for a variety of land uses, including low, medium, and high density residential uses, business officepark, neighborhood and community level retail, and hospitality. The Comprehensive Plan is the guiding policy documentfor all decision making within the City. It contains goals, objectives and policies to guide public and private land use development, redevelopment and preservation of all lands and waters within the City. The City's goals are centered on housing quality and diversity, environmental and natural resource protection, economic vitality, security, access, information technology, human development, infra- structure, urban expansion area, and efficiency in government. The City identifies current land uses, analyzes growth projections, and makes future land use determinations. The future land use map is the primarytool used to guide future development on individual parcels. The text and policies in the com- prehensive plan are reflected in the Zoning Ordinance and other official development controls. A variety of different future land uses make up the study area along the County Highway 42 corridor. Existing Conditions/ 7 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Low Density Residential (R-LD) 600 acres — This land use designation is primarily for detached single family homes at densities of 0 -4 dwelling units per acre, as well as schools, churches, recreational space and public buildings. Single family attached units in cluster developments or mixed use developments may be permitted through issuance of a conditional use permit or planned unit developments. Low density residential is optimal for areas with variable terrain or for environmentally sensitive resources. They are generally served by neighborhood parks and are buffered from commercial and industrial uses. Medium Density Residential (R -MD) 18 acres — This land use designation provides an opportunity for a wider range of housing options at slightly higher densities than the low density residential designation. Single family homes, cluster developments and planned unit developments at densities between 4.1 and 7.1 units per acre are typical for this land use. Areas designated for medium density residential are intended to be in close proximity to employment and transit centers and have good access to collector streets. The also serve as a transition between low density residential areas and commercial and industrial areas. A WSB High Density Residential (R- HD) 138 acres — These areas are primarily intended for attached homes and apartments at densities of 7.1 -20 dwelling units per acre. They help to create population centers and provide opportunities for affordable housing. They are generally located near employment and transit centers and have good access to collector streets. High density residential areas typically serve as a buffer from traffic from commercial and industrial areas. Business Office Park (C -BO) 203 acres- This land use designation is intended to serve a combination of small professional services with low traffic generation. Higher design standards promote compatibility with adjacent high density housing and provide opportu- nities for shared parking and open space. Some typical uses might include corporate headquarters, professional and administrative offices, and limited research, development and manufacturing facilities. Restaurants, hotels and other businesses having limited contact with the public and where no retail sales are conducted may also be appropriate as conditional uses. These areas are typically located near arterial access points, such as intersections of arterials and /or major collector streets. Existing Conditions/ 8 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Transportation Background The transportation network provides access to the various land uses and amenities within a community. It also provides connections to adjacent communities and to the greater Twin Cities metropolitan area. Because transportation, be it roadway, transit, pedestrian /bicycle, plays a critical role in how a community is served, planning for changes and upgrades to that overall network it is an important part of any community's comprehensive plan. It also requires coordination and cooperation with multiple agencies to ensure that transportation needs are being met. Unlike land use, which the City of Prior Lake has jurisdiction over, the transportation network has multiple owners. Some roadways are developed and maintained by the city, while others are controlled by Scott County or the Minnesota Department of Transportation (MnDOT). The transit system and bicycle and pedestrian networks can also be developed by the city and by outside agencies such as the county and Metro Transit. County Highway 42 is one of the city's most important roadways — however, it is owned and maintained by Scott County. Part of the reason that it is operated by the county is due the role it plays in linking communities and other transportation facilities. County Highway 42 provides an east -west connection to several communities, including the Cities of Savage and Shakopee. Beyond Scott County, the highway A WSB links to Burnsville, Apple Valley and Rosemount. In addition to linking to other communities, County Highway 42 links to other important transportation facilities such as trunk highway (TH) 13 and County Highways 17, 83, 21 and 18. Because of its role in the transportation network, Scott County has invested significant resources in studying County Highway 42 and developing long -term recommendations for its design, the amount and type of access and the supporting transportation facilities that are needed in order to ensure that it will continue to serve demand into the future in a safe and efficient manner. The county has developed the long -term recommendations with the assistance of the communities along the corridor in order to ensure that the planned land can be adequately served. Some of the studies initiated by the county occurred before the City of Prior Lake last updated its comprehensive plan (1999 study; 2004 maps for the city's comprehensive plan) and other studies occurred after the city adopted its comprehensive plan. Transportation/ 10 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Collector (both major and minor) roadways provide linkages to larger developments and community amenities. They generally do not link communities to one another. Collector roadways generally favor access to the system over mobility, but they try to balance to two competing needs. Collector roadways are generally lower speed than the principal or minor arterial routes. Collector roadways are usually owned and operated by cities, although counties have some of these facilities. Local roadways provide connections to individual homes and commercial uses. These roadways favor access over mobility and provide short linkages within communities. These roadways are owned by cities and townships. The City of Prior Lake's transportation plan identifies County Highway 42 as an existing principal arterial route from the city's eastern border to County Highway 18 (Crest Avenue NE). It shows it as a future principal arterial route to County Highway 21 (Eagle Creek Avenue NE) in the future. West of County Highway 21 it shows County Highway 42 as a minor arterial route. The transportation plan also identifies a future County Highway 21 corridor to the north and the addition of major and minor collector routes parallel and connecting to County Highway 42. Roadway Network and Access — Scott County Since the city's comprehensive plan was completed there have been additional studies completed and updates to Scott County's comprehensive plan. These studies and comprehensive plan amendments have made some changes to the functional classifi- cation of county highways and have included access modifications to County Highway 42. Changes have included the following: Scott County, along with MnDOT and the Cities of Savage and Prior Lake completed a corridor study in 2008 which identified access locations along County Highway 42 from County Highway 21 through the City of Savage. Maximum allowable access identified in the City of Prior Lake included the following: • County Highway 21— full access with a traffic signal - Pike Lake Road —full access with a traffic signal WSB • Meadowlawn Road —full access with a traffic signal • Ferndale Avenue — three - quarter access • County Highway 18 —full access with a traffic signal • New connection —(east of County Highway 18) right -in /out access • Aspen Avenue —full access with a traffic signal • Kensington /Meadow Avenue — right -in /out It should be noted that the maximum allowable access is what the future could accommodate. Traffic signals will not be installed until they meet the required traffic signal warrants. Following the 2008 County Highway 42 study, Scott County made changes to its comprehensive plan. These changes included: • County Highway 42 has been designated as an existing principal arterial route to County Highway 21. • County Highway 42 has been designated as a future principal arterial route through the entire City of Prior Lake. • County Highway 21 north of County Highway 42 has been constructed and has been designat- ed as a principal arterial route. Because the county extended the principal arterial designation beyond County Highway 21, new access strategies will be required for roadways west of County Highway 21. Figure 7 on the following page shows existing access as well as the access strategies identified in the 1999 and 2008 plans. The Scott County CIP also calls for expansion of County Highway 83 from two lanes to four lanes between Wilds Parkway and County Highway 82 with Transportation/ 12 • Rolling Oaks — right -in /out access County Road 42 Study • Land Use and Transportation Plan City of Prior Lake a multiuse trail. CH 83 is currently four lanes from County Highway 42 to Wilds Parkway with a multiuse trail. The project is scheduled for 2015 and will provide additional capacity and pedestrian and bike connections between County Highway 42 and County Highway 82. This project is being led by the efforts of the Shakopee Mdewakauton Sioux Community. Longer -term, the county's plans include for widening County Highway 42 to four lanes through the City of Prior Lake and into the City of Shakopee. The expansion is currently planned for 2020. Future Network and Access — City and County This study reviews the access identified in the 1999 and 2008 studies in context with the new principal arterial designation for the whole corridor through the community. It will also review the supporting collector roadway network identified in the city's comprehensive plan to ensure that it can supportthe proposed development along County Highway 42 and takes into account environmental constraints and property owner input. As part of the review, future traffic volumes will be identified on the existing and proposed transportation network. At the base level, it is assumed thatthe county and city would work together to preserve the right of way needed to accommodate an eventual six -lane facility on County Highway 42 with separated multi -use trails on both sides of the corridor to support pedestrian and bicycle mobility. Market Demand The Commercial Market The Prior Lake Commercial and Industrial Demand Analysis (Maxfield, 2011) was prepared to provide insight into future market conditions and demands for commercial and industrial development within the City of Prior Lake, not just the study area. The study projects what an additional 900,000 square feet will be needed to meet the demand for retail, office and industrial space through 2030. This is a 72 percent increase from the 1.25 million square feet that existed in 2011. Approximately 100 to 120 acres of land will be needed to accommodate this additional space. These statistics are based on economic and demographic trends, as well as the existing commercial supply and market conditions. The table below breaks down the type of demand projected over five year increments. FIGURE 8. Commercial and Industrial Summary 2010 -2030 According to the 2030 Comprehensive Land Use Plan, the County Highway 42 Study Area contains 145 acres of land slated to be zoned for commercial (mostly community retail) and 200 acres slated to be zoned for Business Office Park. Much of the planned industrial property lies outside of current City boundaries and is slated to be annexed in 2014. Therefore, it is necessary to re- examine the need for business office parks in the study area. A WSB Transportation/ 14 2010 -2015 2015 -2020 2020 -2025 2025 -2030 Total Retail 55, 000 125,000 125,000 125,000 125,000 Office 45,000 100,000 75,000 75,000 295,000 Industrial 20,000 40,000 60,000 1 260,000 60,000 180,000 Total 120,000 1265,000 260,000 1905,000 FIGURE 8. Commercial and Industrial Summary 2010 -2030 According to the 2030 Comprehensive Land Use Plan, the County Highway 42 Study Area contains 145 acres of land slated to be zoned for commercial (mostly community retail) and 200 acres slated to be zoned for Business Office Park. Much of the planned industrial property lies outside of current City boundaries and is slated to be annexed in 2014. Therefore, it is necessary to re- examine the need for business office parks in the study area. A WSB Transportation/ 14 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake The anticipated demand for industrial development suggests smaller manufacturers, construction firms, and wholesale companies with less than 10 employees and will need 10,000 square feet or less. The study concludes new development of industrial space may be limited by the large amount of space being marketed in the area. Given Prior Lake's proximity to larger regional shopping areas, increased demand for future retail space will be gradual and will be predicated on what happens in places such as Burnsville, Shakopee, and Lakeville. The demand for retail space will likely grow in direct relation to the growth of the local population. The Maxfield study reports a retail leakage in 2010 of 53 percent. Leakage is the concept that demand for retail in the city will be developed in other cities. The analysis suggests that reduced leakage from Prior Lake will result from new small to medium size stores that serve the local population with goods and services and could be accommodated on land along County Highway 42. Based on the 2030 Comprehensive Land Use Plan, the land designated for future retail development is ideally situated all along the corridor. It is, however, important to note that planning for future retail along County Highway 42 may put negative pressure on small to medium retailers located in downtown Prior Lake. Based on the estimated demand for additional office space, the land slated for future Business Office Parks at the corner of County Highway 42 and County Highway 18, and the corner of County Highway 42 and County Highway 21 will not be necessary. Both sites have direct access to U.S. Highway 169 and are well - located for Business Office Parks. However, given the anticipated need for smaller businesses serving the local population and business base, the Business Office Park slated forthe corner of County Highway 42 and County Highway 21 would be more ideal. Another piece of valuable information regarding the commercial market is to examine employment data for Prior Lake. Figure 9 summarizes the changes in employment overtime. Employment numbers have remained relatively low despite population increase. In fact employment decreased between 2000 to 2010, when population increased 43 percent (almost 7,000 people) over the same time period. This indicates thatthe employment market is currently weak in Prior Lake, although it is anticipated that employment will grow by 2030. The EDA business plan anticipates a growth of 1,800 new jobs in Prior Lake between 2011 and 2030. 14,000 17,000 �i i 10,000 �i•fii 8,000 —f- Projected Employment 6,000 (Met Council) - �— Actual Employment 4,000 2,000 0 - 1970 1980 1990 2000 2010 2020 2030 Igure 9. employment Growt WSB Transportation/ 15 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake 350 300 250 200 #Residential Building 150 Permits 100 So 0 2004 2006 . 2008 2010 2011 Figure 10. Residential Building Permits Isssued (Prior Lake) 25000 20000 15000 —W—Residential Bulldirg 10000 Permits 5000 0 2004 2006 2008 2010 2011 Figure 11. Residential Building Permits (Twin Cities Metro) The Housing Market As part of this study, available data related to housing starts, population, and employment were analyzed at city, county, and regional levels. Given the housing market slump for the past five years, it is important to consider both long -term trends and very short -term rebounds) rather than analyzing mid -term housing trends. Figures 10 and 11 depict a summary of permits issued in Prior Lake and the Twin Cities from the past 10 years. These graphs show a similar trend in new housing starts. The housing market bottomed out in 2008/2009 at a low of less than 25 percent at its peak, but has begun to recover, gaining back to about 50 percent of the housing starts in 2011/2012 as the peak of the market in 2004. This is consistent when looking at the region, or Prior Lake. Over the past 12 years Prior Lake has, on average, issued 272 building permits per year. However, given changes in demographics regionally, and the current demand for new housing, this study concludes that 272 new housing starts per year is not likely; the number will be lower. The demand for single - family housing will remain strong, as evidenced by the consistent construction of single - family housing even in the years of least construction (see Figure 12) but the amount oftownhome and apartment development will be weak in the near future. Therefore, our study uses an average of 150 to 180 new housing starts per year when analyzing the needs for additional land in the study area. Transportation/ 16 - Figure 12. Prior Lake Residential Building Permits byType WSB County Road 42 Study • Land Use and Transportation Plan City of Prior Lake '! 7 Plans For The Future Prior Lake 2030 Vision and Strategic Plan The 2030 Vision and Strategic Plan identifies the community's vision for the city, and provides a broad blueprint on how to get there. One area specifically mentioned in the plan that is within the study area is the Vierling & Summit Preserve (at County Highway 21 and 42). The area is envisioned as a business incubator and technology village, including a community college, conference center and resort hotel at the lake, all connected by trails. The plan goes into further detail to describe the vision for specific areas. The 2030 vision for this area is described as "a 22nd century, high technology village for living, working and playing ". It will include a mix of single family homes, apartments and senior housing and cater toward high end commercial stores such as "REI, Whole Foods, Haskell's and Hockey Giant ". "The Vierling Property (at County Rd. 42 and Pike Lake Tr.) is an example of a complete eco- friendly and healthy - living neighborhood. A mix of single family homes, multi - family housing and daily - needs -based businesses are connected in a pe- destrian- friendly, self- sustaining community within a community. The Vierling Property (at County Rd. 21 and 42) is a mix of retail and family units. The historical significance of farming and natural environment features like water and rolling hills are incorporated into development designs. Trails intersect with the existing trail system." A WSB Plans For The Future/ 18 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake WSB &a � a�rares, zn�. Prior Lake Economic Development Authority Business Plan The Prior Lake EDA Business Plan is a document intended to guide the EDA towards achieving the City's vision with regard to economic development. The City's goals regarding jobs and businesses added and increase in market value are described as follows. The "Base" figures are projections based on normal market conditions while the "New" figures represent increases beyond the historical average. A goal of the EDA is to work towards increasing the number of pad -ready sites for commercial and industrial development. The City has a significant amount of property guided for commercial and industrial use; however, little of it can be development ready within 30 -90 days. The EDA has compiled a commercial and industrial land inventory to manage this task and utilizes the 2011 Maxfield C/I demand analysis report to project demands for commercial and industrial land. The EDA will continue to evaluate actions necessary to make more sites pad -ready to meet potential demands. This effort is estimated to result in 10 new businesses and 300 new jobs by 2020. The plan states the EDA will explore other ways to encourage commercial and industrial development in targeted areas of the City, with specific mention to the County Highway 42 corridor. This may include feasibility reports for utilities or building partnerships with land owners. The EDA also wishes to analyze existing city codes and fees to make Prior Lake more "business friendly ". 5 -Year Time Periods Base Jobs Created (Historical) Plus New Jobs Created Base Businesses Added Plus New Businesses Added Base Value Increase (Historical) Plus New Value Increase 2000 -10 5 -Yea r Avg. 235 Xxx 10 xxx $17 M xxx 2011 -2015 250 125 10 5 $20 M $10 M 2016 -2020 350 175 15 S $25 M $12 M 2021 -2025 300 150 12 6 $22 M $11 M 2026 -2030 300 150 13 6 $23 M $12 M Total 2011+ 1,200 600 50 25 $40 M $45 M Figure 15. Expected Employment Growth -EDA Business Plan Figure Assumptions: 1. 2000 -10 'Base information is based on city building permit activity reports or new commercial and industrial construction, not including public facilities and mutli- family rental housing 2. Annual increase in base jobs, business and value continue trends from 2000 -2010 3. Estimated increase due to Economic Development ('New') uses the Base times 1.5. 4. Total city /county /school taxes below are estimated using $2.75 per square foot of building space. Plans For The Future/ 20 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Industry Construction Employees 352 Percent 4.5% SMSC Est. 25 Wholesale Trade 112 1.41 101 Retail Trade 353 4.5% 12.9% Finance, Insurance and Real Estate 223 2.91 Education and Health Services Professional and Technical Services 162 2.11 25 Management,Admin. and Other Services 659 8.41 25 Accommodation and Food Service 3,533 45.2% 3,250 Arts, Entertainment and Recreation 149 1.91 75 Public Administration 919 11.7% Other TOTAL EMPLOYEES 1,361 7,823 17.4% 100°1 400 3,800 Figure 16. Employment within sub - industries- Prior Lake 2010 Industry Establishments Percent Construction 93 16.6% Trade, Transportation and Utilities 101 18.0% Financial Activities 72 12.9% Professional and Business Services 120 21.4% Education and Health Services 59 10.5% Leisure and Hospitality 29 5.2% Other Services 52 9.3% Public Administration 4 0.7% Other 30 5.4% TOTAL BUSINESS ESTABLISHMENTS 560 100% Figure 17. Number of Establishments within sub industries- Prior Lake 2010 WSB &a � a�rares, zn�. Plans For The Future/ 21 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Property Owner Feedback Individual Property Owners /Ownership Groups Shakopee Mdewakanton Sioux Community (SMSC) SMSC Property- The Shakopee Mdewakanton Sioux Community (SMSC) owns 256 acres of land in the study area in fee or in trust. Based on discussions with representatives from the SMSC, it is anticipated thatthe land currently held in fee will ultimately become trust land, removing it from the land use jurisdiction of the City of Prior Lake. However, it is beneficial to discuss what the SMSC's vision for the property is in order to plan for needed infrastructure improvements. The SMSC is currently undertaking an in -depth land use analysis and plan fortheirtrust property. In general, the plan is to develop property in Prior Lake as mostly low- density residential, with the exception of land immediately adjacent to key intersections, where there is an opportunity for commercial development. More specific information will be available when the SMSC completes their land use planning process; however, for the purposes of this study, we included both low- density residential land uses and commercial land uses in planning for the future of the SMSC - controlled property. A WSB Vierling Property — The Vierling family owns 381 acres within the study area, which includes of the 109 acres of property on the southeast corner of CSAH 21 and County Highway 42 and 272 acres o located on the east side of Pike Lake. Repre- sentatives for this land have been involved in the discussions regarding changes in land use and have not raised dispute with the proposed designations. Shepherd Property — The Shepherd Property is currently exempt from the moratorium in place, however it is subject to analysis under this study. The representatives from K. Hovnanian have been part of the planning process, and wish to see the property remain guided for a single - family residential land use. Bolger Property — The Bolger property owners have been involved in this study, and have primarily commented on the importance of the alignment and design of the roadway connection between Carriage Hills Drive and County Highway 42. Given the need to locate the intersection as far west as possible for access spacing and safety reasons, a future connection to Carriage Hills Drive will be located partially on the Bolger property. The exact alignment and configuration will come at the time when a development application is. However, it is important to visualize this connection as part of the K. Hovnanian plat, since the development of one piece affects the other. The owners anticipate developing i low- density residential housing. Plans For The Future/ 22 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Property on Eastern Portion of CSAH 18 — Feedback from two property owners located on the east of CSAH 18 in the study area, their plans were to construct and stay in their single - family homes forthe foreseeable future. Previous Summit Preserve Property — City staff engaged with representatives of Cardinal Development, the company that currently controls the former Summit Preserve parcel. They envision a mixed use concept on their property. Community Feedback Several comments regarding proposed land uses were received from the public at the draft plan meeting held on July 9, 2013. Regarding land use, a comment was received that it makes sense for the commercial lot on the south side of Fountain Hills Drive NE to be rezoned to high density residential. In addition, there was concern expressed over the entire northeast corner of County Highway 42 and County Highway 21 being guided for mixed use. Access to this corner is a concern. Commercial will be most important if County Highway 42 and County Highway 21 is to become a gateway to Prior Lake. Access and size of parcels should not be limited. There was also a concern over the parcel at the northwest corner of Pike Lake Trail and County Highway 42 being entirely guided for commercial when wetlands are an issue on the site. A WSB There was interest expressed in seeing more community gardens with new development as a way to promote local sustainability and community involvement. Interest in multi -modal transportation options, specifically infrastruc- ture for pedestrians and cyclists on new or improved roads was also inquired about as a way to allow residents opportunities to exercise and save money. Comments were received regarding the potential for public transpor- tation within the City of Prior Lake, such as a circulator bus that connects neighborhoods to desirable locations like downtown Prior Lake, Village Market and the Savage commercial district, or the potential for a street car along county highways 21, 42, and trunk highway 18. Plans For The Future/ 23 Summit Preserve County Road 42 Study • Land Use and Transportation Plan City of Prior Lake ii Summary of Land -use Findings Below is a summary of this study's findings, based on an analysis of the existing conditions: • 80 to 90 acres of additional commercial prop- Some property in the study area has immedi- erty is needed city -wide to meet the demand ate availability. The eastern most properties by 2030; therefore, the amount of land guided in the study area (Summit Preserve) do not as commercial, business office, and retail in have ready access to sewer and water the study area should be reduced. However, facilities, and have significant environmental given the EDXs goals for job growth, having resources; therefore development should be extra land available for commercial develop- staged accordingly. ment is also desirable. • 20 to 30 acres of industrial land is need- Property owners and the City of Prior Lake ed city -wide to meet the demand by 2030; have a desire to develop their property in a therefore, there may be an opportunity for market - driven way; therefore, their individual some additional industrially guided land in thoughts and desires should influence the the study area. outcome of this study • Current housing starts suggest an average of 150 to 180 new starts annually, resulting in an additional 2,400 to 2,800 households in Prior Lake (which is significantly lower than the 2005 Comp Plan anticipates); therefore, a discussion about the location of new resi- dential housing in Prior Lake is necessary. A WSB &�s,a�E ares,zn�. Findings/ 24 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Land Use Recommendations Given the uncertainty of the future, a fbxible approach was of paramount value when proposing an alternative land use scenario for the study area. However, equally important are the property owner's visions and the stated vision of the community found in the Prior Lake 2030 Vision and Strategic Plan. Given the findings of this study, Figure 18 outlines changes to the land use map and associated comprehensive plan amendment are recommended. 1) Reduce the amount of land guided for solely residential. Currently, 600 acres of the study area are guided for low density residential, 18 acres guided for medium density, and 136 acres guided for high density housing. This study recommends a flexible approach through establishment of a mixed -use district rather than limiting land to primary low density, single - family uses. The following 430 residential acres remain outside the new mixed use areas: • Proposed R -Low Density (R -LD) 362 acres gross total Average density of 2 dwelling units per net acre • Proposed R- Medium Density (R -MD) 15 acres gross total Average density of 4.1 dwelling units per net acre Proposed R -High Density (R -HD) 53 acres gross total Average density of 7.1 dwelling units per net acre A WSB Recommendations / 25 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake the proposed development and roadway network, therefore it makes sense to leave flexibility in the location of commercial development to the proposer. Given the site's proximity to future parkland and high value natural resources, it seems likely that any residential development would be low- density residential. It makes sense to guide this area for some high density housing to serve as a buffer between commercial and lower density residential uses. This site, however, is challenged by the necessity of a developer to have to assemble several properties owned by multiple property individuals. Proposed Mixed Use 2 0 (50 percent commercial; 25 percent R- Medium Density, 25 percent R -High Density) • 66 acres gross total • 33 acres gross commercial • 17 acres gross residential at 4.1 units per net acre • 17 acres gross residential at 7.1 units per net acre This proposed mixed use district is likely to be the most compatible with immediate development. The entire property is owned by one individual, it is well served by sewer and water, and its location on the southeast corner of County Highway 21 and County Highway 42 position it well for the development market. The city desires to see half of the mixed use piece be developed with commercial uses catering to traffic along the corridor, but recognizes that development may be somewhat constrained by the existence of a large wetland complex. The adjacent property guided for low density and high density residential will probably ultimately become part of an overall development plan, butthe city felt it important to retain those designations, given existing adjacent land uses. The study anticipates some medium density residential also planned for the mixed use district to serve as a transition between the low density land uses and commercial along the corridor. Proposed Mixed Use 3 (25 percent commercial, 50 percent R- Medium Density; 25 percent R -Low Density) - • 207 acres gross total WSB • 52 acres gross commercial • 51 acres gross residential at 2 dwelling units per net acre • 104 acres gross residential at 4.1 dwelling units per net acre The Mixed Use 3 District is also well suited for immediate development. It too is owned by one individual and is located in an area that is well served by the transportation system, but also has high natural resource value. While the city anticipates most of the land near Pike Lane being developed as lowdensity residential, the remaining 207 acres of the Vierling property is anticipated to be developed with as a Planned Unit Development with a variety of uses proposed. Key to developing this parcel will be obtaining adequate backage roads to serve local traffic, as outlined in the transportation reccomendations. This study envisions the development of medium density housing to serve as a transition between lowdensity housing and commercial uses. While 52 acres of commercial use for this property is probably more than adequate to accommodate the market, it is important to understand the city's 2030 Strategic Plan and Vision guidance for this area as a premiere office /technology campus in the future. Proposed Mixed Use 4 M (25 percent commercial, 75 percent R- Medium Density) • 49 acres gross total • 12 acres gross commercial • 37 acres gross residential at 4.1 dwellings units per net acre The area on the northeast corner of County Highway 18 and County Highway 42 has previously had a development proposal, Summit Preserve. While that approval has expired, the landowner still intends to develop it as a mixed use site. Therefore, this piece is also guided for medium density residential, with a small amount of commercial likely near an access onto County Highway 42. However, this property is challenged by the immediate lack of full sanitary sewer service, and may be a number of years before service is readily available. This study does not foresee immediate development Recommendations / 27 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake at this site. When development does occur, it should be noted that anew access point at Aspen Avenue should be anticipated, at which time access from County Highway 42 to Kensington and Meadow should be eliminated, and alternative access from the new Aspen Avenue would be made to accommodate existing development. 4) It is anticipated that the land currently owned in fee by SMSC will be entered into trust prior to its development. However, given the impacts this area has on transportation and land use planning, assumptions were made about land use in the area, in consultation with SMSC. Therefore, portions of this land have been designated for low- density housing and for mixed use, as depicted below. This allows for proper planning of the area, but acknowledges that final layout and plans fall within the control of the SMSC, especially if the land is put under trust. A WSB Proposed Mixed -Use 5 EM (SMSC) (75 percent low- density residential, 25 percent commercial) • 182 acres gross total • 46 acres gross commercial • 136 acres gross residential at 2 dwelling units per net acre 5) Add a land use designation for public/ semi - public. This study recommends the addition of a public /semi - public land use district to the land use plan. The purpose of this district is to accommodate future or existing land uses dedicated to park, permanent open space, large stormwater management ponds, or other uses that are not classified in other districts and are used to benefit the public. Other uses include land owned by Scott County for right of way purposes and utility substations. This district allows the city to identify lands intended for use to benefit the public and not guided for development. The total acreage proposed for Public /Semi - Public in the study area is 87 acres. Recommendations / 28 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake ii Future Transportation Plans Draft Concept Plan — June 2013 In addition to collecting information about previous studies and plans for County Highway 42, meetings with city and county staff were held to better understand any existing transportation concerns as well as to identify any new information that should be included as part of the study. As part of the discussions, previous plats and concepts that had been submitted to the city (but were ultimately not approved or built— due to changes in the economy) were also reviewed. Additionally, the county and city were asked to provide input on the recommendations of the previous plans and studies — were there things that in hindsight did not look like it could work? The meetings with city and county staff confirmed that County Highway 42 needed to be treated as a principal arterial throughoutthe entire city. This means that the access originally identified in the 1999 study of County Highway 42 is no longer applicable. In the 1999 study, the area west of County Highway 21 (Eagle Creek Avenue) was identified as a minor arterial. Additionally, the county indicated that it would prefer to have access along County Highway 42 reflect opportunities that are actually feasible — taking into consideration the types of development, resources that have to be avoided, etc. A WSB & Assao,l -, In,. The city confirmed that local roadways were needed both north and south of County Highway 42 to support development that is planned along the corridor. The city acknowledged that the supporting roadways should function as collector roadways — that they should link the development to County Highway 42 and not necessarily provide direct driveway access. The City of Prior Lake directed the consultant team to use the information obtained from the environmental scan performed as part of this study to help identify where it would generally be feasible to construct continuous supporting roadways. Locations where there were significant slopes, wetlands, and sensitive species /resources were to be avoided if practical. Finally, information from past plans was used to understand generally what traffic volumes were expected in the future based on land use in the city's 2030 Comprehensive Plan. While the study partners understood that land use will be changing — it was a base to understand general demand in the area and to understand the demand for through traffic on County Highway 42. The information above was used to develop a preliminary supporting roadway and access concept plan that was presented to property owners along the corridor on June 4, 2013. This same information, with comments received from the property owners noted, was presented at a joint planning commission and city council meeting on June 17, 2014. Figure 19 shows the original preliminary concept. Recommendations / 29 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Steps in the Forecasting Process The Scott County Travel Demand Model follows a standard four -step process, in which the major model components are: • trip generation • trip distribution • mode choice • traffic assignment Trip Generation The first step in forecasting travel is trip generation. Information from land use, population and economic forecasts is used to estimate how many person -trips will be made to and from each zone. Trip generation is estimated by applying trip generation equations to socioeconomic information. Trip production zones are based on household characteristics such as the number of people in the household and the number of vehicles available. Trip attractions are based primarily on the number and type of jobs (retail or non - retail) in a zone. Trip Distribution In the trip distribution stage, trip ends are linked together to form an origin- destination pattern of trips. The number of trips between two points is dependent upon their attractiveness for a given trip purpose and the separation (distance or travel time) between the points. A zone with a large number of trip attractions will receive a greater number of trips than one with a small number of trip attractions. The other primary factor in trip distribution is distance. The number of trips from an origin zone to a given destination zone decreases with increasing travel time between the origin zone and the destination zone. A WSB Mode Choice Here, trips between a given origin and destination are split into trips using different modes of travel including public transit and personal vehicles. Calculations are conducted that compare the attrac- tiveness of travel by different modes to determine their relative usage. The Metropolitan Council's Regional Travel Demand Model includes a sophis- ticated mode choice model. This project maintains consistency with all of the coefficients, networks and processes. Traffic Assignment The fourth step in the modeling process assigns trips to specific routes. These routes are first determined based on the shortest travel times between origins and destinations. The assigned trip volumes are then compared to the capacity of each link to determine which links, if any, are congested. If a link is congested, the speed on the link slows, resulting in longer travel time assigned to that link. Trips on congested links will be shifted to less congested links until there is a system -wide balance between travel demand and travel supply. Recommendations / 33 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Travel Forecasting Process Travel forecasting involves a series of mathematical equations that attempt to simulate human travel behavior. The models follow a sequence of steps that answer a series of questions about traveler decisions. The goal is to simulate choices that travelers make in response to a given system of highways. Many assumptions need to be made about how people make decisions, the factors they consider, and how they may react to a particular alternative. The travel simulation process follows trips as they begin at a trip - production zone (e.g., Home), move through a network of links and nodes (roads and intersections), and end at a trip- attracting zone (e.g., Workplace). TAZ Comp Plan Data Proposed Development Change 2030 Pop 2030 Emp 2030 Pop 2030 Emp 2030 Pop 2030 Emp 1784 2252 389 3231 1062 979 673 1852 402 545 470 22 68 -523 1854 107 35 119 14 12 -21 1855 493 341 1162 387 669 46 1856 520 0 1300 557 780 557 1857 1013 576 1105 886 92 310 1943 349 0 1341 304 992 304 1973 1434 186 2377 1314 943 1128 1976 1207 38 1636 0 429 -38 1978 1582 139 699 734 -883 595 Total 9359 2249 13440 5280 4081 3031 WSB Recommendations / 34 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake As shown in Figure 23, TAZ zones 1784,1852 -1859, 1943, 1973, 1976, and 1978 directly feed traffic into the project area. The Scott County and City of Prior Lake planning organizations agree thatthe population and employment in these zones is different than was originally planned. These local changes in population and employment estimates affect year 2030 forecast traffic volumes in the study area and have been applied to the Scott County Travel Demand Model. The travel simulations used in the Scott County model represent the highway system as a network. The networks consist of links to represent highway segments and nodes to represent intersections. Data for links include travel times on the link, average speeds, capacity, and direction of travel. Node data include information about intersections and the locations of the nodes (coordinates). A WSB &a 2030 Traffic Volumes The traffic projections for County Highway 42 are shown in Figure 24. It should be noted that the model takes into account transportation improvement projects that have been funded at the regional and local level. Recommendations / 36 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Summary of Transportation Findings Below is a summary of the findings related to the transportation network and access along County Highway 42. County Highway 42 is an important roadway in the regional transportation network. It needs to be able to provide safe and efficient travel within the county. Because of its importance, Scott County has identified it as a Principal Arterial Roadway throughout the county — including all of Prior Lake. Previously, it was identified as a Principal Arterial from the east- ern city limits to County Highway 21. • County Highway 42 needs to function at a high -level in order to accommodate future traffic demand. Access on County Highway 42 will be limited to preserve mobility and maintain safety. Road- way connections to County Highway 42 should generally be collector roadways and above, with a majority of the connections being other principal or minor arterials. A WSB It is the county's intention to preserve 200 feet of right of way along County Highway 42 in order to ensure that adequate capacity can be provided for along the corridor. As plats and development along the highway are submit -ted for review and comment, this area must be shown for roadway and trail hudre (trips) on County Highway 42 will increase as land uses intensify and more development occurs. • County highway connections to County High- way 42 (such as County Highways 83, 21 and 18 also play an important role in the transpor - tation network. Access to these roadways is also managed by the county to ensure reliable traffi c fl ow and safety. Because access is limited to the county highway network, a majority of the access to future development will need to come from the city street network and the street network operated by the SMSC. Therefore, these street networks need to provide continuous travel where feasible. Recommendations / 38 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake • Portions of the existing roadway network will be above capacity (roadway will become congested) without improvements. Segments of roadways expected to experience congestion include: County Highway 42 west of County Highway 83 (Canterbury Road S) County Highway 42 between County Highway 83 and County Highway 18 • Based on the network identified in the revised concept plan, adequate connections should be provided for local trips. The proposed roadway network and access plan has some flexibility as implementation occurs. Alignments and exact access loca- tions may be tweaked as plats are submitted and reviewed by the county and city. Howev- er, roadway connections that are shown as continuous need to be so. The type of access shown in the plan is the expected access along the corridor. A WSB Recommendations / 39 County Road 42 Study • Land Use and Transportation Plan City of Prior Lake Transportation Recommendations Below is a series of recommendations for the transportation network. Most of the improvements identified on the map should be implemented as development occurs. However, timing for improvements such as traffic signals will be dependent upon meeting certain requirements called traffic signal warrants. Until an intersection meets those warrants, it is not good nor safe practice to install a traffic signal. The county and city will coordinate with one another on the installation of proposed traffic signals, just as they will for proposed roadways and access as plats come in for review and approval. Recommendations for the future roadway network and access locations included feedback from stakeholders atthe July 9th meeting, results of the travel forecasting and input from city and county staff A WSB & Assao,l -, In,. 1) The proposed transportation network and access map (Figure 25) should guide the development of local street connections that support intensification of land use along County Highway 42. 2) The proposed transportation network and access map show the ultimate connections and access types that are proposed along /near the corridor. Because development is incremental, not all of the changes will be made at once, nor are they likely all needed at once. This means that some connections may not be completed until additional development occurs and some access locations may not get their traffic signals right away. Trafft signals should only be installed once the intersection meets the required signal warrants. 3) The supporting roadway network should be sensitive to environmental resources within the community. Impacts to wetlands, slopes, etc. should be avoided if possible and minimized if they cannot be avoided. Transportation / 40