HomeMy WebLinkAboutCorrespondence
,'-
~.~ VALLEY ENGINEERING CO., INC.
Civil Engineering for Public Works
and Private Industry
November 10, 1992
~~
~j-- ,,~
,/ i'~
~~ ~
~~
Mr. Larry Anderson, P.E.
Director cl Public Works
City of Prior Lake
4629 Dakota Street, S.E.
Prior Lake, MN 55372
Re: Holly Court Street Extension and Channel Crossing.
Dear Larry:
Due to interruption of the work schedule as a result of the rejection of the bids, we have been forced to
postpone the preconstruct Ion conference as planned. This situation has left us holding expenses which
would otherwise have been invoiced. As originally proPOSed, one fourth of the fee was due upon completion
of the preconstruction conference. Since we are about half-way to the preconstruction conference, we are
requesting that the fee for the bid phase portion of the work be split into one eighth due now, and one eighth
due after the re-scheduled preconstruction conference is complete.
An invoice reflecting this request is attached. Please give it kindly consideration. Thank you.
Sincerely,
~~
Steven D. Harvey, P. E.
President
SDH/sdh
attachment
7301 Ohms Lane, Suite 500
Minneapolis, Minnesota 55439
(612) 832-9475 · Fax 832-9542
---..
- .A l. _, VALLEY ENGINEERING CO., INC.
~\
Civil Engineering for Public Works
and Private Industry
Mr. J. W. Knoblaugh
13017 Maywood Lane
Hopkins, MN 55343
1::1~~J::
JA ' "/~/)
N 'S
~l'lCrry ~99.1
rilOI1 OF
(41((:
January 12, 1993
Re: Holly Court Impoundment Structure, City of Prior lake Project No. 92-12 and Development of the
Plat of Holly Court.
Dear Joe:
Last October, after the bids were rejected by the City Council, I met with an independent contractor on
the site to evaluate a scaled-down version of the proposed project. By eliminating the concrete retaining
wall and railing and by draining down the existing impounded water, the base project construction cost,
including engineering, surveying and inspection fees, could be reduced to $47,991.00. Public funding for
the project cannot exceed $45,230.00. The City Engineer is determined to proceed with the project and
has arranged for an extension of the funding. In order for the work to commence, two options are
available: 1 ). Reduce the construction cost by scaling down the scope of the work b~ructing a
narrower dam, or 2). Arrange for public\private cost sharing of the project as planne~etaining wall
and raili ng. -:"
\oj
The first option would restrict street construction across the proposed dam. Additional costs would be
needed at some future date to widen the roadbed. The second option would require infusion of private
capital into the municipal project. Essentially, the city is asking that you enter into an agreement to pay
for all costs over and above $45,230.00 if option two is implemented.
In conjunction with the impoundment structure, it is prudent to include the construction of sanitary sewer
and watermain stubs across the outlet pipe as an additional cost. These items were included in Alternate
No.1 in the bid documents. The low bid price was $7751.00.
Additional grading and erosion control measures to finish the house pads and complete the sewer, water
and streets will cost $27,577.25 after Option 1 and $22,413.05 after Option 2. Summaries of ail the
improvement costs in consideration of each of the two options are given in the following page. Please
review this data and let me know whether or not you wish to proceed with either of the options as
presented. If you have questions or need more information, I will be happy to respond.
cc: Larry anderson
attachments
7301 Ohms lane, Suite 500
Minneapolis, Minnesota 55439
(612) 832-9475 · Fax 832-9542
; .
,_.
DESCRIPTION OPTION 1 OPTION 2
Bid proposal without item 2.07
(Reinforced Conc. Ret. Wall) and item
2.11 (Steel Pipe Railing) per Busse
Const. $~ 1,902.00
Bid proposal as above, but scaled down
with narrower dam. $39,141.00
Alternate No. 1 - Sanitary Sewer &
Watermain Stubs per Jay Bros. f $ 7,751.00 $ 7,751.00
(;,
Engineering, surveying & inspection fee
for City Project 92-12. $ 6,089.00 . $ 6,089.00
Additional grading to complete
development after City Project 92-12 is ?
completed. $ 7,792.00 $},loo.00 '"
Additional sanitary sewer & watermain
construction after City Project 92-12 is
completed.
? $ 8,573.25
I.,
$ 8573.25
Street construction
$ 8,702.25
$ 8,702.25
Engineering, surveying & inspection fee
for additional public works construction
after City Project 92-12 is completed.
$ 2506.75
$ 2,037.55
Public funding
-$45,230.00
-$45,230.00
TOTAL
$35,325.25
._~
\~~/~~~
sea I I COUNTY
HIGHWAY DEPARTMENT
600 COUNTRY TRAIL EAST
JORDAN, MN 55352-9339 (612) 496-8346
FAX (612) 496-8365
BRADLEY J. LARSON
Highway Engineer
DANIEL M. JOSE
Asst. Highway Engineer - Design
DON D. PAULSON
Asst. Highway Engineer - Construction
August 14, 1991
Larry Anderson, Engineer
city of Prior Lake
4629 Dakota street SE
P.o. Box 359
Prior Lake, MN 55372
Mr. Horst Graser
City of Prior Lake
4629 Dakota street SE
P.O. Box 359
Prior Lake, MN 55372
\e: Scott County Transportation
~ ~"' study
Dear M~on and ~ser:
Enclosed for your City's review an~ comments is a Draf~ Scott
county Transportation Study. The draft study incorporates all
the transportation-related issues that were submitted by the
Cities and Townships in November, 1990. In addition, issues
and other transportation elements were developed by Scott
county and the consultant firm of Strgar-Roscoe-Fausch, Inc.
We are requesting your comments on the draft study by Friday,
September 27, 1991 in order to incorporate your input into the
final document tentatively scheduled for submittal to the Scott
County Board of Commissioners in November, 1991.
The format for the final study report will be the review of the
comments/issues noted in the draft, along with your comments on
the draft itself and the development of staff/consultant
recommendations on those issues. Therefore, it is very
important that your issues be noted toegether with
justification/documentation on why your community's position be
adopted. This is particularly true in the jurisdiction and
transportation issues portion of the draft study (Chapter 3).
In addition, the County Board would very much appreciate input
and help in developing a mechanism for implementing and
coordinating the projects/programs of the Transportation Plan.
A brief and not necessarily complete outline of the Plan
Implementation is shown in Chapter 8.
An Equal Opportunity I Affirmative Action Employer
A
Mr. Larry Anderson
Mr. Horst Graser
Re: Scott. Co. Trans. study
August 14, 1991
Page 2
To help in finalizing comments on the Transportation Plan, we
have scheduled Wednesday, September 25, 1991 for individual
community meetings with the Consultant and County staff.
Please call Karin Gray at 496-8346 before September 20, 1991 to
schedule your time. We estimate approximately 1/2 to 3/4 of an
hour for each meeting.
If you have any special concerns and would like additional
meetings, please call and we will try to make arrangements.
Sincerely,
~~
Bradley J. Larson, P.E.
County Highway Engineer
BJL/kmg
Enc.
cc: County Commissioners
Joe Ries, County Administrator
,)-.,
---...
./
February 16, 1994
Mr. Pete Beckius
scorn COUNTY SOIL & WATER CONSERVATION DISTRICT
107 Water Street
Jordan, MN 55352
RE: HOLLY CmCLFJCA.l~S STREET IMPOUNDMENT S .I.,D,UCTURE lJ.t"'JJA.I.~
Dear Pete:
As you are aware, the City has attempted to obtain other funding sources, to help pay for some of the
costs of the impoundment structure. When the City advertised for this project in September 1992,
the bids received were more than 2 1/2 times higher than the estimates for the project. The City felt
the project would not be feasible without assistance from the developer, or other source. When it
became apparent the developer was not prepared to make this commitment, the City looked for other
funding sources.
The latest attempt by the city for this funding assistance was in the form of the EPA grant, which
was submitted by the Watershed District late last summer and early fall When the EPA grant was
not awarded to the Watershed District, Public Works Director Larry Anderson felt the project should
be abandoned.
I wanted to thank you for your patience and understanding while the City was working towards
obtaining additional funding for this project. A scaled back version of the original project was
investigated, which would have reduced the project costs to what the original estimates were.
However, it was staft's opinion that a better alternative would be to install much simpler, less costly
structure, which would not require the use of the &.& gilt awarded by the Board of Soil and Water
Resources. I apologize for the time it took to make this determination.
If you would like to discuss this project, or would like more information, please call me at 447-4230.
Thank-you.
Sincerely,
~.~
Assistant City Engineer
CJ.~ i OF PRIOR LAKE
BUacj
BLB16O.BNG
4629 Dakota St. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER