HomeMy WebLinkAbout5K Approving Plans/Specs for Maplewood 14-012 1:1> PRIO
4646 Dakota Street SE
4 fINNESO t ` Prior Lake, MN 55372
CITY COUNCIL AGENDA REPORT
MEETING DATE: FEBRUARY 24, 2014
AGENDA #: 5K
PREPARED BY: SENG THONGVANH, PROJECT ENGINEER
PRESENTER: SENG THONGVANH
AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION APPROVING PLANS AND
SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS
FOR THE MAPLEWOOD STREET IMPROVEMENT PROJECT (CITY
PROJECT #14 -012)
DISCUSSION: Introduction
The purpose of this agenda item is to seek approval from the City Council
for the plans and specifications and authorize advertisement for bids for the
Maplewood Street Improvement Project.
History
Each year the City reconstructs street segments that are scheduled for
reconstruction as part of its Capital Improvement Program (CIP) and have
exceeded their useful design life. The City uses the Capital Improvement
Program and its Pavement Management Program to plan for infrastructure
improvements and the financing for capital improvements. At its
September 9, 2013 meeting the City Council adopted Resolution 13 -128
authorizing staff to prepare a Feasibility Report for the Maplewood Street
Improvement Project as outlined in the CIP.
The M.S. Chapter 429 process applies to all projects that will be financed in
whole or in part through special assessments or bond proceeds.
The Maplewood Street neighborhood is considered in the report and
includes improvements to JoAnna Stepkas 4th Addition, Brooksville Center
1St, Brooksville Center 2 " and S 02, T 114, R 22 1.19A in E1/2 SW1 /4.
These properties were platted and developed in 1973. A map of the project
area (Figure 1) is included in the Feasibility Report. The proposed
improvements include street reconstruction, storm sewer, storm water
quality, concrete curb and gutter, concrete sidewalk, and appurtenant work.
City utilities under the street are also proposed to be repaired or
reconstructed base on need. Watermain and sanitary sewer is proposed to
be replaced for the entire segment of Maplewood Street.
On November 12, 2013, Council adopted Resolution 13 -169 accepting the
Feasibility Report and calling for a Public Hearing on December 9, 2013 for
the Maplewood Street Improvement Project. At the December 9, 2013
Public Hearing, one person spoke regarding the project.
In addition to the Public Hearing, the City has held two informational
meetings to discuss the project. The last informational meeting was an
open house held on February 12, 2014 and offered residents the
opportunity to comment on the proposed plans. At the open house persons
from 1 business and 1 residential property were represented. City Staff
explained the proposed design and passed out information regarding the
various programs available. Since the open house, City Staff has been
busy finalizing the design.
Current Circumstances
The project includes storm sewer, sanitary sewer, water main, concrete
curb and gutter, aggregate base, concrete sidewalk, bituminous surfacing,
and appurtenant work. The construction of this project is proposed to be
funded through special assessments, tax levy, and the Sewer and Water
Fund.
At this point the project design is complete and it is appropriate to seek City
Council authority to advertise for bids. A copy of the plans is available in
the Engineering Department for review. Once the bids are received, City
Staff will present the bids to the City Council for award. If the bids received
are higher than expected, the City Council can elect not to move forward
with awarding a contract.
ISSUES: Driveway Reconstruction and Lake Friendly Programs
The driveway reconstruction program has been modified from previous
projects. Private driveway bid items will be obtained for the project but all
costs and agreements for private driveway reconstruction will be between
the property owner and contractor. The contractor will be required to
provide full private driveway replacement quotes based on bid item unit
prices.
The Lake Friendly Program was not offered to individual property owners.
Funding sources are being allocated for larger scale water quality projects.
FINANCIAL The table below shows the funding of this project.
IMPACT:
Assessments $127,070
Sewer & Water Fund $210,866
, Tax Levy $190,604
Project Total Cost $528,540
The estimated assessment rate is proposed at $109.38 per front footage for
street improvements.
ALTERNATIVES: The alternatives are as follows:
1. Approve Resolution 14 -XX approving plans and specifications and
authorizing advertisement for bids for the Maplewood Street
Improvement Project #14 -012.
2. Deny this item for a specific reason and provide staff with direction.
3. Defer this item until a future date.
RECOMMENDED A motion and a second to adopt a Resolution approving plans and
MOTION: specifications and authorizing advertisement for bids for the Maplewood
Street Improvement Project #14 -012.
PR101P
ti
try
4646 Dakota Street SE
` iNEso ' Prior Lake, MN 55372
RESOLUTION 14 -xxx
A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE
ADVERTISEMENT FOR BIDS FOR MAPLEWOOD STREET
IMPROVEMENT PROJECT #14 -012 FOR THE CITY OF PRIOR LAKE, MINNESOTA
Motion By: Second By:
WHEREAS, Pursuant to Resolution 13 -182, adopted on December 9, 2013, the City Engineer
has prepared plans and specifications for the Maplewood Street Improvement
Project (Project #14 -012),
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The plans and specifications for the Maplewood Street Improvement Project #14 -012, a copy
of which is attached hereto and incorporated by reference herein, are hereby approved.
3. The City Manager shall prepare and cause to be inserted in the official newspaper of the City
and in the Construction Bulletin an advertisement for bids for the making of the improvement
pursuant to the attached plans and specifications. The advertisement shall be published not
less than 21 days prior to the bid opening, shall specify the work to be done, and shall state
that the bids will be received by the City Manager at which time the bids will be publicly
opened at City Hall at 4646 Dakota Street SE by the City Engineer. No bids will be
considered unless sealed and filed with the City Manager and accompanied by a cash
deposit, cashier's check, bid bond, or certified check payable to the City of Prior Lake in the
amount of five (5) percent of the amount of such bid.
4. The City reserves the right to reject any and all bids for any reason as determined solely by
the City Council.
•
PASSED AND ADOPTED THIS 24TH DAY OF FEBRUARY, 2014.
YES NO
Hedberg Hedberg
Keeney Keeney
McGuire McGuire
Morton Morton
Soukup Soukup
Frank Boyles, City Manager