CONSIDER A REPORT CONCERNING TOPSOIL
REQUIREMENTS, LANDSCAPING, SODDING, WEED
CONTROL, EROSION CONTROL AND DRAINAGE ISSUES
ON NEW LOTS
On June 21, 2004, the City Council considered the final plat
for Sterling South 2nd Addition, At that time, there were some
questions posed about erosion control and drainage on the
lots within the existing subdivision, These questions led to a
larger discussion about the development of existing lots,
including topsoil, landscaping, erosion control and drainage,
and weed control. The Council directed staff to report on
these issues,
The purpose of this agenda report is to provide the City
Council with some background on these issues,
Topsoil Reauirements: Section 1005,1100 of the
Subdivision Ordinance currently requires the following:
1005.1100. TOPSOIL AND SODDING. The builder shall
spread a minimum of four inches (4'~ of topsoil over the
boulevard, front and side yards, All boulevard, front and side
yard areas shall be sodded except those areas that are
landscaped. Such topsoil and sodding shall be installed by the
builder prior to the issuance of a certificate of occupancy,
The purpose of the topsoil requirement is to aid in the
landscaping on the site and also to help conserve water. The
reality is that the topsoil on every site is different, so the
effectiveness of this provision is questionable because the
staff does not inspect the depth or quality of the topsoil
installed.
If a more aggressive topsoil requirement were adopted, new
black dirt would have to be brought in for each building lot,
and the native topsoil hauled away, This could increase the
cost of the new homes by up to $2,000. This amount would
be even greater if more topsoil, i.e, 6" rather than 4", is
www.cityofpriorlake.com
1:\04 files\04 subjectlerosion rePDJl'fiE,fll!'<lJ!J11''ll47,4230 / Fax 952,447.4245
Page 1
required, In addition, we are not currently staffed to manage
the additional inspections this would require,
Theoretically, the placement of topsoil will help to conserve
water. However, this depends on the type of topsoil used on
the site and, most important, on the watering habits of the
property owners, Most new homes in Prior Lake include a
landscape sprinkling system, which can discourage rather
than encourage water conservation,
Landscaoina and Sod: The Subdivision Ordinance also
requires each new single family dwelling to install sod and at
least 2 front yard trees. The City collects a $1,500,00 builders
deposit with each permit in order to assure satisfaction of
these provisions, The City will not issue a permanent
certificate of occupancy, or release the builder's deposit until
these items are complete.
The placement of landscaping and sod is very dependent on
the weather and the season of the year, In essence, the City
will issue temporary certificates of occupancy, with the
condition that the landscaping and sod be completed on the
following schedule:
Landsca e & Sod Deadline
October 15
November 15
Au ust 15
While we do our best to keep track of open permits, the
amount of construction activity limits staff's ability to follow-up
on these issues. At present, we have 1,918 open permits.
Most often, follow-up inspections take place when a
homeowner requests the return of the builder's deposit.
Erosion Control: Erosion problems can occur in any
developing community, Up until a few years ago, erosion
control was the responsibility of the individual builders, We
have since evolved our strategy so the developer is
responsible for the overall erosion control of a new
subdivision. This includes the placement of silt fence, street
cleaning and the like, These responsibilities are listed in the
development contract and the developer is responsible until
the City accepts all of the public improvements and releases
the contract and the letter of credit. This strategy seems to be
working, Complaints are most often made as a development
nears completion, and the first homeowners in the area
become frustrated with the construction activity,
1:\04 files\04 subject\erosion report\cc report.doc
Page 2
Drainaae: Drainage issues usually become apparent after
the lots have been graded, sodded, or rains has compacted
the soil to a final grade, or as the second generation of owners
make changes to lot grading, This is another area in which
our approach has evolved over the last few years,
In order to try to prevent drainage issues, we now require as.
built grading plans as part of the development contract. The
developer must also identify the types of houses to be located
on each lot (I.e, walkouts, lookouts, etc,), Any change to the
grading or house style at the building permit stage must be
approved by the Engineering staff before any permit will be
issued,
This strategy also seems to be effective, Many of the
problems we encounter are a result of changes made by the
builders or the property owners after the City has completed
its inspections,
Weed Control: City Code provides that vegetation in excess
12" must be cut. State Statutes also identifies about one
dozen species as noxious weeds. Staff members in the Public
Works Department are responsible for weed inspections, The
inspections are conducted on a complaint basis.
The staff sometimes receives complaints about weeds on
undeveloped parcels of land, These parcels may be
agricultural, or they might be in transition between agricultural
and developed, An example is some of the platted, but
undeveloped land in The Wilds. The question is whether or
not these larger parcels should be held to the same standards
as parcels adjacent to built-out areas.
The existing City Code provides that properties meeting
certain criteria can be declared natural preserves by the
Council and by doing so become exempt form mowing. The
Council could decide to allow the staff to make the natural
preserve determinations to speed up the process.
Another option might be to amend the City Code to exempt
parcelS of land that are greater than 1 acre and do not abut a
lot with an existing building from the weed provisions, This
would address portions of subdivisions which are awaiting
development.
ISSUES:
In the most recent complaints the City Council has received,
the issues are primarily a result of work that occurred after the
City had completed inspections and signed off on the project.
The homeowner's association is responsible for fixing the
problems,
1:\04 files\04 subject\erosion report\cc report.doc
Page 3
More generally, the staff deals with these issues every day.
Because we are a growing community, there is a lot of
construction activity, which, as we all know, is noisy and
messy, We try to deal with these problems in the following
ways:
1, Identify the specific issues with each complaint, and then
work with the developers, builders and property owners to
solve the problem.
2, When necessary, utilize the tools for enforcement of the
ordinance, This may include completing the work and
drawing down a letter of credit or spending the builder's
deposit to reimburse the City for the cost of this work,
3. Continue to evolve our strategies for dealing with these
issues, This may mean changing policies or even
ordinances so we have fewer issues and problems.
ALTERNATIVES:
As the City continues to grow, we will continue to face these
challenges. The staff has identified a few, long-term
strategies the City Council may wish to consider in the future,
1, Reauire as-built certificates of surveys orior to
aooroyal of a foundation insoection. This will help to
identify issues on the lot, such as improper grading,
setback problems and so forth, This will help to minimize
future problems and allow a builder to fix existing problems
or mistakes before they are too far along in the
construction process, It will also provide a survey for
future building permits in many cases, The downside of
this action is that it will be an additional cost to the builders
and homeowners.
2. Take a more aaaressiye aooroach to enforcement and
utilize the existina builder's deoosit. Under this
approach, when the City receives a complaint or notices a
problem, we would provide the builder or developer with a
violation notice and allow a relatively short period of time to
correct the problem. If it is not corrected, the City will
contract to have the problem fixed and draw on the
builder's deposit to reimburse the cost of the work, The
builder or developer must then replenish this deposit
before commencing any additional work related to that
permit.
3, Review staffina needs. As the City grows, and especially
as the orderly annexation is developed, we need to review
our staffing needs to manage this development. This may
include the need for additional inspectors, permit
reviewers, and support staff to aid in the follow-up
1:\04 files\04 subject\eroslon reportlcc report.doc
Page 4
inspections, This will require that we establish priorities in
dealing with the different types of issues and needs that
will inevitably occur with growth,
CONCLUSION:
The staff is requesting Council direction on these matters, in
order that changes can be considered for the 2005 general
fund budget.