CITY COUNCIL AGENDA REPORT
MEETING DATE: June 23, 2014
AGENDA#: 5J
PREPARED BY: Jake Theisen, Maintenance Superintendent
PRESENTED BY: Jake Theisen
AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION ACCEPTING BIDS AND
AUTHROIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE
CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR THE 2014
STREET OVERLAY PROJECT 14-500 AND CONCRETE REPAIRS
DISCUSSION: Introduction
The purpose of this agenda item is to accept the bids and authorize the
Mayor and City Manager to execute the City's Standardized Construction
Contract with McNamara Contracting, Inc. for the 2014 street overlays and
concrete repairs as identified in the 2014 Street Department portion of the
General Fund Budget. Streets to be overlaid are in the Coachman &
Brooksville Hills area.
History
Staff utilizes a pavement management system for rating the condition of
streets throughout the City. Staff then uses this system as a tool when
identifying areas for maintenance and repair.
To be eligible for an overlay the street must have concrete curb and gutter,
storm sewer, and a sound sub base. The City also includes maintenance
resurfacing of existing streets in the overlay project area that do not have
concrete curb and gutter and will not be reconstructed in the next ten
years.
These maintenance activities include patching, concrete repairs. And
resurfacing of road segments necessary to keep the streets usable until
they are reconstructed.
The following street overlays and maintenance resurfacings have be
identified by staff for construction in 2014:
1. Full length road overlay
Route Description _
Bounty Street Franklin-Crossandra
Fillmore Av Bounty- Crossandra
Itasca Av Crossandra - Bounty
Coachman Lane 21 — Carriage Hill Parkway
Cherry Ct Coachman — End
Phone 952.447.9800 / Fax 952.447.4245/www.cityofpriorlake.com
Carriage Ct Coachman — End
Coachman Ct Coachman — End
Landau
Chestnut Coachman — End
This is approximately 1 linear mile of street.
2. Concrete Repairs
Mountable Curb B618 Curb Concrete Pedestrian
Ramps
LF 602 LF 84 20
Current Circumstances
Advertisement for bid were published in both the Prior Lake American and
Minnesota Construction eAdvertising with bids due and opened on June
13, 2014 at 11:00 am for the Street Overlay project. The City received 6
bids for the Street Overlay project, which are listed in the chart below
Company Address Total
McNamara Rosemount, MN $173,481.05
Contracting
Hardrives Rogers, MN $186,689.93
Bituminous Roadways Mendota Heights, MN $186,834.54
Northwest Asphalt Shakopee, MN $202,377.99
Prior Lake Blacktop Prior Lake, MN $207,624.71
Valley Paving Prior Lake, MN $221,604.50
Conclusion
Staff is recommending awarding the construction contract to the lowest
bidder, McNamara Contracting, in the amount of$173,481.05. McNamara
Contracting has previously worked for the City of Prior Lake and have
completed these projects successfully.
ISSUES: The 2014 Street Budget considered $420,000 for pavement management
maintenance (overlay, seal coat, crack sealing, striping, and patching).
$130,0693 will be utilized for the Street JPA, $173,481 for the overlay
project with the remaining $115,000 for other overlay and patching repairs.
The City's goal is to complete about 3.4 miles of street overlay per year,
however there will be about 2 miles completed between the overlay
contract and other in-house work. Considering the historical price of
petroleum based products, we have seen significant increases in costs to
complete these projects not allowing us to meet our pavement
management goals. Increases in the pavement management portion of the
budget should be considered to most cost effectively manage street
conditions.
FINANCIAL Funds for this project will be drawn from the Street Department portion of
IMPACT: the general fund budget, of which $420,000 is identified for the City's street
maintenance programs. We will utilize $130,693 for the JPA and
$173,481.05 for the Overlay. The remaining funds from this balance will be
used for other pavement maintenance throughout the City.
ALTERNATIVES: 1. Motion and a second as part of the consent agenda to approve the
resolution which accepts the bids and authorizes the Mayor and City
Manager to execute the City's Standardized Construction Contract with
McNamara Contracting for the 2014 Street Overlay Project 14-500.
2. Table this item for a specific reason and provide staff with direction
3. Direct staff not to proceed with the project.
RECOMMENDED Alternative # 1
MOTION:
Oi PRIO4,
N
U �
4646 Dakota Street SE
tso'ct' Prior Lake,MN 55372
RESOLUTION 14-xxx
A RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE MAYOR AND CITY MANAGER TO
EXECUTE THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR THE 2014 STREET
OVERLAY PROJECT 14-500 AND CONCRETE REPAIRS
Motion By: Second By:
WHEREAS, The following streets have been identified by staff for overlay maintenance in 2014:
Route Description
Bounty Street Franklin-Crossandra
Fillmore Av Bounty- Crossandra
Itasca Av Crossandra - Bounty
Coachman Lane 21 —Carriage Hill Parkway
Cherry Ct Coachman — End
Carriage Ct Coachman — End
Coachman Ct Coachman — End
Landau Coachman — End
Chestnut Coachman — End
WHEREAS, The City of Prior Lake is committed to improving the streets within the City by providing
continued maintenance; and
WHEREAS, Continued maintenance of City streets will reduce the need of costly reconstruction in the near
future; and
WHEREAS, A total of 6 bids (provided in the chart below)were received for the identified improvements,
with the low bid from McNamara Contracting at a cost of$173,481.05.
Company Address Total
McNamara Contracting Rosemount, MN $173,481.05
Hardrives Rogers, MN $186,689.93
Bituminous Roadways Mendota Heights, MN $186,834.54
Northwest Asphalt Shakopee, MN $202,377.99
Prior Lake Blacktop Prior Lake, MN $207,624.71
Valley Paving Prior Lake, MN $221,604.50
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. The Mayor and City Manager are hereby authorized to execute the City's Standardized Construction
Contract for the identified street overlays with McNamara Contracting for a cost not to exceed
$173,481.05
3. Funding for the project shall be drawn from the Street Department portion of the General Fund Account
#101-43100-412
PASSED AND ADOPTED THIS 23th DAY OF JUNE 2014.
VOTE Hedberg Keeney McGuire Morton Soukup
Aye ❑ ❑ ❑ ❑ 0
Nay 0 0 0 0 D
Absent 0 0 0 0 ❑
Abstain 0 0 0 0 0
Frank Boyles, City Manager
http:/(splash/teams/am/October 4 2010/06 23 2014/Overlay Resolution.docx 2