HomeMy WebLinkAboutBuilders Deposit Release 12. 1235 04 rRto1A
ti� Builders Deposit
U '
SozA City of Prior Lake
A$1,500.00 Builders Deposit is included in the Building Permit fee. The Builders Deposit is issued as security to
insure compliance for a Final Occupancy Permit. (It is not an escrow account.) All exterior items including but
not limited to grading,sodding, landscaping,tree planting,driveways,siding and painting shall be completed 180
days after the date the building permit is issued. If the work is not complete within the 180 day time period, the
City shall notify the applicant of the violation and the applicant shall have 10 days to comply or the $1,500.00
builders deposit will be forfeited and the applicant will be billed for clean up or corrective work to rectify the
situation.
A$500.00 Tree Deposit may also be required and will be refunded if specified trees are preserved for a period of
one year. By signing this I, the undersigned contractor, acknowledge that I am aware of the erosion control
requirements of the City of Prior Lake as outlined in the Erosion Control Measures for Building Contractors
handout.
DATE: ///5/."6/, --SITE ADDRESS: 3-575C-94./h/ PERMIT# /2--/43-)
REFUND TO BE MAILED TO: j/ 72er4e9/5"
i
��� . ♦� Bio. �" 2 ��
PLEASE REMEMBER
f i�OC1• d 0
1. KEEP STREETS CLEAN DURING CONSTRUCTION Lynda S'Al1en,Building Services Amount
2. KEEP EROSION CONTROL IN PLACE / /� Acct.801.20204
Date
3. TEMPORARY OCCUPANCY PERMIT MUST NOT EXPIRE OR$501k
•
SIGNATURE: LAR' ' POPPLER, CITY ENGINEER
79570 3117
DBOW PROPERTIES LW 759
22382 CHIPPENDALE AVE W
FARMINGTON, MN 55024-1654 /�Pay to the ,/ of r /7 (arr, s �.,J!KOrder of �/r /
4/Ortfy 1rV / ''�` �Yy� /1th ,KI 111WiteT 31 0 Dollars L'1 ..151
Associated Bank
nip
For
I:0 7 5900 5 7 Sn 2283 2 78 485116 3 L L7
J:IFORMSIBUILDERS DEPOSIT FORM.DOC