HomeMy WebLinkAbout2014 RPZ Test Heating Loop M -1-r`c-m,f.r
i
Reduced Pressure Zone Backflow Preventer Valve & Double Check (DC) Assembly Valve
Rebuild & Test Report
VCtill Woodteiverrla/i J`m 46,0-Wc`.. . s--.2-22‘0-60.5(1 f,_s -(ei
sow inion,se-tet Si'. SE 7)y/cAr Ecru S-- 3-22
;,x;. �:• '/U 'qS
hilahl 06°1 in '3AI
gLi( r- /zoom c i Loa) _
Test Yr. Check Valve#1 Check Valve#2 Differential Pressure Relief
1 2 3 4 Leaked ( ) Closed (,C) Leaked ( ) Closed (X) Did Not Open( )
Overhauled(`4
Install( ) Pressure : $ O 0 Opened At: 'C' 6
C� Pressure : P
R Cleaned Cleaned Cleaned
E Replaced Replaced Replaced
Poppet Poppet Poppet
P Spring Spring Spring
A 0 Ring 0 Ring 0 Ring
Rubber Seat Rubber Seat Rubber Seat
I
Other Repairs Other Repairs Other Repairs
R
S
Certification 1 I # 2 Shutoff Valve:
I hereby certify the r oing data to be correct and that the device tested is Pass RI
functioning w. in e imits of the standards. Fail LiSignature:
1
Date: $,S -(t Assembly Final Test
Performance:
COLE FORD BF066445 I GARY FORD BF058476 I ALAN FARR BF066481
Metro Testing/Metro Mechanical Consultants,LLC 31222 Cedar Creek Rd,Hinckley,MN 55037 612-221-5888 Pass
Plumbing Bond License:PC646918 Mechanical Bond Certificate ID:5054-MB Fail ❑
This report is for the purposes of recording only;Owner is responsible for safe operation and upkeep of scheduled maintenance.