Loading...
HomeMy WebLinkAboutPlumbing Plans. Mn. State 14. 0920 (Allure Salon) 443 Lafayette Road N. MINNESOTA DEPARTMENT OF (651,1284-5005 St. Paul, Minnesota 55155 LABOR INDUSTRY 1-800-342-5354 www.dli.mn.gov x . Division of Construction Codes and Licensing REPORT ON PLANS Plans and specifications on plumbing:Allure Salon& Studios Suite B, 16511 Anna Trail,Prior Lake, Scott County,Minnesota,Plan No. PLB1409-00017 OWNERSHIP: F&B Construction Co, 1743 17th Avenue E, Shakopee,MN 55379 SUBMITTER: ENM Plumbing LLC, 120 Todd Court,New Market,MN 55054 Plans Dated: Date Received: September 3,2014 Date Approved: September 10,2014 SCOPE: This review is limited to the provisions of the Minnesota Plumbing Code,as amended.The review is based upon the supposition that the data on which the design is based are correct. Approval is contingent upon. requirements included in this report. A copy of the approved plans,specifications,and this Report on Plans must be retained at the project location for future reference. INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements Df the Minnesota Plumbing Code. No plumbing work may be covered prior to completing the required tests and inspections. The contractor/installer must obtain an inspection permit from the Minnesota Department of Labor and Industry when an installation is for a state owned facility,Minnesota Department of Health licensed healthcare facility, or a project in an area where there is no local administrative authority. To schedule inspections,contact the state plumbing standards representative for your region. For your regional inspector's contact information, visit our website at http://www.dli.mn.gov/CCLD/CCLDContactus.asp REQUIREMENT(S): 1. Changes in direction in drainage piping must be made by appropriate use of wyes and bends. Sanitary tees are not allowed where the direction of flow changes from either vertical to horizontal or horizontal to horizontal(see Minnesota Rules,part 4715.2410). 2. Hot water shall be provided to all fixtures for the proper functioning of those fixtures. Since the size of th e heater is not shown on the plans,please verify compliance for this requirement. In addition,verify that the water heater, including their controls and valves, is installed so that they are capable of being reached safely and quickly for inspection,repair, or replacement without requiring the use of tools or the removal of obstacles,panels, or similar obstructions(see Minnesota Rules,part 4715.2240). 3. A full-way valve must be provided on the cold water supply line to the water heater(see Minnesota Rules, part 4715.1800). 4. If any of the shampoo sink is the adjustable tailpiece type,the adjustable tailpiece sink systems must comply with ASME Standard A112.19.12-2006. The tailpiece must be of rigid construction(see Minnesota Rules, part 4715.1390, subpart 3). 5. Verify that the water supply line to a spray/rinse hose on a shampoo sink shall be protected against backflow by the use of an in-line vacuum breaker(see Minnesota Rules,part 4715.2110). Deck-mounted vacuum breakers must meet ASSE 1001 and be at least 1-inch above the sink flood level. This information can be provided to you in alternative formats(Braille,large print or audio). An Equal Opportunity Employer Allure Salon& Studios Suite B Plumbing Plan No.PLB1409-00017 Page 2 September 10,2014 6. Water supply connections to fixtures or equipment which have inlets below the spill line must be provided with an air gap or approved backflow preventer(see Minnesota Rules,part 4715.2000). Verify compliance for all water supply connections to fixtures and equipment. 7. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. The water distribution system shall be disinfected per Minnesota Rules,part 4715.2250. 8. Materials used for the plumbing system shall comply with the standards set forth in the Minnesota Plumbing Code(see Minnesota Rules,part 4715.0420). a. PVC plastic pipe used for the drain,waste, and vent system shall comply with ASTM Standard D2665, D2949 or F891 (see Minnesota Rules,part 4715.0570 through part 4715.0600). b. PEX piping must comply with Minnesota Rules,part 4715.0520. The tubing system must comply with ASTM F877 and F876. When installed as a system in accordance with ASTM F877,the system tubing and fittings must be of the same manufacturer and be marked as required. When not installed as a system,the fittings must be marked with ASTM F1807,F1960,F2080, F2098 01, or F2159. The tubing must list the fitting and tubing standard. NOTE(S): 1. The scope of this project consists of a remodeling for six shampoo sinks,a counter sink,a clothes washer,a floor drain,and a water heater. 2. This facility will be served by existing municipal water and sewer services. 3. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the plans may use the plans for construction. If another plumbing contractor is contracted to install the plumbing,they must submit their own plans and specifications for the project. Authorization for construction in accordance with the approved plans may be withdrawn if the plumbing installation is not undertaken within a period of two years. Plan approval does not necessarily mean that recommendations or requirements for change will not be made at some later time when changed conditions, additional information, or advanced knowledge make improvements necessary. Approved: Cathy M.Tran, PE Public Health Engineer Plumbing Plan Review and Inspections Unit 651/284-5898 or cathy.tran@state.mn.us cc: F&B Construction Co ENM Plumbing LLC City of Prior Lake Building Official File