HomeMy WebLinkAboutPlumbing Plans. Mn. State 14. 0920 (Allure Salon) 443 Lafayette Road N. MINNESOTA DEPARTMENT OF (651,1284-5005
St. Paul, Minnesota 55155 LABOR INDUSTRY 1-800-342-5354
www.dli.mn.gov x .
Division of Construction Codes and Licensing
REPORT ON PLANS
Plans and specifications on plumbing:Allure Salon& Studios Suite B, 16511 Anna Trail,Prior Lake, Scott
County,Minnesota,Plan No. PLB1409-00017
OWNERSHIP: F&B Construction Co, 1743 17th Avenue E, Shakopee,MN 55379
SUBMITTER: ENM Plumbing LLC, 120 Todd Court,New Market,MN 55054
Plans Dated:
Date Received: September 3,2014
Date Approved: September 10,2014
SCOPE: This review is limited to the provisions of the Minnesota Plumbing Code,as amended.The review is
based upon the supposition that the data on which the design is based are correct. Approval is contingent upon.
requirements included in this report. A copy of the approved plans,specifications,and this Report on Plans
must be retained at the project location for future reference.
INSPECTIONS: All plumbing installations must be tested and inspected in accordance with the requirements Df
the Minnesota Plumbing Code. No plumbing work may be covered prior to completing the required tests and
inspections. The contractor/installer must obtain an inspection permit from the Minnesota Department of Labor
and Industry when an installation is for a state owned facility,Minnesota Department of Health licensed healthcare
facility, or a project in an area where there is no local administrative authority. To schedule inspections,contact
the state plumbing standards representative for your region. For your regional inspector's contact information, visit
our website at http://www.dli.mn.gov/CCLD/CCLDContactus.asp
REQUIREMENT(S):
1. Changes in direction in drainage piping must be made by appropriate use of wyes and bends. Sanitary tees
are not allowed where the direction of flow changes from either vertical to horizontal or horizontal to
horizontal(see Minnesota Rules,part 4715.2410).
2. Hot water shall be provided to all fixtures for the proper functioning of those fixtures. Since the size of th e
heater is not shown on the plans,please verify compliance for this requirement. In addition,verify that the
water heater, including their controls and valves, is installed so that they are capable of being reached safely
and quickly for inspection,repair, or replacement without requiring the use of tools or the removal of
obstacles,panels, or similar obstructions(see Minnesota Rules,part 4715.2240).
3. A full-way valve must be provided on the cold water supply line to the water heater(see Minnesota Rules,
part 4715.1800).
4. If any of the shampoo sink is the adjustable tailpiece type,the adjustable tailpiece sink systems must comply
with ASME Standard A112.19.12-2006. The tailpiece must be of rigid construction(see Minnesota Rules,
part 4715.1390, subpart 3).
5. Verify that the water supply line to a spray/rinse hose on a shampoo sink shall be protected against backflow
by the use of an in-line vacuum breaker(see Minnesota Rules,part 4715.2110). Deck-mounted vacuum
breakers must meet ASSE 1001 and be at least 1-inch above the sink flood level.
This information can be provided to you in alternative formats(Braille,large print or audio).
An Equal Opportunity Employer
Allure Salon& Studios Suite B
Plumbing
Plan No.PLB1409-00017
Page 2
September 10,2014
6. Water supply connections to fixtures or equipment which have inlets below the spill line must be provided
with an air gap or approved backflow preventer(see Minnesota Rules,part 4715.2000). Verify compliance
for all water supply connections to fixtures and equipment.
7. The plumbing system shall be tested in accordance with Minnesota Rules,part 4715.2820. The water
distribution system shall be disinfected per Minnesota Rules,part 4715.2250.
8. Materials used for the plumbing system shall comply with the standards set forth in the Minnesota Plumbing
Code(see Minnesota Rules,part 4715.0420).
a. PVC plastic pipe used for the drain,waste, and vent system shall comply with ASTM Standard D2665,
D2949 or F891 (see Minnesota Rules,part 4715.0570 through part 4715.0600).
b. PEX piping must comply with Minnesota Rules,part 4715.0520. The tubing system must comply with
ASTM F877 and F876. When installed as a system in accordance with ASTM F877,the system tubing
and fittings must be of the same manufacturer and be marked as required. When not installed as a
system,the fittings must be marked with ASTM F1807,F1960,F2080, F2098 01, or F2159. The tubing
must list the fitting and tubing standard.
NOTE(S):
1. The scope of this project consists of a remodeling for six shampoo sinks,a counter sink,a clothes washer,a
floor drain,and a water heater.
2. This facility will be served by existing municipal water and sewer services.
3. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepared the
plans may use the plans for construction. If another plumbing contractor is contracted to install the
plumbing,they must submit their own plans and specifications for the project.
Authorization for construction in accordance with the approved plans may be withdrawn if the plumbing
installation is not undertaken within a period of two years. Plan approval does not necessarily mean that
recommendations or requirements for change will not be made at some later time when changed conditions,
additional information, or advanced knowledge make improvements necessary.
Approved:
Cathy M.Tran, PE
Public Health Engineer
Plumbing Plan Review and Inspections Unit
651/284-5898 or cathy.tran@state.mn.us
cc: F&B Construction Co
ENM Plumbing LLC
City of Prior Lake Building Official
File