HomeMy WebLinkAbout8A - Watershed Outlet Project 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT DATE: AGENDA #: PREPARED BY: AGENDA ITEM: SEPTEMBER 7, 2004 SA STEVE ALBRECHT, CITY ENGINEER PRIOR LAKE OUTLET CHANNEL IMPROVEMENTS PROJECT PRESENTATION PRESENTATION: Shannon Lotthammer, District Administrator of the Prior Lake Spring Lake Watershed will be presenting information regarding the proposed Outlet Channel Improvements. She will provide an overview of the proposed project along with the redesign of the lake outlet structure. Shannon will also address the status of the Environmental Assessment Worksheet (EAW) for the project. G: \Agenda\Agenda04\Lotthammer Presentation. DOC www.cityofpriorlake.com Phone 952.447.4230 / Fax 952.447.4245 Prior Lake Outlet & Channel Improvement Project Prior Lake City Council September 7, 2004 Prior Lake Oudet & Channel Improvement Project -- Background . Prior Lake has natural overflow at 918.0 feet . Outlet constructed in the early 1980s . Channel connected and improved to carry water from lake to :Minnesota River . Watershed District operates outlet and completes maintenance/repairs . System has worked well for last 20+ years 1'!iII...~..- ~'-;"'!o i ..ro, 0 I.. .-i b~~., ]~ '8 0 .J.tPriOt La..,;..... L : . w.....hMDha1... 1 Changing Uses, Future Needs . Shift from flood mitigation to storm-water conveyance . Increasing pressures: . Current development . Approved future development plans . 20 years of "wear and tear" . 2003 Prior Lake Outlet Channel and Lake Volume Management Study . Five management strategies Outlet & Channel Improvement Project . Restoration and enhancement of system . Need for the project: . Current system is expensive to operate and maintain . Erosion from 20 years of use . Flow in some segments is inefficient . Future development pressures (increased runoff): . Additional channel stabilization . More efficient outlet Outlet Box Improvements . Replace existing box with new struc . Same elevation (902.5') . Allow outlet to reach maximum capacity at lower lake elevations . Proposed Operating Plan changes: . Allow fall outletting between lake levels of 902.0' and 902.5' under certain conditions . Allow up to 30 cfs discharge during spring and fall discharge period ~~:~~~;/~}~; 2 Impacts & Benefits of Improvements . Less maintenance during operation . Larger structure, enhanced aesthetics . Greater efficiency, no change in overall capacity . Potential for slightly higher volumes discharged . More likely to reduce intensity of discharge during high water events without increasing total volume . Prior Lake water quality is relatively good, so effect on downstream waters is minimal or beneficial Channel Restoration & Enhancement . Increase easement to 75 feet (minimum) . Remove accumulated sediment . Re-slope channel banks to enhance stability and increase capacity in some areas . Stabilize banks through combined approach: . Traditional engineering using rocks and boulders . Bioengineering using native plants such as willows, dogwoods and grasses Impacts & Benefits of Outlet Channel Improvements . Decreased potential for future erosion . Increased habitat . Greater compatibility with greenway . Enhanced water quality (less erosion, wider buffer) . May impact wetlands; work in wetlands will be minimal . Outlets, channel side slopes and "toe protection" . Reduced erosion, increased habitat, reduced bounce . Winter construction to minimize potential impacts 3 Project Costs & Financing . Overall cost estimated at $3.7 million . Cooperative effort ofWD, cities of Prior Lake and Shakopee, and possibly the Shakopee Mdewakanton Sioux Community . Watershed District share proposed at $1.7 million . Watershed-wide levy, due to watershed-wide benefits . District likely to issue bonds for at least part of the project costs Next Steps . Voluntary EA W - comment period extended . Other permits: DNR, WCA, Corps of Engineers, Cities, MPCA . Revision of Joint Powers Agreement . Plan to advertise bids this fall for first segment Geffers), and smaller project just south of CR 16 . Construction during winter . Planting during spring . Future segments as agreements, funding allow Questions? Comments? Thank YOU! 4