Loading...
HomeMy WebLinkAbout5G - 2005 Improv Proj Surveying 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT DATE: AGENDA #: PREPARED BY: REVIEWED BY: SUBJECT: OCTOBER 4, 2004 5G LARRY POPPLER, ASSISTANT CITY ENGINEER STEVE ALBRECHT, CITY ENGINEER CONSIDER APPROVAL OF TWO RESOLUTIONS 1) AUTHORIZING PROFESSIONAL SERVICES FOR PROJECT SURVEYING THE 2005 IMPROVEMENT PROJECT #05-11 AND 2) AUTHORIZING PROFESSIONAL SERVICES FOR SUBSURFACE SOIL BORING ANALYSIS FOR PROJECT #05- 11 AND AUTHORIZING THE MAYOR AND CITY MANAGER TO EXECUTE THE CITY'S STANDARD PROFESSIONAL SERVICES CONTRACT FOR EACH. DISCUSSION: HISTORY City Project #05-11 includes proposed street and utility reconstruction improvements to Fishpoint Road, Frost Point Circle, Fairlawn Shores Trail and Bluedorn Circle (Project #05-11). The project was in the approved 2005 Capital Improvements Program and on July 19, 2004 the Council authorized the preparation of the feasibility report for this project. The purpose of this agenda item is to accept quotes and award contracts for the preliminary surveying and the soil borings. CURRENT CIRCUMSTANCES Part of the process involved in developing plans for the reconstruction projects, is to perform topographic surveying and soil analysis for the project. The project surveying is used to set up the design plans for the project. A survey crew collects topographic data, which is then transferred digitally to the computer. Design software is then used to analyze the survey data and create the project design. The soil analysis is used to explore the project area for subsurface conditions and to determine the paving section. (1) Survevina I Professional Services In the past the Engineering Department has performed the topographic surveying for the reconstruction project. This year due to current staff workload and the large size of the reconstruction project, it is necessary to hire a consultant to perform the surveying. These costs have been incorporated into www.cityofpriorlake.com n.\A.gpnrb\A.gpnrla.().d\O.i aoura.rrll::l1'MlI')' aonrl hn..;ng n()r Phone 952.447.4230 / Fax 952.447.4245 the total project amount. Staff requested proposals for surveying from WSB and Associates, MFRA, and Bohlen. WSB & Associates MFRA Bohlen $11,900 $25,000 $37,000 The lowest quotation was submitted by WSB and Associates. Based on the not-to-exceed amount, staff recommends that WSB and Associates provide surveying services for the 2005 Reconstruction Project. WSB has worked with the City of Prior Lake in the past and most recently completed surveying and construction staking for the 2004 Reconstruction Project. They also performed construction staking for the Ring Road Project. (2) Subsurface Soil Borina Analvsis I Professional Services Each year the Engineering Department hires a consultant to perform soil analysis on the reconstruction project. These costs have been incorporated into the total project amount. Staff requested proposals for subsurface soil boring analysis from Twin City Testing, Braun lntertec, McGhie and Betts and American Engineering Testing. $5,970 $7,851 $7,970 $12,000 The lowest quotation was submitted by Stork Twin City Testing. Based on the not-to-exceed amount, staff recommends that Stork Twin City Testing provide subsurface soil boring analysis services for the 2005 Reconstruction Project. Stork Twin City Testing provided the subsurface soil boring analysis services for the City of Prior Lake in the past and most recently for the 2004 Reconstruction Project. ISSUES Current City staff workload requires the hiring of a consultant to perform the project surveying for the 2005 Reconstruction Project. The hiring of the surveying work will help maintain the overall project timeline. G:lAgendalAgenda04\04 award survey and boring.DOC CONCLUSIONS Staff recommends that the Council award the following Contracts for professional services: (1) 2005 Project Surveying to WSB and Associates (2) 2005 Project Subsurface Soil Boring Analysis to Stork Twin City Testing. ALTERNATIVES: There are three alternatives for the City Council to consider: 1. Approve two resolutions (1) authorizing the Mayor and City Manager to execute the City's Standard Contract for Professional Services with WSB and Associates in the amount not to exceed $11,900 for project surveying. (2) authorizing the Mayor and City Manager to execute the City's Standard Contract for Professional Services with Stork Twin City Testing in the amount not to exceed $5,970 for subsurface soil analysis. 2. Deny this item for a specific reason and provide staff with direction. 3. Table this item until some date in the future. RECOMMENDED MOTION: A motion and second to adopt resolutions (1) authorizing the Mayor and City Manager to execute the City's Standard Contract for Professional Services with WSB and Associates in the amount not to exceed $11,900 for project surveying. (2) authorizing the Mayor and City Manager to execute the City's Standard Contract for Professional Services with Stork Twin City Testing in the amount not to exceed $5,970 for subsurface soil analysis. ~ G:lAgendalAgenda04\04 award survey and boring. DOC 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 RESOLUTION 04.XX RESOLUTION AUTHORIZING XXXXX AND XXXXX, TO PROVIDE PROFESSIONAL SERVICES FOR PROJECT SURVEYING AND SUBSURFACE SOIL BORING ANALYSIS FOR 2005 STREET IMPROVEMENT PROJECT (CITY PROJECT 05.11) MOTION BY: XXX SECOND BY: XXXX WHEREAS, the Council approved Resolution 04-117, ordering preparation of the Feasibility Report for the 2005 Reconstruction Improvement Project, and WHEREAS, construction staking and soil boring analysis services are required on the project, and WHEREAS, the City cannot cost effectively provide the surveying services at its current staffing level and does not have the equipment or qualifications to complete subsurface soil boring analysis services. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, 1. The recitals set forth above are incorporated herein. 2. WSB and Associates is hereby authorized to provide Project Surveying Services for the 2005 Reconstruction Improvement Projects (Project #05-11) for a fee not to exceed the amount of $11 ,900. 3. Stork Twin City Testing is hereby authorized to provide Subsurface Soil Boring Analyis for the 2005 Reconstruction Improvement Projects (Project #05-11) for a fee not to exceed the amount of $5,970. 4. Funding for these engineering services will be drawn from the Construction Fund 5. The Mayor and City Manager are authorized to execute the City's standard contract for professional services on behalf of the City. Passed and adopted this 4th day of October, 2004. YES NO Haugen Hauaen Blambera Blombera LeMair LeMair Petersen Petersen Zieska Zieska Frank Boyles, City Manager www.cityofpriorlake.com G:IResolutionIResoI04\04SURVEYINGSCW:ooe 952.447.4230 / Fax 952.447.4245