HomeMy WebLinkAbout110104 Trans. Plan Update City of Prior Lake
Transportation Plan Update
City Council Meeting
Monday, November 1, 2004
Agenda
1. Review and Discuss Transportation Plan Elements
a. Future Roadway Functional Classification
b. Map and List of Future Roadway Projects
c. Existing and Forecasted Traffic Volumes for Year 2030
d. Access Management Guidelines
SRF Consulting Group, Inc.
SRF//5046
Access Spacing For Exceptions and Deviations
Table 1 identifies the basic access management guidelines that would be applied to county and
city roadways and/or streets. The guidelines are broken into different categories by functional
classification and then by area or facility type. For each category, the recommended full-
movement intersection spacing is given along with the spacing for a conditional secondary
intersection. This secondary intersection typically has restricted movements (e.g., right-in/right-
out). In addition, each category identifies the treatment of private access. It should be noted that
the guidelines are more restrictive (exception/deviation) of private access in urbanizing areas
than in rural and/or urban core areas (subject to conditions). This is due to the fact that planning
should be able to limit private access in these developing areas versus areas that have already
been developed (core urban area) and/or areas where there is no other supporting street system
(rural).
Table 1
Recommended Access Spacing
Intersection
Spacing
Area or -ypical
Primary Full Conditional Signal
Category Facility Type Functional Private Access
Class Movement Secondary Spacing
Intersection Intersection
5 Minor Arterials
5A Rural, Exurban Permitted
& Bypass 1/2 mile 1/4 mile '1/2 mile Subject to
Conditions
5B Urban Minor Arterials 1/4 mile 1/8 mile 1/4 mile By Exception or
Urbanizing Deviation Only
5C Urban Core 300 - 600 feet dependent upon Permitted
block length 1/4 mile Subject to
Conditions
6 Collectors
6A Rural, Exurban
& Bypass 1/2 mile 1/4 mile 1/2 mile
6B Urban Permitted
Urbanizing Collectors 1/8 mile NA 1/4 mile Subject to
Conditions
6C Urban Core 300 - 600 feet dependent upon 1/8 mile
block length
7 Specific Access Plan
7 All ] By Adopted Plan
City of Prior Lake Transportation Plan Update
Table 1
Major Roadway and Intersection Projects
Reference Termini
Number Corridor From To Type of Improvement Year
1 CSAH~21 CSAH 42 Prior Lake/Shakopee city 4-lane Urban Divided Expressway 2007
limits
2 CSAH 82 CSAH 17 CSAH 21 4-lane Urban Divided 2006
3 CSAH 83 North of CSAH 42 Prior Lake/Shakopee city 4-lane Urban Divided 5-10 years
limits
4 CR 81 Within Spring Lake Regional Tumback to city park and upgrade When park is
Park gravel road to bituminous road. developed
5 CSAH 12 CSAH 17 TH 13 2-lane Urban on west end, possible 3- 2006
lane on east end
6a CSAH 21 South of CSAH 82 CR 87 Under study 2008
6b CSAH 21/TH 13 area Potential 1st stage construction of 6a
7 CSAH 42 Boone TH 13 6-lane Urban Divided 2008
8 CSAH 42 CSAH 18 Boone 6-lane Urban Divided Dependent on
feasibility study
9 CSAH 42 CSAH 21 CSAH 18 6-lane Urban Divided Dependent on
feasibility study
10 TH 13 150th Street Upgrade intersection: 2-lane divided .9
with turn-lanes
11 TH 13 CSAH 44/Main Street : Upgrade intersection: 2-lane divided 2006
with turn-lanes, realign west approach-
city street
12 TH 13 TH 282/CSAH 17 Upgrade intersection/signalized 5-10 years
13 CSAH 83 North of CSAH 82 South of CSAH 42 4-lane Urban Divided 5-10 years
City of Prior Lake Transportation Plan Update 2004 Page
Reference Termini
Number Corridor From To Type of Improvement Year
14 CSAH 23 ~CSAH 68 170th Street 4-lane Urban Divided next 20 years
15 CSAH 17 TH 13/282 CSAH 82 4-lane Urban Divided next 20 years
16 ' 170th Street CSAH 17 CR 79 Upgrade Roadway
17 CSAH 42 CSAH 83 Prior Lake city limits? 4-lane Divided
18 CSAH 21 Fish Point Road intersection Upgrade Intersection
19 CSAH 21 CSAH 87/170th intersection Upgrade/Realign Intersection
20 CSAH 79 TH 282 160th Street Intersections Improvements
21 TH 13 Oakland Beach/Rustic Intersection/Acces Improvements
22 CSAH 21 TH 13 :Upgrade intersection and TH 13 (part 2008
of Project//6)
23 TH 13 CSAH 12-South Leg Realignment of CSAH 12/TH 13 2006
Intersection - Part of//5
24 East-west roadway through Vierling - Pike Lake Trail CSAH 18 New Roadway
north of CSAH 42
25 Carriage Hill Parkway Meadowlawn Trail Finish roadway
26 Fountain Hills Drive East and west of CSAH 21- New Roadway
!South of CSAH 42
27 McKenna Road 1/2 mile north and south of New alignment - 1/2 mile north and
CSAH 42 south of CSAH 42
28 New Street McKenna Road East to new CSAH 21 New roadway
29 Fish Point Road CSAH 21 North to Existing Fishpoint Finish roadway
Road
30 Fish Point Road Mushtown Road North to Existing Fishpoint Finish roadway
Road
City of Prior Lake Transportation Plan Update 2004 Page 2
Reference Termini
Number Corridor From To Type of Improvement Year
31 New Roadway In Lally property south of TH New Roadway
13
32 Stemmer Ridge Rd Stemmer/CSAH 12 CSAH 82 New Roadway
33 North-South collector - Dairy Lane TH 282 160th Street New Roadway
34 East-West Collector on 165th CSAH 17 CSAH 79 New Roadway Next 20 years
:alignment
35 East-West Collector on 176th CSAH 17 CSAH 79 New Roadway Next 20 years
alignment (1 mile)
36 East-West Collector north of CSAH TH 13 Vergus New Roadway Next 20 years
68
37 Vergus South of TH 13 (1/2 mile) Upgrade existing Township Road
(pave)
38 160th Street CSAH 17 CSAH 79
39 Pike Lake Trail CSAH 42 North City Limits Realign and upgrade Roadway
realignment/improvement
40 Meadowlawn Trail From East-West Collector Carriage Hill Parkway New Roadway Next 20 years
north of CSAH 42
41 New Roadway East-west collector north of CSAH 17 New Roadway Next 20 years
CSAH 68
City of Prior Lake Transportation Plan Update 2004 Page 3
===,I.=.====~=:~==
- /
0
0
0
'- ...........
0
,,--
'.. /1'
~_...-' -~. ~ \.
.. .
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O.
0
0
..
?
0
0
0
Lo
o
o
...
0
0
0
0
0