LAKEFR~3NT PARK CONSTRUCTION PUNCH LIST (2 PAGES)
FROM:
RE;
E~ELOW IS THE PUNCH LIST FOR THE CONSTRUCTION OF LAKEFRONT PARK AS OF DECEMBER 8, 1999. THE CITY HAS
RECOGNIZED AND APPRECIATED THE CONCESSIONS MADE aY ]NGRAM EXCAVATING THROUGHOUT THE DEVELOPMENT OF
THIS PARK AND WOULO LIKE TO CONTINUE THE GOOD WORKING RELATIONSHIP. THEY WOULD, HOWEVER, LIKE TO PUT
FINAL CLOSURE ON THE PROJECT IN A TIMELY FASHION AS THE PUBLIC IS GETTING VERY ANXIOUS TO USE THIS RESOURCE.
THE CITY OF PRIOR LAKE WOULD LIKE A COMMITMENT FROM YOUR COMPANY (IN LETTER FORM) TO COMPLETE ANY
REMAINING PUNCH LIST ITEMS IN THE SPRING AS SOON AS POSSIBLE.
SHOULD YOU FAIL TO COMPLETE THESE ITEMS IN THE SPRING IN A TIMELY FASHION, THE CiTY OF PRIOR LAKE WiLL ASSIGN
COSTS TO ANY UNFINISHED / uNAcCEPTABLE woRK ON THIS L'IST, OR ANY OTHER INCOMPLETE PORTION OF THE CONTRACT
WHICH WILL THEN BE DEDUCTED IN THE FORM OF A CHANGE ORDER.
CALL ME AT 238-0831 #14 IF YOU HAVE ANY QuEsTIONS OR CONCERNS.
,
,
PUNCH LIST ITEMS:
PLAY AREA
A. GRIND DOWN GROUT AT HANDRAIL POST LOCATIONS TO MATCH E%ISTING CONCRETE - VERY SLOPPY
WORK
B. TOUCHUP HANDRAILS - COLOR SHOULD BE MATCHED To THE DARK BLUE OF MAIN PLAY EQUIPMENT
STRUCTURE
C. BACKFILL AROUND CATCH BASIN NEAR PLAY AREA
D. FURNISH AND INSTALL DRINKING FOUNTAIN
E. NEED TO SUBMIT VERIFICATION / LETTERS OF SAFETY COMPLIANCE FROM EACH OF THE PLAY EQUIPMENT
MANUFACTURERS REPRESENTATIVES
MAIN PARK BUILDING AREA
A. COMPLETE ASPHALT TRAIL CONNECTIONS TO THE BUILDING
B. COMPLETE EXPOSED AGGREGATE CONCRETE WORKAROUND THE BUILDING
C. COMPLETE INSTALLATION OF SPLIT RAIL FENCING
BI~AUE~ & ASSOCIATES, LTD. - PROJEOT 98-09^
C:\DO CS~1998\9809A~UNc~usT-I 2-08,gg.WPD
..... Pa~e I of 2
3an. 31. 2000
.
9'05AM BRAUER & ASSOC. No. 5343 P. 2/3
HOCKEY AREA
A. ADD A 10' CONCRETE CURB CUT FOR THE TRAIL TO THE HOCKEY RINK (ADDENDUM #1) - ALSO NEED TO
ADD TRAIL FROM THE PARKING LOT
B. THE TRAIL TO HOCKEY RINK SHOULD LINE Up WITH THE VEHICLE GATE OPENING
,
.
.
BALLFIELD AREA
A. COMPLETE BALLFIELD BACKSTOP AND FENCING
B. SOD BETWEEN FENCE LINE AND BASELINE OF BALLFIELD AS PER ADDENDUM
TENNIS COURT AREA
A. GROUT AROUND POSTS
OVERALL SITE
A. FINISH ALL ELECTRICAL WORK - LIGHTING, AND CONNECTIONS ETc.
I. NEW ELEC. POLES AND FINAL HOOKUP OF ALL LIGHTS
B. FINISH ALL IRRIGATION WORK
C. GRADING WEST OF AMPHITHEATER TO AVOID PONDING WATER ON THE TRAIL
D. GRADING, FINE GRADING, TOPSOIL RESPREAD
I. MANY AREAS AROUND THE BUILDING, PLAY AREAS, BASKETBALL COURT, AMPHITHEATER HAVE A
MIX OF TOPSOIL AND CLASS 5 - THESE AREAS SHOULD BE CLEANUP, ALL CLASS 5 / ROCKS
SHOULO BE REMOVED
CHECK ALL CONCRETE CURB AND FLATWORK - REPLACE BROKEN / CRACKED CONCRETE
TEST RESULTS ON ALL CONCRETE HAS FAILED - STILL WAITING FOR A RESPONSE FROM INGRAM AS TO
HOW THE ISSUE WILL BE DEALT WITH (REFER TO 3 PAGES ATTACHED)
TRIM GEOTEXTILE FABRIC FLUSH WITH GRADES BEHIND ALL BOULDER RETAINING WALLS
COMPLETE THE INSTALLATION OF SITE AMENITIES, IL. EEl HOOPS, TETHER BALL (ITEMS ARE IN STORAGE
AT THE CITY OVER THE WINTER)
FINISH ASPHALT WORK
I. 7' MINIMUM RADIUS ATALL TRAIL JUNCTURES
II. FINISH CONNECTIONS AROUND THE BUILDING
Iii. TRAIL TO FLOATING BOARDWALK DOES NOT MEET REQUIRED ELEvATIoNS FOR coNcRETE
ABUTMENT RELATIVE TO POND - NEED TO REDO
ALL TRAIL JUNCTURES SHOULD MAINTAIN A MIN. 8' RADIUS UNLESS SPECIFIED OTHERWISE
SUBMIT OPERATION ! MAINTENANCE MANUALS FOR ALL ELEC, IRRIG, MECHANICAL WORK, ETC.
SUBMIT AS BUILTS FOR ALL REVISIONS TO THE PROJECT
CLEANUP
E.
G.
J.
BRAUER & ASSOCIATES, LTO. - PROJECT 98-09A
C:~DOCS\1998~980gA~PUNCHUST. 12-08-gg.WPO
I~a~,e 2 of 2
Jan. 3L'2000 9'05AM BRAUER & ASSOC.
,.
No. 5343
DATE: DECEMBER 8, 1999
To: TODD INGRAM, INGRAM EXCAVATING - FAX 934-0901
JEFF & BOB, INGRAM EXCAVATING
·
CC; PAUL HOKENESS, PRIOR LAKE - FAX 447-4245
AL FR~EDGES, PRIOR'LAKE - FAX 440-9678
FROM:
RE:
JASON L. AMBERG, R.L.A.
BRAUER & ASSOCIATES, LTD.
LAKEFRONT PARK- ITEMS THAT NEED TO BE COVERED BY RETAINAGE
THE FOLLOVV1NG IS A LIST OF ITEMS WITH ASSOCIATED AMOUNTS FOR WHICH WILL REQUIRE RETAINAGE UNTIL THE ITEMS
AREA COMPLETED.
CALL ME AT 238-O831 #14 IF YOU HAVE ANY QUESTIONS OR CONCERNS.
,
,
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
RETAINAGE ITEMS;
.. ·
DRINKING FouNTAIN VVITH SUBDRAIN
ASPHALT TRAILS
TYPE 1 CONCRETE AT PLAY AREA
TYPE 2 INTEGRAL CONCRETE
4" THICK CONCRETE PAVEMENT
7 RISER CONG. STEPS
6 RISER CONC. STEPS
AREA I IRRIGATION
AREA 2 IRRIGATION
BASKETBALL OUTFIT
ADJUSTABLE BAS KETBALL OUTFIT
HANDRAILS
PLAY EQUIP. #1
PLAY EQUIP. #2
ELEC. i~ HOCKEY
ELEC. {~ BASKETBALL
AREA 3 IRRIGATION
ELEC. t~ SLIDING HILL .
ELEC. ~._TEN NI S
TOTAL AMOUNT OF RETAINAGE WITHHELD
SCHEDULED AMOUNT
AMOUNT TO WITHHOLD
3,1oo.0o 3,~oo.oo (~o°o/o)
98,425.00 9,842.50 (10%)
6,000.00 6,000.00 (100%)
3,375.00 3,375.00 (100%)
31,948.00 $1,948.00 (100%)
8,700.00 8,700.00 (100%)
s,6So.oo 5,68o.0o (lOO%)
31,000.00 3,100.00 (10%)
s,ooo.oo 600.00 ¢0%)
2,964.00 148.20 (5%)
1,479.00 73.95 (5%)
9,ooo.oo goo.oo (lO%)
46,292.00 2,314.60 (5%)
68,538.00 3,426.90 (5%)
25,958.00 12,g92.50 (50%)
25,870.00 12,935.00 (50%)
8,500.00 850.00 (10%)
15,869.00 . . 7,934.50 (50%)
26,472.00 13',236.00 (~50%)
$127,127.15
BRAUER & ASSOCI^TES, LTD. - PROJECT 98-ogA
C:\DOCS\1998\9809A~RETAIN~CE-12-08-99.WPO
Pa~e I
2000 OFFICIAL FEE SCHEDULE
City of Prior Lake
(Effective January 4, 2000)
ASSESSMENT RATES:
Collector Street Acreage Charge
Park Dedication (residential 10% ~ $13,000/ac)
Sewer & Water Trunk Acreage Charge
Storm Water Trunk Acreage Charge (residential)
Water Rate for Unassessed Parcels
Sewer Rate for Unassessed Parcels
UTILITY BILLING RATES:
Water Rate
Sewer Rate
Capital Facility Charge
Storm Water Charge
SERVICE CHARGES:
.n
Assessment Search
NSF Charge
Late License Processing Charge
Plumbing Registration
Survey, Plat & Parcel Report
Water Tower Antenna Rental - Communication Companies
Water Tower Antenna Rental - ISD #719
POLICE, FIRE & RESCUE SERVICE CHARGES:
Burning Permit ·.
Drivers License/Warrant Check
Fire Call False Alarm (eft. upon 3rd false alarm ea. yr.)
Police Accident Reports
LIQUOR LICENSES: Club License
Consumption & Display Permit
Off Sale Intoxicating
Off Sale Non-intoxicating
On Sale Intoxicating
On Sale Non-intoxicating
Set-up License
Sunday Liquor
Temporary On Sale Non-intoxicating (1~3 days)
Wine License
Investigation Fee - on/Off Sale Intoxicating
Investigation Fee - On Sale Non-intoxicating
Investigation Fee - Off Sale Non-intoxicating
MISCELLANEOUS LICENSES:
Bingo/Gambling License
Cigarette License
Dog License
Dog Boarding Fees
Kennel License
Redemption of Dogs
Current
1500.00/ac
1300.00/ac
3500.00/ac
3180.00/ac
20.00/fl
40.00/ff
1.40/1000 gals
2.85/1000 gals
7.5 O/billing cycle
3.75 (residential)
15.00
15.00
50.00
25.00
0.50
13,000.00
1,200.00
25.00
4.00
100.00
5.00
650.00
25.00
150.00
50.00
5,300.00
200.00
100.00
200.00
25.00
1,250.00
500/10,000 (max.)
100.00
50.00
10.00/100.00
250.00
10.00/20.00
10.00
50.00
1st licensed- 25.00
1st unlicensed - 30.00
2nd offense- 50.00
3rd offense - 100.00
FEESOO.XLS
:23 PM 11412000
2000 OFFICIAL FEE SCHEDULE
City of Prior Lake
(Effective January 4, 2000)
Massage Therapy License
Investigation Fee
Outdoor Concert Permit/(clean-up deposit):
wedding/private reception
commercial events
Refuse Haulers License ·
Taxi Cab License
Current
250.00
500.00/(max.)
50.00/200.00
200.00/500.00
1st truck - 125.00
ea. addnl truck - 25.00
100.00/50.00 ea addnl cab
PERMITS:
Building Permit
Common Home Improvements
Re-roofing
Re-siding
Windows.
Lower level finish (1 room)
Lower level finish (2 room)
Lower level finish (3 room)
Lower level finish (4 room)
Swimming pool (above ground)
Swimming pool (below ground)
Driveway Permit
Plan Review
Plumbing Permits ·
Industrial, commercial, multi-residential
Residential - new construction (single/two family)
Residential - additions
Mechanical Permits
Industrial, commercial, multi-residential
Residential - heating/air (single/two family)
Residential - heating
Residential - gas fireplaces
Residential - additions
Residential Contractor's Deposit
State Building Code
Fixed valuation fee
74.75
74.75
74.75
34.75
62.25
74.75
87.25
74.75
162.25
10.00
65% Building Permit Fee
1.0% of cOst (39.50 min.)
99.50
39.50
1.0% of cost (39.50 min.)
99.50
64.50
39.50
39.50
1,500.00
CONNECTION PERMIT CItARGES: Frost Plates
MCES Metro Sewer Availability Charge
Pressure Reducer
Sewer Connection Charge
Water Connection Charge
Water Meter - residential 5/8" (inc. meter horn)
Water Tower Charge
Water Inspection
Industrial, commercial, multi-residential
Residential
Sewer Inspection
Industrial, commercial, multi-residential
Residential
PARK PERMITS:
Boat Trailer Parking
Park Daily Admission
Park Program Surcharge (non-resident)
Park Season Sticker (non-resident)
FEESOO.XLS
7.50
1,100.00
45:00
600.00
600.00
125.00
700.00
1.0% of cost (17.50 min.)
17.50
1.0% of cost (17.50 min.)
17.50
10.00
4.00
5.00
30.00
2 !:9 PMl/4/2000
2000 OFFICIAL FEE SCHEDULE
City of Prior Lake
(Effective January 4, 2000)
Park Season Sticker (resident)
Park Support Fee
Picnic Table Moves
Picnic/Field reservation (resident)
Picnic/Field reservation (non-resident)
Current
Charges
20.00
850.00
5.00/table
50.00
100.00
PARK FACILITY RENTALS: Field/Rink Lights
Lakefront Park Pavilion Rental (resident)
Lakefront Park Pavilion Rental (non-resident)
Resource Center Studio Rental (resident)
Resource Center Studio Rental (non-resident)
Rink/Warming House Reservation
25.00/hr.
50.00/hr.
75.00/hr.
25.00/hr.
37.50/hr.
reg./non-reg, hrs. 15.00/30.00
ZONING/SUBDI.VISION FEES: Administrative Plat Fee
Comprehensive Plan Amendment (minor/major)
Conditional Use Fee
Excavation/Filling Permit (UBC graduated fee schedule)
Final Plat Application Fee
Home Occupation Permit
Landscape Plan
Letter of Credit (residential building relocation)
Moving Permit
P.U.D. (new/amendment)
Preliminary Plat Application Fee
Registration Charge (variance/cup)
Rezoning
Sign Permit
Sign Plan
Site Plan
Solicitor Permit
Special Hunting Permit
Survey Waiver
Temporary Sign Permit
Temporary Sign Permit Deposit
Tree Preservation Lot Deposit
Vacation Fee
Variance Fee (Other)
Variance Fee (SF)
Zoning Code Amendment
Zoning Officer's Appeal
Zoning Verification Letter
175.00
500.00/1000.00
350.00
O. mc)
150.00 + 5/lot
10.00
500.00
5,000.00
50.00
500',00 + 1 O/acre
500.00 + 10/lot
50.00
300.00 + 10/acre
30.00 - 1st 40 sq. ft. plus
.25/sq.ft. thereafter
25.00
300.00
50.00
25.00
50.00
15.00
100.00
500.00
200.00
200.00
150.00
350.00
75.00
10.00
MUNICIPAL FINANCING APPLICATION FEES:
Annexation Filing Fee (plus reimburse of city expenses up to $2500)
TIF Application
500.00
1,000.00
PUBLICATIONS:
Audit Booklet
Budget Booklet
CIP Booklet
City Code Book
Comprehensive Plan
FEESOO.XLS
10.00
15.00
15.00
(purchase/update)- 100.00/25.00
50.00
1:23 PMI/4/2000
2000 OFFICIAL FEE SCHEDULE
City of Prior Lake
(Effective January 4, 2000)
Comprehensive Utility Plans (each)
Shoreland Ordinance
Sign Ordinance
Subdivision Booklet
Zoning Ordinance Booklet
Current
Charges
25.00
10.00
15.00
25.00
25.00
A GEND A/MINUTES: ( ann u al)
City Council Agenda
City Council Minutes
EDA Agenda
EDA Minutes
Planning Commission Agenda
Planning Commission Minutes
20.00
40.00
10.00
20.00
20.00
40.00
MAPS:
Aerial Maps
Plan Copies (regular/large)
Developers will be given 1 set of S&W asbuilts
at no charge-addnl prints will be charged above rate
Copies
City Maps
Topo Maps
SAND BAGS:
5.00
5.00/10.00
.25 ea.
1.00
12.00/a¢. ($50.00 minimum)
(Actual cost)
FEESOO.XLS
1:23 PMI/4/2000
,
3.
4.
5.
6.
7.
.
.
11.
12.
13.
t4.
15.
16.
17.
18.
19.
20.
$
o.b.
u.f.
t.r.
m.s,
i.g.
CAPSULE PROJECT SUMMARY
2000 CIP PROJECTS
Project Description
Fire Department
Bunker Turnout Gear
Project Amount Financing
6,000.00 6,000.00
Dollar.
. o.b,
Park Department
(Developrnent) '
Neighborhood Park Resilient Surfaces .............. : 8,000.00 ........ 8,000.00 .
Oakland Beach/Willows Basketball Courts :10,000.00 10,000.00
Park Appurtenant Equipment 10,000.00 10,000.00
Memorial Park Picnic Shelter ,r'~~'~ 16,000.00 16,000.00
Sand Point Beach Parking Lot Lighting 18,000.00 18,000.00
Neighborhood Park Playgrounds 103,000.00 103,000.00
(Trails.)
Glynwater ' 22,000.00 22,000.00
..'
Public Works~.'
(Buildings/Plant)
Lift Station Renovation 60,000.00 60,000.00
Water Tower Painting 250,000.00. 125,000.00
125,000.00
(ImDrovernents)
Trunk Watermain (Fountain Hills development) 30,000.00 30,000.00
Linden Circle Bituminous Paving 75,000.00 75,000.00
Main Avenue Street Lights 100,000.00 100,000.00
Fish Point Road/Fairlawn Shores Trail Overlay .300,000.00 180,000.00
~ 120,000.00
Oak Ridge/Pixie Point Reconstruction 1,195,000.00 717,000.00
478,000.00
TH 13 Intersection Imp. (Commerce/B0udins) 1,750,000.00 850,000.00
6OO,O0O.OO
300,000.00
Water Resources
(Improvements)
Drainage Improvements 15,000.00 15,000.00
Storm Sewer Outlet Dredging (Green Hgts Tri) 15,000.00 15,000.00
Water Quality Pond (Center Road) .- 15,000.00 '15,000.00
Storm water Pond Dredging (Boudins) 30.000.00 30.000.00
Totals ...' ·4,028,000.00 4,028,000.00
· Financing Source Summary
Project Tax Levy
Operating Budget
· Sewer & Water Utility Fund
Storm Water Utility Fund
Capital Park Fund -
Collector Street Fund
Trunk Reserve Fund
Municipal State Aid
Special Assessments.
Intergovernmental
Project Amount Tax Impact
Dollar
897,000.00 $21.87
6,000.00
125,000.00
75,000.00
187,000.00
400,000.00
215,000.00
600,000.00
673,000,00.
. - .
850.000.00
4,028,000,00
_ . .
Totals ...
City Cost
Tax Impact
'Percentage
c.p.
c.g.'
c.p.
c.p.
c.p.
c.p.
t.r,
t.r.
u.f.
t.r,
s.a.
c.s.
4.39
s.a
17,48
s.a.
i.g.
ITI.S.
'0.52%
2.09%
S,Wo
S.W.
S.W.
S.W.
percentage
2.61%
8
CAPSULE PROJECT SUMMARY
2001 CIP PROJECTS
Project Description
Project Amount
Fire Department
1. Bunker Turnout Gear
7,000.00
Park Department
(Oevelo.~ment)
2. Neighborhood Park Resilient Surfaces
3. Park Appurtenant Equipment
4. Memorial Park Fencing
5. Neighborhood Park Playgrounds
(Trails.)
6. Fish Point, Island View & Sand Point
8,000.00
10,000.00
10,000.00
60,000.00
35,000.00
.
Public Works..
(Buildings/Plant)
Lift Station Renovation
Water Tower Painting
60,000.00
250,000.00
(Improvements)
9. Trunk Watermain (Deerfield development)
10. Trunk Watermain (CSAH 21 from Carriage Pkwy to 42)
11. 150th Street Reconstruction
'.,
..
12, ' Pixie Point- Green Oaks S[reet Reconstruction
171,000.00
200,000.00
765,000.00
925,000.00
Financing
7,000.00
8,000.00
10,000.00
10,000.00
60,000.00
35,000.00
60,000.00
125,000.00
125,000.00
171,000.00
200,000.00
196,000.00
306,000.00
263,000.00'
555,000.00
370,0OO.OO
City Cost
Tax Impact
Dollar. Percentage
o.b.
c.p.
c.p.
c.p.
c.p.
c.po
t.r.
t.r.
u.f.
t.r.
4.70
s.a
m.s.
13.32
s.a
0.55%
1.55%
13.
14.
$
o.b.
u.f.
g.f.
$oWo
c.p.
t.r.
m.s,
$oa.
Water Resources
(Improvements)
Storm Water Pond Dredging (Hampton Pond)
Lake Bank Stabilization (Pike Lake Trail)
Financing Source Summary
Project Tax Levy
Operating Budget
Sewer & Water Utility Fund
Grant Funding
Storm Water Utility Fund
Capital Park Fund
Trunk Reserve Fund
Municipal State Aid Fund
Special Assessments
Totals ...
Totals ...
20,000.00
60,000.00
2,581,000.00
Project Amount
751,000.00
7,000.00
125,000.00
20,000.00
60,000.00
123,000.00
556,000.00
263,000.00
676.000.00
2,581,000.00
20,000.00
20,000.00
40.000.00
2,581,000.00
Tax Impact
Dollar
$18.02 .
S,W.
Percentage
2.10%
9
,
Project Description
Fire Department
Bunker Turnout Gear
Park Department
(Development)
2. Neighborhood Park Resilient Surfaces
3. Park Appurtenant Equipment
4. Neighborhood Park Playgrounds
(Trails)
5. Deerfield Development
CAPSULE PROJECT SUMMARY
2002 CIP PROJECTS
.
Public Works
(Buildings/Plant)
Lift Station Re'~'ovation
Municipal Well
Project Amount
8,000.00
(Irnprovernents)
8. Carriage Hills Road (Knob Hill east extension)
9. Trunk Watermain (CSAH 42 from 21 to McKenna)
10. Frog Town Area Reconstruction
8,000.00
10,000.00
60,000.00
60,000.00
11. TH 13 Intersection Imp. (150th Street)
60,000.00
350,000.00
12.
13.
175,000.00
185,000.00
935,000.00
$
m.s.
s.a.
i.g.
700,000.00..
·
Water Resources
'(Improvements)
Storm Drainage Improvements
Storm Water Pond Dredging
40,000.00
40.000.00
Totals ... 2,631,000.00
Financing Source Summary
Project Amount
Project Tax Levy
Operating Budget
Storm Water Utility Fund
Capital 'Park Fund
Collector Street Fund
Trunk Reserve Fund
Municipal State Aid
Special Assessments
Intergovernmental
Totals ...
560,000.00
8,000.00
80,000.00
138,000.00
175,000.00
595,000.00
100,000.00
375,000.00
600.000.00
2,631,000.00
Financing
8,000.00
City Cost
Tax Impact
Dollar Percentage
o.b.
8,000.00 c.p.
10,000.00 c.p.
60,000.00 c.p.
60,000.00 c.p.
60,000.00 t.r.
350,000.00 t.r.
175,000.00 c.s.
185,000.00 t.r.
560,000.00 13.16
375,000.00 s.a
600,000.00 i.g.
100,000.00 m.s.
1.50%
40,000.00 s.w.
40.000.00 s.w.
2,631,000.00
Tax Impact
Dollar Percentag~
$13.16 1.50%
10
CAPSULE PROJECT SUMMARY
2003 CIP PROJECTS
Project Description
Project Amount
Fire Department
1. Bunker Turnout Gear
(Buildings & Plant.)
2. -Satellite Fire Station
Park Department
(Development)
3. Neighborhood Park Resilient Surfaces
4. Park Appurtenant Equipment
5. Neighborhood Park Playgrounds '
.[Trails.)
6. Jeffers Pond Development
·
·
Public Work~'
(Buildings/Pte nt)
7. Lift Station Renovation
(Irn.~rovement$)
8. Shady Bch Trl/Fish Point Rd W Reconstruction
8,000.00
750,000.00
·
·
8,000.00
10,000.00
60,000.00
40,000.00
60,000.00
1,185,000.00
Water Resources
(Irn.~)rovements) . .
9. Storm Drainage Improvements
10..' Sto'rm Water Pond Dredging
Financing Source Summary
$ Project Tax Levy.
o.b. Operating Budget
s.w. Storm Water Utility Fund
c.p. Capital Park Fund
t.r. Trunk Reserve Fund
s.a. Special Assessments
g.o. G.O. Referendum Bon~ls
Totals ...
Totals ...
40,000.00
40.000.00
2,201,000.00
Project Amount
711,000.00
8,000.00
80,000.00
118,000.00
60,000.00
474,O0O.OO
750.000.00
2,201',000.00
Financing
City Cost
Tax Impact
Dollar
8,000.00 o.b.
750,000.00 .g.o.
8,000.00 c.p.
10,000.00 c.p.
60,000.00 c.p.
40,000.00 c.p.
60,000.00 t.r.
711,000.00 16.40
474,000.00 s.a
.40,000.00 · s.w.
40.000.00 s.w.
2,201,000.00
Taxlmpact
Dollar Percentag~
$16.40 1.85%
1.85%
11
Project Description
Fire Department
1. Bunker Turnout Gear
Park Department
· (Develo.~ment)
2. Neighborhood Park Resilient Surfaces
3. Park Appurtenant Equipment
CAPSULE PROJECT SUMMARY
2004 CIP PROJECTS
Public Works
(Buildings & Plant.)
4. Lift Station Renovation
5. Municipal Well
6. Water Filtration Plant
[Improvement~)"'
7. Trunk Watermain (Fish Point Rd Ext. to CSAH 21)
8. Trunk Watermain (CSAH 42 from CSAH 83 to W. Limit)
9. Gateway Shores Street Reconstruction
Project Amount
8,000.00
10. TH 13 Intersection Imp. (CSAH 23/Five Hawks)
8,000.00
10,000.00
11.
12.
60,000.00
350,000.00
6,000,000.00
50,000.00
127,000.00
1,180,000.00
1,150,000.00
$
o.b.
$.W.
C.p.
Co$o
t.r.
m.s.
$.a.
i.g.
w.r.
Water Resources
(Irn.orovements)
Storm Drainage Improvements
Storm Water Pond Dredging
Financing Source Summary
Project Tax Levy
Operating Budget
Storm Water Utility Fund
Capital Park Fund
Collector Street Fund
Trunk *Reserve Fund
Municipal State 'Aid
Special Assessments
Intergovernmental
Water Revenue Bonds
Totals ...
Totals ...
40,000.00
40.000.00
9,023,000.00
Project Amount
708,000.00
8,000.00
80,000.00
18,000.00
255,000.00
587,000~00
400,000.00
472,000.00
495,000.00
6.000.000.00
9,023,000.00
Financing
8,000.00
8,000.00
10,000.00
60,000.00
350,000.00
6,000,000.00
50,000.00
127,000.00
708,000.00
472,000.00
495,000.00
400,000.00
255,000.00
40,000.00
40.000.00
g,023,000.00
Tax Impact
Dollar
$16.00
City Cost
Tax Impact
.Dollar Percentage
o.b.
t,r.
t.r.
w.r.
t.r.
16.00
s.a
i.g.
m.s.
C.S.
1.77%
S oW.
Percentage
1.77%
o. _
12
PRIOR LAKE PARK MAINTENANCE BUDGET HISTORY
PERSONNEL
OPERATING
TOTAL % INCREASE
1996 $443,225.00 $165,210.00 $619,385.00
1997 $436,280.00 $183,270.00 $641,500.00 .03
(secretary and attendants to rec.)
1998 $478,090.00 $171,960.00 $650,050.00 .01
1999 $504,244.00 $170,340.00 $674,584.00 .04
2000 $535,679.00 $180,775.00 $716,454.00 .06
.
THE PERSONNEL BUDGET INCLUDES SALARIES AND BENEFITS FOR
THE PARKS AND RECREATION DIRECTOR, PARK MAINTENANCE SUPERVISOR,
PARKS LEAD PERSON, FOUR (4) FULL TIME PARK MAINTENANCE EMPLOYEES,
ONE (1) REGULAR PART-TIME PARK MAINTENANCE EMPLOYEE, FIFTEEN (15)
SEASONAL EMPLOYEES, AND ONE HALF TIME SECRETARY.
THE OPERATING PORTION OF THE PARK MAINTENANCE BUDGET INCLUDES
ALL OPERATING SUPPLIES SUCH AS GRASS SEED AND FERTILIZER, PLAY
EQUIPMENT PARTS, CEMENT, LUMBER, HARDWARE, ALSO UTILITIES SUCH AS
PHONE, GAS, AND ELECTRIC, REFUSE DISPOSAL, CONTRACTUAL REPAIRS OF
BUILDINGS AND EQUIPMENT, PORTABLE TOILETS, ETC..
PRIOR LAKE PARK ACRES
NUMBER OF ACRES NUMBER OF ACRES DEVELOPED
1996 463.95 297.45
2000 517.53 439.50
2001 DEERFIELD-27, GLYNNWATER-11.91, WILDS SOUTH-4
560.44
THESE NUMBERS DO NOT INCLUDE BOULEVARDS AND MEDIANS, CITY HALL,
FIRE STATION, LIBRARY, OR MAINTENANCE CENTER
BUDHIST.DOC
PRIOR LAKE RECREATION BUDGET HISTORY
PERSONNEL
OPERATING* TOTAL % INCREASE
1996 $72,530 $24,500 $97,030
1999 .09
1997 $122,010 $24,700 $146,710 .06
(seasonalworkersandsecretaryadded ~om parks)
1998 $146,137 $24,800 $170,937 .09'
(seasonalhourlyrateincreasebasedon market)
$157,731 $24,800 $182,531
(seasonalhourlyrateincreasebasedon market)
2000 $157,113 $24,900 $182,013 (.01)
THE PERSONNEL BUDGET INCLUDES SALARIES AND BENEFITS FOR
THE RECREATION SUPERVISOR, 31 SEASONAL EMPLOYEES, AND ONE HALF
TIME SECRETARY.
THE OPERATING PORTION BUDGET INCLUDES ALL TAX SUPPORTED
E~ENDITURES, NOT REVENUE SUPPORTED EXPENDITURES SUCH AS THE
WAVELENGTH NEWSLETTER AND POSTAGE.
PRIOR LAKE PROGRAMS
NUMBER OF REGISTERED PARTICIPANTS (does not include dance program,
beach, and skating attendance)
1996 3,759
1999 4,817
ACTUAL PROGRAM REVENUES (includes programs, facility rental,
concessions, and park admission fees)
1996 $194,582
1997 $270,912
1998 $281,561
RBUDHIS.DOC
Park
On December 15, 1999, a Public Hearing was concluded for residents living within a 1/~ mile
radius of the proposed park. Of the 300 households invited, 30+ residents attended the public
meeting. ..
The purpose of the meeting was to explain the results of the traffic study to interested
residents and solicit input regarding improvements that could be made to traffic safety in the
area once the Park is in operation. The traffic safety enhancements are shown on the attached
map keyed by number.
.
Shown below are the improvements requested by attendees of the December 15th meeting
and the actions the City will take in response to each request.
(1) How does the study account for parental drop-offs and pick-ups of Children at
the Park?
The traffic generation figures were estimated using the Institute of Traffic Engineers
Trip Generation' Manual and comparisons with The Ponds Park actual trip generation.
The traffic counts are estimateS only and could vary by _+'10%. This is a generally
accepted method of estimating traffic. These estimates are for peak use periods such
as weekend tournaments.
Park personnel have observed over many years that parental drop-offs and pick-ups of
children occur more frequently during practices which are typically during weekday
evenings. (non-peak usage). During tournaments and league games on weekends,
parents typically stay and watch the games which would not add to the trip generation.
Using this basis, the number of parental drop-offs/pick-ups would not have a significant
affect on the estimated traffic counts. When the park is fully operational, actual traffic
counts can be taken which Will provide a more scientific basis for any. additional traffic
remediation projects.
(2) Determine whether a stop sign
[stopping all three legs].
can be installed at Mushtown
and Maple
The City will request that the Township determine whether criteria are met for stop
signs in this area. If so, the City will provide and install the signs, but the Township will
be responsible for sign maintenance and traffic enforcement.
Busse Athletic Park- Traffic Safety Improvements
(3) Could additional directional signage be installed directing traffic from TH13 to
the park?
Yes. Directional signs will be installed along Duluth at TH13 to Tower and at Tower to
Toronto. Signs will also be installed at Panama and TH13 directing traffic to Tower and
Toronto. When the ring road is comi:)leted and when the CSAH 23 intersection is
reconfigured, directional signs will direct traffic to Toronto and 170th to access the
parks ....
(4) What impact will the ring road have?
With appropriate directional signage, the ring road will actually help encourage traffic to
access the park via Toronto.
(5) Could the 30 mph zone on Mushtown Road be extended to the East (along the
gravel portion) to increase safety at the entrance?
Yes. The City will attempt to move this speed zone as far as possible to the east in
cooperation with the Township. Additional signage will be installed to advise motorists
and pedestrians.
·
(6) Could "30 mph" be printed on the rOadway?
Yes. The City will complete and maintain the "30mph" markings west of the park
entrance on the blacktop segment of Mushtown.
(7) Could more consideration be given to pedestrians walking along Mushtown
Road westerly?
Yes, the City would be willing to evaluate trail costs within the City and program as
funding is available if the Township will do the same for the trail segments within their
corporate limits leading to CSAH 23.
(8) Would the City maintain or provide financial support for the maintenance of
Township road used to access the site?
Most of the roads accessing the site are City roads or have been upgraded at the
City's expense. The City currently completes the snow and ice control on Mushtown
Road from CSAH 23 to The Ponds park entrance even though half of the road is
Township responsibility. A written agreement on shared maintenance will be explored.
'I:\FRANIGNOTES\00\BUSSETRA.DOC 2
Busse Athletic Park- Traffic Safety Improvements
(9) What can the City do to improve safety on Toronto Avenue at the Woodridge
Neighborhood Park?
The City will consider prohibiting parking on the east side of the street adjacent to
Woodridge park and will post more speed limit signs along Toronto.
(lO)Could a blinking amber light be installed at the park entrance?
The City will mark the crossing on the street. It will also place stop signs at the roads
and trails exiting the two parks at the crosswalk, and install "park entry ahead" typ.e
signage as appropriate, all of which will be in conformance with the Uniform Traffic
Control Manual.'A street light will also be installed at the intersection for night safety.
Amber 'blinking lights are not being considered at this time. After the park is in use,
traffic counts and experience may justify further consideration of this installation.
I:\FRANIGNOTES\00\BUSSETRA.DOC
3
.
T.
OOD
TR.
WELL
.
¢~ER
,DVIEW
TR.
TACO~
ST. C~R'
170th ST:
~ND
Blind
oke
THE .
PONDS/'~~
PARK' ~/~
BUSSE
· /PROPERTY
Oct. 6. 1999~ 2'53PM~BRAU~t~ & ASSOC.
;duJOO ::)l:lelqtV tlnpv
%lJwdoad qJWd m:q.l BUlJd8
wlomeuu~N 'mqwl JOlJd ;0 At~'J
/
/ /
/
! / ,/
( \ ~ ~
I--
Z
W
W~
Omm
- 0
!
~ 0
~ 0
E E E E
LO I~ 0 0
E