HomeMy WebLinkAbout9D - 2005 Public Imp. Projects 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 DATE: AGENDA #: PREPARED BY: REVIEWED BY: SUBJECT: DISCUSSION: G: \Al!:enda\Al!:enda04\05FEAS. DOC CITY COUNCil AGENDA REPORT December 20, 2004 9D lARRY POPPlER, ASSISTANT CITY ENGINEER STEVE ALBRECHT, CITY ENGINEER CONSIDER APPROVAL OF A RESOLUTION ACCEPTING FEASIBILITY REPORT AND SCHEDULING A PUBLIC HEARING TO CONSIDER 2005 IMPROVEMENT PROJECT HISTORY Each year the City reconstructs street segments that are worn out. At the July 19, 2004, City Council meeting, Council adopted Resolution No. 04-117 authorizing staff to prepare a Feasibility Report for the 2004 Improvement Project as approved by the Council in the 2004-2008 Capital Improvement Program (CIP). The project area considered in the report includes Fish Point Road, Fairlawn Shores Trail, Frost Point Circle, Bluedorn Circle, Centennial Street, and Candy Cove Trail (TH 13 to CR 44). A map of the project area is included as Exhibit 1 of the Feasibility Report. The proposed project includes street reconstruction, storm sewer, concrete curb and gutter and appurtenant work. Sanitary sewer spot repairs are proposed in a number of areas. Watermain replacement is proposed for Fish Point Road and Frost Point Circle. Sanitary sewer pipe lining is proposed for various segments of pipe within the project areas. CURRENT CIRCUMSTANCES The attached report indicates the estimated costs for the project, along with preliminary assessment estimates. At the end of the Feasibility Report, a project financing summary is included to show project cost splits. The total estimated cost of the project is $3,918,139. Fish Point Road, Bluedorn Circle, Fairlawn Shores Trail, and Candy Cove Trail have failing bituminous surfaces and bituminous curb. Frost Point Road and 150th Street have failing bituminous surface and concrete curb and gutter. Centennial Street is a gravel roadway and no curb and gutter. The existing road width on Bluedorn Circle, Frost Point Road, and Fairlawn Shores Trail is 30 feet. The existing pavement width is 25 feet and 36 feet on Fish Point Road and Candy Cove Trail, respectively. Centennial Street is a gravel roadway with a roadway width of 21 feet. Fish Point Road, Fairlawn Shores Trail, and Frost Point road were originally paved in 1974. Candy Cove Trail and Bluedorn Circle were paved in www.cityofpriorlake.com 1 Phone 952.447.4230 / Fax 952.447.4245 G: \Agenda\Agenda04\05FEAS.DOC 1975 and 1978, respectively. The geotechnical report indicates very poor soil conditions below the existing streets. The street width is proposed to be 28' for Fish Point Road and 24' for Centennial Street. The street width is proposed to be 30' for Bluedorn Circle, Frost Point Circle, and Fairlawn Shores Trail. The street width is proposed to be 32' for Candy Cove Trail and would include a 5 foot sidewalk along the east side of Candy Cove Trail. All streets will remain on a similar alignment and be constructed with B618 curb and gutter. The watermain system for Frost Point Road, Fairlawn Shores Trail, and Fish Point Road was installed in 1974 and consists of 6-inch cast iron pipe and 6-inch ductile iron pipe. Cast iron pipe generally experiences more watermain breaks and has typically been replaced with ductile iron pipe during reconstruction projects. The 6- inch ductile iron pipe watermain in Centennial Street was installed in 1975. In 1978, 6-inch ductile iron pipe watermain was installed in Bluedorn Circle. The watermain system for Candy Cove Trail was installed in 1975 and consists of 20- inch ductile iron pipe. The watermain in this area has not shown a history of failure. The 6 inch cast iron pipe is proposed to be replaced with 8 inch ductile iron pipe, because cast iron pipe breaks more easily. The watermain on the rest of the project will remain in place but all watermain services are scheduled to be replaced. The sanitary sewer system for Frost Point Road, Fairlawn Shores Trail, and Fish Point Road was installed in 1974. Candy Cove Trail and Centennial Street had sanitary sewer systems installed in 1975. The sanitary sewer system in Bluedorn Circle was installed in 1978. All of these sanitary systems consist of 8-inch vitrified clay pipe. The sanitary sewer for the project area was televised in October 2004. The televising report indicates offset joints, open fractures, and roots in many segments of pipe. A 6-inch cast iron pipe forcemain was installed in 1974 on Fish Point Road between Flint Road and Forest Circle. It is recommended that the failing segments of vitrified clay pipe in these areas be replaced with 8-inch PVC pipe. Pipe lining is proposed for the sanitary sewer not scheduled for replacement and where lining is necessary. Pipe lining will be done by a separate contractor prior to paving of the bituminous wear course. In areas that the sanitary sewer is replaced, service connections will be replaced from the main line to the property line. Some sanitary service connections are also proposed to be replaced. Pipe lining is proposed in these areas because it is less disruptive than the replacement of the sanitary sewer. Storm sewer improvements will include replacing existing pipe and catch basins and adding additional storm sewer. An informational meeting is tentatively scheduled for January 13th, 2005. The proposed improvements, project schedule and assessments will be presented. 2 ISSUES: FINANCIAL IMPACT: G: \Agenda\Agenda04\05FEAS.DOC The attached Feasibility Report outlines which portions of the cost for the above project will be assessed to the benefiting properties. If the Council approves the Feasibility Report, the Chapter 429 special assessment statute requires a public hearing be conducted prior to proceeding with the project to determine if it is to move forward. The Special Assessment Committee met on December 9th at which time the following issues were discussed and recommendations made: Street and Storm Sewer Reconstruction · Pursuant to the assessment policy, the street and storm sewer reconstruction should be assessed at up to 40% of the total project cost against the benefiting properties, depending upon the special benefit created for each such property. Centennial as a first time improvement should be assessed at 100% for street and storm sewer. The remaining amounts should be recovered through the general ad valorem property tax. Assessment Method · The Special Assessment Committee recommends the unit method of assessment for Fish Point Road, Fairlawn Shores Trail, Frost Point Circle, Bluedorn Circle, and Candy Cove Trail (TH 13 to CR 44) due to the fact that lots in the project area are of similar size and/or value. The estimated assessment rate is $8,094/unit. Centennial Assessment · The Special Assessment Review Committee recommended that the 100% units on Centennial be separated from the rest of the project, a 24' wide street be proposed, and 2 additional units be added. Making these changes results in an assessment of $16,660.00. Appraisals will be done for Centennial Street properties to verify the proposed assessment. CONCLUSION In summary, the project is feasible from an engineering and economic standpoint. Approval of the Feasibility Report does not grant final approval of the project. The 2005 improvement project is proposed to be financed by special assessments, tax levy, enterprise fund, water quality fund, capital park fund, trunk reserve, and the operating budget. Funding sources and amounts are as shown below: Assessments $1,226,914 Tax Levy $1,590,499 Sewer & Water Fund $881,513 Trunk Reserve Fund $18,504 Water Quality Fund $107,815 Capital Park Fund $66,878 3 $26,016 $3,918,139 AL lERNA liVES: The alternatives are as follows: 1. Approve Resolution 04-XX accepting the Feasibility Report and establish a Public Hearing date as per the attached Resolution. 2. Table the resolution for a specific reason. 3. Deny the Resolution. RECOMMENDED MOTION: A motion and a second to adopt a Resolution accepting the Feasibility Report and calling for a Public Hearing for the 2005 Improvement project. 1tM1 / REtJ :;#-- REVIEWE G: \Agenda\Agenda04\05FEAS.DOC 4 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 RESOLUTION 04.xx RESOLUTION ACCEPTING FEASIBILITY REPORT AND CALLING FOR A PUBLIC HEARING ON 2005 IMPROVEMENT PROJECTS MOTION BY: SECONDED BY: WHEREAS, pursuant to Resolution 04-117, the City Council, on July 19, 2004, ordered a feasibility report to be prepared by the City's Engineering Department with reference to the improvement of Fish Point Road, Fairlawn Shores Trail, Frost Point Circle, Bluedorn Circle, Centennial Street, and Candy Cove; and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost- effective, and feasible. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that 1. The recitals set forth above are incorporated herein. 2. The City Council hereby accepts the Feasibility Report as submitted. 3. The Council will consider the improvement of such streets and areas in accordance with the report and the assessment of property as described in the report for all or a portion of the cost of the improvements pursuant to Minnesota Statutes Chapter 429 at an estimated total cost of the improvements of $3,918,139.00. 5. A Public Hearing shall be held on such proposed improvements on the 18th day of January, 2005 at the Fire Station No.1, with the address of 16776 Fish Point Road, City of Prior Lake, Minnesota at 7:00 p.m. Statutory notice and publication requirements shall be followed. Passed and adopted this 20th day of December, 2004. YES NO Haugen Haugen Blomberg Blomberg LeMair LeMair Petersen Petersen Zieska Zieska Frank Boyles, City Manager Seal} www.cityofRriorlake.com (Jo\Resolution\Resol04\O'i-llacceptfeas doc. 1 Phone 952.447.4230 / Fax 952.447.4245 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 NOTICE OF PUBLIC HEARING ON PUBLIC IMPROVEMENT PROJECT #05-01 & #05-11 FISH POINT ROAD, FAIRLA WN SHORES TRAIL, FROST POINT CIRCLE, BLUEDORN CIRCLE, CANDY COVE TRAIL AND CENTENNIAL STREET TIME AND PLACE: Notice is hereby given that the City Council of the City of Prior Lake, Minnesota, will meet in the Council Chambers/Fire Station No. 1 in the City of Prior Lake, Minnesota, on the 18th day of January, 2005, at 7:00 0' clock P.M. to consider the construction of the Street Improvements of 2005 heretofore ordered by the City Council. NATURE OF IMPROVEMENT: Reconstruction of Fish Point Road. Fairlawn Shores Trail. Frost Point Circle. Bluedom Circle. Centennial Street. and Candy Cove Trail, including grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, sidewalks, utility improvements, and appurtenant work ESTIMATED COST: The total cost of the project is estimated to be $3,918,139.00. The total amount proposed to be assessed is $1,226,914. AREA PROPOSED TO BE ASSESSED: The area proposed to be assessed consists of every lot, piece or parcel of land benefited by said improvement, which has been ordered made and is as follows: Fish Point Road, Fairlawn Shores Trail, Frost Point Circle, Bluedom Circle, Centennial Street, and Candy Cove Trail in the City of Prior Lake, Minnesota. The area proposed to be assessed is every lot, piece, and parcel benefiting from said improvements, whether abutting or not, within the following described areas: Portions of the northeast quarter Section 36, Township 115 north, Range 22, west, and portions of the southeast quarter Section 25, Township 115 north, Range 22 west, Scott County, Minnesota. Specific property descriptions included in the above described area, but not inclusive, are as follows: www.cityofpriorlake.com Phone 952.447.lig}Ol ~fB'ax 952.447.4245 Property abutting including: Cable 1 st Addition Centennial Addition Eastwood 1 st Addition Fairlawn Shores Forest Oaks 1 st Addition Gary Matson Addition John Titus Addition Maves 1 st Lake Addition Maves 2nd Lake Addition North Prior 1 st Addition Nystrom 1 st Addition R.L.S. 29 Shangri-la Storm's 1 st Addition Wayne & Harriet's 1 st Addition AUTHORITY: The Council proposes to proceed under the authority granted by Chapter 429 M.S.A. Such persons as desire to be heard with reference to the proposed improvements will be heard at this meeting. Written or oral objections will be considered. A reasonable estimate of the impact of the assessments will be available at this meeting. DATED: ,200_. BY ORDER OF THE CITY COUNCIL /s/ City Manager Published in the Prior Lake American, on December 25,2004 and January 1,2005. Page 2 of2 G:\PROJECTS\2005\II]ishPoint]airlawn\PUBLIC HEARING NOTICE IAN 05.doc 'lOWER PRIOR LAKE N ~+ s 700 I o 700 Feet I ..., Road wI Concrete Curb L-...J & Gutter .. Mill & Overlay wI Concrete Walk ~ CITY PROJECT #05-11 PROJECT AREA MAP EXHIBIT 1 WESTWOOD DR DDD DO CITY PROJECT #05-01 PROJECT AREA MAP () ~ ~ (') o < m -i ;AJ r- 700 I N /+ o 700 Feet I .. Road wi Concrete Curb L...-.I & Gutter EXHIBIT 1A