MEETING DATE:
AGENDA #
PREPARED BY:
REVIEWED BY:
AGENDA ITEM:
DISCUSSION:
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
CITY COUNCIL AGENDA REPORT
JANUARY 3, 2005
5D
AL FRIEDGES, PARKS AND FLEET MAINTENANCE SUPERVISOR
BUD OSMUNDSON, PUBLIC WORKS DIRECTOR
CONSIDER APPROVAL OF A RESOLUTION RECEIVING AND REJECTING
ALL BIDS FOR CONSTRUCTION OF CONCESSIONS/RESTROOM
BUILDING ADDITION AND REMODELING AT THE PONDS ATHLETIC
COMPLEX
Historv
At the September 20,2004 City Council meeting staff was directed by Council to:
1. Enter into the City's Standard Professional Services Agreement with Oertel
Architects to provide professional services to design a concession room
addition and upgrade existing restrooms at The Ponds Athletic Facility;
2. Design the facility so that it is fully A.D.A. compliant; and
3. Prepare plans, specifications and construction documents
At the November 15,2004 City Council meeting, plans, specifications, and
authorization to solicit bids for the construction of a concession room addition and
upgrades to existing restrooms were approved.
The purpose of this agenda item is to receive and reject all bids for the proposed
addition.
CurrentC"cumswnc~
The total estimated cost for the restroom/concessions addition and renovation was
$95,000. Bids were opened on Tuesday, December 21st at 2:00pm at the City of Prior
Lake Maintenance Facility. The low bid was $182,207 (including alternates) from
Greystone Construction Co.
A total of 10 companies bid the project. The bid results are as follows:
Vendor Base Bid Alternate #1 Alternate #2 Total
Gladstone Const 213,975 19,500 4,500 $237,975
Merrimac Const 219,702 12,000 3,500 $235,202
Ebert Const 213,400 15,000 3,500 $231,800
Maertens-Brenny 205,300 16,840 3,421 $225,561
Parkos Const 208,600 9,500 3,500 $221,600
CM Const 203,100 10,000 3,500 $216,600
Gen-Con Const 199,800 9,800 3,950 $213,550
George S Cook 189,000 12,000 4,000 $205,000
Const
Lund Martin 183,000 8,600 3,300 $194,900
Greystone Const 173,000 5,914 3,293 $182,207
C:\Documents and Settings\KellyM\Local Settings\Temporary In~~~i9.~.bfdpadditions remodel the ponds.DOC
Phone 952.447.4230 / Fax 952.447.4245
ALTERNATIVES:
RECOMMENDED
MOTION:
REVIEWED BY:
These bids are well beyond our estimates that we increased greatly from Capital
Improvement Program estimates. Because of the increase staff recommends rejecting
all the bids and re-bidding the project in conjunction with the Sand Point Beach
Concession/Restroom Building in the fall of 2005 after the fields and beaches facilities
are closed for the season.
Issues:
Staff anticipates a more favorable bid at this time for the following reasons:
1. Winter construction cost will not be a factor
2. The size and scope of the project will be larger, which we hope will result in
greater competition.
You may recall that the City Council directed staff to research and redesign the
proposed Sand Point Beach concession/restroom facility addition. Staff will be
returning in February to the City Council with the requested information.
Conclusion
Should the Council reject all bids we would continue to work with Oertel Architects on
the Sand Point Beach Concession/Restroom design and bring both projects back to
Council in May of 2005 for approval with an anticipated project start-up in late August
or early September of 2005.
The alternatives are as follows:
1. Approve a resolution rejecting all bids for the construction of Concession/Restroom
Building Addition and Remodeling at The Ponds Athletic Facility and directing re-
bid in conjunction with the Sand Point Beach Concession/Restroom Building
Project in the fall of 2005.
2. Table this agenda item for a specific reason.
3. Deny this agenda item for a specific reason and provide staff with direction.
Staff recommends alternative number 1.
C:\Documents and Settings\KellyM\Local Settings\Temporary Internet Files\OLKlFA\reject bids additions remodel the ponds.DOC
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
RESOLUTION OS-XX
A RESOLUTION AUTHORIZING STAFF TO REJECT ALL BIDS FOR THE
CONSTRUCTION OF CONCESSIONS/RESTROOM BUILDING ADDITIONS AND
REMODELING AT THE PONDS ATHLETIC COMPLEX
MOTION BY:
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
SECOND BY:
Because of the continued growth of Prior Lake and updated health,
handicapped access and safety requirements, the Capital Improvement Program
contains funds for upgrades and additions to the Concession/Restroom Building
at The Ponds Athletic Complex (2005); and
At the November 15,2004 City Council meeting Council approved plans and
specifications and authorization to solicit bids for the construction of
Concession/Restroom Buildings for The Ponds Athletic Facility; and
On December 21, 2004, bids were opened for the construction of
Concession/Restroom Building additions and remodeling at The Ponds Athletic
Facility; and
The following bids were received:
Vendor Base Bid Alternate #1 Alternate #2 Total
Gladstone 213,975 19,500 4,500 $237,975
Const
Merrimac 219,702 12,000 3,500 $235,202
Const
Ebert Const 213,400 15,000 3,500 $231,800
Maertens- 205,300 16,840 3,421 $225,561
Brenny
Parkos Const 208,600 9,500 3,500 $221,600
CM Const 203,100 10,000 3,500 $216,600
Gen-Con 199,800 9,800 3,950 $213,550
Const
George S 189,000 12,000 4,000 $205,000
Cook Const
Vendor Base Bid Alternate # 1 Alternate #2 Total
Lund Martin 183,000 8,600 3,300 $194,900
Greystone 173,000 5,914 3,293 $182,207
Const
The lowest bid from Greystone Construction Co was $182,207, which was
significantly higher than the architects estimate, and have determined that it is
C:\Documents and Settings\KellyM\Local Settings\Tem~~WFlr!~r1e~~FA~ct bids additions remodel the ponds.DOC
Phone 952.447.4230 / Fax 952.447.4245
in the best interests of the City to reject all bids.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA, that:
1. The recitals set forth above are incorporated herein.
2. All bids for the project are hereby rejected.
3. The City Manager is authorized and directed to return to all bidders the deposits made with their
bid.
Passed this 3rd day of January 2005.
Haugen Haugen
LeMair LeMair
Petersen Petersen
Zieska Zieska
YES
NO
{ Seal }
Frank Boyles, City Manager