HomeMy WebLinkAbout5G - Adv. For Bids MEETING DATE: AGENDA # PREPARED BY: AGENDA ITEM: DISCUSSION: ageJl~~ ~1'tJ" ~~ Fnl'" t~~t UT~l1 Maintenance Center 17073 Adelmann Street S.E. Prior Lake, Minnesota 55372 CITY COUNCIL AGENDA REPORT February 7, 2005 5G Bud Osmundson, Director of Public Works CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING ADVERTISEMENT FOR BIDS TO DRILL AND PUMP A TEST WELL Historv The Comprehensive Water Plan update is now in final draft form. This plan has been compiled over the last 8 months to guide the City in its long term potable water system infrastructure construction. A key component of the plan is to have a water treatment plant on the Brooksville Hills city owned parcels, adjacent to Wells 3, 4, & 7. Well No.5 is also close by and raw water lines were installed under the local streets to direct Well 5 water to the proposed Treatment Plant when it is constructed in the future. To serve the existing population, the Treatment Plant is required to be about a 6 million gallon per day (mgd) facility. The existing wells (3,4,5, & 7) have a firm water production capability of about 4 mgd. This means we are about 2 mgd short of water production. Staff has been working with the DNR and our consultants to develop a plan on future well location to provide this additional water. This plan is based on the State rules of not allowing any pumping of the Jordan aquifer which has an affect on the Savage Fen. We are proposing that a new Jordan aquifer well (No. 8) and a Frankonia, Ironton, Galesville (FIG) aquifer well (No.9) be located adjacent to the Maintenance Center. Another Jordan well (No. 11) is proposed to be located further south of the Maintenance Center, possibly on the Busse property that is currently in the process of being annexed. An additional FIG (No. 10) is proposed to be located on the City owned outlot in the southeast quadrant of Fish Point Road and CH 44 (160th St.). Another Jordan (No. 12) is proposed for the Snell property at some time in the future. A map showing these locations will be provided at the meeting. The purpose of this item tonight is to consider authorizing an advertisement for bids to drill a test well into the FIG and perform pump testing of the well. The driller will be drilling through the Jordan which will enable us to confirm the existence of this aquifer. The Jordan is a very dependable aquifer; we just need to confirm its existence in the area. The FIG is much less dependable and the test pumping will allow us to project whether or not it will be adequate for a production well. This will also allow us the opportunity to gather water quality data which will assist in the dysign 9f the water treatment plant. www.cltyQtpnorlake.com Phone 952.440.9675 / Fax 952.440.9678 FISCAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: REVIEWED BY: agenda auth ad for test well We had previously worked with Engineering Resources Inc. on obtaining quotations for this proposed test well since we estimated the cost would be under $50,000. However, the feedback from the prospective drillers has shown that the cost will be over $50,000 which requires us to proceed with the competitive bidding process prescribed by State statute. The proposed schedule for the test well is as follows: City Council authorizes ad for bid ......................F eb 7, 2005 City opens bids. ...... .... .................... ...... ..... .Feb 25, 2005 City Council awards contract.......................... ....March 7, 2005 Test well pumping complete............................ ..June 15, 2005 If the test well pumping shows that we can provide adequate Jordan and FIG wells, we would then advance to the City Council for authorization to proceed with the drilling and developing of the proposed Jordan and Fig wells, No.'s 8 & 9. If drilling and developing and construction all go smoothly the wells could be on line or in use by the summer of 2006. Conclusion Staff recommends that we move forward with the FIG aquifer test well. Our existing FIG well (No.7) has been a fair producer to this point. Weare trying to work with the DNR showing that we will utilize the FIG while still utilizing the Jordan without affecting the Savage Fen. The only way to determine what we can expect from a FIG production well is to drill the test well and analyze it. Bud1!et ImDact The estimate for the test well is about $60,000. Staff recommends that the funding amount come out of the Trunk fund. The engineering required has been paid for out of the Water operating budget - professional services and will only total about $2,000 to $3,000. The alternatives are as follows: 1. A motion to approve a resolution authorizing the advertisement for bids for a FIG test well. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason. Staff recommends alternative number 1. Mr. Costa Dimitracopoulos of Engineering Resources c. will be present at the meeting to answer any unc may have. .._.,..c_c....__..._c.,+......c_..._~._'--r___...___'_.._.___........................"__.......................c......_,..__..,,,..__.......... Maintenance Center 17073 Adelmann Street S.E. Prior Lake, Minnesota 55372 RESOLUTION OS-XX ATHORIZING THE ADVERTISEMENT FOR BIDS FOR A FIG TEST WELL AND APPURTENANT WORK MOTION BY: SECOND BY: WHEREAS, The City is concerned about having an adequate potable water supply for the community, and WHEREAS, The City has prepared a Comprehensive Water Plan which recommends the addition of wells to provide potable water for the City in conjunction with the anticipated Brooksville Hills Water Treatment Plant, and WHEREAS, The plan locates one additional Jordan aquifer well and one Franconia, Ironton, Galesville aquifer well adjacent to the City Maintenance Center, and WHEREAS, As part of the process, staff is recommending that a FIG test well be completed so that the adequacy of the aquifer adjacent to the Maintenance Center is determined. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, 1. The recitals set forth above are incorporated herein. 2. The City Council authorizes the advertisement for bids for the drilling and testing of a FIG well. Passed and adopted this 7th day of February 2005. YES NO Fleming Fleming Haugen Haugen LeMair LeMair Petersen Petersen Zieska Zieska {Seal} Frank Boyles, City Manager !:1IgPnl'1!:11 !:IlItn !:11r1 f'n,. tpc;:t Ulpll www.cityofpriorlake.com Phone 952.440.9675 / Fax 952.440.9678