HomeMy WebLinkAbout7A - Centennial Street Imp.
CITY COUNCIL AGENDA REPORT
SUBJECT:
JULY 6,1999
7A
SUE MCDERMOTT, ASSISTANT CITY ENGINEER
GREG IlKKA, PUBLIC WORKS DIRECTOR/CITY
ENGINEER
CONDUCT ASSESSMENT HEARING FOR CENTENNIAL
STREET IMPROVEMENT PROJECT #99-12 AND
CONSIDER APPROVAL OF THE FOllOWING
RESOLUTIONS:
DATE:
AGENDA #:
PREPARED BY:
REVIEWED BY:
~;JJ
~
'9.Q.:XX ADOPTING THE ASSESSMENT ROLL FOR THE
CEf;n:ENNIAL STREET IMPROVEMENT PROJECT
D€~\N4 ALL
~E;:'P~~:M~ P~~J:gTR THE CENTENNIAL
DISCUSSION:
HISTORY
Centennial Street is one of the few remaining gravel streets
in the community. It is a neighborhood street, approximately
500 feet long which ends in a cul-de-sac and serves 6
households. construction of this street to a city standard
bituminous street with curb and gutter was approved for
inclusion in the 1999 Capital Improvement Program.
CONTRACT AWARD
At the April 19, 1999 Council Meeting, the Council approved
plans and specifications and authorized the advertisement
for bids for Centennial street Improvements. . Bids were
received and opened on May 25, 1999. The bids have been
checked and tabulated. The low bidder was K.A. Witt
Construction, Inc., of New Prague, MN in the amount of
$59,085.75. Their bid was over the Engineer's Estimate of
$52,741.75. Based on references provided by K.A. Witt
Construction, Inc., staff believes the contract would be
successfully completed by this contractor.
ASSESSMENTS
At the June 7, 1999 Council Meeting, the Council approved
Resolution 99-56 which declared the cost to be assessed
and ordered the preparation of the assessment roll. In
addition, Resolution 99-57 was approved establishing the
162QQ~RS!99&~g. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
date of the Assessment hearing as July 6, 1999 for the
Centennial Street Improvement project.
CURRENT CIRCUMSTANCES
ASSESSMENTS
All benefiting property owners have been mailed a
Statement of Special Assessments which included
information pertinent to their property such as the total
assessment amount and the assessment rate. A Public
Hearing notice has been mailed to each property owner
indicating time and place of the Assessment Hearing. The
Public Hearing Notice has also been published in the
newspaper for two weeks.
The total project cost for the Centennial Street project is
$75,009.98. There are five (5) benefiting properties in the
project area. It is proposed to be funded through trunk
reserve funds and assessments. $6,005.00 for water main
improvements would be paid through the trunk reserve and
$69,004.98 would be assessed against the benefiting
properties. A copy of the assessment roll is attached
showing the proposed assessments per parcel.
The Assessment Review Committee recommended
assessing the project on a uhit basis. Each unit was
determined per the City's Assessment Policy utilizing the
existing plat drawings on file for these areas as well as
records for prior assessments.
The assessment terms are to be for ten (10) years. Added
to the first installment will be an additional 178 days of
interest which accounts for the remainder of 1999 following
the Assessment Hearing. An interest rate of 80/0 will be
charged in accordance with City Assessment Policy.
Prior Lake Code, Chapter 1-13, allows for the deferment of
assessment principal and interest if the following four criteria
are satisfied:
1. Applicant must be 65 years of age or older.
2. The qualifying property must be the homestead of the
applicant.
3. Annual gross income shall not exceed the income limits
as set forth by family size according to Attachment "A" of
Ordinance 86-3.
4. Total special assessment to be deferred must exceed
$1,000.00.
The property owners have a right to appeal their
assessments as per Minnesota Statutes Chapter 429.
G:\AGENDA99\ASSESSCT.DOC
FINANCIAL IMPACT:
G:\AGENDA99\ASSESSCT.DOC
Written objections must be signed and filed with the City
Manager prior to the Assessment Hearing or presented to
the Council at the Hearing.
ISSUES
ASSESSMENTS
1) The Assessment Review Committee recommends that if
the project moves forward, that the Unit Assessment
method be used. The proposed unit rate is $11,500.83.
There are six (6) assessable units on Centennial Street, with
two (2) of the units under the same ownership. The owner
of these units has expressed opposition to the project
(attached). In addition, a letter of opposition was received in
November which was signed by all of the Centennial Street
residents.
2) The two properties on each corner of Centennial Street
and Candy Cove Trail have been previously assessed with
Candy Cove Trail upgrades and therefore can not be
assessed with this project. A third property, Cable First
Addition, does not have access from Centennial Street.
3) Improvements to the watermain that are necessary
include fire hydrant and valve replacement. These costs are
proposed to be funded through the Trunk Reserve.
CONTRACT AWARD
1) The bid received by K.A. Witt Construction, Inc. is valid
for 60 days from the date of the bid opening unless an
extension is mutually agreed upon. The 60 day time period
expires on July 24, 1999. If Council chooses not to award
the bid at this meeting, the July 19th meeting would be the
final opportunity.
If the proposed assessments are adopted after an
assessment hearing financing of the improvements will be
as follows:
Funding Amount
Source
Assessments $69,004.98
Trunk $6,005.00
Reserve
Project Totals $75,009.98
The numbers shown above for the assessments include
300/0 indirect costs for design, survey, inspection,
administration, and financing. At the conclusion of the
Assessment Hearing and subsequent adoption of the
assessment roll, all property owners will be mailed a follow-
up billing statement of their final amount owed.
AL TERNA TIVES:
RECOMMENDED
MOTION:
REVIEWED BY:
REVIEWED BY:
G:\AGENDA99\ASSESSCT.DOC
The alternatives are as follows:
1. Approve Resolution 99-XX adopting the assessment
roll as submitted or with amendments and approve
Resolution 99-XX accepting the bid and awarding the
contract for Project 99-12 Centennial Street
Improvements to the lowest responsible bidder, K.A.
Witt Construction, Inc. for the bid amounting to
$59,085.75.
2. Close the hearing and deny Resolution 99-XX
adopting the assessment roll and Resolution 99-XX
accepting the bid and awarding the contract for
Project 99-12 Centennial Street Improvements.
The City Council could adopt both Resolutions (Alternative
1) adopting the assessment roll and accepting the bid and
awarding the contract if it believes that it is essential to move
forward with this road reconstruction project at this time and
that the proposed assessment amounts are appropriate.
The City Council could close the hearing and deny both
resolutions (Alternative 2) if it believes that completion of this
road improvement project at this time is not essential
because it serves only six properties, that the maintenance
costs for the street in its existing condition are not
significantly greater than bituminous streets, that the
proposed improvement costs are onerous considering the
benefit received, and/or that the project could be made more
economical at some future date by including it with another
project.
DESCRIPTION: PROJECT 99-12, CENTENNIAL STREET
ASSESSMENT HEARING DATE: 7/6/99
ASSESSMENT RATE: $1 1,500.83
ASSESSMENT CODE:(PA VlNG) 97
INTEREST RATE: 8.00%
PAVING: 10 YEARS
INITIAL YEAR: 2000
ADDITIONAL INTEREST: 178 DAYS
PAYMENT METHOD: EQUAL PRINCIPAL
-- ......................... ... .................................................. ........................ ..
.................................................. ........................
~mm~mf;;;;;~;;;;~~;~r;m;;mmm;~; ................................................
.1 ................................................
::::::::::::::::::::::::::::::::::::::::::::::::
.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:
:;:r~:~:;:f~:~:~:;:~:~:~:~:~:~:~:~:;:~:~:~:~: ::::::::::::::::::::::::::::::::::::::::::::::::
................................................
1\1111111111111111111 ........................
.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:
................................................
........................
.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:
......j......f.ONltS......
:::::::...::~.:;.:.....:....:::::::
Lot 1 Block 1 Centennial Addition 25-163001-0 Arnold & Gladys Gruetzmacher
5344 Centennial Street SE $1 1 ,500.83 1 $1 1,500.83
Prior Lake, MN 55372
Lot 2 Block 1 Centennial Addition 25-163002-0 Georgiana Dillon
5375 Centennial Street SE $1 1,500.83 1 $11,500.83
Prior Lake, MN 55372
Lot 3 Block 1 Centennial Addition 25-163003-0 Bernard S Schwan beck
5401 Centennial Street SE $1 1,500.83 1 $11,500.83
Prior Lake, MN 55372
See 36 T1 15 R22 .94 PIO SE1/4 SW1/4 Com 325.66 E of 25-936033-0 James E & Mary Lou Simon
NW Cor. E 352.1 1 to POB S 210.7, W 193.9, N 210.7 E to 5366 Centennial Street SE $1 1,500.83 2 $23,001.66
Beg. DOC 121 187 Prior Lake, MN 55372
Sec 36 T1 15 R22 .5 5/10 A in SE1/4 SW1/4 Com at INT. 25-936031-0 Albert J Kocher
of Hwy 13 E 352.1 l' to Pt of Beg. Thence S 210.7 E 1 16.3' , 5400 Centennial Street SE
$1 1,500.83 1 $11,500.83
N to N line W 92.2 to pt of Beg. Prior Lake, MN 55372
TOTAL $69,004.98
PRINTED 6/8/99
G:\PROJECTS\ 1999\ 12CENnASSESS.XLS
.
Date:
June 21, 1999
To:
Members of the
Prior Lake City Council
From:
Jim and Mary Lou Simon
In response to the declared costs of the
Centennial Street project we were lead to believe the
costs would be much less than the' actual cost. In
lite of this, we would again like to go on record as
opposing the project.
Originally the cost was to be about $8,000 -
$9,000. Now the cost is nearer to $12,000. This
increase is totally unacceptable to us as well as our
neighbors.
We are also being assessed for 2 units when we
only have one unit. We were originally going to sub-
divide our lot but city regulations make that cost
prohibitive.
.Re?~
~ & Mary Lou
~~~~~~
Simon
.
MOTION BY:
RESOLUTION 99-XX
RESOLUTION ADOPTING ASSESSMENTS
FOR PROJECT #99-12 CENTENNIAL STREET IMPROVEMENTS
SECOND BY
WHEREAS, pursuant to proper notice duly given as required by law, the Council has met and
heard and passed upon all objections to the proposed assessments for projects 99-
12 Centennial Street Improvements, and has amended such proposed assessment
as it deems just.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA:
1. Such proposed assessment, a copy of which is attached hereto and made
part hereof, is hereby accepted and shall constitute the special assessment
against the lands named therein, and each tract of land therein included is
hereby found to be benefited by the proposed improvement in the amount of
the assessment levied against it.
2. Such assessments shall be payable on an equal principal method extending
over a period of ten (10) years for paving. The first installment shall be the
annual principal plus interest calculated from the Public Hearing date to the
end of this year plus twelve months of the next year and shall bear interest
at the rate of eight (8) percent per annum from the date of adoption of this
assessment resolution . To the first installment shall be added one hundred-
seventy-eight (178) days of interest on the entire assessment from the date
of this resolution until December 31, 1999. To each subsequent installment
when due shall be added interest for one year on all unpaid installments.
3. The owner of any property so.assessed may, .at any time prior to certification
of the assessment to the County Auditor, pay the whole of the assessment
on such property, with interest accrued to the date of the payment, except
that no interest will be charged if the entire assessment is paid within thirty
(30) days, and the individual may at any time thereafter, pay to the City's
Finance Director the entire amount of the assessment remaining unpaid,
excepting the installment portion appearing upon the current year's property
tax statement.
4. The City Manager shall forthwith transmit a certified duplicate of this
16200 ~~~m Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
A'!'. EQUAL OPPORTUNITY EMPLOYER
assessment to the County Auditor to be extended on the property tax lists of
Scott County. Such assessments shall be collected and paid to the City in
same manner as other municipal taxes.
5. The final project cost apportionment has been determined to be $75,009.98
of which $6,005.00 shall be paid from the City's Trunk Reserve Fund, and
$69,004.98 to be assessed to the benefited property owners as per the
attached assessment roll.
Passed and adopted this 6th of July, 1999
YES
NO
Mader
Kedrowski
Petersen
Schenck
Wuellner
Mader
Kedrowski
Petersen
Schenck
Wuellner
{Seal}
Frank Boyles
City Manager
City of Prior Lake
99CENT AH.DOC
RESOLUTION 99-XX
~ ~~
IlVNESO
ACCEPTING BIDS AND AWARDING CONTRACT FOR CENTENNIAL STREET
IMPROVEMENTS (CITY PROJECT #99-12)
MOTION BY:
SECOND BY:
WHEREAS, pursuant to an advertisement for bids for the improvement project at Centennial
Street (Project 99-12) which includes aggregate base, concrete curb and gutter,
bituminous pavement, watermain improvements and appurtenant work; and
WHEREAS, The following bids were received, opened, and tabulated according to law
and the following bids were received complying with the advertisement:
K.A. Witt Construction, Inc.
McNamara Contracting, Inc.
Northwest Asphalt, Inc.
BID
$ 59,085.75
$ 66,183.25
$ 66,990.35
CONTRACTORS
WHEREAS, it appears that K.A. Witt, Construction, Inc. of New Prague, Minnesota is the
lowest responsible bidder.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA:
1. The Mayor and City Manager are hereby authorized to enter into a contract
with K.A. Witt Construction, Inc. of New Prague, Minnesota in the name of
the City of Prior Lake for the Centennial Street Improvement project (Project
99-.12) in the amount of $59,085.75.
2. The City Manager is hereby authorized and directed to return to all bidders
the deposits made with their bids once a contract has been signed.
Passed and adopted this 6th day of July, 1999.
YES
NO
Mader
Kedrowski
Petersen
Schenk
Wuellner
Mader
Kedrowski
Petersen
Schenck
Wuellner
1620~~~OCreek Ave. S.E., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245
AN EQUAL OPPORTUNITY EMPLOYER
{Seal}
Frank Boyles
City Manager
City of Prior Lake
AWIlDCENT.DOC
PrkrU18
PUBLIC HEARING
TO CONDUCT ASSESSMENT HEARING FOR CENTENNIAL STREET
IMPROVEMENTS PROJECT 99-12
* * *
July 6, 1999
'-l '-i 7 - L.J t:J s: '-
Sl