' • "EXHIBIT A"
rgto
o fAiiiiii, FOR CITY USE ONLY
ar��4� PERMIT# /1/_6 -/3
DATE 61446e-4.0 9—31y
EXCAVATING & GRADING PERMIT
Applicant: ehi 15O,1L Phone: 6/Z - S 3Z ` ` ;L O
Project/Development Name if Applicable:
Address:
Property Owner: (7//7 a 1`d �e7,co—r i Phone: 6'/Z 5--m'z''7-'
Address: 5-30 ) Fit/057L PiP272- (_? r (.1-69.
Contractor: P t / u /I ley c-715- %I X21,!L Yl- Phone: 47 S Z`"1-76 7' Z<� )r
Address: VO. , �r) / e i/' ay" Lag-, . , A)
Consultant Engineer/Surveyor: Phone:
Address: / �� 7 C,
Emergency Contact(24 HR): (ilio(i (1L 507,, Phone: ((Z J Z-' 7- Z EJ
Location of the Property: J `� /-----'o } Pr)l� ( ✓Cl-e. 1
j^)bCI'16510/\ Msk,mc- RLS 0.21, k TG T 131 1 co if' 0h p
Legal Description:
25-0 '60 C. j yr a , (0fk & Z Sc'' 2'5" ' S c ,k) � �
� ... -j w"_ _ r-1
"
i
1,0' W0-E. RD3, t- t br i P, ip po L, ccoc/ ft TC 2'01 q L�' co AJ 1/1/e,ir d r a S /.>-Z3-3c, f r div 1,,,v +(c,' 5w lv �" W t..N zo y Su (
Will the excavation or filling be in a: Watercourse / Wetland upland
Purpose for the proposed excav tin�j,or filling: 11b two,-75 t c \r1I 'f Rsgor'_ foa
, (4 tw
Estimated start date: r5,1k P Completion date: TD
What is the type of material to be removed or deposited? 131c-'k C t ori" ' 1 q >') > -co(4
What is the quantity of material to be removed or deposited? I 457 (i5 81 fir.k rii;1+ 7 19 ii 115 C lc .
What is the total area disturbed for excavation or filling? ')1\ -� ) Sr c c,ie -(4)24-- j
In what manner will the material be removed and/or deposited? -u e IZ1,x 6 4,4--
What highway, street or other public-way will material for removal or deposition be hauled or carried? 1-73.k PoI nr`- fed
What, if any,street,avenue,lane,alley,highway,right-of-way,thoroughfare or public ground will be obstructed? _
IT SHALL BE THE RESPONSIBILITY AND THE BURDEN OF THE APPLICANT TO DEMONSTRATE TO THE SATISFACTION OF THE
CITY ENGINEER FOR THE CITY OF PRIOR LAKE THAT THE PROPOSED EXCAVATION AND/OR FILLING COMPLIES WITH THE
OVERALL CITY OF PRIOR LAKE STORM WATER MANAGEMENT PLAN. SAID BURDEN SHALL INCLUDE THE FURNISHING OF
A REPORT WITH SUPPORTING CALCULATIONS OF A REGISTERED PROFESSIONAL ENGINEER.
Will proposed excavation or deposition affect the City of Prior Lake overall storm water management plan?Yes_ No�
If yes, explain proposed effect /
"EXHIBIT A"
SUBMISSION REQUIREMENTS:
A. Completed application form
B. Map or plat of the proposed filling or excavating showing location and amount of material proposed to be
removed or deposited,with a description of the area
C. The depth or heights to which such removal or deposition is proposed throughout the area and the proposed
angle of all slopes to be shown on a 2' contour map at a scale of 1"=50' or larger. The proposed and original
contours shall be shown including all property within 200' of proposed excavation or deposition and shall be
signed by an engineer or surveyor registered in the State of Minnesota
D. Erosion control plan
E. Effect on existing utilities
F. Application fee
G. Amount of Letter of Credit,or deposit of monies in a sum sufficient to pay the cost of restoring a site. The extra
ordinary costs of repairing, highways, streets or other public ways along designated routes of travel and to pay
such expenses as the City may incur by reason of doing anything required to be done
H. Public liability insurance
CONDITIONS OF APPROVAL:
A. Applicant must call the Engineering Department for erosion control inspection at (952) 447-9830 prior to earth
moving activities.
B. Maximum 4:1 slopes are allowed in "maintained" areas except approved by City Engineer. Maximum 3:1 slopes
are allowed adjacent natural resources.
C. Slopes greater than or equal to 3:1 shall have approved erosion control Best Management Practices installed
immediately after finished grading.
D. Minimum grade for drainage swales shall be 2%or greater.
E. Removal or depositing of material greater than 400 cubic yards requires a conditional use permit, unless ii:is part
of a preliminary plat application.
F. Applicant is responsible for obtaining and meeting the conditions outlined by other permitting agencies including
but not limited to the following: DNR,Corps of Engineer, Prior Lake/Spring Lake Watershed District,Scott County,
Mn/DOT, MPCA.
G. Applicant is responsible for all damages to other property or facilities as a result of work covered by this permit.
H. Applicant must call the Engineering Department for final grading inspection at(952)447-9830 prior to release of
grading security.
I. Additional Conditions:
THE UNDERSIGNED HEREIN CERTIFY THAT THEY HAVE READ SECTION 706 OF THE CITY CODE AND ACCEPT THE TERMS AND
CONDITIONS TO THE ISSUANCE OF THIS PERMIT AND AGREE TO FULLY COMPLY THEREWITH TO THE SATISFACTION OF
THE CITY OF PRIOR LAKE ENGINEERIG DEPARTMENT OR ITS DESIGNATED AGENT.
Applicant: (/ / Date G
Property Owner: ("it ad C.T71 Date //-(
"EXHIBIT A"
IMPORTANT BEFORE STARTING WORK
EXCAVATOR AND OPERATOR'S NOTICE
This tie is to inform excavators an operators they nmst compiy with
Sections 216D.03 to 216D.07 of tviiNNESOTA SAT Y :E
Cali Gopher State One
Call(800)252et166 or 651-454-0002
Or go to www.gopherstateonecall.org
Smart Phone: http://mnticketentrv.korterraweb.com
FOR CITY USE ONLY
AUTHORIZATION OF PERMIT
Financial Guarantee Amount$ Financial Guarantee Type
(Letter of Credit,Bond or Cash)
Permit Fee$ 0- de
Liability Insurance provided? 0 Yes '' No (Insurance Certificate must name the City of Prior Lake as an additional
insured party)
In consideration of agreement to comply in all respects with the regulations of the City of Prior Lake covering such
operations, and pursuant to authorization duly given by said City of Prior Lake,permission is hereby granted for the
work to be done as described in the above application and submitted drawings,said work to be done in accordance
with this application and submitted drawings. z ,`
ENGINEERING OFFICIAL Date �—✓ �T _
Permit is all if signed by City Official
PERMIT EXPIRATION DATE(90 days from approval date) /4-3--/y Planning Dept.Initials _
Site Perimeter Protection
Silt fencing or bio-rolls are required in the front and rear of the construction site and in areas that drain away
from the construction site. These perimeter protection measures must be installed properly. The detail below
shows proper installation of silt fence and bio-rolls. Silt fencing material must be properly trenched to prevent
soil from eroding under the fabric. Bio-rolls must be staked every foot to prevent movement.
SILT FENCE DETAIL
STEP 1 STEP 2 STEP 3
STAPLE WOVEN
MONOFILAMENT
3' DIA STEEL A 5 • ANOEXCAVATE POSTTO EACH f1 FLOW DIRECTION f(t CO cr THE Is
OR 2" X 2"WOOD,1 1 '
EXCAVATED SOIL
SPACING POST 4. M►J( w THE UNE OFF THE FLOW DIRECTION—+ j IBACKFILL COMPACTEDPOSTS ``
TRENCH �1 LAY FABRIC 1
g" X 14 IN TRENCH 4
�� T=l I I= 11 4111
ill-FT- 77 II III il
-"
STRAW OR WOOD BIOROLL DETAIL
2• DEEPYRENCH—\\
•�-�
NOTE: •+ .••
STAKED INTO THE GROUND WITH
WOOOSTAXES
WOOD STAKES AREA MINIMUM i -�
S'X2' /Y 16' LONG AND PLACED '—I — 11 — I!-L-1 LL= ' (
EVERY UNLESS P o sr it llPANED SURFACE OR ROCK I I—�� IIin— 1111 ail—II1i� (iillll�� _11 TE-1ll:
WOOD STAKES DRNEN THROUGH
LACK HALF OF BIOROLL. OR
COMPOST LOG AT AN APPROXIMATE
455 ANGLE WITH TOP OF STAKE
POMTMG UPSTREAM
WHEN MORE THAN T -.0.111011 FLOW
SIOROLL/COMMPOST LOG IS NEEDED.
OVERLAP ENDS A MINIMUM OF s-
AND STAKE l—1 l l—ill—!l r____i r r----1 I l ) —�!l-
iii =_lie=il i i=�i�=Iiiiiiiii-Irl1
Special Construction Sites
Sites with slopes over 3:1 or
abut natural amenities should
include additional erosion con-
trol protection. Additional
measures can include: double
row silt fence,heavy duty silt
fence,sedimentation basins,or
rock check dams. All sites
draining directly to a pond,
Example of Poor Erosion Control
creek,lake,or wetland must
include a double row of heavy
duty silt fencing.
Example of Good Erosion Control