Loading...
HomeMy WebLinkAbout5E - Generator Purchase 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 MEETING DATE: AGENDA # PREPARED BY: REVIEWED BY: AGENDA ITEM: DISCUSSION: CITY COUNCIL AGENDA REPORT FEBRUARY 22, 2005 5E CRAIG ELDRED, STREET AND UTILITIES SUPERVISOR BUD OSMUNDSON, PUBLIC WORKS DIRECTOR "- CONSIDER APPROVAL OF A RESOLUTION AUTHORIZING THE PURCHASE OF ONE REPLACEMENT PORTABLE GENERATOR AND APPURTENANT EQillPMENT (FROM THE PUBLIC WORKS EQillPMENT INVENTORY) Historv The purpose of this agenda item is to obtain approval for the purchase of one new Caterpillar/Olympian Model D80P4 portable generator from Ziegler Power Systems of Shakopee, Minnesota. Included in this purchase is the cost of new cables and installation of new and existing cables from Hayes Electric of Hampton, Minnesota. The purpose of the Equipment Fund and Matrix is to identify and budget for equipment and vehicles that need replacement due to age, wear, or for additional equipment that needs to be purchased due to growth. All equipment identified in the matrix is subject to Council approval regardless of price. Cu"entC"cumsmnc~ The City currently has three portable generators. The following information on each unit is listed below: the brand name, age, kilowatts (kw), fuel type, usage areas and life expectancy per the equipment matrix. Unit Brand Year KW Fuel U sage areas Life # purchased type Expectancy 477 Caterpillar 1996 225 Diesel Booster 20 station, well #6, wells 3 & 4 476 Caterpillar 1996 70 Diesel Lift stations, 15 maintenance center 475 Onan 1975 55 Propane Lift stations 30 Issues Unit 477 is dedicated to operating the booster station and well #6. In an emergency, it may be moved to wells #3 and #4 if well #6 is unable to provide enough water to maintain adequate levels in the elevated towers for domestic use and fire flows. The main reason the generator would need to be kept at the booster and well #6 is to provide sufficient system pressure to the Wilds and Sterling South areas of Prior Lake's distribution system, if there is a power outage. Unit 476 also has multiple uses; it can be used on many of the 36 lift stations Prior C:\Documents and Settings\KellyM\Local Settings\Tempo~~<Pt~~~QlD,le generator (2).DOC Phone 952.447.4230 / Fax 952.447.4245 Lake staff maintains. Its main function, if there were a prolonged power outage, would be to provide standby power to the Maintenance Center to allow staff to pump fuel at the fuel islands and enter the equipment storage area at the Maintenance Center. One limiting factor of this unit is that we cannot use it to provide standby power to ten of the 36 lift stations maintained by Prior Lake maintenance staff because of variable frequency drive units (VFD). VFD units provide the ability to take single-phase power supplied by the power company and convert it to three-phase power to operate the pumps in the 10 lift stations. Three phase pumps are traditionally cheaper than single-phase pumps. Staff expects to see more use ofVFD's within the current city limits and the planned orderly annexation areas to convert single-phase power for new lift stations. Unit 475 is the thirty-year old unit we are asking to be replaced. It is the only generator presently available to use on the 10 VFD stations. Two 100-pound propane gas cylinders mounted on the back of unit 475 provide the fuel to power this unit. Staff feels this raises safety concerns while moving the unit from station to station on an emergency basis, and the shortage of propane fuel to run the generator during prolonged power outages. Updating Unit 475 with the ability to cover more voltages and utilize diesel fuel to power the power generation unit will improve staff response to power outages. FISCAL IMPACT: Budeet ImDact Staff contacted three vendors which supply portable generators that have the capability to provide the voltages used at Prior Lake lift stations. They are listed below along with costs for the cable installations as previously mentioned. These cable installation costs ($656) were obtained from Hayes Electric of Hampton, Minnesota and are built into the total cost in the chart below: Vendor Ziegler Power Interstate Compo Cummins Power, Systems, Inc., Mpls, MN LLC, White Bear Shakopee, Mn Lake, MN Unit model D80P4 - Diesel 8RED2JC - Diesel 80DGDA - Diesel Unit cost $27,985 $32,850 $35,830 Less trade ($1,000) N/A ($5,000) Total less trade $26,985 $32,850 $30,830 Tax $1,754.03 $2,135.25 $2,005.25 Generator cost $28,739.03 $34,985.25 $32,855.25 Cable installation $656 $656 $656 Total Cost $29,395.03 $35,641.25 $33,511.25 Warranty Limited 2 year Limited 1 year Limited 1 year The equipment matrix identifies $42,383 in the 2005 Capital Improvement Program for the replacement cost of the generator, and the funding source is the Equipment Revolving Fund. Staff recommends that the City purchase the generator from Ziegler. The total cost of the generator and appurtenant equipment totals $29,395.03. C:\Documents and Settings\KeIlyM\Local Settings\Temporary Internet Files\OLKlFA\portable generator.DOC .~_.. ...... ~r" ... _. ........ ........._.h ......... . ..... ........--.......,..............,..............,.......,-...............-........"".,.......--.-.------r--'---~-._...... ALTERNATIVES: RECOMMENDED MOTION: REVIEWED BY: The alternatives are as follows: 1. Approve the resolution authorizing the purchase of one Caterpillar/Olympian portable diesel generator from Ziegler Power Systems of Shakopee, Minnesota and approve the purchase of appurtenant equipment and the cable installation from Hayes Electric of Hampton, Minnesota, for a cost not to exceed $29,395.03. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. Staff recommends alternative number 1. Bud C:\Documents and Settings\KellyM\Local Settings\Temporary Internet Files\OLKIFA\portable generator.DOC _.~._--_.. ---..... .... ..---.......--...... ..,. ...-.-....1........-.......-........ 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 RESOLUTION OS-XX A RESOLUTION AUTHORIZING THE PURCHASE OF ONE PORTABEL DIESEL GENERATOR FROM ZIEGLER POWER SYSTEMS AND APPURTENANT EQUIPMENT AND THE INSTALLATION THEREOF FROM HAYES ELECTRIC OF HAMPTON, MINNESOTA MOTION BY: SECOND BY: WHEREAS, Power outages within the City affect essential City services such as water and sanitary sewer; and WHEREAS, The updated generator will supply improved voltages, safety and longer service run times during power outages; and WHEREAS, The 2005 Equipment Replacement Matrix identifies the replacement of Unit 475. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that: expenditure not to exceed $29,395.03 from the Equipment Revolving Fund for the purchase of a new 2005 Caterpillar/Olympian 80KW generator from Ziegler Power Systems and appurtenant equipment from Hayes Electric is hereby approved. Passed this 22nd day of February 2005. YES NO Haugen Haugen Fleming Fleming LeMair LeMair Petersen Petersen Zieska Zieska { Seal } Frank Boyles, City Manager C:\Documents and SettingsOCellYM\Local SettingsWMI*h~Q{~~~l;~WA'portable generator. DOC Phone 952.447.4230 / Fax 952.447.4245