CITY COUNCIL AGENDA REPORT
MEETING DATE: February 23, 2015
AGENDA#: 51
PREPARED BY: JAKE THEISEN, MAINTENANCE SUPERINTENDENT
PRESENTED BY: JAKE THEISEN, MAINTENANCE SUPERINTENDENT
AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION AWARDING CONTRACT
TO INTERSTATE POWER SYSTEMS FOR GENERATOR PREVENTIVE
MAINTENANCE SERVICES
DISCUSSION: Introduction
The purpose of this agenda item is to seek City Council authorization to
enter into the City's Standardized Contract with Interstate Power Systems
for preventive maintenance service and load bank testing of eleven City
generators.
History
The City of Prior Lake currently has eleven generators located across the
City at key locations; Fire Station #1, Fire Station #2, Police Station, City
Hall, Maintenance Center, WTF, Booster Station, Well 8 & 9, Estate Lift
Station, Lime Lift Station, Franklin Trail Lift Station, and three portable
generators to service the remaining thirty-seven lift stations. The purpose
of the generators is to provide power when normal electrical service is
interrupted. These generators need yearly preventive maintenance and
load bank testing to ensure they are working in the event of a power failure.
In previous years all of maintenance work was completed under the City's
maintenance contract. The price for the preventive maintenance and load
bank test has met the threshold of the City's purchasing policy which now
requires City Council Approval.
Current Circumstances
A scope of work was developed to assist the City meet the generator
service and load banking guidelines.
This includes type "A" Inspection during the month of March to obtain data
about the generator power system to determine all components are
working properly. Additionally Interstate Power Systems will bring portable
load bank testing equipment to perform load bank testing on all City facility
generators per National Fire Protection Association guidelines.
This includes type "B" Inspection during the month of September to
complete engine oil and filter changes, fuel and coolant filters if applicable,
and oil and coolant samples will be taken for lab analysis.
Phone 952.447.9800/Fax 952.447.4245/www.cityofpriorlak-e.com
In line with the City's purchasing policy two quotes were obtained for this
work. Both Companies are well respected and fully qualified. Their
proposals are as follows:
Interstate Power Systems Ziegler Power Systems
$ 21,968 $ 37,246
Conclusion
The City has worked with Interstate Power Systems in the past and is
comfortable with the proposal provided. City Staff recommends that
Interstate Power System be selected for preventative maintenance
services and load bank testing pertaining to the City's generator
components. This contract is for one year.
ISSUES: The City does not have the resources or the equipment to complete the
generator service and load bank testing in-house.
The scope of service for each type of preventative maintenance is
standardized within the industry. It has been our experience that Ziegler
has a significantly higher fee schedule for these generator services. The
attached quotes note the fee for each service type for each of the eleven
generators. Although there is a significant variance in the quotes, it is
appropriate to award the contract to Interstate Power Systems.
FINANCIAL The Generator Service Contract will be funded through the General Fund
IMPACT: and Utility Funds.
ALTERNATIVES: 1. Approve a resolution accepting quotes and authorizing the execution
of the City's Standardized Contract with Interstate Power System for
the Generator Service Contract and Load Bank Testing for a cost of
$21,968.
2. Table this agenda item for a specific reason
3. Deny this agenda item for a specific reason and provide staff with
direction
RECOMMENDED Alternative#1
MOTION:
2
O� PRION
U
4646 Dakota Street SE
� SomvP Prior Lake,MN 55372
RESOLUTION 15-xxx
A RESOLUTION AWARDING CONTRACT TO INTERSTATE POWER SYSTEMS FOR GENERATOR
PREVENTIVE MAINTENANCE SERVICES
Motion By: Second By:
WHEREAS, The City needs to complete preventive maintenance on our generators to ensure they
provide emergency power during electrical outages; and
WHEREAS, The City does not have the resources or equipment to provide the service in-house; and
WHEREAS, The City received the following proposals for services:
Interstate Power Systems Ziegler Power Systems
$21,968.00 $37,246.00
And
WHEREAS, City Staff recommends award of the City's Standardized Professional Services Contract to
Interstate Power Systems for the City's generator maintenance and load bank testing.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA
as follows:
1. The recitals set forth above are incorporated herein.
2. The Mayor and the City Manager are authorized to execute the City's Standardized Professional
Services Agreement with Interstate Power Systems for an amount of$21,968.
3. Funding for these services will be drawn from funds 101 and 601 in the respective departments
associated with the generator maintenance.
PASSED AND ADOPTED THIS 23rd DAY OF February 2015.
VOTE Hedberg Keeney McGuire Morton Thompson
Aye ❑ ❑ ❑ ❑ ❑
Nay ❑ ❑ ❑ ❑ ❑
Abstain ❑ ❑ ❑ ❑ ❑
Absent ❑ ❑ ❑ ❑ ❑
Frank Boyles, City Manager
2015 Generator Service Contract Quotes
Interstate Ziegler Power Systems
Generator Location Make Size A Service B Service Load Bank TOTAL A Service B Service Load Bank TOTAL
Franklin Trail Olympian 40kw $ 295.00 $ 547.00 $ 440.00 $ 1,282.00 $ 568.00 $ 756.00 $ 750.00 $ 2,074.00
Fire Station#2' Cat 125kw $ 295.00 $ 684.00 $ 525.00 $ 1,504.00 $ 568.00 $ 764.00 $ 990.00 $ 2,322.00
WTF Cat 1000kw $ 295.00 $ 1,500.00 $ 1,600.00 $ 3,395.00 $ 900.00 $ 2,525.00 $ 2,870.00 $ 6,295.00
Well 8&9 Cat 350kw $ 295.00 $ 920.00 $ 750.00 $ 1,965.00 $ 707.00 $ 1,101.00 $ 1,550.00 $ 3,358.00
Fire Station#1 Onan 100kw $ 295.00 $ 534.00 $ 500.00 $ 1,329.00 $ 568.00 $ 764.00 $ 990.00 $ 2,322.00
Estate Olympian 75kw $ 295.00 $ 551.00 $ 475.00 $ 1,321.00 $ 568.00 $ 764.00 $ 990.00 $ 2,322.00
Lime Olympian 40kw $ 295.00 $ 547.00 $ 440.00 $ 1,282.00 $ 568.00 $ 756.00 $ 750.00 $ 2,074.00
Police Station Onan 150kw $ 295.00 $ 646.00 $ 525.00 $ 1,466.00 $ 568.00 $ 764.00 $ 990.00 $ 2,322.00
City Hall Cat 30kw $ 295.00 $ 547.00 $ 430.00 $ 1,272.00 $ 568.00 $ 756.00 $ 750.00 $ 2,074.00
Booster Station Cat 225kw $ 295.00 $ 736.00 $ 625.00 $ 1,656.00 $ 707.00 $ 929.00 $ 1,159.00 $ 2,795.00
Maintenance Center Cat 100kw $ 295.00 $ 565.00 $ 500.00 $ 1,360.00 $ 568.00 $ 764.00 $ 990.00 $ 2,322.00
742 Cat 80kw $ 295.00 $ 623.00 $ 480.00 $ 1,398.00 $ 568.00 $ 764.00 $ 990.00 $ 2,322.00
747 Cat 80kw $ 295.00 $ 565.00 $ 480.00 $ 1,340.00 $ 568.00 $ 764.00 $ 990.00 $ 2,322.00
776 Cat 80kw $ 295.00 $ 623.00 $ 480.00 $ 1,398.00 $ 568.00 $ 764.00 $ 990.00 $ 2,322.00
TOTAL CONTRACT AMOUNT $ 4,130.00 $ 9,588.00 1 $ 8,250.00 $ 21,968.00 1 $ 8,562.00 $ 12,935.00 $ 15,749.00 $ 37,246.00