HomeMy WebLinkAbout03 06 2015 Work Session #1 - Studies b� PR12 u 4646 Dakota Street SE Prior Lake,MN 55372 �rNNESO�P CITY COUNCIL WORK SESSION REPORT MEETING DATE: MARCH 9, 2015 PREPARED BY: KATY GEHLER, PUBLIC WORKS DIRECTOR PRESENTED BY: KATY GEHLER AGENDA ITEM: 1. PARK DEDICATION & OTHER FEE AND SURFACE WATER STUDIES DISCUSSION: Introduction The City has a number of efforts either underway or planned to review infrastruc- ture needs for the future. In addition, the Council has provided direction to staff to review and update the City's development fees. History Many of the planning documents that the City utilizes today were created or up- dated as part of the last update to the City's Comprehensive Plan in 2007. As such some of the supporting plans are over ten years old and have become out- dated both in the population projections that were used to calculated the infra- structure needs to the changes in how the city has actually developed. These plans will need to be updated to best inform the update of the Comprehensive Plan that is due to be completed in 2018. Current Circumstances The attached chart provides the hierarchy of the documents the City utilizes when planning infrastructure improvements. Moving from the right to the left the docu- ments provide a greater level of detail of the needed improvements starting with the vision for the City through programing of specific projects into the CIP or planned within the operating budgets. Once a project is identified in the CIP it goes through a project process which is not detailed to the right of this flowchart. Staff would like to review the various studies, order which they should occur and schedules to complete them. For example, some of the infrastructure plans should be updated prior to updating the development fees so the most up to date capital costs are used. This will also be an opportunity for staff to provide an update on the studies or efforts in progress. itret Overslzing # Fees Study Last Update 2005 CR 42 Corridor Study Completed in 2014 -• • Transportation Plan CR 21 Corridor Study ' Not Programmed CR 17ITH13 Corridor Study ADA Transition Plan ... Not Programmed Pavement Management • • Program Updated Annually f � • Water Rates&Fees Study O. Water Pian Last Update 2005 ® Last update 2004 =rte Update Early 2015 W1rF 92 Facility Plan ! - . Not Scheduled • CC Sewer Rates&Fees Study t� C Sanitary Sewer Last Update 2005 p Plan d Last update 2005 ?L1k Station or Area Studies( • As Needed -• . # ' C Storm Rates&Feea lli C Last Update 20XX e CL Markley Lake Flood Study V Surface Water Flood Damage Reduction Management Plan Study and Modeling Last update 2005 Update 2016 ,_• NPDRS MS4 Permit Implementation e i TMDL Implementation Plan Park Dedication Fee Study 1 Master Park Plan (Community Park Planning) _ 2007 Parks&Trail Plan ' ADA Transition Plan Not Programmed Not Programmes ' Pike Lake Park Master Plan 1 In Proaress Parks,Athletic& Recreation Study(PAR) 2006 Trail&Sidewalk Pavement Management Ir r.m—ess