Loading...
HomeMy WebLinkAbout9A - Fig Well Resolution MEETING DATE: AGENDA # PREPARED BY: AGENDA ITEM: DISCUSSION: agenda award test well draft 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT March 7, 2005 9A Bud Osmundson, Director of Public Works CONSIDER APPROVAL OF A RESOLUTION ACCEPTING BIDS AND AUTHORIZING EXECUTION OF THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR THE DRILLING AND TESTING OF A FIG WELL Historv At the February ih meeting, the City Council authorized staff to advertise for bids for the drilling and testing of a Franconia, Ironton, Gal~sville (FIG) aquifer well. Staff opened bids on February 25 and a total of two bids were received. Mark J. Traut Wells, Inc. (Traut Wells) was the low bidder with a total bid of $64,138.00. The only other bid received was from Bergerson-Caswell, Inc. in the amount of $82,404.50. The engineer's estimate was $60,000. The purpose of drilling and testing of the FIG is to find out if the aquifer in the proposed location can produce an adequate amount of water to be considered a viable production well for City purposes. At the same time it will allow staff and the consultant for the project, Costa Dimitracopoulos of Engineering Resources, Inc., to determine the adequacy of the Jordan aquifer in the same location, by observing the drill cuttings and depth of the Jordan aquifer. The proposed location for both wells is adj acent to the Maintenance Center on Adelmann Street. This location for a Jordan well has been determined by geologic modeling to have virtually no affect on the Savage fen. By combining a Jordan and a FIG well at the same location the City can utilize one pump-house for both wells, saving significant sums of money. And it shows the DNR that the City is trying to utilize an alternative source of water in the FIG aquifer. Backf.!round The staffs preference is to place additional Jordan and FIG wells in the Brooksville Hills area to provide an adequate supply of water to the proposed water treatment plant in the Brooksville Hills area. Our Comprehensive Potable Water System Plan and our physical water system constructed to date, is built around the concept of the water being pumped from the Brooksville Hills area out to the city. If the development of a FIG well is warranted, which will take 3 months to www.cityofpriorlake.com Phone 952.447.4230 / Fax 952.447.4245 FISCAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: REVIEWED BY: agenda award test well draft determine, we would proceed with the plans and specifications for a FIG and Jordan well at the proposed location. The goal is to have both wells on line by summer of 2006. Conclusion Staff recommends that we move forward with the FIG aquifer test well. The FIG formation is very spotty in its pumping capabilities. The only way to determine what we can expect from a FIG production well is to drill the test well and analyze it. Therefore staff recommends award of a contract to drill a FIG test well to Traut Wells in the amount of$64,138.00 Budf.!et Imoact Staff recommends that the funding come out of the Utility Trunk fund. The alternatives are as follows: 1. A motion to approve a resolution Accepting the Bids and Awarding the City's Standardized Construction Contract for a FIG test well to Mark J. Traut Wells, Inc. in the amount of$64,138.00. 2. Table this agenda item for a specific reason. 3. Deny this agenda item for a specific reason. Staff recommends alternat' e number 1. Costa Dimitracopoulos will be present at the ing to ns er y questions the City Council may have. 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 RESOLUTION OS-XX ACCEPTING BIDS AND AWARDING THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR A FIG TEST WELL AND APPURTENANT WORK MOTION BY: SECOND BY: WHEREAS, pursuant to an advertisement for bids for the drilling and testing of a FIG Test Well and appurtenant work; WHEREAS, the following bids were received, opened, and tabulated: BIDDER AMOUNT OF BID Mark J. Traut Wells, Inc. $64,138.00 Bergerson - Caswell, Inc. $82,404.50 I WHEREAS, the City Council has determined that Mark J. Traut Wells, Inc. of Waite Park, Minnesota is the lowest responsible bidder. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, 1. The Mayor and City Manager are hereby authorized to execute the standardized construction contract with Mark J. Traut Wells, Inc. of Waite Park, Minnesota in the name of the City of Prior Lake for the construction of a FIG Test Well and Appurtenant work, in the amount of$64,138.00. 2. Funding for the test well shall come from the Utility Trunk fund. Passed and adopted this 7th day of March 2005. YES NO Fleming Fleming Haugen Haugen LeMair LeMair Petersen Petersen Zieska Zieska {Seal} Frank Boyles, City Manager agenda award test well draft www.cityofpriorlake.com Phone 952.447.4230 / Fax 952.447.4245