CITY COUNCIL AGENDA REPORT
MARCH 21, 2005
5H
CRAIG ELDRED, STREET AND UTILITIES SUPERVISOR
BUD OSMUNDSON, PUBLIC WORKS DIRECTOR
CONSIDER APPROVAL OF A RESOLUTION TO APPROVE PLANS
AND SPECIFICATIONS AND AUTHORIZE SOLICITATION OF BIDS
FOR THE 2005 LIFT STATION REHABILITATION PROJECT, CITY
PROJECT NUMBER 05-05
History
The purpose of this agenda item is to approve the plans and specifications
completed by Engineering Resources for the 2005 Lift station Rehabilitation
project and authorize the advertisement for bids.
Staff has put together a more comprehensive Manageme, nt and Rehabilitation
Plan and schedule than what previously had been completed due to the age and
condition of the majority of the lift stations. While all these efforts are an
ongoing process, it is necessary to begin reconstruction of four lift stations
identified below as contained in the 2005-2009 Capital Improvement Program.
Current Circumstances
On December 20, 2004, the City Council approved a resolution authorizing
Engineering Resources, Inc. to provide professional engineering services for the
2005 lift station rehabilitation project. Engineering Resources, Inc. has prepared
plans and specifications to improve the lift stations in Prior Lake's sanitary
sewer system shown below:
No. 4 - Green Heights
No. 6 - Public Access (DeWitte)
[] No. 23 - Sunset Trail
No. 29 -Quaker Trail
These lift stations all require maj or rehabilitation including replacement of
pumps, guide rails, electric panels, other electric components, wet well covers
and hatches. Generally, the concrete walls are in good conditions and do not
require replacement.
Listed below are additional improvements to each lift station:
Lift Station No. 4 - Green Heights:
The control cabinet will be removed from a light pole and a new one will be
based on a concrete slab with limited elevation changes.
· Lift Station No. 6 - Public Access (DeWitte):
Engineering Resources and staff are working with the Prior Lake Spring Lake
R:\RESOLUTI~ENG&PW RESX2005\031205 2005 lift station re~t~t~j~.{~e'cOm
Phone 952.447.4230 / Fax 952.447.4245
FISCAL IMPACT:
ALTERNATIVES:
Watershed District and the Minnesota Department of Natural Resources to
combine improvement efforts to both the lift station, storm water run off and
improvement to the access for parking. Currently, an open storm water drainage
ditch will be replaced by concrete storm pipe and environmental manholes to
catch sediment from city streets. Also, improved curb elevations will allow for
the raising of the lift station above the current high water level for Prior Lake,
prevent flooding of the lift station. The City's improvements will be required to
be completed between July 5, 2005 and August 15, 2005.
Lift Station No. 23 - Sunset Trail:
The lift station valve vault will be totally replaced as well as elevation
improvements for drainage and an off street concrete work area.
Lift Station No. 29 - Quaker Trail:
The lift station is in a low area between Quaker Trail and Edinborough Avenue.
Access to the station is by way of a small gravel road. Additional improvements
include new conduits to supply power from the control cabinet and replacement
of an old wood retaining wall that sits on the existing top slab and hatch.
All these lift stations are proposed to be connected to our wireless telemetry
provided by Omni-Site. This service allows staff to monitor lift station
conditions via the internet site and respond to pump station failures without
relying on citizen phone calls for alarm failures.
A copy of the plans and specifications are available at the Maintenance Center
for Council review. If authorized to move forward, staff would advertise for
bids as required by state statute and set a bid date for April 21, 2005. The bids
would be brought to the City Council at its May 2, 2005 Council meeting to
award the bid and authorize entering into the City's standard contract. The
completion of the total rehabilitation project would be approximately October 1,
2005.
Issues
The Council's previous actions to allow standardization of lift station
components has resulted in a savings of staff time and city expenditures. This
bid continues to replace components with standardized equipment.
Budget Impact
The funding for the project will come from the sewer-operating fund since it is
the rehabilitation of existing sewer infrastructure. Staff estimates the total cost
of engineering and actual repairs to be approximately $523,000.00. The C.I.P.
has identified these lift station rehabilitation projects as a priority.
The alternatives for City Council to consider are as follows:
1. Approve a resolution approving the plans and specifications and authorizing
advertisement for bids for the 2005 Lift Station Rehabilitation, City Project
05 -05.
2. Table this agenda item for a specific reason.
3. Deny this agenda item for a specific reason and provide staff with direction.
R:\RESOLUTIXENG&PW RESX2005\031205 2005 lift station rehabilitation project. DOC
RECOMMENDED
MOTION:
ACTION
REQUIRED:
REVIEWED BY:
Staff recommends alternative number 1.
A motion and a second to adopt the resolution stated above.
Bud~~~0~ ~und n,P lic/ orks
Frank Boyles~~Ma~ager
Director
R:XRESOLUTI~NG&PW RESX2005\031205 2005 lift station rehabilitation project. DOC
16200 Eagle Creek Avenue S.E.
Prior Lake, MN 55372-1714
RESOLUTION 05-XX
A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING
ADVERTISEMENT FOR BIDS FOR THE 2005 LIFT STATION REHABILITATION PROJECT, CITY
PROJECT 05 - 05
MOTION BY:
WHEREAS,
SECOND BY:
City staff has identified the following four lift stations requiring major rehabilitation
in 2005: r
ca Green Heights
[2 Public Access (DeWitte) .
[2 Sunset Trail
~ Quaker Trail; and
The adopted Capital Improvement Plan for 2005-2009 has identified these
rehabilitation projects as a priority for the City and allocated funding therefore; and
Engineering Resources, Inc. was authorized to provide professional engineering
services including final design specifications, bidding, construction and post-
construction at the December 20, 2004 council meeting.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA,
that:
1. The recitals set forth above are incorporated herein.
2. The City Council approves the plans and specifications for the 2005 Lift Station Rehabilitation Project,
City Project No. 05 - 05 and authorizes the advertisement for bids.
Passed this 21 st day of March 2005.
YES NO
Haulgen Hausen
Fleming Fleming
LeMair LeMair
Petersen Petersen
Zieska Zieska
{ Seal }
Frank Boyles, City Manager
R:\RESOLUTI~ENG&PW RESX2005\031205 2005 lift station re~tft~jl3~'~.~r~e'c°m