Loading...
HomeMy WebLinkAbout10B - Status Report MS4 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT MEETING DATE: AGENDA #: PREPARED BY: SUBJECT: MARCH 21, 2005 10B STEVE ALBRECHT, CITY ENGINEER CONSIDER APPROVAL OF A STATUS REPORT REGARDING THE CITY OF PRIOR LAKE MUNICIPAL SEPARATE STORM SEWERS SYSTEM (MS4) NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT STATUS DISCUSSION: History The City of Prior Lake is currently permitted as an operator of a Municipal Separate Storm Sewer System (MS4) under the MPCA National Pollutant Discharge Elimination System (NPDES) General Permit. This permit regulates the management of storm water discharge and erosion control in the City of Prior Lake. The City enforces conditions of this permit through our Storm Water Pollution Prevention Plan on all qualifying activities that require City permits or approvals. On February 28, 2005 the MPCA issued new rules for the NPDES General Permit that require City's currently permitted as US4's to apply for new permit coverage by September 1, 2005. As part of a legal settlement with the Minnesota Council for Environmental Advocacy (MCEA) the MPCA has added a new requirement to the permit for 30 MS4 permittees selected based on past and projected growth. The City of Prior Lake along with surrounding communities including Savage, Shakopee, Burnsville and Lakeville are being to required to meet the additional permit requirements. The new requirement establishes a non-degradation standard that must be met by the 30 selected US4's. The City of Prior Lake has been given until April 30, to develop a work plan to meet this new standard. The City has until April 7, 2007 to have the new NPDES Permit approved by the MPCA including the non- degradation requirements. Other MS4 permittees such as the Prior Lake Spring Lake Watershed District (PLSLWD) and Scott Water Management Oraganization (WMO) will most likely be required to meet the new standards within 5 years. The new non-degradation standard requires the City to develop a plan to reduce runoff volumes and nutrient loadings to receiving waters to 1988 levels. The City must develop a plan to retrofit existing development that has occurred since 1988 to meet the requirement. Additionally all future development must incorporate Best Management Practices (BMP's)in their projects that reduce pollutant and runoff volumes to 1988 levels. If a City is unable to reduce the loadings to 1988 levels based on an analysis of existing and future development the City must use all G:La, gendaLa, genda059,londegradation update. DOC www.cityofpriorlake, com Phone 952.447.4230 / Fax 952.447.4245 ISSUES: RECOMMENDED ACTION: reasonable and practical means to maximize reduction of these volumes and loadings. There are numerous issues, which are raised by these new requirements including: The City will need assistance from a consultant to prepare the plan and schedule. Neither the cost of the consultant nor the source of funding for these expenditures have been identified. 2) The storm water rules required by this permit exceed the current standards of the Prior Lake Spring Lake Watershed District (PLSLWD) and Scott WMO. These differences will need to be reconciled. 3) Staff time for implementation of these requirements through the development review and permit process will increase dramatically. This may delay developments or increase review costs to Developers. 4) The City may need to undertake significant retrofits for developments occurring since 1988 to meet the new permit requirements. This will increase costs to tax payers as these developments are already complete and retrofits would need to be funded by the City. 5) New development will need to provide more and larger storm water facilities. This will have a number of impacts including a reduction in developable land, increased storm water facility costs and increased City maintenance costs. Staff has begun discussing the impacts of the permit with our adjacent municipal and watershed partners and will continue to update the Council as new information becomes available. The Scott County Association for Leadership and Efficiency will be including this topic as part of their ongoing dialogue with Builders Association of the Twin Cities in the coming months. No motion is needed by the Council at this time. Staff will continue to gather information regarding the scope and cost to meet the MS4 permit requirements for review by the Council at a later date unless otherwise directed. RE G:~Agenda~S~genda05~Nondegradation update. DOC