HomeMy WebLinkAboutMore Info. 13. 0753 VRio 4. 4646 Dakota Street Southeast 0 0 t j' Prior Lake, MN 55372 May 1, 2013 Mr. John Gasper nai Architects 1959 Sloan Place Suite 100 Maplewood, Minnesota 55117 RE: Plan review for Honest One Auto Care Dear Mr. Gasper, Following are the results of the building permit review for Honest One Auto Care. The review was based on the 2007 Minnesota State Building Code (MSBC) which adopted with amendments the 2006 International Building Code (IBC) with handicap regulations of the Minnesota Accessibility Code Chapter 1341. Also requirements of the 2007 Minnesota State Fire Code (MSFC), which adopted with amendments the 2006 Fire Code (IFC). 1. Complete a Building Code analysis. IBC Chapter 5. Include the following: a. Location on Property. b. Allowable Floor Area. c. Occupant exiting. 2. Complete the Structural Engineers requirements for Special Inspections IBC 1701.5. See attached. 3. Sht. Cl: Indicate location of fire hydrants adjacent to the site. A fire hydrant must be located within 300 feet of all exterior portions of the building as measured around the exterior of the building. MSFC 7511.508.5.1. 4. Site Plan or Sht. Cl: Provide fire lanes for fire apparatus response. Signage to read:"No Parking Fire Lane by order of Fire Department". Locate on each side of parking lot. IFC 1001.7.1. 5. Sht. Cl: Provide assessable parking signage details and locations. 6. Provide address numbers on building. IFC 505. 7. Submit signed HVAC, plumbing, and emergency lighting/exit signs. May be submitted at a later date. Separate permits are required for each. 8. Provide a soils report. www.cityofpriorlake.com Phone 952.447.4230 / Fax 952.447.4263 9. Does the business conduct any open flame steel cutting or welding? Provide a narrative of all work to be conducted in the building. 10. Provide Energy envelope calculations. 11. Submit signed drawings of roof trusses at framing inspection. 12. Where is the mechanical equipment located? 13. Sht. A104: Provide attic ventilation clear vent specifications and calculations for each of the attic draftstopped areas. IBC 1203.2. 14. Sht. A104: Provide draftstopping every 3000 sf horizontal area in the attic, indicate on plans. IBC 717.4.3. 15. Provide fire department lock box at the front door. An application for purchase of the box will be received with the approved building permit. 16. Provide fire extinguishers minimum 2A10BC rated, within 30 feet travel distance of all areas of the building. IFC 1002. 17. Provide a specifications of listed oil storage tanks. 18. List types, quantities, location of storage and Material Safety Data Sheets (MSDS) of combustible and flammable liquids. 19. If provided, submit a racking plan for stored materials. 20. A city supplied water meter and pressure reducing valve must be sized and purchased by the plumber. 21. Repair garage shall have a separator installed into which all oil, grease, and sand bearing and/or flammable wastes shall be discharged before emptying into the building drainage system. Minnesota State Plumbing Code 4715.1300, Subp. 6 and 4715.1120. 22. Plumbing plans must be submitted and approved by the State of Minnesota Department of Labor and Industry. 23. If provided, indicate a means of lawn irrigation with back flow prevention device. A separate service and metering for billing purposes may be used. Water shutoff valves shall be located in the City right of way. 24. Ventilation for the building must meet IBC chapter 12. This review is based on building and civil plans dated March 6, 2013 and March 7, 2013 respectively. Other code items may be addressed when the above items are submitted and reviewed. Questions,please call me at 952-447-9851. Sincerely, Robert D. Hutchins Building Official cc. Reg Plowman, RJ Marco Construction Inc. Enc. OPR104 U � Memo 4tINATEse" Date: April 30,2013 To: Bob Hutchins, Building Official From: Jeff Matzke,Planner Subject: Honest 1 Auto Care Building Permit Review The Community & Economic Development Department has reviewed the Conditional Use Permit, variance, and site plans for the subject project with a plan date of November 1, 2012 and we have the following comments. General 1. Project has been issued a Conditional Use Permit (Resolution 12-15PC) and granted variances from minimum lot area and minimum parking setback(Resolution 12-14PC). 2. A Class D Bufferyard is required along the Duluth Avenue property line. Please increase screening by a minimum of one more canopy tree north of three parking stalls to meet bufferyard requirement. City Staff would recommend coniferous trees to provide year round screening. An ash tree is not an allowed landscape tree species, choose different species. 3. All exterior signage will require separate sign permit approval. Phone 952.447.9800 / Fax 952.447.4245/www.cityofpriorlake.com Bob Hutchins From: Bob Hutchins Sent: Thursday, November 29, 2012 11:33 AM To: 'shawn@nai-architects.com' Cc: Jeff Matzke Subject: Honest 1 Auto Care project Attachments: COMMERCIAL BUILDING PROJECT REQUIREMENTS.doc Shawn,I have a couple of preliminary building code questions regarding the project.The questions are based on proposed floor plan drawings dated 11/1/12. 1. Lavatory requires a urinal in the lobby/office area See MN state building code 1305.2902 exception#4. 2. What occupies the Mezzanine,notice a ladder and not a full set of stairs.If storage please provide storage tank sizes and MSDS sheets on all fire hazard liquids and solids. 3. Provide a racking plan with descriptions of stored items. 4. Does the business conduct any open flame steel cutting or welding?,please provide a description of all work to be conducted in the building. See attached commercial Building Project Requirements handout.The comments above are on the proposed floor plan,additional items will be reviewed on the finalized plans. Thank you 00 '4..21-0/ Robert D.Hutchins Building Official City of Prior Lake 4646 Dakota Street SE Prior Lake,MN 55372 952.447.9851 Fax 952.440.4263 City Email Updates.Sign up now. 1 CITY OF PRIOR LAKE BUILDING INSPECTION DEPARTMENT COMMERCIAL & MULTI-UNIT FIRE PLAN REVIEW CHECKLIST Project Name: L ogS r 'r'0 . 1 Job Address: w 4 v''1 • Provide access roadway for fire apparatus in accordance with Section 503 of the International Fire Code(IFC). This includes the following: ( ) All-weather driving surface. IFC 503.2.3 ( ) 20 feet of unobstructed width. IFC 503.2.1 ( ) 13 feet 6 inches of vertical clearance. ( ) Adequate turning radius capable of supporting fire apparatus. IFC 503.2.4 The radius is: 45 feet for a sprinklered building. 60 feet for a non-sprinklered building. ( ) Dead end access in excess of 150 feet long shall be provided with a turnaround. IFC 503.2.5 • Access roadways shall be extended to within 150 feet of all portions of the exterior walls of the first story of any building per IFC 503.1.1. Where access cannot be provided, an approved fire protection system shall be provided. • An adequate and approved access for Fire Department equipment must be provided during construction. If on site pavement is not provided when construction begins an approved roadway surface must be installed with approved dimensions which will support fire vehicles and equipment. Non-sprinklered Building: Fire hydrants are required er IFC 508. All portions of the exterior of any non-sprinklered building must be within30 feet of an approved fire hydrant, as measured by an approved route around the exterior of the building.. • Sprinklered Building: Buildings with a sprinkler system require one hydrant within 150 feet of the fire department connection and a hydrant(s) within 400 feet of all portions of the exterior. The fire department connection shall be located on the front of the building. The PIV must be located a minimum of the height of the building away. MSFC 508.5.1 Provide not less than one standpipe for use during construction. Fire sprinkler/riser permit required before building permit issued. International Building Code 3311. FJREPLAN • All hydrants shall be accessible to the fire department apparatus by roadways meeting above requirements. Hydrants shall be located within 5 feet of the curb so that apparatus can pull along side for the connection. City design manual • Provide fire lanes for fire apparatus response. Signage should read: "No Parking Fire Lane by order of the Fire Department." Location and number to be determined. IFC 503.3 • Provide numbers of addresses in such a way to be plainly visible from the street or road fronting the property per IFC 505. Numbers shall contrast with their background. • Townhouse projects must have directional signs designating the numbering sequence of units for each individual roadway. • Provide approved key box to be installed in accessible location per IFC 506. This is required when access to a structure is unduly difficult or where immediate access is necessary for life safety or fire fighting purposes. Key boxes shall contain keys to gain necessary access. Key boxes also recommended for building where entry may be delayed and to prevent damage as result of forcible entry. Obtain order forms from the Building Inspection Department. • Fire extinguishers are required per MSFC 906. Extinguishers are required to be a minimum 2A10BC rated and located within 75 feet travel distance of all areas. This distance decreases for more hazardous occupancies. Location and size to be determined. • Submit plans for required fire protection equipment to the Building Inspection Department per IFC 901.2. Requirements based on the 2003 Minnesota State Building Code. Submit two copies of detailed shop drawings before installation to receive approval and permit. (One copy will be returned.) The contractor should submit installation permit application with plans. ( ) Automatic fire extinguishing systems (sprinklers). ( ) Sprinkler systems of more than 20 heads must be monitored by an approved 24-hour station. ( ) Fire hydrant systems. ( ) Wet standpipe systems. ( ) Fire alarm systems. ( ) Cooking appliance and vent extinguishing systems. ( ) Fire pumps. ( ) Other extinguishing systems. • Fire alarm plans must be submitted by State licensed electrician or low voltage contractor. F1REPLAN • Protection systems installed that are not required are subject to approval by the Fire Department and must meet code requirements. • Submit 8-1/2 x 11 inch site plan for development of emergency response plan. • Submit plans for underground storage tank installation to the State Fire Marshal for approval. Upon approval, submit approved plans to the Building Inspection Department which will conduct the inspection and testing. • Provide information or see instructions as indicated below for special hazards. Please supply information,plans, specifications, as applicable. ( ) Places of assembly, IFC Chapter 10. ( ) Cellulose nitrate storage in excess of 25 lbs.,IFC Chapter 42. ( ) Storage and handling of combustible fibers,IFC Chapter 29. ( ) Garages,repair, IFC Chapter 22. ( ) Dry cleaning operation, IFC Chapter 12. ( ) Application of flammable finishes including dip tanks, spray booths, etc., IFC Chapter 20. ( ) Welding and cutting operations, IFC Chapter 26. ( ) Refrigeration equipment using other than air or water and more than 20 lbs., IFC Chapter 6. ( ) Compresses gases,flammable,IFC Chapter 30. ( ) Compresses gases,non-flammable,IFC Chapter 30. ( ) Cryogenic fluids, IFC Chapter 32. ( ) Explosives or blasting agents (storage or use),IFC Chapter 33. ( ) Flammable and combustible liquids,IFC Chapter 34. ( ) Hazardous chemicals, storing and handling of hazardous materials including toxic chemicals,poisonous gas,hazardous waste as defined by DOT and EP regulations, IFC Chapter 27. ( ) High piled combustible storage, IFC Chapter 23. -- This includes requirements for fire sprinklers designed for proposed commodity and storage ltrrangement, building access, access doors, smoke and heat removal, curtain boards, and hose connections. ( ) Liquefied petroleum gases,'IEC Chapter 38. FIREPLAN 04 PRio.p 6 1 F6Y5' 4-k-Gt-ti9 '4)4 64_, e 1204671 Memo 40NNEsolt. 5/zoi /4 - oh,ar- ,,, itor, t, /(2 . s ' Date: May 1 2013 •/4 ; . 804,4,4,44,... avetti" To: Bob Hutchins,Building Official From: Engineering Department—Seng Thongvanh,Project Engineer Nate Briese,Engineering Tech Public Works Department—Pete Young,Water Resources Engineer Subject: Honest 1 Auto Care Building Permit Review —City Project#12-126 The Engineering and Public Works Departments have reviewed the Building permit for the subject project with a plan date of April 15, 2013 and we have the following comments. General 1. Obtain all regulatory agency permits and approvals necessary for proposed construction (Mn/DOT, MN Department of Health, etc.) a Preconstruction meeting will be required prior to commencement of construction. 0 After construction, an as-built record plan shall be submitted. The as-built plan shall follow the requirements of Section 10 of the Public Works Design Manual prior to issuance of the certificate of occupancy. A Letter of Credit will be required for grading and erosion control, utility connection restoration, and right of way restoration. 9'Consider secondary containment for the trench drain located inside the facility to help prevent contamination on site. Site Plan K,1. P vide removal plans. / Small triangular slivers of bituminous pavement may not be ideal. Utili an moi. Pipe class for sanitary sewer service shall be PVC SDR26. Gradi ,Erosion, and Sediment Control /yet.. Pr vide contact information for person responsible for erosion and sediment control plan reparation, implementation, and maintenance. ent ditch checks should be added to the swale upslope of CB 4 to function as tional pretreatment for the infiltration basin. le on west side of lot must have minimum of 2%drainage. Hydrology 1. Additional information is needed for the subsurface infiltration basin. Ensure that the. infiltration basin meets MN Stormwater Manual design standards. The MN Stormwater manual contains helpful reference information for the design of underground infiltration. basins.Note the following requirements: Phone 952.447.9800 / Fax 952.447.4245/www.cityofpriorlake.com a. Native soils in the proposed infiltration area must have a minimum infiltration rate of 0.2 inches per hour. Provide soils information (from at least 2 soil boring locations within the proposed basin) for the infiltration basin location so that the infiltration capacity of the native soils can be verified. Using an assumed rate of 0.6`inches per hour for the HydroCAD calculations is not valid. The required drawdown time for the basin is 48 hours. b. Avoid soil compaction of the infiltration basin bottom during construction by staking off and marking areas not to be disturbed. c. A flow splitter or diversion device should be added so that larger flows cart bypass the infiltration facility. The current design has no bypass or emergency overflow defined. 2. Provide updated HydroCAD calculations. Ensure that all City rate control requirements are met. 3. Provide a public drainage and utility easement over the swale, infiltration basin, and stormwater conveyance pipes. 4. A maintenance agreement is required to ensure that the stormwater management features are regularly maintained and will function as designed. A long-term monitoring and maintenance plan is a required component of the maintenance agreement. A copy of the standard agreement will be provided to the applicant. g p4" LA)/F- -&, s v-2--(Ji--, 4-/ 7/74 (4A w ousY1- (3_0c, 56a& nro-f' Pe,,2 y • e iMA-rNre ,'- 4,,z65 r (I) L May 20, 2013 Ir� City of Prior Lake V 4646 Dakota Street SE (j jPrior Lake,MN 55372 a ,_ Attn: Robert Hutchins,Building Official — Re: City Review Letter dated May 1, 2013 IDear Mr.Hutchins, Below are our responses to your review letter. U cr 4. Complete Buildig Code analysis, IBC Chapter5. Including the following: a. Location of Property, b.Allowable Floor Area, c. Occupant existing. i. Building Code Information on sheet A001 updated per above requirements. l2. Complete Structural Engineers requirements for Special Inspections IBC 1701.5 i. Attached special inspections form. ✓3. Sheet Cl: Indicate location of fire hydrants adjacent to the site.A fire hydrant must be located within 300 feet of all exterior portions of the building as measured around the exterior of the building.MSFC 7511.508.5.1 Ii. Sheet Cl, updated showing fire hydrants. . Site Plan or Sheet Cl: Provide fire lanes for fire apparatus response. Signage to read: "No Parking Fire Lane by order of Fire Department". Locate on each side of parking lot. IFC 1001.7.1 / i. Sheet CO,updated showing fire lanes and signs required. 'E. Sheet Cl: Provide accessible parking signage details and locations. Nt . i. Sheet Cl,updated showing parking signage details and locations. ' . Provide address numbers on building. IFC 505. i. Sheet A201, address location and IFC 505 note added to building NAI ARCHITECTS elevations. INCORPORATED 1959 Sloan Place 7. Submit signed HVAC, plumbing, and emergency lighting/exit signs. Suite 100 �rr Maplewood,MN 55117 /i� HVAC and plumbing plans to be submitted by others at a later 651-487-3281 ��// date. (FAX)651-487-3283 /ii. Emergency lighting/exit signs added to sheet A002, Life Safety nai-architects.com and Exiting plan. 8. Provide a soild report. i. Soils report attached. May 20,2013 Page 2 of 3 Robert Hutchins-City of Prior Lake,Building Official City Review Letter dated Ma 1,2013 „i! Does business conduct any open flame steel cutting or welding?Provide a narrative of all work to be conducted in the building. i. Honest 1 generally does not do welding or steel cutting.They may 1(1�tv. from time-to-time use a torch to unfreeze corroded parts. They do all car repairs including engine repair/replacement. They generally subcontract transmission and differential work. x0. Provide Energy envelope calculations. 4i. Building Envelop Compliance Documentation attached. i HVAC, lighting energy envelop will be submitted by appropriate contractors with plan submittal. v+,f O. Submit signed drawings of roof trusses at framing inspection. i. Roof truss drawings and calculations will be submitted after approval of shop drawings. —'� 12. Where is the mechanical equipment located? i. Mechanical equipment to be located by mechanical contractor. Sheet A104: Provide attic ventilation clear vent specifications and calculations for each of the attic draftstopped areas. IBC 1203.3 i. Attic ventilation specifications to be submitted by HVAC contractor. Sheet A104: Provide draft stopping every 3000 sf horizontal area in the attic, indicate on plans. IBC 717.4.3 P61 /-1/0 i. Draft stopping has been indicated on Sheet A104. " is w 15.Provide fire department lock box at the front door. An application for purchase of the box will be received with the approved building permit. i. Fire lock box indicated on Sheet A201,by the front door. `Y .Provide fire extinguishers minimum 2A1OBC rated,within 30 feet travel distance of all areas of the buildign. IFC 1002. i. Fire extinguishers indicated on Sheet A002, Life Safety and Exit Lighting Plan. 47<4'4 V Provide a specifications of listed oil storage tanks. '�' V7 ,til; ` � � r �` i. Each tank is made of poly and have remote fill tubes. 0� 1 �ne '" �1� 48. List types, quantities, location of storage and Material Safety Data Sheets 17,4_,5 ! ✓ r 7 0 I ✓• 4101 i. Data sheets Attached. (P a.Tank 1 180 Gallon Chevron Supreme Oil a/o ., CA 4A14 �► �,j b.Tank 2 - 180 Gallon Chevron Red Oil 0- /- U jtxris 4.."Akf, 0/PIX 01 • � ` May 20,2013 Page 3 of 3 Robert Hutchins-City of Prior Lake,Building Official City Review Letter dated May 1,2013 c.Tank 3 - 180 Gallon LTI Full Synthetic Oil Ow20 e d.Tank 4 - 120 Gallon LTI Yellow Coolant z j v otP C),\koe.Tank 5 -120iallon Washer Fluid Z. -z, &2�,t,1 f.Tank 6 - 120 Gallon Floor Degreaser L119. 1 Z 0 6,46,40A� �t�� J9^If provided, submit a racking plan for stored materials. i. Racking and Equipment plan A106 added to set. 40. A city supplied water meter and pressure reducing valve must be sized and purchased by the plumber. i. Plumbing contractor to submit plans and purchase water meter and pressure reducing valve. 11.Repair garage shall have a separator installed into which all oil, grease, and sand bearing and/or flammable wastes shall be discharged before emptying into building drainage system. Minnesota State Plumbing Code 4715.1300, Subp. 6 and 4715.1120. i. Flammable waste trap shown on floor plan A101, other drainage requirements to be submitted by plumbing contractor. �L .Plumbing plans must be submitted and approved by the State of Minnesota Department of Labor and Industry. i. Plumbing contractor will submit plans to appropriate parties. 60i1 / �. If provided, indicate a means of lawn irrigation with back flow prevention device. A separate service and metering for billing purposes may be used. Water shutoff valves shall be located in the City right of way. i. Lawn irrigation will be provided on Duluth Street. Plan to be submitted by subcontractor. �; • Ventalation for the building mest meet IBC chapter 12. C. i. HVAC contractor to submit plans. Please feel free to call or email with any other questions. Yours Respectfully, Shawn G.Berry Senior CAD Technician NAI ARCHITECTS, INC. Building Envelope Compliance Documentation Part I Project Name: HONEST 1 AUTO CARE Project Address: 1667 DULUTH AVE SE,PRIOR LAKE,MN 55372 Date: 05/13/2013 Designer of Record: NAI ARCHITECTS,INC Telephone: 651-487-3281 Contact Person: SHAWN BERRY Telephone: 651-487-3281 City: PRIOR LAKE Climate Zone: 8 Criteria Table: 5.5-6 Mandatory Provisions Checklist Insulation(§5.4.1) Fenestration and Doors(§5.4.2) ❑ Cargo doors and loading dock doors are equipped with weatherse8ls in ❑ Insulation Materials are installed in ❑ U-factors are determined in climates zones 3 through 8. accordance with manufacturer's accordance with NFRC 100.U-factors recommendations and in such a for skylights shall be determined for a ❑ Entrance doors have vestibules. manner as to achieve rated R-value of slope of 20°above the horizontal. Exceptions: insulation ❑ Exception:for metal building roofs Exceptions: ❑ Climate zone 1 or 2 or metal building walls. ❑ U-factors are taken from A.8.1 for ❑ Building is less than four stories. glazed wall systems in vertical ❑ Doors not intended as building ❑ Loose-fill insulation is not used in attic fenestration and/or skylights. entrance. roof spaces when the slope of the ❑ U-factors are taken from A.8.2 ceiling is more than three in twelve. ❑ Doors open from dwellirg unit(s). other fenestration products. ❑ Doors open from spaces smaller ❑ Attic eave vents have baffling to deflect ❑ U-factors are taken from A.7 for than 3,000 ft2. the incoming air above the surface of opaque doors. ❑ Buildinghas revolvingdoors. the insulation. ❑ U-factors are derived from DASMA 105 for garage doors. ❑ Doors for vehicular movement or ❑ Insulation is installed in a permanent g g material handling. manner in substantial contact with the ❑ Solar heat gain coefficient(SHGC)is inside surface. determined in accordance with NFRC ❑ Batt insulation installed in floor cavities 200. is supported in a permanent manner by supports no greater than 24 in.o.c. Exceptions: ❑ SHGC is determined by ❑ Lighting fixtures,HVAC,and other multiplying the shading coefficient equipment are not be recessed in (SC)by 0.86.Shading coefficient ceilings in such a manner to affect the is determined using a spectral insulation thickness unless. data file determined in Exceptions: accordance with NFRC 300. ❑ The recessed area is less than ❑ SHGC for the center of glass is one percent. used.SHGC is determined using a spectral data file determined in ❑ The entire roof,wall,or floor is accordance with NFRC 300. covered with insulation to the full ❑ SHGC is taken from§A8 for depth required. glazed wall systems in vertical ❑ The effects of reduced insulation fenestration and skylights. are included in calculations using an area weighted averages. ❑ Visible light transmittance is determined in accordance with NFRC ❑ Roof insulation is not installed over 200. suspended ceiling with removable ceiling panels. Air Leakage(§5.4.3) ❑ Exterior insulation is covered with a ❑ The building envelope is sealed, protective material to prevent damage. caulked,gasketed,and/or weather- Insulation is protected in attics and stripped to minimize air leakage. mechanical rooms where access is needed. ❑ Air leakage through fenestration and doors is less than 0.4 cfm/ft2(1.0 ❑ Foundation vents do not interfere with cfm/ft2 for glazed swinging entrance the insulation. doors and for revolving doors)when ❑ Insulation materials in ground contact tested in accordance with NFRC 400. have a water absorption rate no Exceptions: greater than 0.3 percent. ❑ Field fabricated fenestration and doors. ❑ For garage doors tested in • accordance with DASMA 105. IES 'H ANSI/ASHRAE/IESNA Standard 90.1-2004 E"� • 1 • 1 - • • - • • • - B • 11 - 1 • • 1 ' . 4 - Project Name: HONEST 1 AUTO CARE Contact Person: SHAWN BERRY Telephone: 651-487-3281 Space Category §5.5.4.4.1 Exceptions Window-Wall Ratio Total North(Opt.) Other(Opt.) ' Skylight-Roof Ratio Nonresidential 1=1North Oriented Gross Wall Area(ft2):, 6973 ,049 5924 Gross Roof Area(ft): 7113 Residential ❑ Overhangs', Window Area(ft2): 532 0 532 Skylight Area: 0 Semiheated ❑ Street Level Windows Window-Wall Ratio: 0.msa 0 0.0898 Skylight-Roof Ratio 0 Opaque Surfaces Class(Pick one) Pick Pick one one mo o° Roof Wall Floor SlabDoor 8 Description/ Ai Proposed Criteria Surface Name t -c CD E Insulation Insulation Area (ft2) O R-Value, R-Value, (optianal) a, Q , = U-Factor, U-Factor, o c 5 m wa a� a 0 C-Factor C-Factor or G❑ = b F L aE 6 N E X oU �' or F-Factor-❑ o. cc Q0 a LL O 'o u 5 § m F-Factorm m ImT] .a O 1U6 T 3 O -o w ym „GaW0) NOdco0) O C03o mo4 g.� FOUNDATION 0 0 0 O O O O (a O O O 0 0.0 O Gd 0 ®0 0 R-10 R-7.5 1418 SF CONCRETE SLAB 0 0 0 O O O 0 0..0 0 0 !7t Q..0 O4)Lv 0; 4)0 L� R-10 R-10 5828 SF EXTERIOR WALLS-CMU WITH INSULATED CORES 0 0�'.0 O O O C) O O O 0 C) O O `R0 0 `Q O R-16 R-13 6973 SF OVERHEAD-INSULATED STEEL DOOR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 t 0. ®. ZOO U-0.065 U-0.5 868 SF FOOT DOORS INSULATED STEEL DOOR 0 0 0,0 0 0 0 0 0 0 0 0 0..Q) 0 0 ( 0 0 U-0.68 U-0.7 MAX 49 SF ALUMINUM DOOR w/INSUALTED GLASS 0 0 0.0 0 0 0 0 0 0 0 0 0..,,m 0 0 0 0 0 I U-0.56 / U-0.7 MAX 24 SF ROOF-WOOD TRUSS w/LOOSE FILL INSULATION 0 0.0 0 0 0 0 0..0 0 0 0 0,.0 0 A 0. 0 0 t 5-39 „// 5-38 7113 SF 000000000000000 00 00 0000000000000`0000 00 0 0000000 (300000'00 0 0'i 00 000'0000000000'00 00' 00 000'00000'0000000 00', 00 000000000000000 00'' 00 0', 000'0000000000'00 0 0 00 00000000'00000'00 00 00 000000000000000 0000 0' 0000000000000 00 0'0' 00 Ula 00000000'00000'00 010'' 00 000'0000000000'00 00; 00 r , 00000000'0000000 0'0' 00 ©; 000'000000000000 0'0' 00 000'000000000000 0'000 0 00000000'00000`00 0'0< 00 0 000000000000000 0'0 00 a 000000000000000 0`0' 00 0: 000000000000000 00' 00 000000000000000 00' 00 0'', 000000000000000 00 00 0 • 00''00000'0000000 0;0'. 00 00000000000001100 0'0 00 ANSI/ASHRAE/IESNA Standard 90.1-2004 1110) 1 • 1 - • • - • 11 • . 1 - B • 11 - 1 . • 1 • • - 1 - Project Name: HONEST 1 AUTO CARE Contact Person: SHAWN BERRY Telephone: 651-487-3281 Fenestration Class(Pick one) :iez Proposed Fenestration Criteria Description/ Lid iP°t .:A Name °' !,!, 76 „cciat c a) N i10):,,I�1 N .y 0 OLE O D co e "i P U �' af6i U U r _c ' "m cU' o n SC7 C7 o r m c> > m2 �2 Z Z U U Z fi1i is c rn c (n-E mm c o c z) ac) 0)) 0) °o °o �C 11 rn rn •a as 03 m E .2 o r w 2'� C c 1}C G"r, Y 7. Y N Il a a) a) '� N 7 a1 LL a5 O O O > > O O O O § $ Ct �1 Q- 3 CSU o a o aU 3 u)c) ALUMINUM STOREFRONT W/1"INSULATED GLASS 0 0O 0 0 3,„), 363 0.56 0.81 0 1.22 NR 001, OOOu ❑ 0004000 ,I�s ❑ 7- 00 ,- ;000 O 0 00 000 o 0 000 ,000 db o 00 1,'"'000 & . o , 0 0 3„ s 0 0 0 =Q' 0 000000P 0 0 0,t):_q 000 dio ❑ 00000 ❑ 0 0,4,01;0 0 0 ?v ► o 0 0 0 0 0 0 tip_': o 00�0 ,00004 0 000' ,000 0 ❑ O O,'_;, 'I O O O 60, ❑ 0 0 05 0 0 0 0 ' 0 OOO `000 06 0 O 0O 0 0 0 Op, 0 00 !000 , o 00 da 000 Off, o 00o000Z ❑ ` 00,1,,000 ! 0 0001 ;000 6:,•,_ 0 0 0 6',6 OOOQ o OO WO000 d o O O ,IO 0 0 0 :4 0 OOH; `000 Qb 0 o 0 676 0 0 0 64 o 00 ©;0`000 op ❑ 00, 000 _DO o iiii*ANSI/ASHRAE/IESNA Standard 90.1-2004