Loading...
HomeMy WebLinkAboutBuilding Permit 15. 0728 - O O n O ODDO > §_ : 0 - - - 0 A yr m 4 k r o XI XIX me = 1rEk§ 01 xi z k n� § t 0 0 � , 2 m § Bq@ P 2§ » ■ © 73 z § s 00 ( • z 0x o - z - mm § k ,p k k Q1 .k. % § m 0 0 00 �� 000000 'n m mm m _ � r0tNr 2 _ B ° i & mx3 n co | K ? m 1 � � � m � m © II § ° 0 0 > § kk z ri - 0 q / 0 ■ 7 m z r § 2 i § D CA � � � P 0 X0 X 73m ) , 0 ' 0 • ❑ OO000 4 k- 4 m ih > XI G) 233 ii MM3o -WI > ha 0 � rn 00E � 4 in m � ■ � F g -1 - - m -1i 0 oi PR/04, CITY OF PRIOR LAKE BUILDING PERMIT, Date Rec'd AZt- . B TEMPORARY CERTIFICATE OF ZONING COMPLIANCE AND UTILITY CONNECTION PERMIT *big sO 1 White File 2. Pink. City I PERMIT NO * 3.Yellow Applicant (Please type or print and sign at bottom) ADDRESS ZONING(office use) 4'1 4 t tcutx.c- ,3i--. , 3s7 I t LEGAL DESCRIPTION(office use only) ., „, LOT BLOCK ADDITION .&,.... ._. QA-\,,ckc\ektc-kt \ \ 0....eSC,CVtt 0 t'N Pm t:) C)rs. ,.... 14C) OWNER , r Lch.V..e. EckkbVdc. (Zocks -lb') (Phone) etS .-444-0 -sq (11 a (Address) (46(440 --- ( 1 BUILDER (Company Name)ROQ.,\<.CtC.c'd \ an c:\ LIL\07-k..c (Phone) . 1,S-cct „S- (Contact Name) -11)0, (..S...,... 0c--, (Phone) (Address) t , TYPE OF WORK 0 New Construction ODeck ['Porch ORe-Roofing ORe-Siding OLower Level Finish 0 Fireplace DAddition DAlteration Othility Connection CODE: DI.R.C. I.B.C. 0 Mise: CI te.S"' 4'0 4.4-e-17-11)()Vt‘e._Type of of Construction: I II III IV V A B Occupancy Group: A B E F H I M It S U PROJECT COST/VALUE $ a C) C) Ob o Division: 1 2 3 4 5 (excluding land) I hereby certify that I have furnished information on this application which is to the best of my knowledge true and correct I also certify that I am the owner or authorized agent for the above-mentioned property and that all construction will conform to all existing state and local laws and will proceed in accordance with submitted plans. I am aware that the building official can revoke this permit for just cause. Furthermore,I hereby agree that the city official or a designee may enter upon the property to perform needed inspections. X 1,)= OXi N.4 PN,Ktt) icc..4.koisJaCo._.,4-\ ti\ t-3 1 s -S- ‘S. Signature Contractor's License No. Date Permit Valuation '.3-‘; - Park Support Fee # $ Permit Fee $ gei Z.----) SAC # $ Plan Check Fee $ 5-7,36., Water Meter Size 5/8";1"; $ „ State Surcharge $ I, 5--° Pressure Reducer $ Penalty $ Sewer/Water Connection Fee # $ Plumbing Permit Fee $ Water Tower Fee # $ Mechanical Permit Fee $ Builder's Deposit $ Sewer&Water Permit Fee $ Other $ Gas Fireplace Permit Fee $ TOTAL DUE ' $ 141. / This App' ati Becomes Your Building Permit Wh A7ppro d Paid I Receipt No. / LA, 6, z.5 1:4-- Date i.t, )5- j By ' :,ilding I,t et. Date Nom _—.-.. 4...... This is to certify that the request in the above application and accompanying documents is in accordance with the City Zoning Ordinance and may proceed as requested. This document when signed by the City PI constitut s a to. ... Certificate of Zoning compliance and allows construction to commence. Before occupancy,a Certificate of Occupancy must be issued. c- % -7 Planning Di .' Date Special Conditions,if any 24 hour notice for all inspections(952)447-9850,fax(952)447-4245 4646 Dakota Street S.E.,Prior Lake,Minnesota 55372 F ~ • 0 ZMIII W Z wO 1 N II .-- t111 o Z W _ W — — 2 —I 0 m ---& 1— 5 0 oft _ c re ca a G W g _ � o CQ 4 C ,_ill 4�QRV WW � -z�_V f 3,. % Lii N w < U) Et 0r J Z I__-- Z o OCIIIIIMINI 0 U 0 Z cn LL w 0 w - Q m Z Q Q 0 0 H W aCe Ljj LOU- Ill Ct J Z J SEH Building a Better World for All of Us® TRANSMITTAL To: Mr. Nick Zurbey Date: October 6, 2015 City of Prior Lake, Minnesota 17073 Adelmann St SE SEH File No.: PRIOR 131444 Prior Lake, MN 55372 Client No.: Re: Prior Lake I Tower Street I T-Mobile MV Closeout We are: ® Enclosing ❑ Sending under separate cover 0 Sending as requested One[1]CD containing the Closeout Documents for the above-referenced project. For your: Information/Records 0 Review&Comment 0 Approval ❑ Action 0 Distribution ❑ Revision & Resubmittal The electronic files provided'herewith are intended solely for the use by the addressee.These electronic files may be subject to manipulation and changes beyond the control of SEH. SEH provides no warranties,express or implied,including warranties of merchantability and/or fitness for a particular purpose for the files furnished under this agreement release. By acceptance of these files,the addressee agrees to indemnify and hold harmless SEH from any and all costs,including attorney's fees,claims,or causes of action of any sort that result from the use,reuse,or manipulation of these electronic data files, and to waive all claims for consequential and any other damages of any kind against SEH. The providing of these files by SEH shall not be construed in any manner to be in derogation of any reserved or intellectual property rights. Remarks: 1. 360: UG work no 360 on this project. 2. Shared project with Verizon and T-Mobile. Carriers shared a common trench fo fiber routing in separate conduits. 3. Construction dates: August 4, 2015(1 day on site) 4. Project delayed from July 22, 2015 to August 4, 2015 due to innacurate construction drawings. Tenants could not agree on placement of hand hole. 5. Revised Site plan and SOW submitted by Verizon. T-Mobile did not submit red-lines or As-built drawings for this project. 6. Verizon final drawings and SOW attached. T-Mobile and Verizon worked off a common plan set for this project. T-Mobile did not submit their own plans or SOW. By: Mike Pease c: SEH eFiles dmk s:\pt\p\prior\131444\telecomltower street MV-mo flber\closeout\tmo am,transmittal_08195.docx Engineers I Architects I Planners I Scientists Short Elliott Hendrickson Inc.1 3535 Vadnais Center Drive I Saint Paul,MN 55110-5196 SEH is 100%employee-owned I sehlnc.com I 651.490.2000 I 800.325.2055 I 888.908.8166 fax i SEH Building a Better World for AR of Us' June 3, 2015 RE: City of Prior Lake, Minnesota T-Mobile Fiber at Tower Street Water Tower Site No.Al P04120A SEH No. PRIOR 131444 14.00 Hal Frazer Project Director Faulk& Foster 1811 Auburn Avenue Monroe, LA 71201 Dear Mr. Frazer: In accordance with the request of the City of Prior Lake, we have reviewed the plans submitted by Fullerton Engineering Design dated May 22, 2015 referencing the construction of the proposed T- Mobile/Zayo Fiber Project at the Tower Street Water Tower in the City of Prior Lake Minnesota and have the following comments for your review: 1. Sheet C-1 Site Plan and Equipment Layout • Site Plan indicates one(1) new 2"conduit proposed from the existing Zayo Hand Hole to a 12"x 12"junction box on the T-Mobile equipment shelter. Since there are other tenants at this facility, the engineer needs to provide an updated survey specifically identifying the T- Mobile lease area, width of the easement and underground utilities in the area of the conduit run. Survey provided with CDs dated May 22, 02015. • NOTE: Verizon has a proposed Zayo dark fiber project at this same location. Per request of the City, T-Mobile needs to work with Verizon to share the same trench for the conduits. Based on our review and the above information as provided by Faulk& Foster, it is our opinion that the City of Prior Lake can proceed with approval of this phase of the project; the remaining comments have been addressed to the satisfaction of the City. Following approval by the City, a pre-construction meeting must be scheduled by the tenant to include the City, SEH, the contractor and T-Mobile's representatives prior to commencement of project construction. Engineers I Architects I Planners I Scientists Short Elliott Hendrickson Inc.,3535 Vadnais Center Drive,St.Paul,MN 55110-5196 SEH is 100%employee-owned sehinc.com I 651.490.2000 I 800.325.2055 I 888.908.8166 fax Hal Frazer-Mobile Dark Fiber at Tower Street Water Tower City of Prior Lake, Minnesota June 3, 2015 Page 2 If you have any questions regarding our comments, please contact me directly at 651.208 6386. Sincerely, SHORT ELLIOTT HENDRICKSON INC. John Cvek Project Manager dmk Attachments c: Nick Zurbey—City of Prior Lake, Minnesota Dan Zienty—SEH Saint Paul Dale Romsos—SEH Saint Paul s.\pt\p\prior\131444\telecom\tower street wt\t-mo fiber\correspondence\letters\t-mobile fiber at tower street wt to h.frazer 060315.docx Disclaimer-"SEH and the City review plan sets for each Tenant's proposed installations and upgrades in the order that they are received. Each review is independent of any other proposed Tenant modification(s). Any approval of Tenant's proposed installation are conditioned upon Tenant completing its approved improvements prior to another Tenant completing its modifications. If Tenant's proposed improvements are approved but Tenant fails to promptly commence construction such that another subsequent Tenant completes its improvements first Tenant may need to resubmit its plans and update its structural analysis to reflect the new site conditions." Bob Hutchins From: Nick Zurbey Sent: Tuesday,June 23, 2015 10:36 AM To: Bob Hutchins Subject: FW:Tower Street water tower fiber projects Attachments: A1P0420A BP application 6-5-15.pdf From: Nick Zurbey Sent: Monday,June 08, 2015 2:51 PM To: Bob Hutchins Subject: RE:Tower Street water tower fiber projects Bob, Attached is the BP from T-Mobile but I am still waiting on one from Verizon. It looks like they are already trying to avoid trees as best as they can. On the Verizon plans page A-2 photo#3 you can see the route seems to avoid most of the trees but not sure if the roots can be avoided. They are going to be just off of the fence line on the east side and it looks like that is best way to until they get to the corner where there are no trees on the south side of the lot. I will go out and take a look at it tomorrow and see if Greg or Tom from the Parks department have any suggestions-. However, it has been pretty difficult to get T-Mobile and Verizon to cooperate and coordinate on this. I will touch base with you after go take a look or if I get Verizon's BP. Thanks, Nick Zurbey Public Works Technician City of Prior Lake 952-447-9892 From: Bob Hutchins Sent: Monday,June 08, 2015 1:42 PM To: Nick Zurbey Subject: RE:Tower Street water tower fiber projects Nick, need applications for both projects. The only initial response would be: any way to reroute to miss the root systems of the trees? Suggest an arborist analyze the cable route and offer options on rerouting or tree saving measures. Thanks Robert D.Hutchins Building Official City of Prior Lake 4646 Dakota Street SE Prior Lake, MN 55372 952.447.9851; Fax: 952.447.4245 Sign up for Email Updates. 1 From: Nick Zurbey Sent: Thursday, June 04, 2015 9:58 AM To: Bob Hutchins Subject: Tower Street water tower fiber projects Bob, I have received the approval of plans from SEH for the installation of fiber by T-Mobile and Verizon at the Tower Street water tower. For these projects,they were both going to be placing fiber relatively in the same location. So, we had them work together to develop plans that have them placing the conduit in the same trench and scheduling the work so the trench is only opened once. Please let me know if they are good for approval on your end. They are both getting amendments for the utility easements and a drafts have been agreed upon by all parties and reviewed by the City Attorney. Can you please let know... -if they will need ROW permits? -have they submitted building permit applications? If not, I will request they submit those ASAP? -Verizon-would have been from Shelley Trampetti with Buell Consulting -T-Mobile-would have been from Hal Frazer,Joe Egge, or Gary Buster with Faulk and Foster Let me know if you have any questions. Thanks, Nick Zurbey Public Works Technician City of Prior Lake 952-447-9892 2