HomeMy WebLinkAbout7B - 2010 Comp. Plan Contracts, p AGENDA if: PREPARED BY: SUBJECT: DATE: DISCUSSION: STAFF AGENDA REPORT 7 -1 CONSIDER APPROVAL CONTRACTS TO COMPLETE ELEMENTS OF THE 2010 COMPREHENSIVE PLAN INCLUDING: (1) Public Affairs Consulting - Land Use Plan and Document Coordination and (2) MSA Consulting Engineers - Sewer and Water Element. March 20, 1995 , The City Council has as its number one objective for 1995 the completion and submission of the 2010 Comprehensive Plan. There are five elements of the plan including land use, transportation, sewer, water, storm sewer and housing. There is neither sufficient staff expertise nor is the time available for staff members to complete these plan elements. It is therefore necessary for the city to enter into agreements with consultants to complete various elements of the plan. This report discusses two of those elements. As the Council is aware, Blair Tremere is familiar with the city's 2010 Comprehensive Plan efforts. He has been active both as a consultant and as a staff member in preparing the commercial/office - industrial study and administering day to day planning affairs for the city. It is my belief that Blair is uniquely qualified to complete the draft of the Comprehensive Plan narrative, including the land use plan. Accordingly, Don Rye has worked with Blair to prepare the attached scope of services and work agreements. Councilmembers will note that the total estimated maximum cost for the work included in the agreement is $17,400. The work is itemized based upon services rendered. The plan also provides for a timeline for completion of various items as exhibits A. Under the exhibit it is expected that the draft Land Use Plan document will be prepared by May 1, 1995. Remaining elements including, housing, transportation, public utilities and public amenities will be completed in draft form by May 22 and the approved plan would be submitted to the Metropolitan Council in late July. I believe that this time line is realistic and can be accomplished. -1- 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ALTERNATIVES: RECOMMENDATION: FINANCIAL IMPACT: ACTION REQUIRED: AG7A. WRT MSA Consulting Engineers have worked closely with the city on various major projects. They have worked with the city on the Wilds, Prior South and. other street reconstruction projects. It is apparent from our observation that they are competent engineers in the area of sewer and water design. MSA Consulting has completed sewer and water Comprehensive Plan elements for numerous cities. MSA has agreed to complete the sewer and water comprehensive plan for $21,650 and $19,350 respectively with a total not to exceed $41,000. Initially, the city requested that the water system be updated using a new user friendly computer model rather than the city's existing model which increased the cost of the water system from $19,350 to $27,100. By way of comparison, Progressive Consulting Engineers, Inc quote for the same work was $31,400. Staff may still implement the new computer model separately using a combination of MSA training city personnel with payment of services from engineering professional services. In order to complete the 2010 Comprehensive Plan update within the timeframe set forth above, it is essential that various plan elements be updated in a prompt fashion. It is not possible for the staff to complete this work and to conduct the day to day business affairs effectively. We are in the process of obtaining a proposal from Strgar, Roscoe and Fausch for updating the transportation plan of the 2010 Plan which was last reviewed in April of 1993. Council has the following alternatives: . Authorize the City Manager to enter into an agreement with the firm of Public Affairs Consulting at a cost not to exceed $17,400, and MSA Consulting not to exceed $41,000 for the completion of the land use guide plan, sewer and water Comprehensive Plan elements respectively. 2. Request additional proposals. Alternative #1 - Both firms are fully familiar with issues facing the city of Prior Lake. Both firms have demonstrated their competence in their day to day dealings with the city. In order to complete the project within the proposed time line and with quality consistent with the Council's expectations, we recommend that alternative #1 be approved. The $17,400 contract with Public Affairs Consulting would be drawn from the Planning Department budget. The $41,000 MSA contract would be drawn from the sewer and water trunk fund. Motion and second to authorize the Mayor and City Manager to enter into both agreements. -2- CONSULTING F~GINEER~ 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888-2923 Fax: 612-644-9446 March 14, 1995 File: 900-222-00 Mr. Larry Anderson, P.E. DPW/City Engineer City of Prior Lake 16200 Eagle Creek Avenue Southeast Prior Lake, MN 55372-1714 RE: PROPOSAL TO UPDATE COMPREHENSIVE SANITARY SEWER PLAN CIVIL ENGINEERINGs. ENVIRONMENTAL MUNICIPAL PLANNING SOUD WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICALJMECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOUS PRIOR lAKE ST. PAUL WASECA Dear Mr. Anderson: MSA, Consulting Engineers (MSA) is very pleased to submit this proposal to you for the review and update of the City's Comprehensive Sanitary Sewer Plan. We enjoy our relationship with the City, and we look forward to its continuation throughout the completion of this project. This proposal is based upon our knowledge of the Prior Lake Sanitary Sewer System, our review of existing documents including the draft Prior Lake 2010 Comprehensive Plan, 1991 Comprehensive Sewer Report, and the 1988 Sewer and Water Report for Section 1, Tl14 N, R.22W and upon our discussions with you. BACKGROUND The City of Prior Lake is located partially within the Metropolitan Urban Service Line. Collected wastewater is conveyed to the Metropolitan Council Wastewater Services (MCWS) facility known as the Blue Lake Treatment Plant located in Shakopee. This wastewater treatment plant, and the interceptor sewer connecting the City of Prior Lake to it is sized to handle a fully developed Prior Lake population, including the Mdewakanton Dakotah community of 50,000 persons. Although the MCWS wastewater interceptor and treatment facilities are adequately sized to handle a fully developed City of Prior Lake, recent growth that has occurred is causing some sewage capacity handling problems in Prior Lake's existing sanitary system, and is the basis for this update. In addition, planned future annexation areas will require the extension of sewer lines. These areas are identified as south of the Business Office Park, south of County Market near Mushtown Road, and the vacant parcel between the Jim Dunn tract and the Hennepin County Park Reserve. Infiltration and Inflow (I/I) is an on-going concern. Although the City has an aggressive I/I reduction plan, a review of the current situation is required. 900t'222-1201. fe.b Mr. Larry Anderson, P.E. March 14, 1995 Page Two The specific outline of our Work Plan to address the preceding issues and problem is as follows: PHASE I. IDENTIFICATION OF PROBLEMS Task 1. Task 2. Initial project meeting with key City personnel Collect and review relevant reports and data including, but not limited to: City zoning maps Aerial photos of City City Comprehensive Plan Comprehensive Sewer Report Infiltration and Inflow Study City videotapes of suspect sewer lines City staff data on I/I County Planning Reports 1990 census data MCWS meter data Two-foot interval contour mapping Building permits issued Task 3. Review MCWS issues and identify regulatory agency concerns. Task 4. Hold informational meeting with MCWS and MPCA, if required. Task 5. Interview key City personnel. Task 6. Conduct public information meeting. Task 7. Divide the municipal sewer system into major component nodes, segments, and surface areas. Identify all lift stations and other ancillary structures. Add and map all new sewers, lift stations, and structures added to the system since the preparation of the City's Comprehensive Sewer Report. MSA understands the City may not have information available regarding line sizes, grade, sewer inverts, etc. MSA'will review any missing data needs with the City before selecting a model for use in Task 12. If there are data gaps, MSA will develop a plan with the Prior Lake Engineering Department staff to collect the required information. 900/222-1201.feb lVlr. Larry Anderson, P.E. March 14, 1995 Page Three Task 8. Mentify and visit significant industrial and institutional concerns that discharge to the municipal sewer system. Determine existing and future flow projections for these significant discharges. Task 9. Identify major commercial users and evaluate relevant flow records to determine current and future wastewater flow volumes. Use a land use coefficient appropriate to Prior Lake's situation to estimate wastewater flow volumes from commercial/industrial users. Task 10. Assign residential, commercial, and industrial/institutional data to sewer use districts identified in Task 7. Estimate existing and future wastewater volumes from residential areas. For Tasks 8, 9, and 10, zoning records and population projections will be used to estimate future flows. MSA will meet with City Planning personnel to receive input to this critical task. Task 11. MSA will review existing information, videotapes, sewage metering records, and reports dealing with the apparent inf'fltration and inflow problems present in the City's interceptor sewers. MSA will then make recommendations regarding whether a sump pump/foundation drain inspection and removal program is warranted. Task 12. Compare existing and projected average and peak wastewater flows to sewer system capacities for individual component sections. Specific attention will be paid to the known capacity problems. Maps and charts will be prepared detailing capacity, problems, and projected wastewater volumes. Wastewater volumes will be projected for the years 1995, 2000, 2005, 2010, 2015, and ultimate development. MSA will calibrate existing and projected wastewater volumes by comparing them with wastewater flows recorded at the MCWS meter. MSA has a number of sewer system models available to use on your project. MSA will review the available data and will recommend which, if any,' model will best. fit Prior Lake's situation. Task 13. Identify alternatives to address City needs: Preliminary capacity deficiency calculations and locations Preliminary operations considerations Preliminary sizing and location of relief lines, if required Ability to handle I/I flows 900/222-1201 .feb Mr. Larry Anderson, P.E. March 14, 1995 Page Four Preliminary sizing and location of interceptor sewers to serve future growth areas Descriptions of each alternative Task 14. Complete Technical Memo - Identification of Alternatives. Task 15. Meet with City to review Technical Memo and revise as necessary, before completing Phase H. PHASE H. EVALUATION OF ALTERNATIVES AND DEVELOPMENT OF PLAN RECOMMENDATIONS Task 16. Evaluate each alternative selected in Task 15 for: Topographic and geotechnical constraints. Construction schedule, sequencing, and ability to maintain operation during construction. Environmental impacts and non-monetary impacts. MSA will identify mitigation measures. Regulatory issues and permit requirements (if any). Factors caused by growth inducements related to secondary growth impacts mused by the availability of sanitary sewer capacity. Cost analysis (construction, O+M, present worth, and mitigation costs). Impact from and to industrial dischargers (pipe capacity, materials, and corrosion potential). Odor control issues (if any). Task 17. Review Trunk Charge System. For this task, MSA will determine the cost to construct the remainder of the trunk sanitary sewer system. MSA will also determine the remaining undeveloped acreage that will be assessed the trunk charge. MSA will then compare the remaining trunk system costs with the assessable trunk acreage and determine if the existing trunk sanitary sewer charge, in combination with the current fund balance, is adequate to cover system build-out. Task 18. Mentify and evaluate potential sources of funding. MSA will identify and discuss the advantages and disadvantages of identified options to the City. Task 19. Complete Comprehensive Sanitary Sewer Plan that meets the requirements of the Metropolitan Council. 900/222-1201.feb Mr. Larry Anderson, P.E. March 14, 1995 Page Five Task 20. Review Comprehensive Sanitary Sewer Plan with the City and the Metropolitan Council, and revise as neces~. SCHEDULE MSA is prepared to complete this project within your schedule needs. believe we will require eight (8) weeks from your Notice-m-Proceed. Generally, we FEE The total project fee shown in the following table is a not-to-exc~ fee. Project costs will be billed on an hourly rate basis and will be invoiced to the City monthly. PHASE I: IDENTIFICATION OF PROBLEMS Task 1 Initial Meeting With City $100 Task 2 Collect and Review Information 1,000 Task 3 Regulatory Agency Concerns 100 Task 4 Informational Meeting with MCWS and MPCA 300 Task 5 Interview Key City Personnel 300 Task 6 Public Information Meeting 100 Task 7 Establish Sewer Use Districts 900 Task 8 Identify Industrial/institutional Wastewater Flows 500 Task 9 Identify Commercial Wastewater Flows 500 Task 10 Assign Dischargers to Sewer Use Districts 1,300 Task 11 Review I/I Situation 1,750 Task 12 Compare Existing/Projected Wastewater Flows 4,000 Task 13 Identify Alternatives 2,000 Task 14 Technical Memo 1,500 Task 15 Review Meeting With City and Metropolitan Council 100 PHASE I TOTAL $14~450 900/222-1201.feb Mr. Larry Anderson March 14, 1995 Page Six PHASE H: EVALUATION OF ALTERNATIVES/DEVELOPMENT OF PLAN Task 16 Evaluate Alternatives $4,000 Task 17 Trunk Charge Review 1,000, Task 18 Evaluate Potential Funding Sources 400 Task 19 Comprehensive Sanitary Sewer Plan 1,700 Task 20 Review Plan With City and Metropolitan Council 100 PHASE H TOTAL $7,200 TOTAL PROJECT COST $21,650 If following your review of this proposal you have any questions, please do not hesitate to call me. I look forward to completing this project with you. Sincerely, MSA, CONSULTING ENGINEERS Thomas A. Roushar, P.E. TAR:tw 900/222-1201 .fob CONSULTING ENG]NEEI~ 1326 Energy Park Drive St. Paul,/~155108 612-6~-4389 1-800-888-2923 Fax: 612-6~-94~ CIVIL ENGINEERINC<. ENVIRONMENTAL MUNICIPAL PLANNING SOUl) WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL/MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOUS PRIOR lAKE ST. PAUL WASECA M~ch 14, 1995 File: 900-221-00 Mr. Larry Anderson, P.E. DPW/City Engineer City of Prior Lake 16200 Eagle Creek Avenue Southeast Prior Lake, MN 55372-1714 RE: PROPOSAL TO UPDATE COMPREHENSIVE WATER SYSTEM MASTER PLAN Dear Mr. Anderson: MSA, Consulting Engineers (MSA) is very pleased to submit this proposal to you for the review and update of the City of Prior Lake's Comprehensive Water System Master Plan. We believe this to be a timely project and we look forward to completing it for the City. This proposal is based upon our knowledge of the Prior Lake Water System, our review of existing documents including the Water System Plans prepared in 1979, and updated by the City in 1987, the draft Prior Lake 2010 Comprehensive Plan, and the 1988 Sewer and Water Report for Section 1, T114 N, R.22W, and upon our discussions with you. BACKGROUND The City of Prior Lake has a completely free standing potable water system to serve its residents and commercial/industrial/institutional users. This system consist of three water supply wells, 2 elevated storage tanks, and a distribution network of 6" - 24" diameter pipes. The 1987 Master Plan Update recommended that the City construct a new well and a 1 million gallon elevated storage reservoir. Both these improvements were constructed as recommended. The City's draft 2010 Comprehensive Plan states that 'as development occurs within the 2010 MUSA boundary, watermain trunks will be extended to effectively loop the system to provide fire flow service to these developing areas. In particular, development of the Jeffers Pond, Pike Lake, and Markley Planning Districts will depend on the extension of trunk watermain or a looped watermain system to satisfy the water supply needs of the districts (p. 130).' PROJECT APPROACH Our Project Team's approach for completing this project is presented on a task-by-task basis. 900/221-1007.feb Mr. Larry Anderson, P.E. March 14, 1995 Page Two TASK 1 Analyze population growth trends for the City and determine design population for design years 1995, 2000, 2005, 2010, 2015 and ultimate population. One of the keys to producing a plan that will minimize (and defer as long as possible) the City of Prior Lake's capital outlays for water system improvements is the accurate projection of future population. Also, to permit the proper sizing of water distribution improvements, the locations where the future population will reside must be accurately projected. Our Project Team will work closely with the City's Planning Department to project design population for the years 1995, 2000, 2005, 2010, 2015 and ultimate population, and to project where in the City the future growth will occur. Zoning maps and population density figures will be used to determine future population locations. The new Bloomington Ferry Bridge is scheduled to open this Fall. Our team will work closely with the City Planning Department to determine if the new bridge will accelerate the City of Prior Lake's growth rate. TASK 2 Analyze consumption trends for residential and commercial/industrial uses and determine current average demand for each type of use. Consumption trends for residential water use will be determined on a per capita basis. Residential water consumption from past years will be analyzed to determine trends in residential water use. Based on these trends, residential demand will be projected on a per capita basis for the years 1995, 2000, 2005, 2010, 2015 and for ultimate development. Consumption demands for commercial/industrial water use will be determined on a per acre basis. Industrial/commercial water consumption will be analyzed to determine trends in commercial/industrial water use. Based on past trends, commercial/industrial demand will be determined on a per acre basis for the years 1995, 2000, 2005, 2010, 2015 and ultimate development. Interviews will be conducted With high volume users to determine their future plans that would impact water consumption. 900/221-1007.feb Mr. Larry Anderson, P.E. March 14, 1995 Page Three TASK 3 Based on analysis of current and proposed land use and zoning, determine average demand per type of use for design years and ultimate population. The City Planner will be consulted to determine the acreage available for commercial and industrial purposes and when the land is expected to develop during the study period. The product of commercial/industrial consumption on a per acre basis and the number of acres developed for these purposes will result in the commercial/industrial demand for the study yeal's. The product of the residential demand on a per capita basis and the projected population will result in the residential demand for the years 1995, 2000, 2005, 2010, 2015 and ultimate. The total demands predicted above will then be subdivided into areas of the City. This will permit the evaluation of future water distribution system improvements. TASK 4 Develop individual projections of future consnmption for selected high volume users (if any) identified in Task 2. As mentioned under Task 2 above, interviews will be conducted with any high volume users that are identified to determine their future plans (expansion, implementation of water conservation measures, etc.) that could impact their water use. The information obtained through these interviews will then be used in the study. TASK 5 Determine maximum daily and peak hourly demands for design years and ultimate population, based on past usage records and adjusted per the experience of similar communities within the state. Past maximum daily and peak hourly demands will be determined based on historical water pumping records. The historic demands determined will then be compared to those of similar communities to determine if they are reasonable and, after consultation with City personnel, will be adjusted as appropriate. The maximum day and peak hourly demands will then be projected for the design years and for ultimate development. The relative mix of projected future growth (i.e. residential, commercial and industrial) will be taken into 900/221-1007 .feb Mr. Larry Anderson, P.E. March 14, 1995 Page Four account during these projections because residential demand exhibits very high peaking factors as opposed to commercial and industrial demands which exhibit lower peaking factors. TASK 6 Review the f'we protection rating (ISO classification) for the City and determine maximum fire flow requirements. Also, make recommendations regarding upgrading the City's ISO classification. The Commercial Risks Division of ISO will be contacted to determine the overall fire flow requirements for the City of Prior Ixtke. During this contact, deficiencies discovered during the City's last rating will be identified. Finally, a determination will be made as to whether the City can be awarded a higher classification if the deficiencies in the water distribution system are corrected, and if the anticipated insurance cost savings warrant the additional City expenditures. Nnte_- Most often, a city's fire classification is dictated by its fire fighting capability and not its water system. However, a determination will be made whether the City of Prior Lake can receive a higher classification by correcting the deficiencies in its water system and whether it is cost-effective to do so. TASK 7 Interview Public Works and Engineering Department personnel to review system operation and problems. Interviews will be conducted with the City Engineer, and Water Superintendent to determine how the water system is operated and where deficiencies/operational problems exist. This information will be used to identify existing deficiencies and make subsequent recommendations. TASK 8 Evaluate regulatory impacts2 Evaluate water quality characteristics at the well heads with respect to current and proposed drinking water regulations of the Minnesota Department of Health (MN/DOH), the Metropolitan Council, and the Federal Safe Drinking Water Act. Analyze impacts of these regulations on the City's water supply and the City's utilities budget. ~)O/221-1007.feb Mr. Larry Anderson, P.E. March 14, 1995 Page Five In addition, our Project Team proposes to review potential groundwater sources under this task. As previously mentioned, the location of and number of future wells will affect the layout and operation of the distribution system. Consequently, potential locations for new wells should be identified during the Water System Master Plan Update. This task will be coordinated with Ban' Engineering Company who is completing a hydrogeologic study of the Savage Fen. Of course, potential well locations must not result in a negative impact on the fen. TASK 9 Perform an energy analysis including electrical rates available for operations of the current water system, include considerations for proposed improvements and make recommendations regarding potential operational changes or other cost saving For this task, our Project Team will: a. Review current utility operational logs and electrical billing for the past 24 months to determine the present level of operation and costs. b. Review the current electrical rates available for use by the City. Present a discussion regarding future electrical rate trends and selection of electrical rates most advantageous for utility operation. Review natural gas engines and generators as optional power sources to determine cost-effectiveness. d. Prepare and present a discussion regarding the benefits of average day pumping with additional storage and the use of off-peak electrical rates to reduce and control electrical costs. Make recommendations regarding capital improvements required for present and future facilities to provide long-term cost benefit through electrical cost containment. TASK 10 Using the City's calibrated water system model, identify and evaluate current deficiencies in the City's water system with respect to flow capacities, water system pressures and other operational considerations. Our Project Team will use the calibrated model in conjunction with the Commercial Risk Services required fire flow information to determine where deficiencies exist in the existing 900/221-1007.f~b Mr. Larry Anderson, P.E. March 14, 1995 Page Six water distribution system's ability to deliver the required fire flow at a 20 psi residual pressure. In addition, the model will be utilized to define areas of inadequate or excessive static pressure. The findings of this task will be reviewed with City staff prior to proceeding with the evaluation of improvements. TASK 11 Using the City's calibrated water system model, evaluate and make recommendations regarding the type, locations and sizing of future production, treatment and storage facilities as well as future transmission/distribution mains required to meet the design years and ultimate pop-lation demands. These recommendations shall be based upon total overall costs including initial cost, operation/maintenance costs, energy costs, etc. and current engineering standards and operational methods. For this task, our team will evaluate and make recommendations on the location and sizing of future production, treatment and storage facilities. In addition, the routing and sizing of future transmission/distribution watermains will be evaluated and recommendations will be made. Recommendations will be made for each of the design years and ultimate development and will be based on total overall costs, including capital cost, operation and maintenance cost, energy cost and replacement cost. Providing service to the future annexation areas south of County Market, south of the Business Office Park, and the vacant parcel between the Jim Dunn tract and the Hennepin County Park Reserve will also be evaluated. The results of this evaluation will be the basis of the 5-year and 20-year capital improvements plans to be developed for Task 15, below. TASK 12 Analyze current water rates. Make recommendations concerning changes or adjustments. Our Project Team will review the City's current water rates, water revenues and operating costs to determine if existing water rates are adequate to generate sufficient revenue. In addition, current water rates will be evaluated in conjunction with projected increases in consumption and the timing/cost of water system improvements to determine if water rates should be adjusted and when they should be adjusted. 900/221-1007.feb Mr. Larry Anderson, P.E. March 14, 1995 Page Seven TASK 13 Analyze current utility billings for metered sales, inVestigate and evaluate sources of unaccounted water. Address water meter replacement program advantages. For this task, our team will evaluate billing and production records for the last five years to establish the annual volume of unaccounted-for water. In addition, meter maintenance records for large volume users will be reviewed. Depending on the findings of the unaccounted-for water evfluation, a meter replacement program or a leak detection survey may be recommended. The benefits/costs of a meter replacement program will be addressed in the final report. The leak detection survey would be an additional service beyond the scope of this proposal. TASK 14 Address various water conservation measures with respect to potential rules and legislation, environmental impact, social impact, f'mancial impact and engineering considerations. Potential water conservation measures such as sprinkling bans, progressive rate structures, higher summer-time rates, water saving plumbing fixtures, etc. will be addressed in the final report. The discussion of these measures will include the aspects of potential rules and legislation, environmental impact, social impact, financial impact and engineering considerations. TASK 15 Prepare a 5-year and a 20-year capital improvements plan for the water system. Include in the plan the capital and operation/maintenance costs for each improvement based on present day values. A 5-year capital improvements plan and a 20-year capital improvements plan will be prepared for the water system. Both capital costs and thc operation and maintenance costs for each of the improvements will be presented in the plan. The plans will be based on the projected increases in water consumption and when increased .supply, storage and treatment facilities will be required. The year each improvement should be constructed will be noted along with the corresponding water demand that should "trigger" the improvement. By listing the water demand, City staff can quickly compare predicted water demand to actual water demand and adjust the capital improvements plan accordingly. 900/221-1007.feb Mr. Larry Anderson, P.E. March 14, 1995 Page Eight TASK 16 Prepare ComprehensiVe Plan/Emergency and Conservation Plan. Upon conclusion of this project, produce a draft Comprehensive Plan which shall include the tanks completed previously. Also, prepare an Emergency and Conservation Plan. The Comprehensive Plan shall meet the requirements of the Metropolitan Council. The Emergency and Conservation Plan shall meet the requirements of the Minnesota Department of Natural Resources. TASK 17 Review Trunk Charge System For this task, MSA will determine the cost to construct the remainder of the trunk watermain system. MSA will also determine the remaining undeveloped acreage that will be assessed the trunk charge. MSA will then compare the remaining trunk system costs with the assessable trunk acreage and determine if the existing trunk watermain charge, in combination with the current fund balance, is adequate to cover system build-out. TASK 18 Hydrant Flushing Program The City of Prior Lake does not filter its water supply to remove iron and manganese. The iron and manganese, in mm, result in "red" and "black" water complaints. For this task, MSA will evaluate the City's water distribution system and develop a flushing sequence that will permit a more thorough flushing of the system to minimize "red" and "black" water complaints. TASK 19 Review With the City. MSA will review the draft Comprehensive Plan and draft Emergency and Conservation Plan with the City, and revise them as necessary. The total project fee shown in the following table is a not-to-exceed fee. Project costs will be billed on an hourly rate basis and will be invoiced to the City monthly. 900/221-1007.feb Mr. Larry Anderson, P.E. March 14, 1995 Page Nine TASK 1 Analyze Population Growth Trends $500 TASK 2 Analyze Consumption Trends 700 TASK 3 Determine Average Demand 500 TASK 4 Develop Use Projections 300 TASK 5 Develop Peak Daily/Peak Hour Demands 400 TASK 6 Review Fire Protection Rating 400 TASK 7 Interview City Staff 200 TASK 8 Evaluate Regulatory Impacts 400 TASK 9 Perform Energy Analysis 600 TASK 10 Identify System Deficiencies 3,000 TASK 11 Make Recommendations 2,500 TASK 12 Analyze Current Water Rates 700 TASK 13 Identify Unaccounted For Water 600 TASK 14 Address Water Conservation Measures 600 TASK 15 Prepare Capital Improvement Plans 2,000 TASK 16 Prepare Draft Comprehensive Plan/Emergency and Conservation Plan 4,000 TASK 17 Trunk Charge Review 1,000 TASK 18 Hydrant Flushing Program 750 TASK 19 Review With City 200 TOTAL PROJECT COST $19~350 900/221-1007.feb Mr. Larry Anderson, P.E. March 14, 1995 Page Ten . SCHEBULE MSA is prepared to complete this project within your schedule needs. Generally, we believe it will require eight (8) weeks from your notice to proceed. If, following your review of this proposal, you have any questions, please do not hesitate to call me. I look forward to completing this project with you. Sincerely, MSA, CONSULTING ENGINEERS Thomas A. Roushar, P.E. 900/221-1007.fe.b CITY OF PRIOR LAKE~ H'rNNESOTA SCOPE OF SERVICES AND WORK AGRE~ COMPREHENSIVE PLAN UPDATE THI~ AGREEMENT is made and entered into this [~'~ day of ~~ , 1995 by and between the CITY OF PRIOR LAKE, MINNESOTA, a municipal corporation ("CITY"), and BLAIR TREMERE, dba Public Affairs Consulting (Tax I.D. 504-52-2716), with a mailing address of Post Office Box 27126, Minneapolis, Minnesota 55427- 0126, ("CONSULTANT"). CITY and CONSULTANT, for the consideration here-in-after named, agree as follows: ARTICLE 1. GENERAL DESCRIPTION OF THE WORK CITY agrees to and hereby does retain and employ CONSULTANT, and CONSULTANT agrees to provide professional services to assist CITY update, and revise its Comprehensive Plan ("The Plan"). Services including, but not limited to planning consultation, coordination of related services and activities, meeting facilitation, research, analyses, reports, and editorial products (new and revised text), shall constitute the WORK, to wit: 1.01 Prepare a report with findings and recommendations that will guide the development of draft Plan elements that are responsive to the Metropolitan Land Planning Act and applicable laws, policies, and directives. a · Review the adopted Plan, the draft 2010 Plan, related City plans and policies, State law and rules, and applicable Metropolitan Council guidelines. be Identify required Plan elements or data that are either missing from the adopted Plan and the draft 2010 Plan, or which need revision or replacement. 1.02 Revise Draft 2010 Comprehensive Plan by preparing new elements and revising existing elements to resolve deficiencies and .to provide a contemporary Plan that reflects community visions and policies. a · Edit and reformat draft 2010 Plan to develop a base document that: (1) is conducive to and compatible with elements required and desired for the updated Plan. Page Two of Eight ( 2 ) provides for consistency of policies and information among~ the Plan elements; (3) provides for integration of the applicable "sense-of-community" input derived from the 1993 neighborhood public testimony. b~ Prepare draft element containing statement of the City Mission, Goals and Objectives, and Strategic Plan; C~ Prepare draft element containing description of features and conditions that represent development assets and constraints; dj Prepare draft element containing text of a Land Use Guide Plan that addresses: (1) Development and reservation of land for residential, commercial, industrial, and public and semi-public uses; (2) Commercial and industrial land uses identified in the 1994 consultant reports to the City; (3) Future urbanization as planned municipal services become available; (4) Economic development programs and plans; (5) Applicable features of the approved City Strategic Plan. 1.03 Identify the need for and, as directed and authorized by CITY, coordinate the procurement of qualified technical and design services to produce the following updated Plan elements: a. Housing Plan; b. Transportation Plan; Ce Public Utilities (Waste Management and Domestic Water Supply.and Distribution) Plans; d. Parks and Trails Plans; 1.04 Provide staff support for production and presentation of the draft updated Plan for public hearing, approval and adoption. Page Three of Eight ae Prepare staff report and recommendations regarding draft Plan elements prepared by CONSULTANT for public hearings sc~leduled by CITY. Incorporate revisions to draft Plan elements prepared by CONSULTANT as directed by CITY and develop report with final draft for City Council consideration and approval. Assist CITY with submittal of approved Plan to Metropolitan Council. de Provide staff support during Metropolitan Council review, and, as authorized by CITY, develop necessary responses to inquiries and requirements; assist with presentation to and final adoption by City Council. ARTICLE 2. TIME FOR COMPLETION AND METHODOLOGY 2.01 The WORK under this Agreement will begin immediately. The signing of the contract by both parties grants CONSULTANT authorization to proceed. The compensation terms in Article 3 have been established in anticipation of an orderly and continuous progress of the WORK through completion consistent with the schedule in EXHIBIT A. 2.02 The updated Plan and related materials will be based upon research of CITY information and upon input from CITY officials and sources designated by the CITY. The analyses and recommendations will reflect generally accepted planning and land use regulation principles that are pertinent to the areas under study. 2.03 Input from CITY will be obtained from the documents cited in Article 1 and through meetings with CITY officials who will be asked to review drafts for reaction and further direction. 2.04 The research, analyses, and recommendations for the several elements will be completed in a sequential manner as outlined in Article 1; CONSULTANT may recommend and CITY may elect to schedule certain Plan elements for public hearing and official action individually, rather than collectively or as a unit. 2.05 CITY shall solely determine the adequacy and applicablility of the WORK submitted to it pursuant to Article 1; CITY shall inform CONSULTANT as to its determination pursuant to Article 8. Page Four of Eight ARTICLE 3. PAYMENT TO CONSULTANT CITY shall pay CONSULTANT for services performed in accordance with this Agreement as follows: 3.01 Payment to CONSULTANT for services performed as described in Article 1 of this Agreement shall be at the hourly rate of $75.00, plus mileage at the rate of $.30 per mile and out-of-pocket expenses at cost. These rates include, except as expressly provided otherwise, compensation for all salary costs, payroll burden, general and administrative overhead, and professional fees. 3.02 CITY shall make a single payment to CONSULTANT for each invoice within thirty (30) days of the date of receipt of the invoice. All accounts unpaid after thirty (30) days of the date of receipt of the original invoice shall be subject to a service charge of one (1) percent per month. 3.03 CONSULTANT will submit detailed invoices for services rendered, specifying the work and hours completed and computed in accordance with Sections 3.01 and 3.02. Invoices shall be submitted on a timely basis for work completed and for expenses incurred. 3.04 Payment to CONSULTANT for services performed as described in Article 1 of this Agreement, computed in accordance with Sections 3.01 and 3.02, shall exceed the estimated maximum amount for the WORK as shown in Section 3.05, only upon prior approval by Supplemental Agreement pursuant to the provision in Article 4. 3.05 The estimated maximum cost for the WORK is $17.400.00. plus mileage and direct expenses. The estimate includes up to 40 hours for meetings with CITY staff, Planning Commission, Council, and with others designated by CITY. CONSULTANT will bill CITY for actual work performed plus mileage and expenses. The following are estimates; funds not expended for WORK on one item may be used for authorized WORK on another item. a. $1.200,QQ for work described in Section 1.01. b. $9o600,0Q for work described in Section 1.02. c. $1.800.00 for work described in Section 1.03. d. $1.800,Q0 for work described in Section 1.04. 3.06 In the event that services are provided by CONSULTANT beyond the target completion dates shown in EXHIBIT A, as the result of circumstances beyond the control of Page Five of Eight CONSULTANT, any applicable maximum payment figure shall be subject to an upward adjustment at the hourly and expense rates established in Section 3.01 unless the event is otherwise covered by Supplemental Agreement pursuant to Article 4. 3.07 In the event that services provided by CONSULTANT are not completed by the dates shown in EXHIBIT A, CITY may elect to terminate this Agreement pursuant to Article 6. ARTICLE 4. EXTRA WORK AND SERVICES 4.01 If CONSULTANT is of the opinion that any work he has been directed to perform is beyond the scope of this Agreement, or that the level of effort required significantly exceeds that estimated due to changed conditions and thereby constitutes extra work, he shall promptly notify CITY. 4.02 Extra work, due to direction or request by CITY or due to changed conditions, including meetings and expenses, additional compensation for same, and extension of time for completion, shall be covered by a Supplemental Agreement entered into by both parties prior to proceeding with any extra work or related expenditures. ARTICLE 5. DOCUMENTS FORMING THE AGREEMENT The contract documents shall be deemed to include this Agreement with any and all exhibits, amendments, and supplemental agreements which may be mutually approved and attached. ARTICLE 6. ABANDONMENT, CHANGE OF PLAN, AND TERMINATION 6.01 Either party has the right to terminate this Agreement upon seven (7) days' written notice. 6.02 CITY may at any time, reduce the scope of this Agreement. Such reduction in scope shall be set forth in a written notice to CONSULTANT. 6.03 This Agreement may be terminated in the event of an unresolved dispute over change in scope or changed conditions. 6.04 In the event of termination, all documents finished or unfinished, prepared by CONSULTANT under this Agreement shall be made available by CONSULTANT to CITY, and there shall be no further obligation of CITY to CONSULTANT under this Agreement, except for payment of amounts due and owing for work performed and expenses incurred to the date and time of termination, computed in accordance with Page Six of Eight Article 3. 6.05 In the event of a reduction in scope of the WORK, CONSULTANT shall be paid for the work performed and expenses incurred on the project work thus reduced or on any completed and abandoned work, computed in accordance with Article 3. Any reduction in the maximum payment estimates shall be established by a Supplemental Agreement. ARTICLE 7. DISPOSITION OF PLAN, REPORTS AND OTHER DATA 7.01 At the time of completion or termination of the WORK, CONSULTANT shall make available to CITY, all reports, resource materials, and other documents pertaining to the WORK. CONSULTANT may retain primary data sources which may be examined by CITY but which will be destroyed after one (1) year from completion of the WORK. 7.02 Documents retained by CITY are not intended or represented to be suitable for reuse by CITY or by others on extensions of the WORK or any other project. Any such reuse without written verification of adaptation by CONSULTANT for the specific purpose intended will be at CITY'S sole risk and without liability or legal exposure to CONSULTANT. ARTICLE 8. CITY RESPONSIBILITIES To ~ermit CONSULTANT to perform the serVices required by this Agreement, CITY shall supply, in proper time and sequence, the following at CITY expense: 8.01 Ail necessary information regarding its requirements as necessary for orderly progress of the WORK. 8.02 Designation of a person to act as CITY'S representative with respect to the administration of this Agreement. 8.03 To the extent available and applicable, CITY records and maps; other agency and Metropolitan Council correspondence and information and materials on the subjects of the WORK;-engineering, technical, and legal information prepared by and for the CITY; related pertinent information; and conversion of editorial materials from electronic format used by CITY to electronic format used by CONSULTANT and vice-versa. 8.04 Technical support for reproduction of existing and draft Page Seven of Eight documents such as reports and maps; for the production of maps and graphics drafted.by CONSULTANT; and for final copies of The PLAN and Official Controls; photocopy service for draft and final product text. 8.05 Administrative guidance, technical information, and legal advice as required, regarding the format of proposed amendments, public hearings, and integration of new material with City Code and policies. 8.06 Permission for CONSULTANT to enter upon CITY-owned property as required to perform the WORK. 8.07 Liaison with other agencies to carry out necessary coordination and negotiations; and formal advice and notice to other agencies if and when CITY authorizes and directs CONSULTANT to act in that capacity. 8.08 Examination of all reports, sketches, drawings, specifications, and other documents prepared and presented by CONSULTANT; advice of an attorney, insurance counselor, or others as the CITY deems necessary for such examination; and written decisions pertaining thereto within a reasonable time so as not to delay the services of CONSULTANT. 8.09 Prompt written notice to CONSULTANT whenever CITY observes or otherwise becomes aware of any development that affects the scope or timing of CONSULTANT'S services or any defect in the work of CONSULTANT. 8.10 Other services, materials, or data as may be set forth in this Agreement. ARTICLE 9. CONSULTANT RESPONSIBILITIES AND RELIANCE 9.01 CONSULTANT shall comply with all ordinances, codes, and other regulations applicable to the WORK. 9.02 This Agreement, being intended to secure the personal services of the individuals employed by and through whom the CONSULTANT performs the WORK hereunder, shall not be assigned, sublet,, or transferred without the written consent of the CITY. 9.03 CONSULTANT shall be entitled to rely on the accuracy and completeness of information furnished by CITY. If CONSULTANT finds that any information furnished by CITY is in error or is inadequate for its purpose, CONSULTANT shall promptly notify CITY. Page Eight of Eight 9.04 CONSULTANT is acting as an independent contractor and is responsible for workers and unemployment compensation benefits as they may relate to this agreement. 9.05 CONSULTANT will provide CITY with a copy of draft editorial products related to the Plan and official controls in Paper and electronic form (DOS format). ARTICLE 10. EQUAL EMPLOYMENT OPPORTUNITY CONSULTANT will not discriminate against any employee or applicant for employment because of race, color, creed, sex, or national origin. CONSULTANT will take affirmative actionto ensure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, sex, or national origin. ARTICLE 11. RECORDS ACCESS AND RETENTION FOR AUDIT CITY, or any of its duly authorized representatives, shall have access to any books, documents, papers and records of CONSULTANT which are directly pertinent to this specific contract for the purpose of making audit, examination, excerpts, and transcriptions. CONSULTANT shall maintain records used for billing and for invoicing for one (1) year after CITY has made final payment and all other pending matters are closed for the WORK. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first above written above. By: CITY Ci~anager CONSULTANT PUBLIC AFFAI~NSULTING Principal ATTEST: plnu=~_-_4 Title' EXHIBIT A SCOPE OF SERVICES AND WORK AGREEMENT TARGET COMPLETION DATES FOR COMPREHENSIVE PLAN UPDATE WORK PRODUCTS 1.01 REPORT ON CONSISTENCY WITH LAWS, POLICIES, AND DIRECTIVES TARGET DATE: March 13, 1995 1.02 REVISE DRAFT 2010 PLAN, PREPARE NEW ELEMENTS, AND REVISE EXISTING ELEMENTS; PROVIDE A CONTEMPORARY PLAN THAT REFLECTS COMMUNITY VISION AND POLICIES. ae Edit and reformat draft 2010 Plan to develop a base document. TARGET DATE: March 27, 1995 Be Prepare draft Element containing Statement of the City Mission, Goals and Objectives, and Strategic Plan; Ce TARGET DATE: March 31, 1995 Prepare draft Element containing description of features and conditions that represent development assets and constraints; De TARGET DATE: April 17, 1995 Prepare draft Element containing text of a Land Use Guide Plan. TARGET DATE: May 1, 1995 1.03 IDENTIFY NEED FOR AND COORDINATE PROCUREMENT OF RELATED CONSULTING SERVICES TO PRODUCE OTHER ELEMENTS INCLUDING: A. Housing Plan TARGET DATE: April 24, 1995 Be Ce Transportation Plan TARGET DATE: April 24, 1995 Public Utilities (Waste Management and Domestic Water Supply and Distribution) Plans TARGET DATE: April 24, 1995 Exhibit A Page Two of Two D. Public Amenities (Parks and Trails) Plans TARGET DATE: April 24, 1995 1.04 PROVIDE SUPPORT FOR PRODUCTION AND PRESENTATION OF DRAFT UPDATED PLAN FOR PUBLIC HEARING, APPROVAL, AND ADOPTION ae Prepare staff report and recommendations regarding draft Plan elements prepared by CONSULTANT for public hearings scheduled by CITY. TARGET DATE: May 22, 1995 Be Incorporate revisions to draft Plan elements prepared by CONSULTANT as directed by CITY and develop report with final draft for approval by City Council. TARGET DATE: July 10, 1995 Ce Assist CITY with submittal of approved Plan to Metropolitan Council TARGET DATE: July 21, 1995 (depends upon date of approval by City Council) D. Provide staff support during Metropolitan Council review, and, as authorized by CITY, develop necessary responses to inquiries and requirements; assist with presentation to and final adoption by City Council. TARGET DATE: Fall, 1995 (depends upon Metropolitan Council responses and review period)