Loading...
HomeMy WebLinkAbout5K Assessment Roll - Maple Lane, Mushtown Road, Panama Ave (TRN14-000001) Report U fr 4646 Dakota Street SE Prior Lake, MN 55372 Solt" CITY COUNCIL AGENDA REPORT MEETING DATE: OCTOBER 26, 2015 AGENDA#: 5K PREPARED BY: SENG THONGVANH, PROJECT ENGINEER PRESENTED LARRY POPPLER, CITY ENGINEER/INSPECTIONS DIRECTOR BY: AGENDA ITEM: CONSIDER A RESOLUTION ADOPTING THE ASSESSMENT ROLL FOR THE MAPLE LANE, MUSHTOWN ROAD, PANAMA AVENUE IMPROVEMENT PROJECT (TRN14-000001) DISCUSSION: Introduction This agenda item is necessary to adopt the assessment roll for the Maple Lane, Mushtown Road, Panama Avenue Improvement Project. History At its September 9, 2013 meeting the City Council adopted Resolution 13-126 authorizing staff to prepare a Feasibility Report for Maple Lane, Mushtown Road, Panama Avenue Improvement Project as outlined in the CIP and required for the Minnesota Statutes Chapter 429 process. The Minnesota Statutes Chapter 429 process is required because the City Council intends to specially assess for the improvements. The Maple Lane/Mushtown Road/Panama Avenue neighborhood is considered in the report and includes improvements to Maple Acres, O'Rourke Addition, Parts of S 11, T 114, R 22 and Parts of S 2, T 114, R 22. These properties were platted and developed in the 1950's and 1960's. A map of the project area (Figure 1) is included in the Feasibility Report. The proposed improvements include street reconstruction, sewer and water construction, storm sewer, storm water quality, concrete curb and gutter, and appurtenant work. The Feasibility Report also includes total estimated costs, preliminary assessment amounts, and a pro- ject financing summary. Also included in the report are design criteria, estimates and information on watermain, sanitary sewer, storm sewer, and streets. Details on each can be found in the Feasibility Report which is available upon request. On November 12, 2013, the City Council accepted the feasibility report and scheduled the public hearing. The public hearing was held on December 9, 2013. Staff presented the original project plus three (3) options prior to the public hearing. A dozen or so residents spoke at the public hearing in opposition to the project. While it was recognized that Mushtown Road is in poor condition, the cost for the project as a whole was the major point of objection. The City Council tabled their discussion after closing the public hearing. The City Council communicated support for Option 3, which eliminated sanitary sewer and watermain on Maple Lane and provided services through a proposed easement between two properties on Maple Lane. It was estimated that the cost Phone 952.447.9800 / Fax 952.447.4245/www.cityofpriorlake.com savings would be approximately $10,000 for this option. The City Council also asked that the following additional information be brought back on January 27, 2014. 1. Representative Appraisals 2. Options to reduce project assessment 3. Septic System Credit Information 4. Information on age and condition of the existing septic systems on the pro- ject 5. Additional traffic information for Mushtown Road Each of the items were reviewed and presented at the January 27th meeting. An additional Public Hearing was held on March 10, 2014. Staff presented the proposed improvements, funding mechanisms, and estimated assessment amounts based on the various funding contributions. There were five residents that spoke at the public hearing. Each of the comments or concerns were ad- dressed at the public hearing. At the Public Hearing the City Council Ordered the project. In accordance with MN Statutes 429, bids must be accepted within one year of the date the project was ordered. In addition to the Public Hearings, the City has held a number of informational meetings to discuss the project. The last informational meeting was held on Oc- tober 1, 2015 to provide property owners assessment information prior to the Public Hearing. Additional information regarding the assessment waiver and building permit process for hookup was also provided. On October 13, 2014 the City Council approved the project plans and specifica- tions and authorized the advertisement for bids for the Maple Lane, Mushtown Road, Panama Avenue Improvement Project. The City received 6 bids on January 14, 2015 for this project. The lowest bid was from Chard Tiling and Excavating for $1,497,936.98. The bid was awarded to Chard Tiling and Excavating on February 9, 2015. On January 26th, 2015 the City Council directed that the declaration of costs to be assessed be delayed until the final grant amount was determined and costs further defined by completion of the work (Fall of 2015). The Assessment Review Work Group met on several occasions to discuss this project. Most recently the Assessment Review Committee met on September 3, 2015 to review the project, assessment method, funding sources, and proposed assessment amounts. While the project scope and assessment method remain the same, the proposed assessments have been adjusted based on the actual construction costs and funding allocations as shown in the table below. On October 12, 2015 the City Council held the Public Hearing and three property owners spoke at the hearing. For those property owners that addressed the Council, the amount of the assessment was still a concern. 2 Current Circumstances All benefitting property owners have been mailed a sample payment schedule which included information pertinent to their property such as the total proposed assessment amount and assessment rate. The Notice of Hearing on Proposed Assessment was published in the newspaper on September 19, September 26, and October 3, 2015. Under State Statute, the City may only assess a property up to the amount the property is specially benefitted by the public improvement. Appraisals were con- ducted on several properties on the project. The appraisals suggest that the benefit exceeds the assessment. The property owners who believe that the proposed assessment exceeds the special benefit have a right to appeal their assessments in District Court. In order to perfect their right to appeal their assessment a property owner must submit their written and signed objections to the proposed assessment to the City Man- ager prior to the Assessment Hearing or present it to the City Council at the As- sessment Hearing. Within 30 days of the Assessment Hearing, the property owner must also file the appeal in District Court. A total of nine(9)written appeals have been received for this project. We have apprised each of the property own- ers of our Deferred Assessment Program. The project included storm sewer, sanitary sewer, watermain, concrete curb and gutter, aggregate base, bituminous surfacing, and appurtenant work. The con- struction of this project is now substantially complete. The project construction costs can now be appropriately distributed amongst the funding sources according to the formula discussed in previous City Council meetings and recommended by the Assessment Review Committee. The fund- ing source table shown in the financial consideration section of this report shows the funding distribution according to this formula. Conclusion The assessment roll for the project has been updated to reflect additional funding contributions as directed by the City Council at the Ocotber 12th meeting. The assessment roll also reflects those property owners that chose to roll the hookup charges into their assessments. Waivers from seven (7) properties have been received. State Statute requires that special assessments be certified to the County by November 30th. Since property owners must be allowed 30 days to pay off their assessments interest free, the assessment roll must be adopted prior to Novem- ber 1, 2015. 3 ISSUES: While the actual construction progressed well, property owners have consistently communicated that the cost of the assessment is burdensome. Consequently, over the course of project planning the assessment amount was reduced by the use of Trunk Funding, grant proceeds, Street Oversize Fund, tax levy, and Cap- ital Park Fund. On September 30, 2014, the City learned that they were successful in securing an estimated $249,930 in grant dollars for sanitary sewer components. The final amount was determined to be $255,742. The original funding computations did not assume that the City would be successful in receiving grant proceeds. In- stead, the Assessment Review Committee recommended that Trunk Sanitary Sewer and Water Funds be utilized to reduce assessments. While the watermain and sanitary sewer pipes are of minimum size, they will also be utilized to serve acreage to the south. The Assessement Review Committee recommends that the grant proceeds be utilized to reduce the assessment amounts but also reduce the sanitary sewer trunk allocation. Aside from the assessments, each property owner will incur costs associated with hookup charges and private property work. Based on the the 2015 fee schedule for a typical 5/8"water meter, hookup charges are calculated at$5,738. This permit fee is normally due at the time connection permits are pulled. In ad- dition, private work to hook up the house to the service stubs will be at the prop- erty owners expense. The cost of the private work will be dependent on individual site conditions and how existing pipes are laid out for each house. The Assess- ment Review Committee has discussed that these one time charges could be a large burden at one time for property owners.An option to assist the homeowners would be to allow the hookup charges be assessed to the property owners for a 5 year term. The interest rate charged would be the same as the rates charged for street and utilities assessment. In order to take advantage of this option, the property must consent to waive their rights for appeal of the special assessment before or at the assessment hearing. With this option, the property owner still must secure a permit from the City, but their fees for the permit would have al- ready been charged per the assessment. If the permit fees change in 2016 or if the property owner requests a larger meter, the property owner would pay the difference at the time they secured a permit from the City. The Assessment Review Committee has reviewed and agrees with the assess- ment map, assessment rate, and method of assessment. The unit method for the assessment is used due to the uniformity of benefit received by the benefited parcels and the relative consistency in parcel size. FINANCIAL The assessment calculation has been computed in a manner consistent with the IMPACT: lastest calculation methods and the Assessment Policy. The property owners are proposed to be assessed 100% for all costs associated with the proposed sani- tary sewer and watermain improvements after subtracting trunk amounts and the grant proceeds. Existing properties on Maple Lane and Mushtown Road will be assessed 40% of the street and storm sewer improvement costs for this project after street oversizing and water quality components are subtracted. The remain- ing 60% of the street and storm sewer costs will be paid through the tax levy. Any septic system credits for this project will be paid through the Sewer Fund. 4 The Maple Lane, Mushtown Road, and Panama Avenue Street Improvement Project was originally proposed to be financed by Special Assessments, tax levy, Street Oversize Fund and Water Quality Fund. The following table reflects the original funding sources, interim funding sources, and recommended funding sources per the City Council discussion at the October 12th meeting. It is also proposed that the trail construction, which is part of the Trail Gaps Analysis, be funded through the Capital Park Fund exclusively. Construction Costs: Street and Storm Sewer $1,031,329.51 Sanitary Sewer $572,625.76 Watermain $302,558.72 Total $1,907,513.99 Per City Council Funding Source Original Interim As Bid** Directive Estimate Estimate (Oct 12, 2015) Tax Levy $437,300 $388,384 $441,570 $411,695 Assessments $1,217,294 $906,388 $804,190 $692,619*** Street Oversize Fund $56,152 $131,186 $122,537 $150,000 Water Quality Fund $30,000 $42,588 $61,918 $19,724 Trunk Fund $0 $262,000 $196,500 $262,000 Sewer Fund $0 $0 $0 $32,326 Capital Park Fund $0 $0 $62,356 $83,408 Clean Water Grant $0 $0 $249,930 $255,742 Project Total Cost* $1,740,746 $1,730,546 $1,939,000 $1,907,514 Utilities Assessment (Unit) $24,362 $16,906 $13,416 $12,174 Street & Utilities Assessment (Unit) $35,575 $26,865 $24,738 $22,264 * Includes project support costs ** As recommended by the Assessment Review Committee at the January 16, 2015 meeting *** Does not include connection charges of$40,166. Of the total project costs including sanitary sewer and watermain improvements, $1,214,895 or 64% will be paid through sources other than special assessment. The proposed amount to be assessed against the benefiting properties is $692,619 plus $40,166 for a total of $732,785. There are 26 benefiting units in the project area proposed to be assessed at 40% of the street and storm sewer improvements after applicable subtractions. There are 38 benefiting units in the 5 project area proposed to be assessed at 100% of the sanitary sewer and water- main improvements after applicable subtractions. The final assessment amounts are shown in the table above. The Council approved the issuance of general obligation bonds and initial trans- fers from the Water Fund and Sewer Fund in the spring of 2015 for this project. The interest rate for this project is proposed at 4.44%. A final project reconcilia- tion will be prepared when the project is completed. The anticipated completion date is Fall 2016 after the final lift of asphalt is completed. ALTERNATIVES: 1) Approve a resolution adopting the assessment roll as submitted for the Maple Lane, Mushtown Road, Panama Avenue Improvement Project #TRN14- 000001. 2) Deny this item for a specific reason and provide staff with direction. 3) Table this item for a specific reason. RECOM- A motion and a second for approval of Alternative #1. MENDED MOTION: 6 01 pRIO� 80 en 4646 Dakota Street SE lifINivEsolP Prior Lake, MN 55372 RESOLUTION 15-xxx A RESOLUTION ADOPTING ASSESSMENTS FOR THE MAPLE LANE, MUSHTOWN ROAD, PANAMA AVENUE IMPROVEMENT PROJECT (CITY PROJECT#TRN14-000001) Motion By: Second By: WHEREAS, Pursuant to proper notice duly given as required by law, the Council has met and heard and passed upon all objections to the proposed assessments for the Maple Lane, Mushtown Road, Panama Avenue Improvement Project, City Project#TRN14-000001. NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The proposed assessment for the Maple Lane, Mushtown Road, Panama Avenue Improvement Project, City Project #TRN14-000001, a copy of which is attached hereto and made part hereof, is hereby accepted and shall constitute the special assessment against the lands named therein, and each tract of land therein included is hereby found to be benefitted by the proposed improvement in the amount of the assessment levied against it. 3. The assessment shall be payable on an equal principal method extending over a period of five (5) years for hookup charges, ten (10) years for street and storm improvements, twenty (20) years for sanitary sewer and watermain improvements, the first of the installments to be payable on or before the first Monday, in January 2016, and shall bear interest at the rate of four and forty-four hundredths (4.44) percent per annum from the date of the adoption of this assessment resolution. To the first installment of each assessment shall be added interest on the entire assessment from October 27 until December 31 of the year in which the first installment is payable, and to each subsequent installment shall be added interest for one year on all unpaid installments. 4. The owner of any property so assessed may, at any time prior to certification of the assessment to the County Auditor, pay the whole of the assessment on such property, with interest accrued to the date of the payment, except that no interest will be charged if the entire assessment is paid within thirty (30) days, and he/she may, at any time thereafter, pay to the city treasurer the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before November 25 or interest will be charged through December 31 of the next succeeding year. 5. The Finance Director shall forthwith transmit a certified duplicate of this assessment to the County Auditor to be extended on the property tax lists of Scott County. Such assessments shall be collected and paid to the City in same manner as other municipal taxes. PASSED AND ADOPTED THIS 26th DAY OF OCTOBER 2015. VOTE Hedberg Keeney McGuire Morton Thompson Aye ❑ ❑ E E ❑ Nay ❑ ❑ ❑ ❑ E Abstain E E ❑ ❑ ❑ Absent E ❑ E E ❑ Frank Boyles, City Manager 2 PRELIMINARY ASSESSMENT ROLL ' DESCRIPTION: #TRN14-000001 MAPLE LANE,MUSHTOWN ROAD,PANAMA AVENUE ASSESSMENT UNIT RATE(40%): STREET AND STORM SEWER ASSESSMENT UNIT RATE(100%): UTILITIES ASSESSMENT CODE: 5-251300 S-251310 5-251320 INTEREST RATE: 4.44 TERM: 10 YEAR STREETS 20 YEARS UTILITIES 5 YEARS HOOKUP CHARGES INITIAL YEAR: 2016 2016 2016 ADDITIONAL INTEREST DAYS: 65 TOTAL UNITS 26 STREETS 38 UTILITIES 7 UNITS PAYMENT METHOD: EQUAL PRINCIPAL SEPTIC TOTAL ASSESSABLE STREET WATERMAIN SEWER HOOKUP SYSTEM ASSESSMENT NO. LEGAL DESCRIPTION PARCEL ADDRESS PARCEL NUMBER PROPERTY OWNER&ADDRESS UNITS ASSESSMENT ASSESSMENT ASSESSMENT CHARGES CREDITS AMOUNT HARRIS STEVEN&JEANNE HARRIS 17176 MUSHTOWN RD SE 1 L 1,MAPLE ACRES 17176 MUSHTOWN RD SE 254200010 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 TONY B&CHRISTINE WETHERELL 17124 MUSHTOWN RD SE 2 L2,MAPLE ACRES 17124 MUSHTOWN RD SE 254200020 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 5,738.00 $ 28,001.89 WADE D.NELSON 17125 MAPLE LN SE 3 L3,MAPLE ACRES 17125 MAPLE LN SE 254200030 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ (6,275.29) $ 15,988.60 L4&5,LYING S'ERLY OF A LINE COM AT PT ON W LINE OF 5 20.87'N'ERLY OF SW COR E'ERLY TO A RYAN M STOCKER PT ON E LINE OF 420'S'ERLY OF NE COR&THERE 17101 MAPLE LN SE 4 TERMINATING,MAPLE ACRES 17101 MAPLE LN SE 254200040 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 L4&5,LYING N'ERLY OF A LINE COM AT PT ON W LINE OF 5 20.87'N'ERLY OF SW COR S'ERLY TO A TIMOTHY J KADRLIK PT ON E LINE OF 4 20'S'ERLY OF NE COR&THERE 17075 MAPLE LN SE 5 TERMINATING,MAPLE ACRES 17075 MAPLE LN SE 254200050 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,89832 $ 6,275.29 $ 22,263.89 RANDELL M LIVINGSTON 17040 MAPLE LN SE 6 P/O LOTS 6&9,MAPLE ACRES 17040 MAPLE LN SE 254200060 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ (3,000.00) $ 19,263.89 P/O L6&9 LYING S'ERLY OF A LINE COM 10'5 OF NW COR TO PT 25'NE OF MOST S'ERLY COR.EX P/0 9 COM SE COR NW 53'SE TO PT 15'N'ERLY JEROME A SNELL OF SW COR S'ERLY,ALONG E LINE 15'TO POB, 17048 MAPLE LN SE 7 MAPLE ACRES 17048 MAPLE LN SE 254200070 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 STEPHEN CONDRA 17020 MUSHTOWN RD SE 8 L7&S'ERLY 50'OF 8,MAPLE ACRES 17020 MUSHTOWN RD SE 254200080 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ (6,275.29) $ 15,988.60 GERALD A&HILDA M GUDERJAN L10&P/0 9 COM SE COR SE TO PT ON E LINE 15' 17056 MAPLE LN SE 9 N OF SE COR 5 15'TO P08,MAPLE ACRES 17056 MAPLE LN SE 254200100 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 JAMES A&ELAINE J LARSON L11&P/O OF 12 COM NE COR W TO NW COR OF 17080 MAPLE LN SE 10 12 SW 25'E TO POB,MAPLE ACRES 17080 MAPLE LN SE 254200110 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 5 (6,275.29) $ 15,988.60 112 EX COM NW COR SW 25'ETO NE COR WTO LLOYD 0&BONNIE JOHNSON POE&P/O 13 COM NW COR SW 25'E TO NE COR 17067 KENNETT CURVE SW 11 W TO POB,MAPLE ACRES 17116 MAPLE LN SE 254200120 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 ARLIS FARMER REVOCABLE TRUST L13,EX COM NW COR SW 25'TOE NE COR W TO 17136 MAPLE LN SE 12 POB,MAPLE ACRES 17136 MAPLE LN SE 254200130 PRIOR LAKE MN 55372 1 $ 5,89832 $ 6,275.29 $ 12,173.61 VICTOR LYAKH 17146 MAPLE LN SE 13 L14,MAPLE ACRES 17146 MAPLE LN SE 254200140 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 5,738.00 $ 28,001.89 ROBERT E&JULIE A DEUTSCH 17181 PANAMA AVE SE 14 L15,MAPLE ACRES 17181 PANAMA AVE SE 254200150 PRIOR LAKE MN 55372 1 $ 5,898.32 $ 6,275.29 $ 12,173.61 Page 1 SEPTIC TOTAL ASSESSABLE STREET WATERMAIN SEWER HOOKUP SYSTEM ASSESSMENT NO. LEGAL DESCRIPTION PARCEL ADDRESS PARCEL NUMBER PROPERTY OWNER&ADDRESS UNITS ASSESSMENT ASSESSMENT ASSESSMENT CHARGES CREDITS AMOUNT GLENN ANDERSON 17215 PANAMA AVE SE 15 L16,MAPLE ACRES 17215 PANAMA AVE SE 254200160 PRIOR LAKE MN 55372 1 $ 5,898.32 $ 6,275.29 $ 12,173.61 JOANNA B SMEBY P.O.BOX 63 16 L17,MAPLE ACRES 17233 PANAMA AVE SE 254200170 SAVAGE,MN 55378 1 $ 5,898.32 $ 6,275.29 $ 12,173.61 JAMES&LYNETTE WALSH 17156 MAPLE LN SE 17 L18,MAPLE ACRES 17156 MAPLE LN SE 254200180 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 DARREN N MCCABE 21181 XEON AVENUE 18 L19,MAPLE ACRES 17151 MAPLE LN SE 254200190 JORDAN,MN 55352-9360 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 5,738.00 $ 28,001.89 DANIEL&LYNDA ERICSSON 17121 MUSHTOWN RD SE 19 S 90'OF L1,O'ROURKE ADD'N 17121 MUSHTOWN RD SE 254210010 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 5 6,275.29 $ 22,263.89 JOHN D&KATHY A ELLING P/O L1 COM NW COR SE 110'NE 184.79'NE 110' 17105 MUSHTOWN RD SE 20 SW 184.79'TO POB,O'ROURKE ADD'N 17105 MUSHTOWN RD SE 254210020 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ (3,000.00) $ 19,263.89 MARK A&SHARON L BRAUER 17127 MUSHTOWN RD SE 21 L2,O'ROURKE ADD'N 17127 MUSHTOWN RD SE 254210030 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 SEC 02 TWP 114 RNG 022 SE1/4 SWS/4 COM JOHN M MCKINLEY 414.6'W OF SE COR N 300'W 666.29'TO RD 5 16961 MUSHTOWN RD SE 22 ALONG RD 343.01'TO S LINE SEC 2 E 500'TO POB. 16961 MUSHTOWN RD SE 259020910 PRIOR LAKE MN 55372 3 $ 30,270.82 $ 30,270.82 SEC 11 TWP 114 RNG 022 S 70'OF N 350'OF E 229' ASHLEIGH E HAUGEN OF GOVT L3 W OF CO HWY 23&S 35'OF E 229'OF 17300 PANAMA AVE SE 23 N 280'OF GOV'T L3 W OF CO H WY 23 17300 PANAMA AVE SE 259110490 PRIOR LAKE MN 55372 1 $ 5,898.32 $ 6,275.29 $ 12,173.61 RICHARD L KAUN SEC 11 TWP 114 RNG 022 5 105'OF N 245'OF E 15051 GREEN OAKS TEL SE 24 229'OF GOVT L3 17290 PANAMA AVE SE 259110500 PRIOR LAKE MN 55372 1 $ 5,898.32 $ 6,275.29 $ 5,738.00 $ 17,911.61 NANCY L DANIELSON SEC 11 TWP 114 RNG 022 S 70'OF N 140'OF GOVT 17280 PANAMA AVE SE 25 13 W OF CO HWY 23 17280 PANAMA AVE SE 259110510 PRIOR LAKE MN 55372 1 $ 5,898.32 $ 6,275.29 $ 5,738.00 $ 17,911.61 SEC 11 TWP 114 RNG 022 P/O N 70'OF E 229'OF ROGER A&DONNA L KNOX GOVT L3 LYING W'ERLY OF CO RD 23&E'ERLY OF 17260 PANAMA AVE SE 26 SHORE OF LAKE 17260 PANAMA AVE SE 259110520 PRIOR LAKE MN 55372 1 $ 5,898.32 $ 6,275.29 $ 12,173.61 JON E&MORRISSA L ALLEN SEC 11 TWP 114 RNG 022 N 70'OF S 145'OF GOVT 17220 PANAMA AVE SE 27 LOT 4 LYING W OF CO RD 23 17220 PANAMA AVE SE 259110550 PRIOR LAKE MN 55372 1 $ 5,898.32 $ 6,275.29 $ 5,738.00 $ 17,911.61 MATTHEW GILLEN SEC 11 TWP 114 RNG 022 S 75'OF GOVT LOT 4 17240 PANAMA AVE SE 28 LYING W OF CO RD 23 17240 PANAMA AVE SE 259110580 PRIOR LAKE MN 55372 1 $ 5,898.32 $ 6,275.29 $ 12,173.61 SEC 11 TWP 114 RNG 022 P/O NW1/4 GOVT L4 COM 1693.8 E OF NW COR SE 100 TO BEG PT SE KEVIN R STOCKE 52.1 SE 47.9 E 229.12 NW 99.48 W 230.98 TO 17025 MUSHTOWN RD SE 29 POB. 17025 MUSHTOWN RD SE 259110590 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 SEC 11 TWP 114 RNG 022 P/O NW1/4 BEG 1693.8 JERRY W WEBER E OF NW COR SE 100 E 230.98 NW 100 W 230.98 17011 MUSHTOWN RD SE 30 TO BEG 17011 MUSHTOWN RD SE 259110610 PRIOR LAKE MN 553721 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 SEC 11 TWP 114 RNG 022 NW1/4 COM INT OF N LINE&CL OF RD 1693.8'E OF NW COR SE ALONG CL 152.1'SE ALONG CL 47.9'TO POB SE ALONG CL DARLENE E KAISER 100'E 227.97'N 16-32-58 W 99.67'W 229.12'TO 2102 SIOUX TRL NW 31 POB. 1 17041 MUSHTOWN RD SE 259110620 PRIOR LAKE MN 553721 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 SEC 11 TWP 114 Range 022.28A IN GOVT LOT 4 JEREMY B WUEBBEN 84.16'X 220.29'X 50'X 227.97'EX RD R OF WON 17077 MUSHTOWN RD SE 32 WEND THEREOF. 17077 MUSHTOWN RD SE 259110630 PRIOR LAKE MN 553721 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 5,738.00 $ (3,750.00) $ 24,251.89 SEC 11 TWP 114 RNG 022 COM AT INT OF N LINE& CL OF RD 1693.8'E OF NW COR SE ALONG CL 152.1'SE ALONG CL 332.06'TO POB SE ALONG CL LINDEN J&KAREN M SCHOMMER 93.19'N 72-49-00 E 217.79'N 17-11-00 W 60'S 17079 MUSHTOWN RD SE 33 81-29-00 W 220.29'TO P08. 17079 MUSHTOWN RD SE 259110640 PRIOR LAKE MN 553721 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ 22,263.89 Page 2 SEPTIC TOTAL ASSESSABLE STREET WATERMAIN SEWER HOOKUP SYSTEM ASSESSMENT NO. LEGAL DESCRIPTION PARCEL ADDRESS PARCEL NUMBER PROPERTY OWNER&ADDRESS UNITS ASSESSMENT ASSESSMENT ASSESSMENT CHARGES CREDITS AMOUNT SEC 11 TWP 114 Range 022 P/O NW1/4 COM CHRISTOPHER L&TRACY M CASKEY 1693.8'E OF NW COR SE 152.1'SE 147.9'TO POB 17055 MUSHTOWN RD SE 34 SE 100'E 227.97'NW 100'W 227.97'TO POB. 17055 MUSHTOWN RD SE 259110650 PRIOR LAKE MN 55372 1 $ 10,090.27 $ 5,898.32 $ 6,275.29 $ (3,750.00) $ 18,513.89 SEC 11 TWP 114 RNG 022 P/O NW1/4 COM INT OF PANAMA AVE LLC SW LINE OF MAPLE ACRES&CO RD 23 S 394.21'E 17255 PANAMA AVE SE 35 241.30'N 546.37'SW 285.27'TO POB. 17255 PANAMA AVE SE 259110660 PRIOR LAKE MN 55372 4 $ 23,593.27 $ 25,101.17 $ 48,694.44 MARK A&SHARON L BRAUER SEC 11 TWP 114 RNG 022 40'X 184.79'IN NW1/4 17127 MUSHTOWN RD SE 36 ADJ.TO L2 O'ROURKE ADDN 259110670 PRIOR LAKE MN 55372 CAROLE S&TRU PEACOCK SEC 11 TWP 114 RNG 022 300 X 363'X 302.58'X 17325 PANAMA AVE SE 37 363'IN SE 1/4 NW 1/4 17325 PANAMA AVE SE 259110690 PRIOR LAKE MN 55373 1 $ 5,898.32 $ 6,275.29 $ 12,173.61 UPDATED 10/19/15 $262,347.13 $ 224,136.10 $238,461.13 $ 40,166.00 $(32,325.87) $ 732,784.49 Page 3