Loading...
HomeMy WebLinkAboutUtility Connection 15. 0624 (2) SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY , • Complete items 1,2,and 3.Also complete A. Signa ,re item 4 if Restricted Delivery is desired. 0 Agent X • Print your name and address on the reverse 4.4.../.. 0 ,dd - -e so that we can return the card to you. B.r.=c=ved (Printed Name) C. Date of Delivery • Attach this card to the back of the mailpiece, or on jitfront if space permits. Y `� '^'l c3 n D. Is delivery address different from item 1? 0 Yes 1. Article Addressed to: If YES,enter delivery address below: 0 No gt;-Z. 54 Lek ba 4 I 3. Service Type AA /v ' .Certified Maile 0 Priority Mail Express" I /2)3 ❑Registered 0 Return Receipt for Merchandise 0 Insured Mall 0 Collect on Delivery 4. Restricted Delivery?(Extra Fee) 0 Yes 2. 7014 2120 0001 6624 7515 PS Form 3811,July 2013 Domestic Return Receipt ,1)-6-no . I? S ( RIO* CITY OF PRIOR LAKE BUILDING PERMIT, Date Rec'd TEMPORARY CERTIFICATE OF ZONING COMPLIANCE ` �� �� x AND UTILITY CONNECTION PERMIT U ts7 i. White io 6A 4,1411NNESOlPz. City PERMIT NO. IJ. 3 Yellow Applicant (Please type or print and sign at bottom) ADDRESS ZONING(office use) i q°1611SL4/2=Se24— ‘4Ltfitt,, Ahiki /Q-1S-1D LEGAL DESCRIPTION(office use only) u LOT BLOCK ADDITION4�/J) =k�' Z0/.z PID o�S • l 1 S , 0 (a0 OWNER (---til t /,1 (Phone) (Name) ( "Y - EL1(Address) /2 Z 5 ti I- &6' ( 1:0 1,4L iv 1/ " /t .. /Z3 BUILDER (Company Name) (Phone) � iv4 '' (Phone) (Contact Name) [ 3 ` (Address) TYPE OF WORK ❑New Construction ❑Deck ❑Porch ❑Re-Roofing ❑Re-Siding ❑ ower Level Finish ❑Fireplace ['Addition ['Alteration ❑Utility Connection i- Ai'^ `�/�^ [1Misc. 1 ( CODE: ❑I.R.C. ❑I.B.C. Type of Construction: I II III IV t A B PROJECT COST/V UE $ Occupancy Group: A B E F H I R S U (excluding land) Division: / 1 2 5 I hereby certify that I v fin inform i t 's,...,.tion which is to tl f my knowledge true and correct. I also certify that I am the owner or authorized agent for the above-mentioned pro ty to t t 1 c s 't wi confer to all exist to nd local laws and will proceed in accordance with submitted plans. I am aware that the building official can revoke thi pe- for)t t u the- ore lLeteby rSCfh`tt he official or a designee may enter upon the property to perform needed inspections. X C ✓� Signature Contractor's License No. Date Permit Valuation Park Support Fee # $ 7� Permit Fee $ SAC # $ A 4 8� [i ® Plan Check Fee $ Water Meter Size et; 1"; $ f/ f' r CO _( V State Surcharge $ Pressure Reducer $ // ® , Penalty $ Sewer/Water Connection Fee # $ /,--61 ®; (�0 Plumbing Permit Fee $ 72 Water Tower Fee # $ Hca e . 00 Mechanical Permit Fee $ Builder's Deposit $ Sewer&Water Permit Fee $ 6 6 ` 5 0 Other $ $ .-6 Gas Fireplace Permit Fee $ TOTAL DUE .� r© 1 This Application Becomes Your Building Permit When Approved Paid Receipt No. Date (G2 © C� Building Official Date This is to certify that the request in the above application and accompanying documents is in accordance with the City Zoning Ordinance and may proceed as requested. This document when signed by the City Planner constitutes a temporary Certificate of Zoning compliance and allows construction to commence. Before occupancy,a Certificate of Occupancy must be issued Planning Director Date Special Conditions,if any 24 hour notice for all inspections(952)447-9850,fax(952)447-4245 4646 Dakota Street Prior Lake,MN 55372 '._ SCOTT°COON INAT�i1J►U �"�� i Owner Pumper �» Check all that E Depth df sludge s ` Dta° uu t►tis Pumped F ads iftheta a i 9.9 �iit a� �i313 A,' j 2 PRIG Date Rec'd CITY OF PRIOR LAKE i ,� SEWER AND WATER PERMIT .; a /O /, I NES��� :. YGrellow Ceen Fileity PERMIT NO/ (Ji()64, „((L 2 / J 3. Gold Applicant (Please type or print and sign at bottom) ADDRESS ZONING(office use) f r7 OS l \_,,ti ,<e ,4u-e AAA) 42264) LEGAL DESCRIPTION(office use only) (/ LOT BLOCK ADDITION /4 /V 00 /2— PID � e 8 'O-1.0'-O OWNER (Name) v 2v I / 1'' �l� (.,J nI ) (Phone) j e7D qO /Q � � � (Address) ____Y:7� Z �J� �'A %2 / � ( i2(J (Address) (City) (Zip Code) APPLICANT (Name) (Phone) (Address) (Address) (City) (ZipCode) (Contact Person) (Phone) APPLICANT SIGNATURE DATE APPLICANT PLEASE COMPLETE BELOW Size of water service inches. Location of any couplings from structure feet. Type of sewer pipe. ❑ ABC ❑ PVC n Cast Iron Estimated length of sewer line feet. Clean out(if required) located at feet from structure. FEE SCHEDULE Residential sewer and water line connection $51.50 Industrial,Com'l&Multi-family 1%of job cost with a$51.50 minimum Sewer connection only $25.50 Water connection only $25.50 Estimated Cost $ Building Permit# SEWER AND WATER PERMIT FEE $ The Minnesota Statutes§326B.148 STATE SURCHARGE $ "SURCHARGE"has been extended TOTAL PERMIT FEE $ The minimum surcharge for a "fixed fee"permit is$5.00 (Office Use Only) pp,,�� This Application Becomes Your Building Permit When Approved Paid ' S periLtZe Dateli B7�1 J !.� . Building Official Date /]' (� 24 hour notice for all inspections(952)447-9850,fax(952)447-4245 4646 Dakota Street S.E.,Prior Lake,Minnesota 55372 04 PRip� Date Rec'd CITY OF PRIOR LAKE PLUMBING PERMIT 471vNESO I.Blue File G 2.Cold City PERMIT NO./c 04R.y 3.Yellow Applicant (Please type or print and sign at bottom) ADDRESSZONING(office use) 110gl S/frZ Se74 V Afilk) /-?/SJ LEGAL DESCRIPTION(office use only) LOT BLOCK ADDITIO /U/ T PID 4 OWNE(Name) fl',fr4 /f9-A (Phone) 6,,S7 7e qg r (Address) q7/ _775A_ Z.e. /7 (7d-z//e7-4 APPLICANT (Name) (Phone) (Address) (Address) (City) (Zip Code) (Contact Person) (Phone) APPLICANT SIGNATURE DATE APPLICANT PLEASE COMPLETE BELOW Quantity Type of Fixture Quantity Type of Fixture Bath Tub with or without shower Rough-ins Dishwasher Water Heater Floor Drain Water Softener Lavatory(Bathroom Sink) Stand Pipe(Washing Machine) Laundry Tray(1 or 2 compartment sink Sewage Ejector Shower Stall Backflow Assembly Sinks Backflow Assembly Test Bar Sink Lawn Sprinkler Water Closet(Toilet) Other FEE SCHEDULE Industrial,Commercial&Multi-family 1%of job cost with a$49.50 minimum Residential,New One&Two-Family $149.50 Residential,Additions&Alterations $49.50 The Minnesota Statutes§326B.148 Building Permit# "SURCHARGE"has been extended The minimum surcharge for a LUMBING PERMIT FEE $ TATE SURCHARGE $ .50 "fixed fee"permit is$5.00 'OTAL PERMIT FEE $ (---6A, ( This Application Becomes Your Building Permit When Approved P. d Recei . fah Dat.. Buildinc Official Date 24 hour notice for all inspections(952)447-9850,fax(9 )447-4245 4646 Dakota Street S.E.,Prior Lake,Minnesota 55372 Lynda Allen From: Lynda Allen Sent: Wednesday, June 10, 2015 1:12 PM To: Larry Poppler Cc: Mary Lein; Bob Hutchins; Lynda Allen (fallen@cityofpriorlake.com); Dale Chard Subject: Utility Connection Payment Received for 17081 Sunset Ave NW Karen Julian paid the connection fees today for 17081 Sunset Avenue NW (Receipt#1692;Permit#15- 0624). She also received the Plumbing Permit Application&the Sewer 6 Water Permit Application so she can have her sub-contractors complete and sign these forms. As of today, she does not have her Plumbing& S&W contractor determined but will be deciding on these contractors shortly. (She is the new owner of this property and said she never received any of this information in the past except for the certified letter that was just recently sent on June 1, 2015. Thanks Susan Zick Lynda S.alien City of Prior Lake Building Department 4646 Dakota Street S.E. Prior Lake,Minnesota 55372 952.447.9550 1 rico ;:, City of Prior Lake RECEIPT 4646 Dakota Street SE Prior Lake MN 55372 it,,,,\ Mil 952-447-9840 i f \< 017'- Receipt: 1692 Received Of: Date: 06/10/15 Karen M Julian Customer: Karen M Julian Brett A Julian 4712 Isabelle Ct Saint Paul MN 55123 � ` Lel ��` I40L1 SCrip€orz 11,<> s'�, b I �, �� �� umbers Utility Connection 15-0624/17081 Sunset Ave NW SAC Fee 2,485.00 Water Meter 480.00 Pressure Reducer 110.00 Water Connection 900.00 Sewer Connection 600.00 Water Tower Fee 1,000.00 Plumbing Permit 15-0624/17081 Sunset Ave NW Plumbing Permit 49.50 State Surcharge-Plumbing 5.00 Sewer-New Construction 15-0624/17081 Sunset Ave NW Sewer Permit 51.50 State Surcharge-Sewer 5.00 Receipt Total 5,686.00 TENDERED: Checks 1003 5,686.00 Total:5,686.00 QA/4/ i --6 Y iinp&v Please email tear-off photos to: lallen@cityofpriorlake.corn tri Ali For Domestic Mal/On/ MA-;o t`- For detive y RECEIP7- • rY mtormatt O� P R� rU �n t our website at wtny u O sps.con,. Postage V © Certified Fee 4646 Dakota Street SE 0 (Endow n.,R IptFeente Ilealli I Prior Lake,MN 55372 Re �'°''�� +1djN S�qA ti (Endorser DeRB9uj Fee POHS em ere Total Postage&Fees aIIIIIII ." Sent To r- Street&APt iU------_r, June 1,2015 .6-61.:§E-4t-i, ° Poe°XN° °• ClSZ1 ya1e• i;4 2/ - PS For,380p July p � . " ---t......_.. Karen Julian `/ See Rev erse for Instructions 4712 Isabelle Court Eagan MN,55123 r RE: IMPORTANT ANNOUNCEMENT CONCERNING CONNECTION TO CITY SEWER AND WATER FOR 17081 SUNSET AVENUE NW,SHAKOPEE, MN 55379 Dear Property Owner: Prior Lake Ordinance requires that properties with dwelling units connect to city utilities (domestic water and sewer) no more than one year after the services become available. The one year deadline for your property was March 14,2015. Five properties on the Sunset Avenue project have not completed connection, although some are currently in process. Some have asked the City Council for extensions to the deadline. The City Council discussed these extension requests and all other non-connected properties. The City Council has provided one last opportunity for property owners to connect by following the steps below: 1. By June 12,2015,the Property Owner will need to secure a utility installation permit from the city, including payment of permit and connection fees. The cost for the permit is$5,686 for a 5/8"water meter. 2. Once the utility permit has been secured,the Property Owner will have 180 days (6 months) from the permit date to complete the physical connections through a private contractor. If needed,the City has a listing of companies who complete this type of work. Costs for connection will be based upon the immediate circumstances of each lot through quotes secured by the Property Owner. Some property owners have discussed demolition of the structure on the property. If a Property Owner intends to demolish the existing structure on the lot,then a demolition permit must be obtained from the city and the work concluded by June 12, 2015. As long as there is no dwelling unit on the property by that date,there is no need to connect to sewer and water. However,the fact that a property is for sale,occupied or unoccupied, will not affect the deadlines or process described herein. Phone 952.447.9800 / Fax 952.447.4245/www.cityofpriorlake.com In accordance with City Code and City Council direction, if a Property Owner fails to secure a connection permit by the deadline shown above,or if permit is secured but the work is not completed within 180 days of the permit date,the city will be forced to take action to complete the connection. The City will seek a court order from Scott County District Court to inspect each property and authorize the completion of the connections. If this process is required,the City will secure quotes, award a contract,assure the work is completed,and impose a special assessment for all the costs associated with the connection including an additional administrative fee for the coordination efforts toward making the connection. We appreciate that connection is both a costly and time consuming process, but for public safety and health reasons, prompt connection to the city facilities is critical. If you have additional questions concerning this matter, please call me at(952)447-9832. . Sincerely, Larry Poppler, P.E. City Engineer/Inspections Director CITY OF PRIOR LAKE cc: Frank Boyles, City Manager Property Card Parcel ID Number 254880060 ' l t S Tm —77axpayer Information Taxpayer Name JULIAN KAREN M I� `� „ Mailing'Address , r` �ri ! 4712 ISABELLE CT ° ` EAGAN MN 55123 x„ � a 4, . Property 7Address 1 Address � ,,,I,,,,---1,-------1---- } � 17081 SUNSET AVE NW City - SHAKOPEE MN 55379 .._ _. ._ � . _ - Parc formation) Uses"7-77 GIS Acres 0.16135 125 SRR Tax Acres 0.00 ,Plat SUNRISE VIEW Lot Block Tax Description SubdivisionName SUNRISE VIEW Lot 011 SubdivisionCd 11006 , Building Information �w_._ ,Building Style RAMBLER Bedrooms 0 Year Built 1900 Bathrooms 0.00 Garage Sq'ft „. a_ ffi.�'''''''''.2'--''Ii:-; '''''' '.'''''''''-:--j--''^ ' _ r Miscellaneous Information _ School District Taxing District Code 'N Homestead Status Green Acres Ag Preserve ' 719 2014 N I AssessortInf matian 2014 Values Last Sale Estimated Market Value, (Payable 2015) Lands $196,500.00 Date of Sale 20141029 Building; $23,000.00' Sale Value Total $219,500.00 Disclaimer: This information is to be used for reference purposes only.Scott County does not guarantee accuracy of the material contained herein and is not responsible for misuse or misinterpretation.The preceding disclaimer is provided pursuant to Minnesota Statutes 466.03,Subd.21(2000) and the user of this service acknowledges that the County shall not be liable far any damages,and /,". Gott expressly waives all claims;and agrees to defend,indemnify,and hold harmless the County from any and all claims brought by User. its employees or agents,or third parties which arise out of the use s access or use of data provided. Page 1 of 1 Monday, June 1,2015 Scott County, MN 4001 V11194) ; '—lo 0 gl 4trNNEso� October 2, 2014 Name Address Prior Lake, Minnesota 55372 REMINDER: 1 YEAR DEADLINE FOR UTILITY HOOK UP IS MARCH 14, 2015 XXXX Sunset Avenue Re: PROJECT# 13-011; SUNSET AVENUE UTILITY IMPROVEMENT COMPLETION The Sunset Avenue Utility Improvements are complete and the utilities tested and approved. You may hook up your home to the sewer and water service stubs. You were sent an initial letter on March 14, 2014 regarding the hookup requirements. This is a reminder letter, per City Code, that your utility connection needs to be completed by March 14, 2015. In order to make the connection from the utility stubs to the home, a Building Permit must be obtained from the Building Department(which also includes a Plumbing Permit and a Sewer&Water Permit). A"Master Plumber", licensed in the state of Minnesota must sign the Plumbing Permit. Also, a"Master Plumber'or a sewer and water contractor licensed in the State of Minnesota for pipe laying must sign the Sewer and Water Permit. Building Permit and connection fees of$5,836*are due at the time of the building permit issuance. The connection fees are calculated as follows: 1" Meter Plumbing Permit $54.50 Sewer and Water Permit $56.50 Sewer Access Charge $2,485 Water Meter(1") $ 740 Sewer/Water Connection $1,500 Water Tower Fee $1,000 $5,836* (possible increase in 2015) 5/8" Meter Plumbing Permit $54.50 Sewer and Water Permit $56.50 Sewer Access Charge $2,485 Water Meter(5/8") $ 590 Sewer/Water Connection $1,500 Water Tower Fee $1,000 $5,686* (possible increase in 2015) Phone 952.447.9800 / Fax 952.447.4245/www.cityofpriorlake.com Page 2 The building permit will stipulate requirements for the connection as well as abandonment requirements for the existing septic system. Your existing well can be maintained for outside non-domestic use or can be abandoned and sealed. It should be noted that the sanitary sewer service is required to be located at least 20 feet away from any well or the well will need to be abandoned. The building permit will give further details regarding these items. Sections 704.300 and 705.400 of the Prior Lake City Code requires connection to City water and sewer within one year of availability. Section 4715.0310 of the State of Minnesota Plumbing Code also requires connection to municipal sewer and water systems once they are available. This letter serves as the reminder of the upcoming one year time period which ends on March 14, 2015.Your utility connection needs to be completed by March 14, 2015. Attached for your convenience are copies of the building, plumbing, and sewer and water permits. If you have any questions or concerns regarding the building permit process, please contact the Building Department at 952 447 9850. Also, please contact this office within 30 days (by October 30, 2014) to communicate your plan. Sincerely, Larry Poppler City Engineer/ Inspections Director CITY OF PRIOR LAKE CC: Bob Hutchins, Building Official Lynda Allen, Building/Inspections Assistant (reminder letter 1 year deadline sunset avenue;j/utility connections) c s vRio 1 V 4.14.1100-0- March 14, 2014 Stephen&Denise Wagner 8547 Crane Dance Trl Eden Prairie, MN 55344 Re: SUNSET AVENUE UTILITY IMPROVEMENTS SUBSTANTIAL COMPLETION(Project# 13-011) The Sunset Avenue Utility Improvements are now substantially complete. A number of cleanup items will be completed in the upcoming months and the final layer of asphalt will be completed this summer. The utilities have all been tested and approved. You may now hook up your home to the new sewer and water service stubs. In order to make the connection from the utility stubs to the home, a building permit must be obtained from the Building Department. A"Master Plumber", licensed in the state of Minnesota must sign the plumbing permit. Also, a"Master Plumber"or a sewer and water contractor licensed in the State of Minnesota for pipe laying must sign the sewer and water permit. Building permit and connection fees of$5,786 or$5,636* are due at the time of the building permit issuance. The fee amounts are 2013 rates and will apply for all building permit and connection fees obtained within the calendar year 2014. Fees for permits obtained after December 31, 2014 will be calculated based on the City's adopted fee schedule. The connection fees for permits obtained in 2014 are calculated as follows: 1"Meter Plumbing Permit $54.50 Sewer and Water Permit.. $56.50 Sewer Access Charge ; $2,435ri Water Meter(1") ' $740 / `. Sewer/Water Connection ,500 C (/, Water Tower Fee 1 101 =% $5,7 L 5/8"Meter ' Plumbing Permit $:4.50 Sewer and Water Permit 56.50 Sewer Access Charge �\} $2,435 Water Meter(5/8") $590 Sewer/Water Connection $J,500 Water Tower Fee '.1 101 $5,6 7,* J:\UTILITY CONNECTIONS\Sunset Avenue Utility Connection Lette'(3).do0., Page 1 of 2 The building permit will stipulate requirements for the connection as well as abandonment requirements for the existing septic system. Your existing well can be maintained for outside non-domestic use or can be abandoned and sealed. It should be noted that the sanitary sewer service is required to be located at least 20 feet away from any well or the well will need to be abandoned. The building permit will give further details regarding these items. Sections 704.300 and 705.400 of the Prior Lake City Code requires connection to City water and sewer within one year of availability. Section 4715.0310 of the State of Minnesota Plumbing Code also requires connection to municipal sewer and water systems once they are available. This letter serves as the beginning date for the one year time period. Attached for your convenience are copies of the building,plumbing, and sewer and water permits. If you have any questions or concerns regarding the building permit process, please contact the Building Department at 952-447-9850. Sincerely, Larry Poppler City Engineer/Inspections Director CITY OF PRIOR LAKE CC: Robert D. Hutchins, Building Official Page 2 of 2 4646 Dakota Street S.E., Prior Lake, Minnesota 55372 PROCESS FOR NEW SEWER & WATER HOOK-UP (Building Department) 10/21/13 sz 1. Have Homeowner sign the Building Permit Application 2. Before any payment, Homeowner needs to know if they will have a 5/8" Water Meter or a 1" Water Meter (the prices are different---5/8" = $480.00 + $110.00 for water reducer= total of $590.00 or 1" Meter = $590.00 + $150.00 = $740.00). Building Permit#, Sewer & Water Permit# & Plumbing Permit# will all have same PERMIT NUMBER. Assign the # in next sequence in Building Permit Roster. 3. For 2013* Fees are: a. SAC Charge $2435.00 b. Sewer & Water Connect Fee $1500.00 c. Water Tower Fee 51000.00 i. Total $4935.00 d. Sewer/Water Permit Fee $ 56.50 e. Plumbing Permit Fee S 54.50 i. Total $5046.00 S5046.00 f. Water Meter & Reducer 5/8" S 590.00 Total $ 5636.00 OR 1" $ 740.00 Total $5786.00 4. Complete a receipt for monies paid by Homeowner & give a copy to Homeowner. 5. Make sure Homeowner understands that the Sewer & Water Contractor & the Plumbing Contractor MUST sign the respective form even though the Homeowner is paying the fee. PERMIT# CANNOT BE ASSIGNED UNTIL HOMEOWNER AND BOTH CONTRACTORS HAVE SIGNED THE RESPECTIVE FORMS. *2014 Fees will increase by $50.00 for the SAC Charge. Other potential fee increases are not yet known.