HomeMy WebLinkAbout7B - Ridgemont Ave/Creekside AGENDA #: PREP ARED BY: SIJBJECT: 7B PAUL BOETTCHER, ACTING ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF RESOLUTION 95-37 APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS FOR THE FOLLOWING COMBINED PRO.JECTS; a) PROJECT 93-01 INDUSTRIAL PARK STORM SEWER b) PROJECT 93-03 TH. 13/MITCHELL POND STORM SEWER c) PROJECT 95-01 RIDGEMONT A VENUE d) PROJECT 95-02 CREEKSIDE CIRCLE DATE: AND APPROVAL OF RESOLUTIONS 95-38, 95-39, 95-40, AND 95-41 DECLARING COSTS TO BE ASSESSED AND SETTING ASSESSMENT HEARING DATES FOR RIDGEMONT AVENUE AND CREEKSIDE CIRCLE MAY 15,1995 INTRODUCTION: The purpose of this Agenda item is to approve plans and specifications, to receive authorization to advertise for bids for Project 93-01, 93-03, 95-01, and 95-02 as noted above, and to set an Assessment Hearing date for Projects 95-01 and 95-02. BACKGROUND: Project 93-01. Industrial Park Storm Sewer, was part of the 1993 Improvement Projects and Resolution 93-16 ordered plans for the improvements. Several options were reviewed and the end result was to construct a storm sewer from the top of the hill with a sediment sump manhole and discharge to the vegetated area near Markley Lake. The property owner has agreed to grant a drainage and utility easement for the storm sewer construction. There is a city disposal area at the top of the hill which the city will clean up in order to construct the pipe. This improvement will prevent further uncontrolled slope erosion. The estimated construction cost is $20,000. In the event that the easement is not acquired this storm sewer area will be deleted from the total project. 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER Project 93-03. TH. 13/Mitchell Pond Storm Sewer, was part of the 1993 Improvement Projects and Resolution 93-30 requested MnDOT provide financial assistance for this work. MSA Consulting Engineers has prepared plans and submitted them to MnDOT for cost sharing analysis and approval. This project will correct an eroded area from TH. 13 to Mitchell Pond by the construction of a storm sewer pipe in the ravine and filling over the pipe and restoring the vegetation. The estimated construction cost is $89,000. MnDOT has indicated cost sharing of 31.4%, or $30,353. Project 95-0 1. Rid~emont Avenue, is proposed to be reconstructed from the existing curb and gutter, north 1600 feet to Rutledge Street as shown on Exhibit 2, 3 and 4. Reconstruction to an urban section of a 30 foot width with concrete barrier curb and a sidewalk along the west side is proposed. Sanitary sewer and water will be extended 900 feet to the south limits where no utilities currently exist. This project is a hold-over from the 1994 Capital Improvement Project and will be assessed to the benefiting property owners and included in the 429 Bond issue. Resolution 95-09 ordered preparation of plans for this project. The estimated construction cost is $227,000. The sidewalk will be paid out of the park fund. Project 95-02. Creekside Circle, is proposed to be reconstructed from TH. 13, north 1400 feet to the cul-de-sac as shown on Exhibits 5 and 6. Reconstruction was proposed as a 24 foot wide rural section for the first 1000 feet and then as 24 foot wide urban section the last 400 feet. During the detailed survey and final plan preparation it was determined that curb and gutter would work well along the west side and subsequently the curb and gutter was added to the east side, too, in order to better define the street and to protect the pavement edge. Some additional storm sewer was required near the south end. It is anticipated the reduction in ditch excavation, driveway culverts and restoration area will about offset the cost of the additional curb and gutter. This project is a hold- over from the 1994 Capital Improvement Project and will be assessed to the benefiting property owners and included in the 429 Bond issue. Resolution 95-09 ordered preparation of plans for this project. The estimated construction cost is $120,000. DISCUSSION: These four projects have been grouped together for bidding purposes in order to create a sizable project to obtain competitive bid prices. The combined estimated construction costs total ALTERNATIVES: $447,000. The Mitchell Pond project requires fill material which can be acquired from the Creekside Circle site, also saving money. Under the Cooperative Agreement conditions with MnDOT for Mitchell Pond, the project cannot be advertised until MnDOT has reviewed and approved the plans which is currently underway. MnDOT had indicated award to be required by June 30, 1995, however they have stated funds can be advance encumbered to allow award after June 30, 1995. MnDOT had indicated approval about May 15 which would allow advertisement in the legal paper on May 20 and a bid opening on June 12 and award on June 19, 1995. Construction could then begin about July 5. Waiting for MnDOT approval is potentially worth $30,000 of cost sharing. If MnDOT's approval is after May 15 the ad and bid dates may be pushed back two weeks or more, thus delaying the construction start too. In order to proceed with timely construction in July and August, it is desired to schedule the Assessment Hearing date prior to the receiving of bids. It is recommended that the Ridgemont Avenue assessments be set at 100% of the Public Hearing amounts and that the Creekside Circle assessments be set at 105% of the Public Hearing amounts. If bids are substantially lower than these estimated assessments, the property owners can be re-notified with adjusted rates. Authorizing the Assessment Hearing at this May 15 Council meeting would allow for mailed notices to go out on June 1 for a June 19 meeting. Not moving forward with setting the Assessment Hearing tonight would delay the project by three weeks. The alternatives are as follows: 1. Approve the Resolution approving the plans, authorizing Advertisement for Bids with a bid opening date of June 12, 1995, at 10:00 A.M., and set an Assessment Hearing date of June 19, 1995. All of the above are contingent on MnDOT approval. If MnDOT's approval is delayed, the City Manager and City Engineer would have the authority to advertise and bid one week later, however, the Award and Assessment Hearing could remain on June 19, 1995. 2. Table this item for a specific reason. 3. Deny the project at this time. RECOMMENDATION: The recommendation is to approve a Resolution approving plans and specifications and authorizing advertisement for bids on June 12, 1995, for the combined projects. The recommendation is also to approve Resolutions declaring costs to be assessed and setting an Assessment Hearing date of June 19, 1995. FINANCIAL IMP ACT: Project 93-01 and 93-03 will be paid through Ad Valorem Tax Levy. Projects 95-01 and 95-02 will be paid through Special Assessments, Ad Valorem Tax Levy, and Trunk Reserve. ACTION REQUIRED: Make a motion to approve the Resolutions as recommended. AG515B RESOLUTION 95-37 RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS FOR THE FOLLOWING PROJECT: PROJECT 93-01 INDUSTRIAL PARK STORM SEWER PROJECT 93-03 TH. 13/MITCHELL POND STORM SEWER PROJECT 95-01 RIDGEMONT AVENUE PROJECT 95-02 CREEKSIDE CIRCLE AND SET AN ASSESSMENT HEARING DATE FOR RIDGEMONT AVENUE (95-01) AND CREEKSIDE CIRCLE (95-02) MOTION BY SECONDED BY: WHEREAS, pursuant to Resolution 93-16 which the City Council approved on March 15, 1993, the City Engineer and the City's Engineering Consultant, MSA Consulting Engineers, have prepared plans and specifications for storm sewer improvement project in the Industrial Office Park by the construction of grading, storm sewer, landscaping and appurtenant work; and WHEREAS, pursuant to Resolution 93-30 which the City Council approved on May 17, 1993, the City Engineer and the City's Engineering Consultant, MSA Consulting Engineers, have prepared plans and specifications for the storm sewer improvement project from TH. 13 to Mitchell Pond by the construction of grading, storm sewer, landscaping, and appurtenant work; and WHEREAS, pursuant to Resolution 95-09 which the City Council approved on February 6, 1995, the City Engineer and the City's Engineering Consultant, MSA Consulting Engineers, have prepared plans and specifications for the street improvement project Ridgemont Avenue by the construction of grading, sanitary sewer, watermain, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, sidewalk, landscaping, and appurtenant work; and WHEREAS, pursuant to Resolution 95-09 which the City Council approved on February 6, 1995, the City Engineer and the City's Engineering Consultant, MSA Consulting Engineers, have prepared plans and specifications for the street improvement project on Creekside Circle by the construction of grading, storm sewer, aggregate 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER base, concrete curb and gutter, bituminous surfacing, landscaping, and appurtenant work; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOT A, that 1. Such plans and specifications, a copy of which is attached hereto and made a part of hereof, and hereby approved. 2. The City Manager shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be published not less than 21 days prior to bid opening, shall specify the work to be done, shall state that bids will be opened, and that all bids will be received by the City until 10:00 A.M. on June 12, 1995, at which time they will be publicly opened at City Hall by the City Engineer. 3. The City reserves the right to reject any and all bids for any reason as determined solely by the City. 4. The City Manager shall also have the authority to modify the bid date to June 19, 1995, at 10:00 A.M., if MnDOT approval is delayed and this schedule change remains in accordance with State Statutes. Passed and adopted this 15 day of May, 1995. YES NO Andren Greenfield Kedrowski Schenck Scott Andren Greenfield Kedrowski Schenck Scott Frank Boyles City Manager City of Prior Lake {Seal } AG515B RESOLUTION 95-38 RESOLUTION DECLARING COSTS TO BE ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENT FOR PROJECT 95-02 CREEKSIDE cmCLE STREET IMPROVEMENTS MOTION BY: SECONDED BY: WHEREAS, an Engineer's Estimate has been prepared and costs have been determined for the improvements ofProiect 95-02 and the estimated contract price for such improvements is $125 90000, and the estimated expenses incurred or to be incurred in the making of such improvement amount to $37 80000, so that the total cost of the improvement will be $163 700.00. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOTA: 1. The portion of the cost of such improvement is to be paid by the City's Ad Valorem Tax Levy and is hereby declared to be $65 500.00, and the portion of the cost to be assessed against benefited property owners is declared to be $98 200.00. 2. Assessments shall be payable on an equal principal installment method extending over a period of lQ years. The first installment shall be the annual principal plus interest calculated from the public hearing date to the end of this year plus twelve months of the next year and shall bear interest at the rate of a minimum of 8% and not more than 1 % above the net effective interest rate of the bond issuance per annum from the date of the adoption of the assessment resolution. 3. The City Manager, with the assistance of the City Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece or parcel of land within the district affected, without regard to cash valuation, as provided by law, and he shall file a copy of such proposed assessment in his office for public inspection. 4. The City Manager shall upon the completion of such proposed assessment, notify the Council thereof. Passed and adopted this 15 day of May, 1995. { Seal} YES NO Andren Greenfield Kedrowski Schenck Scott Andren Greenfield Kedrowski Schenck Scott Frank Boyles City Manager City of Prior Lake 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER RESOLUTION 95-39 RESOLUTION DECLARING COSTS TO BE ASSESSED AND ORDERING PREP ARA TION OF PROPOSED ASSESSMENT FOR PROJECT 95-01 RIDGEMONT A VENUE STREET IMPROVEMENTS MOTION BY: SECONDED BY: WHEREAS, an Engineer's Estimate has been prepared and costs have been determined for the improvements of Project 95-01 and the estimated contract price for such improvements is $226 700.00, and the estimated expenses incurred or to be incurred in the making of such improvement amount to $6800000, so that the total cost of the improvement will be $294 700.00. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOT A: 1. The portion of the cost of such improvement is to be paid by the City's Ad Valorem Tax Levy and Trunk Reserve is hereby declared to be $32 590.00, and $11268200 respectively, and the portion of the cost to be assessed against benefited property owners is declared to be $149 428.00. 2. Assessments shall be payable on an equal principal installment method extending over a period of lQ years. The first installment shall be the annual principal plus interest calculated from the public hearing date to the end of this year plus twelve months of the next year and shall bear interest at the rate of a minimum of 8% and not more than ] % above the net effective interest rate of the bond issuance per annum from the date of the I adoption of the assessment resolution. 3. The. City Manager, with the assistance of the City Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece or parcel of land within the district affected, without regard to cash valuation, as provided by law, and he shall file a copy of such proposed assessment in his office for public inspection. 4. The City Manager shall upon the completion of such proposed assessment, notify the Council thereof. Passed and adopted this 15 day of May, 1995. {Seal} YES NO Andren Greenfield Kedrowski Schenck Scott Andren Greenfield Kedrowski Schenck Scott Frank Boyles City Manager City of Prior Lake 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER RESOLUTION 95-40 RESOLUTION FOR HEARING ON PROPOSED ASSESSMENT FOR RIDGEMONT AVENUE STREET IMPROVEMENT PROJECT 95-01 MOTION BY: SECONDED BY: WHEREAS, by a resolution passed by the Council on May 15, 1995, the City Manager was directed to prepare a proposed assessment of the cost of improvements for Project 95-01; and WHEREAS, the City Manager notifies the Council that such proposed assessment will be completed and filed in his office for public inspection. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOTA: 1. A hearing shall be held on the 19th day of June 1995 in City Council Chambers at ~ f...M.. to pass upon such proposed assessment and at such time and place all persons owning property affected by such improvement will be given the opportunity to be heard with reference to such assessment. 2. The City Manager is hereby directed to cause a notice of the hearing on the proposed assessment to be published once in the official newspaper at least two weeks prior to the hearing, and he shall also cause mailed notice to be given to the owner of each parcel described in the assessment roll not less than two weeks prior to the hearing. 3. The owner of any property so assessed may, at any time prior to certification of the assessment to the County Auditor. pay the whole of the assessment on such property, with interest accrued to the date of payment to the City Finance Director: except that no interest will be charged if the entire assessment is paid within 30 days from the adoption of the assessment. He may, at any time thereafter, pay to the City Finance Director the entire amount of the assessment remaining unpaid, excepting the installment portion appearing upon the current year's property tax statement. Passed and adopted this 15 day of May, 1995. {Seal} YES NO Andren Greenfield Kedrowski Schenck Scott Andren Greenfield Kedrowski Schenck Scott Frank Boyles City Manager City of Prior Lake 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER l\-10TION BY: WHEREAS, WHEREAS, RESOLUTION 95-41 RESOLCTION FOR HEARJNG ON PROPOSED ASSESSJ\IENT FOR CREEKSIDE CIRCLE STREET IMPROVEMENT PROJECT 95-02 S-rCONDED BY: by a resolutit)l1 passed by the Council on May 15., 1995. the City tvlanager was directed to prepare a proposed a3sessment of the cost of irriprovements for Proiect o~-O'''; and the City l\.lanager notifies the Council that such ?roposed assessment will be compieted and filed in his office for public inspection. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, l\lINNESOTA: 1. A hearing shall be held on the J Oth day of June ll}~)S in City Council Chambers at ~ ~ M. to pass upon such proposed assessment and at such time and place all pe:'sons owning praperry affected l:Iy such ilnprovement w;li be given the oppommir:,/ to be heard with reference to such assessment. 2. The City Manager is hereby directec to cause a notice of the hearing or! the proposed asseS.5ment to be published once in the official n~\"spaper at least t'NO weeks prior to the hearing, and he shall also CaUse ma~led notice to be given tv the own~; of each parcel des:i'ined in. the :.i~$essmem roll !1(.': less th(;.r~ l\\Q \veeks prio: to thl' he~~ring. 3. The owne" of 3.!1.y prop~:ry 50 assessed maY. at ~n~' time prio: to c-=nif:cation 0: the "~5~s.sm~;:t to the County .t"udiw!'. P3Y the v.'hoie ~)f the a'3sessm::nt an su~h prope.ty, with imeiest a;;:rued te. th~ d~te of payment. to i.fle City :=i:1ance DIrector, excep: that no interest wiU be charged if the entire assessment ~5 paid within 30 days from the adoption of the assessment. He may, at an~' time thereafter, pay to the City Finance Director the enure amOU:lt or the assessmem remaining unpaid. eXL:cpting the installment portion 3'ppear:ng upon rhe CUr7cn: year' s plo~erty tax stat~ment. Passed and adopted this 15 day of 1\'13Y, 1995. { Seal} YES NO Andre-n Greeaneld Kedrowski Schencl~ Scott Andren Greenfield Kedrowski Schenck Scott Fr~a1\. 30yies :=ity l\1:mager City 0: Frior L,<~e 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER , ~ ATTACHMENT FOR AGENDA 7B CC>>0CiG Sl: RUn.EDGE ST EXISnNG~." WETLANDS .. .. HOPE ST. EXlSllNG S1ORt.f TO BE REMOVED ~ ~ ~ PROPOSED 1S-RCP o iE PROPOSED C.B.'S PL023EX1 ~ o 300 . . J:::::::.:::::.:::::::::::~::::::::.::::::l S ~ I IYPROVEWENlS >---0--+-0 EXISllNG STORM SEER ~. c__ PROP. STOIaI SEWER MS STORM SEWER AN) STREET IMPROVEMENTS RIDGEMONT AVE. ~~IMJD~Dii ~ CISOL1IC IICIIIIIS (~) -I 1-- 1 1/2- TYPE ~1A BllUMINOUS WEAR COURSE TACK COAT 3- rtPE 31S SrnJMINOUS BASE COURSE 6- ClASS 5 AGGREGATE BASE 12- SUBGRADE PREP AM liON (F NECESSARY) Sf A 5+50 TO Sf A 14+92 4CI 4- CONCRElE W (6- . DRIVEWAYS) 4- ClASS 5 R 33' 5' VARIES 26' ROW JO' FACE TO F' ACE I ! I I ac GUTTER 2.~___ 33' ROW 30' FACE TO FACE H Ie GUlTER 2.00%___ (~) -J 1-- 1 1/2- nPE ~1A BITUMINOUS WEAR COURSE TACK COAT 3- T'tPE 31 B BITUMINOUS BASE COURSE 6- ClASS 5 AGGREGATE BASE 12- SUBCRAOE PREPARA lION (IF' NECESSARY) STA -0+50 TO STA 5+50 PL023EX1 MS TYPICAL STREET SECTION 7 TON DESIGN RlDGEMONT AVE. CDISUI.B II.1um ~~IXJD~Oli ~ .:~ /" PL023EX1 MS CDI.\1IL11K IaIIIS ,/ CONDONSsr: RU11...EDGE ST EXlSllNG 6- WA TERMAI HOPE ST. EXISllNG 8- SANITARY PROPOSED S-DIP WA lERMAIN ~ o 300 . . o 0 EXISllNC SANITARY SEER · · · PROP. SANITARY SEWER -1-1- EXlSllNG WATERMAIN --e_t- PROP. WA lERYAlN UTIUlY IMPROVEMENTS RlDGEMONT AVE. ~~IXlD~Dir ~ .,,~~ PROPOSED 15-RCP STORM SEWER 9 10 EXISTING 18" RCP STORM SEWER 13 PROPOSED BEEHIVE o APRON IN DITCH NO 1S-RCP STORM SEWER 4 14 15 3 CURB AND GUTTER BOTH SIDES OF SlREET o '\~ ~---( ~ . y..\~"" ~U~'/.. ~ o 200 l:~::::::::::::::::::::~::~::::~:~:::~ S T tct.t.1 IMPROVEMEHlS >-0--+-0 EXlS11NG SlQIW SEWER .. c__ ~ Sl~ SEWER PL027EX1 MS PROPOSED CONSTRUCTION ~~IXlD~Dir CREEKSIDE CFtCLE ~ CDISIIL11I JaIIIS ~ ~.,. >,' ~ R 66' ROW 24' FACE TO FACE . I EXISTING DITCH 2.00%____ 18- ~ I -(TYP.) 1 1/2- TYPE 41A BITUMINOUS \\EAR COURSE TACK COAT J- TYPE J1B BITUMINOUS BASE COURSE 4- CLASS 5 AGGREGATE BASE 12- SUBCUT / SELECT GRANULAR BORROW URBAN STREET SECTION PL027EXl MS PROPOSED TYPICAL S r Ht:t: I SECTIONS 7 TON DESIGN CREEKSIDE CIRCLE ~~IMlD~OlF ~ CDISIII.1IC IaIIIS RESOLUTION 93-16 RESOLUTION ORDERING IMPROVEMENTS AND PREPARATION OF PLANS ON BUSINESS OFFICE PARK (PROJECT#93-11) AND OTHER 1993 CITY IMPROVEMENT PROJECTS MOTIONED BY WHITE SECONDED BY FITZGERALD WHEREAS, pursuant to Resolution 93-05 which the adopted on February 16, 1993 calling Hearing to be held at 8:00 P.M. on March the following improvements: City Council for a Public IS, 1993 for AREA 1 - BUSINESS OFFICE PARK Proposed Business Office Park located south of CSAH 21 and within section 1 by the construction of grading, sanitary sewer, watermain, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing and appurtenant work: AREA 4 - CSAH 21 IMPROVEMENTS CSAH 21 from 2000 feet east of Franklin Trail to east City limit line by the construction of storm sewer, concrete curb and gutter, lighting, sidewalk, landscaping and appurtenant work; / AREA 5 - EXISTING INDUSTRIAL PARK STORM SEWER From the existing Industrial Park and City Maintenance Shop areas within Section 1 to Markley Lake by the construction of a storm sewer/ponding system and appurtenant work: AREA 6 - CSAH 42 FROM FERNDALE AVENUE TO BOONE AVENUE CSAH 42 from Ferndale Avenue to T.H. 13 by the construction of storm sewer, watermain, sanitary sewer crossing, concrete curb and gutter, intersection lighting, bikeway, landscaping, and appurtenant work: AREA 7 - FISH POINT ROAD EXTENSION IN THE GREENBRIAR PARCEL Fish Point Road from CSAH 44 south to approximately 1,500 feet within the Greenbriar property, by the construction of grading, aggregate base, storm sewer, concrete curb and gutter, bituminous surfacing, sidewalk and appurtenant work; 4629 Dakota 51. 5.E.. Prior Lake. Minnesota 55372 ! Ph. (612) 447-4230 / Fax (612) 447-4245 A'~ [QLAl. OPPORTL':--;ITY E.I\.1PLOYER ~--------~-------'-----'-".." RESOLUTION 93-30 RESOLUTION REQUESTING MINNESOTA DEPARTMENT OF TRANSPORTATION FINANCIAL ASSISTANCE IN THE UPGRADING OF THE STORM SEWER OUTLET FROM T.H. 13 TO MITCHELL POND MOTION BY KEDROWSKI SECONDED BY WHITE WHEREAS, the storm runoff from the T.H. 13 drainage system west of Cand~ Cove Trail runs overland across the rear of propertles adjacent to the highway; and WHEREAS, the volume and velocity of this overland flow causes concerns relative to safety and erosion; and WHEREAS, the City understands T.H. 13 is planned to be upgraded in the future at which time the drainage issues would have to be addressed, and WHEREAS, the City feels that immediate improvements to the drainage system in the area would provide a benefit to the trunk highway system. NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that the Minnesota Department of Transportation financially assist the City of Prior Lake with the upgrading of the T.H. 13 drainage system in the area of Candy Cove Trail. Passed and adopted this 11-th day of YES May , 1993. NO Andren Fitzgerald Kedrowski Scott White x X- X- X- X- Andren Fitzgerald Kedrowski Scott White f-- {Seal} ~ Lake 4629 Dakota St. S.E.. Prior Lake. Minnesota 55372 / Ph. (612) 4474230 AN EQLAL OPPORTCNITY EMPWYER EiX ~612) 447-4245 RESOLUTION 95-09 'It ~~ INNESO RESOLUTION ORDERING IMPROVEMENTS AND PREPARATION OF PLANS ON 1995 IMPROVEMENT PROJECTS (RIDGEMONT AVENUE - PROJECT 95-01; CREEKSIDE CIRCLE - PROJECT 95-02; AND TITUS ADDITION - PROJECT 95-03) MOTION BY: WHEREAS: KEDROWSKI SECONDED BY: SCHENCK pursuant to Resolution 94-61 which the City Council adopted on December 5, 1994 calling for a Public Hearing to be held on the proposed 1995 improvement projects. ) Area 1 - Ridl:emont Avenue Ridgemont Avenue from the existing concrete curb and gutter to Rutledge Street, including sanitary sewer, watermain, storm sewer, grading, aggregate base, concrete sidewalk, bituminous surfacing, and appurtenant work. ') Area 2 - Creekside Circle Street reconstruction of Creekside Circle, including grading, aggregate base, storm sewer, concrete curb and gutter, bituminous surfacing, and appurtenant work. Area 3 - Titus Addition - This project was deleted by Council. Area 4 - Construction of Restrooms/Storage in Memorial Park Construction of restrooms/storage beneath the grandstand in Memorial Park. Area 5 - CSAH 18 from City Limits to CSAH 42 CSAH 18 from the City limits to CSAH 42 by the construction of storm sewer, utility crossings, concrete curb and gutter, sidewalk, landscaping, and appurtenant work. ~ - CSAH 44 from T.H. 13 to East City Limit Line CSAH 44 from T.H. 13 to East City limit line by the construction of storm sewer, concrete curb and gutter, sidewalk, trail, lighting, landscaping, traffic control signal, and appurtenant work. ~ - County Road 83 from County Road 82 to CSAH 42 County Road 83 from County Road 82 to CSAH 42 by the construction of a trail system. 16200 Eagle Creek Ave.. Prior Lake. rvlinnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 ", . ::.'.)1 ',\L '.;[V';:CR;-'\r:--' ~~:'!!,'_,.:'::::~ RS953.WRT Area 8 - Construction of Restrooms/Shelter in Grainwood Park Construction of restrooms and shelter at Grainwood Crossing Park. NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that: 1. Such improvement is hereby ordered as proposed in the Council Resolution 94-61 adopted December 5, 1994, for such streets and areas in accordance with the report and the assessment of property as described in the report for all or a portion of the cost of the improvement pursuant to Minnesota Statutes Chapter 429 at an estimated total cost of the improvements of $1,297,968.00. 2. The City Engineer and the city's engineering consultant, MSA Consulting Engineers, is hereby designated as the Engineer for this improvement. He shall prepare plans and specifications for the making of this improvement. Passed and adopted this 6th day of February, 1995. YES NO Andren Greenfield Kedrowski Schenck Scott Absent _X_ _X_ _X_ _X_ Frank Boy s City Man ge City of Prior Lake { Seal } ~.