Loading...
HomeMy WebLinkAbout8B - Mitchell Pond Storm Sewer DATE: 8B PAUL BOETTCHER, ACTING ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF RESOLUTION 95-42 APPROVING MNDOT COOPERATIVE CONSTRUCTION AGREEMENT FOR T.H.13/MITCHELL POND STORM SEWER MAY 15,1995 AGENDA #: PREPARED BY: SUBJECT: INTRODUCTION: The purpose of this Agenda item is to approve entering into an agreement with the State of Minnesota, Department of Transportation for financial assistance in the construction of the T.H. 13/Mitchell Pond Storm Sewer Improvement Project. BACKGROUND: Project 93-03 is a storm sewer construction project to correct an eroded ravine adjacent to Trunk Highwa'y 13. The existing drainage course conveys runoff from the T.H. 13 right-of-way as well as property in the City of Prior Lake. MnDOT has agreed to share in the construction engineering and construction of the project based on the pro rata flow their property contributes to the system which they have figured out to be 34.10/0. Based on the project estimated construction cost of $89,012.00 this amounts to $32,781.34 as shown on Schedule I of the attached agreement. ALTERNATIVES: The alternatives are as follows: 1. Approve the Resolution agreeing to enter into the MnDOT Cooperative Construction Agreement. 2. Table this item for a specific reason. 3. Deny the project at this time. RECOMMENDA TION: Approval of the Resolution would be appropriate. 16200 Eagle Creek Ave" Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER FINANCIAL IMPACT: ACTION REQUIRED: AG515D The cost of Project 93-03 will be recovered through Ad Valorem Tax Levy and this Cooperative Agreement. Make a motion to approve the Resolution as recommended, and sign G~eratifonstruction Agreement. 1tJ l~ REVIEW~D B RESOLUTION 95-42 RESOLUTION APPROVING STATE OF MINNESOTA, DEPARTMENT OF TRANSPORTATION, COOPERATIVE AGREEMENT NO. 73542 CONSTRUCTION MOTION: SECONDED BY: WHEREAS, there is an erosion problem in the ravine adjacent to T.H, 13 leading to Mitchell Pond; and WHEREAS, the City of Prior Lake has requested financial assistance from the Minnesota Department of Transportation which contributes flow to this area; and WHEREAS, the City of Prior Lake has prepared plans and specifications for the storm sewer improvements adjacent to T.H, 13 and Mitchell Pond, and submitted said plans to MnDOT; and WHEREAS, MnDOT has evaluated said plans and specifications and prepared a Cooperative Construction Agreement designating the conditions of the financial assistance. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that the City of Prior Lake agrees to enter into Cooperative Construction Agreement No, 73542 for financial assistance in the construction of the T.H. 13/Mitchell Pond Storm Sewer Improvements. Passed and adopted this 15th day of May, 1995. YES NO Andren Greenfield Kedrowski Schenck Scott Andren Greenfield Kedrowski Schenck Scott Frank Boyles City Manager City of Prior Lake {Seal} 16200 Eagle Creek Ave" Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER DATE: 88 PAUL BOETTCHER, ACTING ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF RESOLUTION 95-42 APPROVING MNDOT COOPERATIVE CONSTRUCTION AGREEMENT FOR T.H.13/MITCHELL POND STORM SEWER MAY 15,1995 AGENDA #: PREPARED 8Y: SUBJECT: INTRODUCTION: The purpose of this Agenda item is to approve entering into an agreement with the State of Minnesota, Department of Transportation for financial assistance in the construction of the T.H. 13/Mitchell Pond Storm Sewer Improvement Project. BACKGROUND: Project 93-03 is a storm sewer construction project to correct an eroded ravine adjacent to Trunk Highwa'y 13. The existing drainage course conveys runoff from the T.H. 13 right-of-way as well as property in the City of Prior Lake. MnDOT has agreed to share in the construction engineering and construction of the project based on the pro rata flow their property contributes to the system which they have figured out to be 34.10/0. Based on the project estimated construction cost of $89,012.00 this amounts to $32,781.34 as shown on Schedule I of the attached agreement. ALTERNATIVES: The alternatives are as follows: 1. Approve the Resolution agreeing to enter into the MnDOT Cooperative Construction Agreement. 2. Table this item for a specific reason. 3. Deny the project at this time. RECOMMENDA TION: Approval of the Resolution would be appropriate. 16200 Eagle Creek Ave" Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER FINANCIAL IMPACT: ACTION REQUIRED: AG515D The cost of Project 93-03 will be recovered through Ad Valorem Tax Levy and this Cooperative Agreement. Make a motion to approve the Resolution as recommended I and sign C..o operatiL:. / onstruction Agreement. l) P ilL} .. ~ REVIEW~D B RESOLUTION 95-42 RESOLUTION APPROVING STATE OF MINNESOTA, DEPARTMENT OF TRANSPORTATION, COOPERATIVE AGREEMENT NO. 73542 CONSTRUCTION MOTION: SECONDED BY: WHEREAS, there is an erosion problem in the ravine adjacent to T.H, 13 leading to Mitchell Pond; and WHEREAS, the City of Prior Lake has requested financial assistance from the Minnesota Department of Transportation which contributes flow to this area; and WHEREAS, the City of Prior Lake has prepared plans and specifications for the storm sewer improvements adjacent to T.H, 13 and Mitchell Pond, and submitted said plans to MnDOT; and WHEREAS, MnDOT has evaluated said plans and specifications and prepared a Cooperative Construction Agreement designating the conditions of the financial assistance. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that the City of Prior Lake agrees to enter into Cooperative Construction Agreement No. 73542 for financial assistance in the construction of the T.H. 13/Mitchell Pond Storm Sewer Improvements. Passed and adopted this 15th day of May, 1995. YES NO Andren Greenfield Kedrowski Schenck Scott Andren Greenfield Kedrowski Schenck Scott Frank Boyles City Manager City of Prior Lake {Seal} 16200 Eagle Creek Ave" Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER ATTACHMENT FOR AGENDA 8B DESIGN SERVICES SECTION STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION COOPERATIVE CONSTRUCTION AGREEMENT AGREEMENT NO. 73542 S.P. 7001-74 (T.H. 13=117) state Funds Agreement between The state of Minnesota Department of Transportation, and The citv of Prior Lake Re: state cost storm sewer construction by the City adjacent to T.H. 13 at Candy Cove Trail ORIGINAL AMOUNT ENCUMBERED $35,781.34 AMOUNT RECEIVABLE (None) THIS AGREEMENT is made and entered into by and between the state of Minnesota, Department of Transportation, hereinafter referred to as the "state" and the City of Prior Lake, Minnesota, acting by and through its City Council, hereinafter referred to as the "City". 73542 WITNESSETH: WHEREAS the city is about to perform storm sewer construction adjacent to Trunk Highway No. 13 at Candy Cove Trail within the corporate City limits in accordance with City-prepared plans, specifications and/or special provisions designated by the city as Project No. 93-03 and by the State as state Project No. 7001-74 (T.H. 13=117); and WHEREAS the storm sewer facilities to be constructed collect and convey storm water drainage from both trunk highway right-of-way and adjacent city property; and WHEREAS the city has requested participation by the state in the costs of the storm sewer construction; and WHEREAS the state is willing to participate in the costs of the storm sewer construction and associated construction engineering as hereinafter set forth; and WHEREAS Minnesota Statute section 161.20, subdivision 2 (1994) authorizes the Commissioner of Transportation to make arrangements with and cooperate with any governmental authority for the purposes of constructing, maintaining and improving the trunk highway system. IT IS, THERE~ORE, MUTUALLY AGREED AS POLLO.S: ARTICLE I - CONSTRUCTION BY THE CITY section A. Contract Award and Construction The city shall receive bids and award a construction contract to the lowest responsible bidder, subject to concurrence by the state in that award, in accordance with state-approved City plans, specifications and/or special provisions designated as state Project No. 7001-74 (T.H. 13=117). The contract construction shall be performed in accordance with state-approved City plans, 2 73542 specifications and/or special prov1s1ons which are on file in the office of the city's Engineer, and are made a part hereof by reference with the same force and effect as though fully set forth herein. section B. Documents to be Purnished to the state The City shall, within 7 days of opening bids for the construction contract, submit to the state's state Aid Agreements Engineer at Roseville a copy of the low bid and an abstract of all bids together with the city's request for concurrence by the state in the award of the construction contract. The city shall not award the construction contract until the state advises the city in writing of its concurrence therein. Section c. cancellation of Aareement Each party to this agreement reserves the right to withdraw from and cancel this agreement within 30 days after the opening of bids if either party determines any or all bids to be unsatisfactory. withdrawal from or cancellation of the agreement shall be accomplished by either party serving a written notice thereof upon the other. section D. Direction. SUDervision and InsDection of construction The contract construction shall be under the direction of the City and under the supervision of a registered professional engineer; however, the state cost participation construction covered under this agreement shall be open to inspection by the state's Metropolitan Division Engineer at Roseville or his authorized representatives. The city shall give the state Aid Agreements Engineer five days notice of its intention to start the contract construction. Responsibility for the control of materials for the state cost participation construction covered under this agreement shall be on the city and its contractor and shall be carried out in accordance with Specifications No. 1601 through and including No. 1609 as set 3 73542 forth in the state's current "Standard Specifications for Construction". section E. comoletion of Construction The city shall cause the contract construction to be started and completed in accordance with the time schedule in the construction contract special provisions. The completion date for the contract construction may be extended, by an exchange of letters between the appropriate city official and the state Division Engineer's authorized representative, for unavoidable delays encountered in the performance thereof. section F. Additional Construction. Plan Chanaes. Etc. The State shall not participate in the cost of any contract construction that is in addition to the State cost participation construction covered under this agreement unless the necessary state funds have been encumbered prior to the performance of the additional contract construction and the terms and conditions in the following paragraph have been met. All changes in the plans, specifications and/or special provisions for the State cost participation construction covered under this agreement and all addenda, change orders and/or supplemental agreements entered into by the City and its contractor for State cost participation construction covered under this agreement must be approved in writing by the State Division Engineer's authorized representative before payment is made by the State therefor. section G. Comoliance with Laws. Ordinances and Reaulations The City shall, in connection with the award and administration of the construction contract and the performance of the contract construction, comply and cause its contractor to comply with all Federal, State and Local laws, including Minnesota Statute section 16B.101 (1994), and all applicable ordinances and regulations. 4 73542 section H. Riaht-of-Wav. Easements and Permits The City shall, without cost or expense to the state, obtain all rights-of-way, easements, construction permits and/or any other permits and sanctions that may be required in connection with the contract construction, and shall promptly furnish the state with certified copies of the documents for those rights-of-way, easements, construction permits and/or other permits and sanctions required for trunk highway construction. ARTiCLE ii - BASiS OP PAYMENT BY THE STATE section A. SCHEDULE "i" A Preliminary SCHEDULE "I" is attached hereto and made a part hereof by reference. The Preliminary SCHEDULE "I" includes all anticipated state cost participation construction items and the construction engineering cost share covered under this agreement. section B. state Cost ParticiDation construction 34.1 Percent shall be the state's rate of cost participation in all of the storm sewer construction to be performed adjacent to Trunk Highway No. 13 at Candy Cove Trail within the corporate City limits under State Project No. 7001-74 (T.H. 13=117), which includes, but is not limited to, those construction items as described and tabulated on Sheet No.2 of the attached Preliminary SCHEDULE "I". Section c. construction Enaineerina Costs The state shall pay a construction engineering charge in an amount equal to 8 percent of the total cost of the State participation construction covered under this agreement. section D. Addenda. Chanae Orders and SUDDlemental Aareements The State shall share in the costs of construction contract addenda, change orders and/or supplemental agreements which are necessary to complete the State cost participation construction covered under this agreement and which have been approved in writing by the State Division Engineer'S authorized representative. 5 73542 section E. Settlements of Claims The state shall pay to the City its share of the cost of any settlements of contract claims made with the City's contractor. All liquidated damages assessed the City's contractor in connection with the construction contract shall result in a credit shared by the state and the City in the same proportion as their total construction cost share covered under this agreement is to the total contract construction cost before any deduction for liquidated damages. ARTICLE III - PAYMENT BY THE STATE section A. Estimate and Advancement of the state's Cost Share It is estimated that the state's share of the costs of the contract construction plus the 8 percent construction engineering cost share and a $3,000.00 contingency amount is the sum of $35,781.34 as shown in the attached Preliminary SCHEDULE "I". The attached Preliminary SCHEDULE "I" was prepared using estimated unit prices. Upon receipt and review of the construction contract bid documents described in Article I, section B. of this agreement, the State shall then decide whether to concur in the City's award of the construction contract and, if so, prepare a Revised SCHEDULE "I" based on construction contract unit prices. The contingency amount is provided to cover overruns of the plans estimated quantities of State cost participation construction and/or state-approved additional construction including construction engineering costs. The State shall advance to the City the State's total estimated cost share, less contingency amount, as shown in the Revised SCHEDULE "I" after the following conditions have been met: 1. Encumbrance by the state of the state's total estimated cost share, including contingency amount, as shown in the Revised SCHEDULE "I". 6 73542 2. Execution and approval of this agreement and the state's transmittal of same to the City along with a copy of the Revised SCHEDULE "I" and a letter advising the City of the State's concurrence in the award of the construction contract. 3. Receipt by the state of a written request from the City for the advancement of funds. The request shall include certification by the City that the construction contract has been executed by all necessary parties. Whenever it appears the cost of the state participation construction covered under this agreement is about to exceed the current amount of encumbered state funds, the City shall notify the state Division Engineer's authorized representative in writing prior to performance of the additional state cost participation construction. Notification shall include an estimate in the amount of additional funds necessary to complete the state cost participation construction including construction engineering costs and the reason(s) why the current amount encumbered will be exceeded. The State shall, upon its approval of the additional state cost participation construction, submit a request for encumbrance of the necessary additional funds to the Minnesota Department of Finance. That action will have the effect of amending this agreement so as to include the state's share of the costs of the additional construction. Should the City cause the performance of additional contract construction which would otherwise qualify for state cost participation covered under this agreement, but for which the state has not previously encumbered funds, that additional contract construction is done at the City's own risk. The City shall notify the State Division Engineer's authorized representative in writing of the additional state cost participation construction. Notification shall include an estimate in the amount of additional funds necessary to cover the additional state cost participation construction including construction engineering costs and the reason(s) why the 7 73542 current amount encumbered was exceeded. If the state approves the additional state cost participation construction, the City's claim for compensation along with a request for encumbrance of the necessary additional funds shall be submitted to the Commissioner of Finance for review pursuant to Minnesota statute section 16A.15, subdivision 3 (1994), but no guarantee is made that the claim will be approved by the Commissioner of Finance. If the Commissioner of Finance certifies the claim for compensation and the request for encumbrance of the necessary additional funds therefor, that action will have the effect of amending this agreement so as to include the state's share of the costs of the additional construction. section B. Records KeeDinq and Invoicinq bv the city The state shall provide the city with a Payment Processing Package containing a Modified SCHEDULE "I" form, instructions, and samples of documents for processing final payment of the State participation construction cost covered under this agreement. The City shall keep records and accounts that enable it to provide the State with the following prior to final payment by the State: 1. A copy of the Modified SCHEDULE "I" which includes final quantities of State cost participation construction. 2. copies of the city contractor's invoice(s) covering all contract construction. 3. copies of the endorsed and canceled City warrant(s) or check(s) paying for final contract construction, or computer documentation of the warrant(s) issued certified by an appropriate City official that final construction contract payment has been made. 4. Copies of all construction contract change orders and/or supplemental agreements. 8 73542 5. A certification form attached to a copy of the Final SCHEDULE "r", both of which shall be provided by the State. The certification form shall be signed by the city's Engineer in charge of the contract construction attesting to the following: a. satisfactory performance and completion of all contract construction in accordance with state-approved city plans, specifications and/or special provisions. b. Acceptance and approval of all materials furnished for the State cost participation construction covered under this agreement relative to compliance of those materials to the State's current "Standard Specifications for Construction". c. Full payment by the city to its contractor for all contract construction. 6. When requested by the state, copies, certified by the city's Engineer, of material sampling reports and of material testing results for the materials furnished for the State cost participation construction covered under this agreement. 7. A copy of the "as built" plan sent to the State Aid Agreements Engineer. 8. A formal invoice (original and signed) in the amount due the City as shown in the Final SCHEDULE "I". section C. Final PaYment bv the State Upon completion of all contract construction, the state shall prepare a Final SCHEDULE "I" based on final quantities of state cost participation construction and shall submit a copy to the city. If the final cost of the State participation covered under this agreement exceeds the amount of funds advanced by the state, the state shall promptly pay the difference to the City without interest. 9 73542 If the final cost of the state participation covered under this . agreement is less than the amount of funds advanced by the state, the City shall promptly return the balance to the state without interest. Procedures relevant to preparation of the Final SCHEDULE "I" and final payment of the state participation cost covered under this agreement are detailed in the Payment Processing Package, which the state shall furnish the city. Pursuant to Minnesota statute section 15.415 (1994), the City waives claim for any amounts less than $2.00 over the amount of state funds previously advanced to the City, and the state waives claim for the return of any amounts less than $2.00 of those funds advanced by the State. ARTICLE IV - GENERAL PROVISIONS section A. Maintenance bv the city Upon satisfactory completion of the storm sewer facilities construction to be performed within the corporate City limits under the construction contract, the City shall provide for the proper maintenance of those facilities, without cost or expense to the State. section B. Additional Drainaae Neither party to this agreement shall drain any additional drainage into the storm sewer facilities to be constructed under the construction contract, that was not included in the drainage for which the storm sewer facilities were designed, without first obtaining permission to do so from the other party. The drainage areas served by the storm sewer facilities constructed under the construction contract are shown in a drainage area map, EXHIBIT "Drainage Area", which is on file in the office of the state's Division Hydraulics unit at Golden Valley and is made a part hereof by reference with the same force and effect as though fully set forth herein. 10 73542 section C. Examination of Books. Records. Etc. As provided by Minnesota statute section 16B.06, subdivision 4 (1994), the books, records, documents, and accounting procedures and practices of the state and the city relevant to this agreement are subject to examination by the state and the City, and either the legislative auditor or the state auditor as appropriate. section D. Claims All employees of the City and all other persons employed by the City in the performance of contract construction, construction engineering and/or maintenance covered under this agreement shall not be considered employees of the state. All claims that arise under the Worker's Compensation Act of the state of Minnesota on behalf of the employees while so engaged and all claims made by any third parties as a consequence of any act or omission on the part of the employees while so engaged on contract construction, construction engineering and/or maintenance covered under this agreement shall in no way be the obligation or responsibility of the state. section E. Nondiscrimination The provisions of Minnesota statute section 181.59 (1994) and of any applicable law relating to civil rights and discrimination shall be considered part of this agreement as if fully set forth herein. section P. Aareement ADDroval Before this agreement shall become binding and effective, it shall be approved by a City Council resolution and receive approval of state and City officers as the law may provide in addition to the Commissioner of Transportation or his authorized representative. 11 73542 IN TESTIMONY WHEREOF the parties have executed this agreement by their authorized officers. DEPARTMENT OF TRANSPORTATION CITY OF PRIOR LAKB Recommended for approval: By ~ f! ~ S-2-~ ~~ Director , Design Services Section By Mayor Date By Division Engineer By City Manager Approved: Date By DEPARTMENT OF ADMiNiSTRATiON State Design Engineer Approved: Date (Date of Agreement) By (Authorized Signature) OFFICE OF THB ATTORNEY GENERAL Date Approved as to form and execution: DEPARTMENT OP PiNANCE By Assistant Attorney General Approved: APPROVED AS TO FORM: CITY OF PRIOR LAKE ATTORNEY By By (Authorized Signature) Glenn R. Kessel Date 12 It) O't ~ ~ . Z N 0 ~ H E-4 < X ~ H - ~ CJ H O't LO ~O ~ 8 0 N MO M /0 ~ . . . . . C M co r-40 r-4 ..-1 ~ LO N coo co .4J ~ M ~ r--o r-- C ..-1 8 . . . . .. Q) ~ U) 0 N NM LO J5 Q) 0 M M M Q) s... CJ I~ ~ I~ Q) ~ ~ ~ 8 ItS < E-4 Q) U) ..c ~ ~ 0 . < C 0 ..... = .4J H U = Q) N Q) U) ~~ ~ ....:ILO ItS . OM ....:I H Qr-- H ~ s... H ::c . 0 CJ 0 ..-1 Q) U)Z ~ ~ ~ U >~ ..-1 ~@ <4-f ~ 0 ~ s... Z,:; ..-1 < HQ) t ItS XQ) s... C ~~ ..-1 8 ..-1 CJ ~< Q) 't:J ~ ~ > Q) Po. Q) 0 ;; ..c 't:J CJ ..-1 s:: ~ co s... ~ - U g fJl 't:J C Q) Q) /0 '0 ~ CJ ..-1 s... ~ fJl 0 .4J Q) /0 <4-f /0 Q) s... c ~ > - ~ M ..-1 s:: ~ r-- ~ N g ~ C ~ 0 0 r-4 s:: . .~ ~ II 0 ::c 0 Q) M ..-1 . Z C U) ~ .4J 8 0 ~ =' U ~ ..... . =' 0 Q)~ C U) ::c s.....c .4J Q) u~ ~ - . .4J .4J ..c =' /0 Q) 8 U)..-I .4J U) ~~ s:: ~ - C ) C .4J 0'.-1 ~ ItS 0 Q) J5 fJl .4J .4J ItS .4J ~ U~ U ~ s:: ..c c ~ U) C' U /0 0 ::s 0 0 I U) ~ ItS .,- rz.. CJ U) CJ 8 Q) ~ 't:J Q) s... '0 ..c 0 s:: ~ .4J ItS .4J 0 ~ Q) C - r-- ~ (J) 0'0 r-4 s... CJ Q) - 0 Q) J5 t .4J rz.. .~ s... /0 Po. /0 0 U - .~ ~ ..-1 0 r-4 U) U) U) CJ ~ - r-4 N -.:r to M C" 8 00- 0f""4 CJ- ~ U H ~ 0.. 8 H Z o oooooooooooooooooooo~oooo OOOOOOOOOOOOOOlOOOOOlO~llOOOO ..................... .... ~~oooooooooooO~OOOON~~~~O ~~O~N~OO~OOlOOOC"OOOO~M~~NlO C"C"O~MOlOlO~~~~~~NM~ON~~~~~~ . . .. ..... ... mM~~ MmMf""4 MN 0 N N N ~ f""4 OOOOOOOOOOOOOOlOOOOOlOlOlOOOO OOOOOOOOOOOOOONOOOON~NOOO ............. ...... ...... OON~NOOOOOOOOlO~lONOlONf""4NNOO ~ OO~~~NOO~OOlOlOC" ~ 0 OlO < NN lOlO M~~ 0 N 8 · · · · . . 0 ~~ ~~ 0 ~ 8 ~ ~ ~-.:rOOOOOOOOOOOOOOOOOOOOONO 8 ~~OOOOOOOOOOOOOOOOOOOOOlOO H......................... 8- OOOM~~~M~~~~N~O~OONNN M Z~ lO~~lO m C"NN lO ~lONNN <- ~N~ ~ N N NNN o · . o ~ ~ 8 H Z ::> ~ 8 H 8 Z < o o -.:r ~:I: I~ ~8 OH o ~~ .0 o..~ . 00 j 0.. /I 0.. ~ ~~ ~~ Z · .8. 8 · .. 8~ 8... oo~o ~ 000 ~CI) ~ooo ~~>t>t .>=~ .===>>>= .0..= .>t>>~= ~~oo~o~~~~~~OOO~~~~~QOO~~ <<uCJ~CI)~~~~~~CJu~~~_~~CI)CI)CI)~~ H H H .;JH u~ . ~~ o u= o N ~ M'~ ~ ~ ~ C1)O~o..~ ~ ~ ~~g!5~<n ~r:1 ~ ~ OCl)Z~CI)~ H ~ .~ Uz~~S~!ig~~~~~ ~ 8 .0:r:~CI)8 C1)~ c..,~Q~or:::.... ><HCI)c:Q~CI)~ 00 8 ~ ~ ~ ->~~~~Q~S~~~ .~ ~> .~~ ~~~~8~~~~~~d~~ r8~~><8 -~~~i~~~~~O~~S~~ ~8g~~~ ~~~~ZQCI)~~~~~~CI)U~ ~Zc:Q~=~ ~~H OlO~Q~ ~5: :z ~ .0~ixl8Z ~O~CI)~.o.. 800..H~HCI)O~~H H~ O~p::00"~H8~8~~~CI)::>UU=UCl)Z~3Q ~~c:Q 0< o..u~ ~ H<O ~ O~~ ZZ ~~Z 0.. 0<8 Q~~ZU~ ~~c:Q~~ g~~~ .i~~~~~~~~~=i~or..r.j~:;:~j ~~~~~8 =-~ ~~0~~~~~~cc8~0.. ~~OO<~~~~ONO~~~~H~~HOOE~~ U~U~CI)~MMMU~U~~~Ua:l8a:lCl)CI)CI)~CI)~ - 0.. - ~ ~ rz.. ~ Z H ~ ~~MlO lOlO ~ N~~lO ~~~NlOlOM~ OONN O~ ~ OOO~ OOOOOONO lOlOlOlO .~lO 'lO · .~lOlOlO .lO~lOlOlOlOlO~ . · · · .CJ · .CJ .CJU · · · .CJ · · · · · · · .CJ ~~lOlO~~~~M~~~~~~~lOMMMlOlOlOlO~ OOOOO"MO~O__O~~~~M~~~~~C"~O" f""4~MMCI)MlOCI)lOCI)CI)lOlOlOlOCI)lOlOlOlOlOlOlOlOCI) NNNN ON N ONNN NONNNNNO o o N ~ o . m ~ (j) m~ om MC'O lOlO M~ . . OC'O MlO I <n ill I I -~ I ~ 8>- <8 8H Cl)U I d\G d\G ~m . ~lO M~ N - ~ 1- RESOLUTION 95-35 RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS ON CARRIAGE HILLS PARKWAY PHASE 2 (PROJECT 95-05) MOTION BY: Greenfield SECONDED BY: Schenck WHEREAS: pursuant to Resolution 95-11 which the City Council approved on February 21, 1995, the City Engineer and the City's Engineering Consultant MSA Consulting Engineers, has prepared plans and specifications for the street improvement project on Carriage Hills Parkway Phase 2 (formerly known as Carriage Hills Road) from Pike Lake Trail to Bluebird Trail by the construction of grading, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, sidewalk, landscaping, and appurtenant work; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that: 1. Such plans and specifications, a copy of which is attached hereto and made a part of hereof, are hereby approved. 2. The City Manager shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be published not less than 21 days prior to bid opening, shall specify the work to be done, shall state that bids will be opened, and that all bids will be received by the City until 10:00 A.M. on June 16, 1995, at which time they will be publicly opened at City Hall by the City Engineer. No bids will be considered unless sealed and filed with the City Manager and accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the City of Prior Lake for five (5) percent of the amount of such bid. 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER 3. The City reserves the right to reject any and all bids for any reason as determined solely by the City. Passed and adopted this 15.tb day of~, 1995. YES NO Andren Greenfield Kedrowski Schenck Scott X Andren -- _X_ Greenfield Absent Kedrowski X Schenck - - ~7 X_ <7 Sco {Seal} AG515 RESOLUTION 95-37 RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS FOR THE FOLLOWING PROJECT: PROJECT 93-01 INDUSTRIAL PARK STORM SEWER PROJECT 93-03 TH. 13/MITCHELL POND STORM SEWER PROJECT 95-01 RIDGEMONT AVENUE PROJECT 95-02 CREEKSIDE CIRCLE AND SET AN ASSESSMENT HEARING DATE FOR RIDGEMONT AVENUE (95-01) AND CREEKSIDE CIRCLE (95-02) MOTION BY: Andren SECONDED BY: Scott WHEREAS, pursuant to Resolution 93-16 which the City Council approved on March 15, 1993, the City Engineer and the City's Engineering Consultant, MSA Consulting Engineers, have prepared plans and specifications for storm sewer improvement project in the Industrial Office Park by the construction of grading, storm sewer, landscaping and appurtenant work; and WHEREAS, pursuant to Resolution 93-30 which the City Council approved on May 17, 1993, the City Engineer and the City's Engineering Consultant, MSA Consulting Engineers, have prepared plans and specifications for the storm sewer improvement project from TH. 13 to Mitchell Pond by the construction of grading, storm sewer, landscaping, and appurtenant work; and WHEREAS, pursuant to Resolution 95-09 which the City Council approved on February 6, 1995, the City Engineer and the City's Engineering Consultant, MSA Consulting Engineers, have prepared plans and specifications for the street improvement project Ridgemont Avenue by the construction of grading, sanitary sewer, watermain, storm sewer, aggregate base, concrete curb and gutter, bituminous surfacing, sidewalk, landscaping, and appurtenant work; and WHEREAS, pursuant to Resolution 95-09 which the City Council approved on February 6, 1995, the City Engineer and the City's Engineering Consultant, MSA Consulting Engineers, have prepared plans and specifications for the street improvement project on Creekside Circle by the construction of grading, storm sewer, aggregate 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER base, concrete curb and gutter~ bituminous surfacing~ landscaping, and appurtenant work; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOT A, that 1. Such plans and specifications, a copy of which is attached hereto and made a part of hereof, and hereby approved. 2. The City Manager shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for bids upon the making of such improvement under such approved plans and specifications. The advertisement shall be published not less than 21 days prior to bid opening~ shall specify the work to be done, shall state that bids will be opened, and that all bids will be received by the City until 10:00 A.M. on June 12, 1995. at which time they will be publicly opened at City Hall by the City Engineer. 3. The City reserves the right to reject any and all bids for any reason as determined solely by the City. 4. The City Manager shall also have the authority to modify the bid date to June 19~ 1995, at 1 0:00 A.M.~ if MnDOT approval is delayed and this schedule change remains in accordance with State Statutes. Passed and adopted this 15 day of May, 1995. Andren Greenfield Kedrowski Schenck Scott {Seal} AG515B YES NO x -- X -- Absent X -- Andren Greenfield Kedrowski Sch ck S 0 RESOLUTION 95-38 RESOLUTION DECLARING COSTS TO BE ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENT FOR PROJECT 95-02 CREEKSIDE CIRCLE STREET IMPROVEMENTS WHEREAS, MOTION BY' Andren SECONDED BY. Scott an Engineer's Estimate has been prepared and costs have been determined for the improvements of Proiect 95-02 and the estimated contract price for such improvements is $125 90000, and the estimated expenses incurred or to be incurred in the making of such improvement amount to $3780000, so that the total cost of the improvement will be $163 70000. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOTA: 1. The portion of the cost of such improvement is to be paid by the City's Ad Valorem Tax Levy and is hereby declared to be $65 500 00, and the portion of the cost to be assessed against benefited property owners is declared to be $98 ')00.00. 2. Assessments shall be payable on an equal principal installment method extending over a period of lQ years. The first installment shall be the annual principal plus interest calculated from the public hearing date to the end of this year plus twelve months of the next year and shall bear interest at the rate of a minimum of 80/0 and not more than 1 % above the net effective interest rate of the bond issuance per annum from the date of the adoption of the assessment resolution. 3. The City Manager, with the assistance of the City Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece or parcel of land within the district affected, without regard to cash valuation, as provided by law, and he shall file a copy of such proposed assessment in his office for public inspection. 4. The City Manager shall upon the completion of such proposed assessment, notify the Council thereof. Passed and adopted this 15 day of May, 1995. { Seal} YES NO Andren Greenfield Kedrowski Schenck Scott 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER RESOLUTION 95-39 RESOLUTION DECLARING COSTS TO BE ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENT FOR PROJECT 95-01 RIDGEMONT AVENUE STREET IMPROVEMENTS MOTION BY: Andren WHEREAS, SECONDED BY. Scott an Engineer's Estimate has been prepared and costs have been detennined for the improvements of Proiect 95-01 and the estimated contract price for such improvements is $226 700.00, and the estimated expenses incurred or to be incurred in the making of such improvement amount to $68 000 00, so that the total cost of the improvement will be $294 700.00. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOTA: 1. The portion of the cost of such improvement is to be paid by the City's Ad Valorem Tax Levy and Trunk Reserve is hereby declared to be $32 590 00, and $112 682.00 respectively, and the portion of the cost to be assessed against benefited property owners is declared to be $149 428 00. 2. Assessments shall be payable on an equal principal installment method extending over a period of J.Q years. The first installment shall be the annual principal plus interest calculated from the public hearing date to the end of this year plus twelve months of the next year and shall bear interest at the rate of a minimum of 8% and not more than 1 % above the net effective interest rate of the bond issuance per annum from the date of the adoption of the assessment resolution. 3. The City Manager, with the assistance of the City Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece or parcel of land within the district affected, without regard to cash valuation, as provided by law, and he shall file a copy of such proposed assessment in his office for public inspection. 4. The City Manager shall upon the completion of such proposed assessment, notify the Council thereof. Passed and adopted this 15 day of May, 1995. {Seal} YES NO Andren Greenfield Kedrowski Schenck Scott Andren Greenfield Kt. ski Sc enck S ott (t '--.. Frank Boy City M~/ City of Prior Lake 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER RESOLUTION 95-40 RESOLUTION FOR HEARING ON PROPOSED ASSESSMENT FOR RIDGEMONT A VENUE STREET IMPROVEMENT PROJECT 95-01 MOTION BY' Andren WHEREAS, WHEREAS, SECONDED BY. Scott by a resolution passed by the Council on May 15, 1995, the City Manager was directed to prepare a proposed assessment of the cost of improvements for Project 95-01; and the City Manager notifies the Council that such proposed assessment will be completed and filed in his office for public inspection. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOTA: 1. A hearing shall be held on the .l.21h day of June 1995 in City Council Chambers at ~ ~ to pass upon such proposed assessment and at such time and place all persons owning property affected by such improvement will be given the opportunity to be heard with reference to such assessment. 2. The City Manager is hereby directed to cause a notice of the hearing on the proposed assessment to be published once in the official newspaper at least two weeks prior to the hearing, and he shall also cause mailed notice to be given to the owner of each parcel described in the assessment roll not less than two weeks prior to the hearing. 3. The owner of any property so assessed may, at any time prior to certification of the assessment to the County Auditor, pay the whole of the assessment on such property, with interest accrued to the date of payment, to the City Finance Director, except that no interest will be charged if the entire assessment is paid within 30 days from the adoption of the assessment. He may, at any time thereafter, pay to the City Finance Director the entire amount of the assessment remaining unpaid, excepting the installment portion appearing upon the current year's property tax statement. Passed and adopted this 15 day of May, 1995. {Seal} YES NO Andren _X_ Andren Greenfield X Greenfield -- Kedrowski AhsW drowski Schenck _X-4 chenck Scott , 'x cott ( 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER 1 RESOLUTION 95-41 RESOLUTION FOR HEARING ON PROPOSED ASSESSMENT FOR CREEKSIDE CIRCLE STREET IMPROVEMENT PROJECT 95-02 MOTION BY' Andren WHEREAS, WHEREAS, SECONDED BY: Scott by a resolution passed by the Council on May 15, 1995, the City Manager was directed to prepare a proposed assessment of the cost of improvements for Project 95-02; and the City Manager notifies the Council that such proposed assessment will be completed and filed in his office for public inspection. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF PRIOR LAKE, MINNESOT A: 1. A hearing shall be held on the .l2th day of June 1995 in City Council Chambers at ~ f..M.. to pass upon such proposed assessment and at such time and place all persons owning property affected by such improvement will be given the opportunity to be heard with reference to such assessment. 2. The City Manager is hereby directed to cause a notice of the hearing on the proposed assessment to be published once in the official newspaper at least two weeks prior to the hearing, and he shall also cause mailed notice to be given to the owner of each parcel described in the assessment roll not less than two weeks prior to the hearing. 3. The owner of any property so assessed may, at any time prior to certification of the assessment to the County Auditor, pay the whole of the assessment on su~h property, with interest accrued to the date of payment, to the City Finance Director, except that no interest will be charged if the entire assessment is paid within 30 days from the adoption of the assessment. He may, at any time thereafter, pay to the City Finance Director the entire amount of the assessment remaining unpaid, excepting the installment portion appearing upon the current year's property tax statement. Passed and adopted this 15 day of May, 1995. {Seal} YES NO Andren Greenfield Kedrowski Schenck Scott _x_ _X_ Absent 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER RESOLUTION 95-42 RESOLUTION APPROVING STATE OF MINNESOTA, DEPARTMENT OF TRANSPORTATION, COOPERATIVE AGREEMENT NO. 73542 CONSTRUCTION MOTION: Schenck SECONDED BY: Greenfield WHEREAS, there is an erosion problem in the ravine adjacent to T.H, 13 leading to Mitchell Pond; and WHEREAS, the City of Prior Lake has requested financial assistance from the Minnesota Department of Transportation which contributes flow to this area; and WHEREAS, the City of Prior Lake has prepared plans and specifications for the storm sewer improvements adjacent to T.H. 13 and Mitchell Pond, and submitted said plans to MnDOT; and WHEREAS, MnDOT has evaluated said plans and specifications and prepared a Cooperative Construction Agreement designating the conditions of the financial assrstance. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that the City of Prior Lake agrees to enter into Cooperative Construction Agreement No. 73542 for financial assistance in the construction of the T.H. 13/Mitchell Pond Storm Sewer Improvements, Passed and adopted this 15th day of M,u, 1995. YES NO Andren Greenfield Kedrowski Schenck Scott _x_ _X_ Alillnt 0. I. IX : ~. rtl Frank B~Y es City M aa City of lor Lake Andren Greenfield K owski ch'enck Srbtt {Seal} 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNI1Y EMPLOYER Economic Development Authority Minutes October 17, 1994 1--~ - V MINUTES OF THE ECONOMIC ~ Monday, October Vice President Scott called the ED. _' Ul /:40 p.m. Members present were: Andren, _.vc;llIlelo, Kedrowski, Robbins, Schenck, Scott and Vonhoff. The first item on the agenda was to elect the following officers: RITV President, Vice President, Secretary/Treasurer. Secretary/Treasurer and Vice MOTION BY ANDREN, SECONDED BY KEDROWSKI, TO APPOINT JEANNIE ROBBINS AS PRESIDENT OF THE ECONOMIC DEVELOPMENT AUTHORITY. Upon a vote taken, yeas by Andren, Greenfield, Kedrowski, Scott, Schenck and Vonhoff. The motion carried. MOTION BY ANDREN, SECONDED BY GREENFIELD, TO APPOINT TOM VONHOFF AS SECRETARYITREASURER OF THE EDA. Upon a vote taken, yeas by Andren, Greenfield, Kedrowski, Robbins, Scott and Schenck. The motion carried. MOTION BY ANDREN, SECONDED BY SCOTT, TO APPOINT TOM KEDROWSKI AS VICE PRESIDENT. Upon a vote taken, yeas by Andren, Greenfield, Robbins, Scott, Schenck and Vonhoff. The motion carried. MOTION BY KEDROWSKI, SECONDED BY ANDREN, TO APPOINT BONNIE CARLSON AS VICE SECRETARYITREASURER OF THE EDA. Upon a vote taken, yeas by Andren, Greenfield, Kedrowski, Robbins, Scott, Schenck and Vonhoff. The motion carried. MOTION BY GREENFIELD, SECONDED BY SCOTT, TO ADJOURN THE EDA MEETING. Upon a vote taken, yeas by Andren, Greenfield, Kedrowski, Robbins, Scott, Schenck and Vonhoff. The motion carried. There being no further business the meetingAdjoumed. ,MJL- ~ President Recording Secretary EDA 1 OWRT 16200 Eagle Creek Ave" Prior Lake, Minnesota 55372-1714 / Ph, (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER PUBLIC HEARING VACATING PART OF WILDS LANE WITHIN PLAT OF THE WILDS AND VACATING UTILITY & DRAINAGE EASEMENT IN OUTLOT B AT THE WILDS MAY 15, 1995 A'rrEH:WCB - PLEASE PRINl' N;\ME ADDRESS TELEPHONE NUMBER NAME ADDRESS TELEPHONE NUMBER