Loading...
HomeMy WebLinkAbout7C - Mushtown Road DATE: 7C JOHN WINGARD, ASSISTANT CITY ENGINEER CONSIDER APPROVAL OF RESOLUTION 95-65, AND CONSIDER APPROVAL OF RECOMMENDATION TO PREPARE A FEASIBILITY REPORT FOR UPGRADING OF MUSHTOWN ROAD (pROJECT 95-07) AND TO AUTHORIZE MSA CONSUL TlNG ENGINEERS TO PREP ARE THE FEASIBILITY REPORT. JULY 17, 1995 AGENDA #: PREP ARED BY: SUBJECT: INTRODUCTION: The upgrading of Mushtown Road from the south end of the existing blacktop surface to the south for approximately 2500 feet is a requirement of the annexation agreement for the W oodridge Estates Development. The annexation agreement between Spring Lake Township and the City of Prior Lake requires the upgrading of Mushtown Road with the fmal phase of the W oodridge Estates Development. BACKGROUND: The agreement between the developer of W oodridge Estates and the City is as follows: "The developer agrees to the responsibility for 500/0 of the costs of the Mushtown Road improvements to be constructed with the last phase of the development. The last phase will be a minimum of 40 lots. The developer's share is for a 36 foot urban road section with a 7 ton design. The City may design a wide road with a 9 ton design. The developer will construct the section of roadway with the last phase ofWoodridge Estates." The above agreement identifies that the developer is responsible for 50% of the cost of Mushtown Road improvements. City staff feels that the developer should be responsible for their share of the frontage along Mushtown Road. Preliminary calculations show that the developer has approximately 25% of the frontage adjacent to Mushtown Road. The feasibility report will more accurately 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTUNITY EMPLOYER DISCUSSION: ALTERNATIVES: identify the lengths and determine the assessable front footages for this project. The City asked MSA Consulting Engineers to submit a proposal with a cost estimate to prepare a feasibility report for Mushtown Road Street and Utility Improvement Project. Attached is a copy of the letter from Mr. Thomas A. Roushar of MSA Consulting Engineers dated July 7, 1995. The estimated total cost to prepare the feasibility report is $5,700.00. They anticipate that it will take approximately four weeks to prepare a rough draft of the report for the City and adjacent property owners to review. After the reviews are complete, then the final draft will be prepared and presented to the City Council. The City has sent a copy of the proposal and cost estimate from MSA to the W oodridge Estates developers. They have agreed to reimburse the City for the cost of the feasibility report if they do not proceed with the final phase of the W oodridge Estates development. If the Mushtown Road project proceeds and the City Council awards a contract and assesses for the street and utility improvements, then the cost to prepare the feasibility report will be spread equally to the assessed properties. See attached copy of the letter from John Mesenbrink dated July 5, 1995. City staff feels that MSA Consulting Engineers would best fit the needs of the City of Prior Lake for this type of project. The developer has a different engineering firm preparing the plans for their development and this other firm has prepared some preliminary cost estimates and street grades for Mushtown Road. However, City staff feels that it would be best to have the City's own Consulting Engineering Firm prepare the feasibility report. There are three alternatives for the City Council to consider: 1. Approve Resolution 95-65, and approve the recommendation to appoint MSA Consulting Engineers as the engineers for the Mushtown Road Street and Utility Improvement Project and authorizing the Mayor and City Manager to enter into a contractual agreement for these services; 2. A motion to direct staff to request proposals from additional firms to submit proposals; 3. Table this item until some date in the future. RECOMMENDATION: Staff would recommend Alternative 1. ACTION REQUIRED: ag9S-07/G:/RESOLU RESOLUTION 95-65 RESOLUTION ORDERING PREPARATION OF REPORT FOR UPGRADING OF MUSHTOWN ROAD IMPROVEMENT PROJECT MOTION BY: SECONDED BY: WHEREAS, it is proposed to construct improvements within the following generally described project area: Mushtown Road from 1000 feet south of Tower Street to the southeast for 2500 feet to Ridgemont Court. The construction will include sanitary sewer and watermain stubs, storm sewer, grading, aggregate base, concrete curb and gutter, bituminous surfacing and appurtenant work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that the proposed improvements be referred to the City Engineer for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvements are feasible and as to \vhether they should best be made as proposed or in connection with other improvements, and the estimated costs for the improvements as recommended. Passed and adopted this 17th day of July, 1995. YES NO Andren Greenfield Kedrowski Schenck Scott Andren Greenfield Kedrowski Schenck Scott Frank Boyles City Manager City of Prior Lake { Seal } RES9S6S.DOC 16200 Eagle Creek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTIJNITY EMPLOYER M~ CONSULTING ENGINEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 1-800-888- 2923 Fax: 612.644-9446 CIVil ENGINEERING: ENVIRONMENTAL MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTATION ELECTRICAL! MECHANICAL ENGINEERING: HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR lAKE ST. PAUL W ASECA July 7, 1995 File: 900-000-00 Mr. John Wingard Assistant City Engineer City Hall 16200 Eagle Creek Avenue Southeast Prior Lake, MN 55372-1714 RE: ESTIMATED LEVEL OF ENGINEERING SERVICES; FEASffiILITY STUDY PHASE, MUSHTOWN ROAD PROJECT Dear Mr. Wingard: Thank you very much for offering us the opportunity to provide you with this estimate of engineering services as may be required to prepare the Mushtown Road feasibility study. MSA has conducted some preliminary research and a windshield survey. Our understanding of the project is summarized below: Mn~htown Road At present, Mushtown Road is paved from the intersection with Scott County Road 23 south to the aggregate surfaced section which is to be improved. It is MSA' s understanding that the improvement is to extend approximately 2,500 linear feet to the south past the Woodridge Estates, Third Addition. Further, it is our understanding that the existing paved section of Mushtown Road is to remain as-is. The 2,500 linear foot section of Mushtown Road that is to be improved is currently an aggregate-surfaced, rural section roadway approximately 24 feet wide. Following improvement, the improved section will be an urban section with curb and gutter, storm sewer and bituminous pavement. Although the curb opening width is yet to be determined, MSA anticipates a curb opening width compatible with a collector street. Fpa~ihility Study MSA will meet with City staff to discuss the Mushtown Road project and further refine the scope of the project as outlined above. MSA will obtain and review the preliminary surveying information. MSA will also review the soil borings that have been taken. MSA will conduct additional field surveys for preliminary design purposes as necessary. 900/000-070I.jul Mr. John Wingard July 7, 1995 Page Two Following review of the soil borings and preliminary field surveys, MSA will complete preliminary design of the street improvements, as well as required storm sewer. The preliminary designs will then be used to prepare cost estimates for the project. MSA understands that the City of Prior Lake wishes to have cost estimates that are accurate to :t 10% of the actual final project costs. Following completion of the preliminary cost estimate, MSA will prepare a detailed draft final report. The draft final report will be submitted to City staff for review. Following a review meeting with City staff, comments received will be incorporated into the draft report, and a final feasibility report will be issued. The fmal feasibility report will be complete with cost estimates, exhibits, and sketches. MSA will present the feasibility study report to the City Council and at public hearing(s). Presentation graphics will be prepared for the presentations. A~4;p..~anent RolP..4; It is MSA' s understanding that City staff will research property records and take the lead in preparing preliminary assessment roles. MSA will assist City staff in this effort by providing construction and engineering cost estimates. A vailahle Information MSA anticipates that record drawings are available for the existing paved portion of Mushtown Road. The record drawings will be used to minimize the field surveying necessary for preliminary design. It is anticipated that little record drawing information will be available for the aggregate- surfaced portion of Mushtown Road. Soil Boring.4; MSA has obtained the logs of auger borings that have been taken. However, there is no geotechnical interpretation of the soil borings. Our proposal includes a $500 allowance for geotechnical interpretation of the auger borings. Geotechnical interpretation will be billed at MSA's cost with no mark-up. 900/000-0701.jul Mr. John Wingard July 7, 1995 Page Three Right-of-Way F~~pmpnt~ MSA anticipates that only prescriptive rights exist for Mushtown Road and not dedicated right-of-way or roadway easement. Prescriptive rights are limited to only the existing traveled surface. Therefore, additional right-of-way will be required. In addition, easements for storm sewer may be required. We have included 8 hours of land surveyor time to research the existing right-of-way and to define additional right-of-way/easement needs. M~ilings MSA anticipates that the City of Prior Lake will undertake the development of the 429 notices, mailings, and public hearing notices. Co~t F.~im9tp To develop a detailed feasibility report for the Mushtown Road project and presentation to City staff and the City Council, MSA anticipates the level of effort as indicated on the attached exhibit. We would be pleased to review our work scope and cost estimates with you and discuss any concerns you might have at your convenience. Sincerely, MSA, CONSULTING ENGINEERS ~~~ Thomas A. Roushar, P .E. TAR:pd 9oo/0oo-070I.jut 900/000-0701.jul EXHIBIT CITY OF PRIOR LAKE MUSHTOWN ROAD FEASffiILITY STUDY COST ESTIMATE Staff Effort Hours Project Manager 2 Design Engineer 8 Staff Engineer 32 Technician 16 Secretary 4 Land Surveyor 8 Survey Crew 8 Total Hours 74 Estimated Labor Cost $5,200.00 Geotechnical $500.00 Estimated Total Cost $5,700.00 B RI N KLAN D JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" JJ.. '" COMPANY LLC 7/5/95 City of Prior Lake Regarding feasibility study from MSA for Mushtown Road. Brink Land will pay 25% of the cost. Providing the City council allows us to start third addition. By blocking off both entrances to Mushtown Road. Per letter dated 7/5/95 to the City of Prior Lake. The other 75% of the cost we feel should be the City of Prior Lakes responsibility. If you have questions please contact me directly at 447-5058. 7765 175th street east Prior Lake, MN 55372 Phone (612) 447-5058 Fax (612) 4475036