HomeMy WebLinkAbout4L - Fire Station #1 Change Ord DATE: INTRODUCTION: BACKGROUND: DISCUSSION: 4 (1) DOUG HARTMAN, PRIOR LAKE FIRE DEPARTMENT CONSIDER APPROV AL OF CHANGE ORDER NO. 4 FOR FIRE STATION NO.1 AUGUST 21, 1995 The purpose of this Agenda item is to approve Change Order No.4 for Fire Station No.1. Change Orders No.1, No.2, and No. 3 combined total came to $42,310.32. It was determined in the beginning of the project that the architect would attempt to submit change order approval requests in $5,000 increments. Change Order No.4 exceeds this amount for the following reasons: 1.) Item #6 of Change Order No. 4 alone is $5,388 for replacement of frost damaged sidewalk. While soil tests of the site were taken, this is an example where the borings were not taken in this location because the primary focus is typically on building foundation and drive aisles. 2.) With repairs on the sidewalk being made this spring and near the point of building completion, the Building Committee directed the architect to hold many small requests and to submit them as one final Change Order just prior to final payment request. Kratochvil Construction is currently processing this final payment request. All of the Change Orders were field decisions made by the Fire Department Building Committee. The City Manager was included on decisions involving significant costs. Items #3 and #5 are for miscellaneous plumbing and electrical items required by building code. These totaled $2,437. Items #1, #2 and #4 totaled $2,267.07 and were minor changes made for the protection and beautification of the site and building. For a complete list of the 1620~~eek Ave., Prior Lake, Minnesota 55372-1714 / Ph. (612) 447-4230 / Fax (612) 447-4245 AN EQUAL OPPORTIJNIlY EMPLOYER modifications included in Change Order No.4 see the attached materials from Boannan Kroos. The total for Change Order No.4 is $10,092.07. The original contract amount was $1,518,790.00. Change Orders No. 1 through No.4 add $52,402.39. With the Change Orders, the total construction price is $1,571,162.39. Despite the Change Orders, the current project cost is still $63,117.00 below the architects original estimate of $1,645,683.00 (including contingency). I expect this to be the final Change Order. However,additional expenses are anticipated for the following: 1.) Extension of the parking lot driveway to Cottonwood Lane on the south side of the building concurrently with the Wilderness ponds development estimated not to exceed $10,000.00. 2.) Some additional plumbing and electrical issues within the building extimated not to exceed $3,000.00. 3.) Purchase of computer equipment to include the Fire Station into the city computer network estimated at $15,000.00. It is estimated that the remaining building funds will be used for these expenditures but would be purchased outside of the building contract. ALTERNATIVES: The alternatives are as follows: 1. Adopt Change Order No.4 in the amount of $10,092.07. 2. Defer action on the Change Order until such time additional information is rendered. 3. Deny this item for specific reasons. RECOMMENDATION: The recommendation is to approve alternative #1. AGFIRECO.DOC ACTION REQUIRED: AGFIRECO\G:\AGENDA AGFIRECO.DOC Make a motion and second as part of the Consent Agenda to adopt Change Orde No. 4 in the amount of $10,092.07 as set forth in the ar . ect' s letter. CHAN\3E ORDER Distribution to: OWNER ARCHITECT CONSULTANT FIELD OTHER ...! AlA DOCUMENT G701 PROJECT: Prior Lake Fire Station Prior Lake, MN CHANGE ORDER NO.: FOUR (4) TO: Kratochvil Const. Co. P.O. Box # 27 New Prague, MN 56071 INITIATION DATE: July 18, 1995 ARCHITECT'S PROJECT NO.: 1244.03 CONTRACT FOR: Complete Construction CONTRACT DATED: April 26, 1994 You are directed to make the following changes in this Contract: 1. 2. 3. 4. 5. 6. Proposal request #23 Add plastic corner guards. (Owner Requested) $802.07 Proposal request #24 item #3 Install final bituminous paving lift in spring rather than late fall. (Owner requested) $663.00 Proposal Request #26 Add check valve at pressure washer and ADA shower connections (Code required) $961.00 Field Change Add additional shrubs to landscape and relocate some plants. (Owner requested) $802.00 Proposal request #22 (final costs) Add miscellaneous electrical items as required by building code and requested by the Owner. (Engineer/Owner Requested) $1476.00 Field Change Replace frost damaged sidewalk at front entry. (Field condition) $5388.00 The total cost of Change Order # 4, ( Items # 1-6 ), including the G.C.'s O.H. & P = $ 10,092.07 -. -- -~. .....--..--[-..... ...---------- - . Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original Contract Sum was Net change by previously authorized Change Orders The Contract Sum) prior to this Change Order was The Contract Sum will be increased by this Change Order The new Contract Sum including this Change Order will be The Contract Time will be unchanged. $ 1,518,760.00 $ 42,310.32 $ 1,561,070.32 $ 10,092.07 $1,571,162.39 Authorized: ARCHITECT CONTRACTOR OWNER BKPR & ASSOC.. INC. Address 222 No. KRATOCHVIL CONST. CO. Address P.O. Box 27. New Praaue B~M/.? .;f~ CITY OF PRIOR LAKE Address Prior Lake BY DATE 1~;'?5- DATE 1-~i-9J DATE AlA DOCUMENT C701 * CHANGE ORDER * APRIL 1978 EDITION * AlA * 1978 lHEAMERICAN INSTITUTE OF ARCHITECT, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006