Loading...
HomeMy WebLinkAboutCandy Cove Retaining Wall Review 09_06_13Retaining Walls at Candy Cover Construction Observation Summary Retaining Walls at Candy Cove Candy Cover Trail City of Prior Lake Hennepin County, MN Prepared for The City of Prior Lake Prepared by WSB and Associates September 6, 2013 Retaining Walls at Candy Cove City of Prior Lake, Hennepin County, MN WSB PROJECT NO. 01905-040 PAGE 1 Wall Review The initial project plans consisted of seven walls and one set of stairs. The walls are located to the northwest of the building area per the 2012 plans for the Candy Cove Development Project. The date of construction of the “large block” segmental retaining walls began on November 2012. Construction of the walls finished in December of 2012. Construction of the stairway did not occur until the spring of 2013. Walls 1, 2 and 3 are tiered walls on the west side of the stairway. Wall 1 is the lowest tier, wall 3 the top tier. Walls 1, 2 and 3 all have a maximum height of 5.33ft. Walls 1, 2 and 3 are approximately 18ft, 22ft, and 30ft in length respectively. The grade behind walls 1, 2, and 3, is approximately 1 vertical to 8 horizontal. Retaining Walls at Candy Cove City of Prior Lake, Hennepin County, MN WSB PROJECT NO. 01905-040 PAGE 2 Walls 4, 5 and 6 are tiered walls on the east side of the stairway. Wall 4 is the lowest tier, wall 6 the top tier. Walls 4, 5 and 6 all have typical heights of 5.33ft. Wall 4 links in with wall 6 and has a maximum height of 12ft. Walls 4, 5 and 6 are approximately 220ft, 150ft, and 156ft in length respectively. The grade behind walls 4, 5, and 6, is approximately 1 vertical to 4 horizontal. Wall 7 joins into the tiers on the eastern side of the walls above wall 4. Wall 7 has a typical height of 5.33ft and is approximately 54ft in length. Walls 1, 2, 3, 6 and 7 are designed as gravity walls. Walls 4 and 5 are designed as soil reinforced walls. Retaining Walls at Candy Cove City of Prior Lake, Hennepin County, MN WSB PROJECT NO. 01905-040 PAGE 3 One additional wall was added to the project in June of 2013. It is located on the southwestern part of the development. The wall is 146ft in length. It was designed as a gravity wall. The design for all of the walls was performed by Civil Design Professionals. The design included an 18.4° gradation away from the back face of walls 6, 7 and the additional southwestern wall. All walls were designed with a 50 psf surcharge. Recommendations for geogrid lengths, block sizes, and locations were provided in the design. Field inspections of materials were made daily by WSB & Associates Inc. Initial construction of the lowest tier wall began on November 2, 2012. Due to the proximity of the wall to the lake, the contractor was required to relocate the wall and start again. Construction of the wall began again November 21, 2012. The Retaining Walls at Candy Cove City of Prior Lake, Hennepin County, MN WSB PROJECT NO. 01905-040 PAGE 4 block used for the walls was measured for correct size and observed to be whole. Geogrid and back-face aggregate field measurements were taken daily and met or surpassed lengths recommended in the design. The majority of wall construction finished December 12, 2012. The stairway and final block caps were added in the spring of 2013. The precast stairway was altered from the original design to a cast-in-place stairway. Design and plans of the altered stairway were not provided as requested by WSB. WSB was not informed of a construction date and did not have opportunity to inspect the installation of the stairway. WSB cannot validate the capacity, stability or durability of the stairway. However, post construction measurements of the stairway’s rise, run, and landing locations were taken. Measurements met the requirements in the Minnesota Building Code for stairways. Retaining Walls at Candy Cove City of Prior Lake, Hennepin County, MN WSB PROJECT NO. 01905-040 PAGE 5 Construction of the additional wall began on August 9, 2013. WSB recorded block dimensions and locations daily. Wall construction was completed on August 20, 2013. Final gradation was completed on August 27, 2013. Braun Intertec Corporation performed initial borings for the onsite soil. Braun determined the onsite soils will meet the requirements for a friction angle of 32° and a soil weight of 120pcf. Field inspections and compaction tests of soils were performed at various locations. Reports for the borings and recommendations for bearing capacity and friction angle were provided to WSB. The compaction test results were not provided to WSB. It is recommended the city request a report of the compaction testing be provided as a supplement to this report. A complete record of field measurements, all submitted testing, design calculations and plans are attached in the appendix. Retaining Wall #4 Review - Hickory Shores Development City of Prior Lake, Hennepin County, MN WSB PROJECT NO. 01905-020 Appendix Retaining Wall #4 Review - Hickory Shores Development City of Prior Lake, Hennepin County, MN WSB PROJECT NO. 01905-020 Field Measurements and Observations by Aaron Nelson, PE 11/21 – Excavation: Approximately 20 feet to front face of wall. Geo-grid: Wall 4 Center, Grid Base: 13’-0” Wall 4 South, Grid Base: 13’-1” 5XT - Miragrid used Aggregate: 2’-0”+ Block rapped for cracking, none observed. 11/23 – Geo-grid: Wall 4 Center, 2nd Layer: 13’-1” Geo-grid: Wall 4 South, 2nd Layer: 13’-0” 5XT - Miragrid used Aggregate: 1’-0”+ 11/26 – Geo-grid: Wall 4 Center, 3rd Layer: 13’-2” Geo-grid: Wall 4 South, 3rd Layer: 13’-3” 5XT - Miragrid used Aggregate: 1’-0”+ 11/29 – Geo-grid: Wall 5 Center, 2nd Layer: 8’-4” Wall 5 South, 2nd Layer: 8’-5” 5XT - Miragrid used Aggregate: 1’-0”+ Block rapped for cracking, none observed. 12/04 – Geo-grid: Wall 4 Far North by Wall 7, 3rd Layer: 11’-5” 5XT - Miragrid used Aggregate: 1’-0”+ Block rapped for cracking, none observed. 5 9 4 10 6 4 11 9 2 2 1/2 3 CLAYEY SAND, slightly organic, dark brown and black, moist to wet. (Topsoil/Slopewash) SILTY SAND, fine- to medium-grained, trace Gravel, brownish gray, moist. (Slopewash) LEAN CLAY with SAND, trace Gravel and roots, brown, olive and gray, wet, rather soft. (Glacial Till) SANDY LEAN CLAY, trace Gravel, with occasional Silty Sand layers throughout, brown and gray, wet, medium to rather stiff. (Glacial Till) POORLY GRADED SAND with SILT, trace Gravel, with Sandy Lean Clay seams, dark brown, moist to waterbearing, very loose. (Glacial Outwash) SANDY LEAN CLAY, trace Gravel, with occasional Silt and Sand seams and rusting, gray, moist, rather stiff. (Glacial Till) END OF BORING. Water observed at a depth of 14 1/2 feet with 14 1/2 feet of hollow-stem auger in the ground. Water not observed with 23 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 23 feet immediately after withdrawal of auger. * SC SM CL CL SP- SM CL * Boring immediately backfilled. 911.0 909.0 906.0 902.0 900.0 890.0 5.0 7.0 10.0 14.0 16.0 26.0 LOCATION: See attached sketch. ST-5 9/26/12 1" = 4'DATE:METHOD: Description of Materials (ASTM D2488 or D2487) Braun Intertec Corporation ST-5 page 1 of 1 3 1/4" HSA, AutohammerK. Keck BORING: SCALE:DRILLER: Tests or NotesWL L O G O F B O R I N G BPF (S e e D e s c r i p t i v e T e r m i n o l o g y s h e e t f o r e x p l a n a t i o n o f a b b r e v i a t i o n s ) BL-10-09736ALO G O F B O R I N G - D R A F T N : \ G I N T \ P R O J E C T S \ M I N N E A P O L I S \ 2 0 1 0 \ 0 9 7 3 6 A . G P J B R A U N _ V 8 _ C U R R E N T . G D T 1 0 / 2 / 1 2 0 9 : 4 8 Braun Project BL-10-09736A SLOPE STABILITY ANALYSIS Candy Cove Park Candy Cove Trail Prior Lake, Minnesota qp tsf ASTM Symbol Elev. feet 916.0 Depth feet 0.0 7 5 8 11 17 21 25 20 4 4 4 1/2 4 1/2 4 1/2 SILTY SAND, fine- to medium-grained, black, moist. (Topsoil) LEAN CLAY, trace Gravel and roots, olive, gray and dark brown, wet, medium. (Slopewash) SANDY LEAN CLAY, trace Gravel, with rusting throughout, olive, gray and brown, moist, medium to very stiff. (Glacial Till) Possible Cobbles encountered from 20 to 21 feet. END OF BORING. Water not observed with 24 1/2 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 23 feet immediately after withdrawal of auger. Boring immediately backfilled. SM CL CL 902.1 897.1 878.1 2.0 7.0 26.0 LOCATION: See attached sketch. ST-6 9/26/12 1" = 4'DATE:METHOD: Description of Materials (ASTM D2488 or D2487) Braun Intertec Corporation ST-6 page 1 of 1 3 1/4" HSA, AutohammerK. Keck BORING: SCALE:DRILLER: Tests or NotesWL L O G O F B O R I N G BPF (S e e D e s c r i p t i v e T e r m i n o l o g y s h e e t f o r e x p l a n a t i o n o f a b b r e v i a t i o n s ) BL-10-09736ALO G O F B O R I N G - D R A F T N : \ G I N T \ P R O J E C T S \ M I N N E A P O L I S \ 2 0 1 0 \ 0 9 7 3 6 A . G P J B R A U N _ V 8 _ C U R R E N T . G D T 1 0 / 2 / 1 2 0 9 : 4 8 Braun Project BL-10-09736A SLOPE STABILITY ANALYSIS Candy Cove Park Candy Cove Trail Prior Lake, Minnesota qp tsf ASTM Symbol Elev. feet 904.1 Depth feet 0.0 7 13 11 9 4 4 8 3 SILTY SAND, fine- to medium-grained, trace Gravel and roots, dark grayish brown, moist. (Topsoil) CLAYEY SAND, trace Gravel, dark brown, moist, medium. (Slopewash) SILTY SAND, fine- to coarse-grained, with Gravel, dark brown, moist, medium dense. (Glacial Outwash) POORLY GRADED SAND with SILT, fine- to medium-grained, trace Gravel, with occasional Silty Sand pockets, light brown, moist, very loose to medium dense. (Glacial Outwash) POORLY GRADED SAND, fine- to coarse-grained, with Gravel, brown, wet, very loose to medium. (Glacial Outwash) END OF BORING. Water not observed with 19 1/2 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 14 1/2 feet immediately after withdrawal of auger. Boring immediately backfilled. SM SC SM SP- SM SP 901.6 899.6 897.6 889.6 882.6 2.0 4.0 6.0 14.0 21.0 LOCATION: See attached sketch. ST-7 9/26/12 1" = 4'DATE:METHOD: Description of Materials (ASTM D2488 or D2487) Braun Intertec Corporation ST-7 page 1 of 1 3 1/4" HSA, AutohammerK. Keck BORING: SCALE:DRILLER: Tests or NotesWL L O G O F B O R I N G BPF (S e e D e s c r i p t i v e T e r m i n o l o g y s h e e t f o r e x p l a n a t i o n o f a b b r e v i a t i o n s ) BL-10-09736ALO G O F B O R I N G - D R A F T N : \ G I N T \ P R O J E C T S \ M I N N E A P O L I S \ 2 0 1 0 \ 0 9 7 3 6 A . G P J B R A U N _ V 8 _ C U R R E N T . G D T 1 0 / 2 / 1 2 0 9 : 4 8 Braun Project BL-10-09736A SLOPE STABILITY ANALYSIS Candy Cove Park Candy Cove Trail Prior Lake, Minnesota qp tsf ASTM Symbol Elev. feet 903.6 Depth feet 0.0 17 14 13 14 12 11 13 13 20 4 4 CLAYEY SAND, fine- to medium-grained, trace Gravel, brown, moist to wet, stiff to very stiff. (Glacial Till) POORLY GRADED SAND with SILT, fine- to medium-grained, light brown, moist, medium dense. (Glacial Outwash) SC SP- SM 965.7 6.0 LOCATION: See attached sketch. ST-8 9/26/12 1" = 4'DATE:METHOD: Description of Materials (ASTM D2488 or D2487) Braun Intertec Corporation ST-8 page 1 of 2 3 1/4" HSA, AutohammerK. Keck BORING: SCALE:DRILLER: Tests or NotesWL L O G O F B O R I N G BPF (S e e D e s c r i p t i v e T e r m i n o l o g y s h e e t f o r e x p l a n a t i o n o f a b b r e v i a t i o n s ) BL-10-09736ALO G O F B O R I N G - D R A F T N : \ G I N T \ P R O J E C T S \ M I N N E A P O L I S \ 2 0 1 0 \ 0 9 7 3 6 A . G P J B R A U N _ V 8 _ C U R R E N T . G D T 1 0 / 2 / 1 2 0 9 : 4 8 Braun Project BL-10-09736A SLOPE STABILITY ANALYSIS Candy Cove Park Candy Cove Trail Prior Lake, Minnesota qp tsf ASTM Symbol Elev. feet 971.7 Depth feet 0.0 19 25 POORLY GRADED SAND with SILT, fine- to medium-grained, light brown, moist, medium dense. (Glacial Outwash) (continued) POORLY GRADED SAND with SILT, fine-grained, light brown, moist, medium dense. (Glacial Outwash) END OF BORING. Water not observed with 39 1/2 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 29 1/2 feet immediately after withdrawal of auger. Boring immediately backfilled. SP- SM 937.7 930.7 34.0 41.0 LOCATION: See attached sketch. ST-8 (cont.) 9/26/12 1" = 4'DATE:METHOD: Description of Materials (ASTM D2488 or D2487) Braun Intertec Corporation ST-8 page 2 of 2 3 1/4" HSA, AutohammerK. Keck BORING: SCALE:DRILLER: Tests or NotesWL L O G O F B O R I N G BPF (S e e D e s c r i p t i v e T e r m i n o l o g y s h e e t f o r e x p l a n a t i o n o f a b b r e v i a t i o n s ) BL-10-09736ALO G O F B O R I N G - D R A F T N : \ G I N T \ P R O J E C T S \ M I N N E A P O L I S \ 2 0 1 0 \ 0 9 7 3 6 A . G P J B R A U N _ V 8 _ C U R R E N T . G D T 1 0 / 2 / 1 2 0 9 : 4 8 Braun Project BL-10-09736A SLOPE STABILITY ANALYSIS Candy Cove Park Candy Cove Trail Prior Lake, Minnesota qp tsf ASTM Symbol Elev. feet 939.7 Depth feet 32.0 1 Aaron Nelson From:Van Abel, Josh <JVanAbel@braunintertec.com> Sent:Wednesday, October 03, 2012 1:34 PM To:Aaron Nelson; 'millerfest@aol.com' Cc:Bennett, Jimmy; Jason Wedel Subject:RE: Candy Cover Retaining Walls Aaron,    Answers to your questions are below in red.                          From: Aaron Nelson [mailto:anelson@wsbeng.com] Sent: Wednesday, October 03, 2012 11:10 AM To: Van Abel, Josh; 'millerfest@aol.com' Cc: Bennett, Jimmy; Jason Wedel Subject: RE: Candy Cover Retaining Walls   Josh, Per the plans we are looking for a maximum 1800 psf bearing capacity. Will this work? From a preliminary standpoint, the subgrade soils will be capable of providing this bearing capacity, assuming the recommended soil corrections are performed. However, please note, we are still in the process of completing our global stability analysis.   How much of the soils correction are need to meet this? Recommended soil correction depths are listed below in the table in the first email. As far as friction angle, 32, and soil weight, 120 pcf, does the existing soil meet these criteria? Yes, assuming onsite soils consisting of SP or SP-SM are used and properly compacted (if used as fill/backfill). Onsite soils not meeting the criteria of SP or SP-SM soils (sands with less 12 percent by weight passing the number 200 sieve) do not meet these criteria. Thank you, Aaron Aaron Nelson, PE Structural Project Manager d: 763-231-4844 WSB & Associates, Inc. | 701 Xenia Avenue South, Suite 300 | Minneapolis, MN 55416 Josh Van Abel, PE  Associate ‐ Senior Engineer  Braun Intertec  11001 Hampshire Avenue S | Minneapolis, MN 55438  952.995.2310 direct | 612.369.0083 mobile  jvanabel@braunintertec.com     Employee Ownership working for you   braunintertec.com |Twitter: Braun Intertec | LinkedIn: Braun Intertec     2 This email, and any files transmitted with it, is confidential and is intended solely for the use of the addressee. If you are not the addressee, please delete this email from your system. Any use of this email by unintended recipients is strictly prohibited. WSB & Associates, Inc. does not accept liability for any errors or omissions which arise as a result of electronic transmission. If verification is required, please request a hard copy. From: Van Abel, Josh [mailto:JVanAbel@braunintertec.com] Sent: Tuesday, October 02, 2012 3:20 PM To: Aaron Nelson; 'millerfest@aol.com' Cc: Bennett, Jimmy Subject: Candy Cover Retaining Walls   Jason, Aaron,    Attached are the results of the additional soil borings we completed last week for the Candy Cover project in Prior  Lake.  We also attached the previous borings for reference.     Our analysis is currently ongoing, however, from a preliminary standpoint we recommend the following excavation  depths for removal of slopewash soils and soft glacial soils below the retaining walls (and reinforcing grid) to reduce the  risk of instability and settlement.  The excavated soils should be replaced with onsite or imported sands.     Preliminary Depths for Recommended Soil Correction for Retaining Walls  Boring Surface Elevation Soil Correction Depth Bottom Elevation  ST‐4 905.0 7 898  ST‐5 916.0 9 907  ST‐6 904.1 7 897  ST‐7 903.6 4 899 1/2    We will continue with our analysis and provide updates as available.     Aaron – If any plans have been revised plans as part of your evaluation, please let us know and send over any revised  documents.      Please contact myself or Jimmy Bennett with questions.    Thanks,         Josh Van Abel, PE  Associate ‐ Senior Engineer  Braun Intertec  11001 Hampshire Avenue S | Minneapolis, MN 55438  952.995.2310 direct | 612.369.0083 mobile  jvanabel@braunintertec.com     Employee Ownership working for you   braunintertec.com |Twitter: Braun Intertec | LinkedIn: Braun Intertec     Project: Client: Boring No.: Soil Type: LL:PI: 11.5 SET-R18a Moisture Density Curve ASTM: D698, Method B Candy Cove Maximum Dry Density (pcf): Civil Design Professionals Sand with a little gravel (SP/SP-SM) Sample:1 2401 W 66th Street Richfield, Minnesota 55423-2031 Job No. Date: Opt. Water Content (%): Location: 9.9 4/30/13 8932 Specific Gravity:As Received W.C. (%):5.7 123.9 PL:*Assumed Depth(ft): 119.0 2.67 114 115 116 117 118 119 120 121 122 123 124 125 5 6 7 8 9 10 11 12 13 14 15 16 Water Content (%) Dr y D e n s i t y ( P C F ) Proctor Points Zero Air Voids +3/8 Corrected ASTM: D3080 Project/Client: Boring No.: Sample No. Depth: Location:Sample Type: Soil Type: 0.15 ====39.7 deg.====33.8 deg. 2.00 Direct Shear Test Test Date: Job No.: Candy Cove / Civil Design Professionals 1 5/1/2013 0.54 0.90 0.50 1.00 Dry Density (pcf) 1.78 114.2 114.7 115.0 Normal Stress Shear Stress Dry Density (pcf) Before Shear Thickness (In.) Water Content (%)17.1 17.0 0.92 0.91 0.91 17.3 113.1 5.0 5.0 A B C D (*) = Assumed Specific Gravity Remarks: Specimens compacted to given densities, using -#4 material (approximately 95% of maximum standard proctor); Inundated after applying normal load. Consolidated and sheared to given displacements at constant rate of 0.007 inches/minute. Plastic Limit: Plasticity Index: Specific Gravity (*): Liquid Limit: 2.68 5/3/2013 Max Stress Failure Criterion: Sand, medium grained (SP) Bulk Date Reported: Shear Rate 0.007 (in/min) Initial 2.50 2.50Diameter (In.) "These tests are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design." 0.93Thickness (In.) Water Content (%) 0.93 5.0 113.1 113.1 8932 Cohesion TSF0.011Apparent X 0.93 2.50 Peak Conditions Friction Angle: Friction Angle: At Given Shear Disp. Of: Apparent Cohesion 0.105 TSF -0.005 0 0.005 0.01 0.015 0.02 0.025 0 0.05 0.1 0.15 0.2 Ch a n g e i n T h i c k n e s s ( i n c h ) 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 0 0.05 0.1 0.15 0.2 Shear Displacement (inch) Sh e a r S t r e s s ( T S F ) 0 0.5 1 1.5 2 0 0.5 1 1.5 2 Normal Stress (TSF) Sh e a r S t r e s s ( T S F ) ASTM: D3080 Project/Client: Boring No.: Sample No. Depth: Location:Sample Type: Soil Type: 0.15 ====38.4 deg.====34.7 deg. Peak Conditions Friction Angle: Friction Angle: At Given Shear Disp. Of: Apparent Cohesion 0.113 TSF 8932 Cohesion TSF0.027Apparent X 0.93 2.50 "These tests are for informational purposes only and must be reviewed by a qualified professional engineer to verify that the test parameters shown are appropriate for any particular design." 0.93Thickness (In.) Water Content (%) 0.93 5.0 113.1 113.1 Initial 2.50 2.50Diameter (In.) 5/3/2013 Max Stress Failure Criterion: Sand, medium grained (SP) Bulk Date Reported: Shear Rate 0.007 (in/min) 2.68(*) = Assumed Specific Gravity Remarks: Specimens compacted to given densities, using -#4 material (approximately 95% of maximum standard proctor); Inundated after applying normal load. Consolidated and sheared to given displacements at constant rate of 0.007 inches/minute. Plastic Limit: Plasticity Index: Specific Gravity (*): Liquid Limit: A B C D 113.1 5.0 5.0 16.9 16.8 0.92 0.91 0.91 17.5 Dry Density (pcf) Before Shear Thickness (In.) Water Content (%) Dry Density (pcf) 1.68 113.9 115.1 115.3 Normal Stress Shear Stress 0.46 0.98 0.50 1.00 2.00 Direct Shear Test Test Date: Job No.: Candy Cove / Civil Design Professionals 1 5/1/2013 -0.005 0 0.005 0.01 0.015 0.02 0.025 0 0.05 0.1 0.15 0.2 Ch a n g e i n T h i c k n e s s ( i n c h ) 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 0 0.05 0.1 0.15 0.2 Shear Displacement (inch) Sh e a r S t r e s s ( T S F ) 0 0.5 1 1.5 2 0 0.5 1 1.5 2 Normal Stress (TSF) Sh e a r S t r e s s ( T S F ) CDP Wall Civil Design Professionals version 3.1.12186 Project: Candy Cove Location: Prior Lake, MN Designer: BTD Date: 7/19/2012 Section: wall 1 Design Method: NCMA_09_3rd_Ed Design Unit: ReCon SOIL PARAMETERS φ coh γ Retained Soil: 32 deg 0 psf 120 pcf Foundation Soil: 32 deg 0 psf 120 pcf Leveling Pad: Crushed Stone GEOMETRY Design Height: 5.33 ft Live Load: 50 psf Wall Batter/Tilt: 3.60/ 0.00 deg Live Load Offset: 0.00 ft Embedment: 1.33 ft Live Load Width: 4 ft Leveling Pad Depth: 1.00 ft Dead Load: 1300 psf Slope Angle: 0.0 deg Dead Load Offset: 4.0 ft Slope Length: 0.0 ft Dead Load Width: 100 ft Slope Toe Offset: 0.0 ft Leveling Pad Width: 6.00 ft Vertical δ on Single Depth FACTORS OF SAFETY Sliding: 1.50 Overturning: 1.50 Bearing: 2.00 RESULTS FoS Sliding: 1.59 (lvlpd) FoS Overturning: 2.31 Bearing 1278.49 FoS Bearing: 10.44 Name Elev.ka Pa Paq Paqd - PaC PaT FSsl (base of leveling pad)FoS OT TC 4.00 0.250 26 18 0 0 45 100.00 18.43 24 2.67 0.250 106 35 0 0 141 51.35 6.10 39 1.33 0.226 217 42 334 0 593 12.90 3.27 60 0.00 0.301 513 68 1295 0 1876 1.59 (1.76)2.31 Civil Design Professionals Page 1 CDP Wall Civil Design Professionals version 3.1.12186 Project: Candy Cove Location: Prior Lake, MN Designer: BTD Date: 7/19/2012 Section: wall 2 Design Method: NCMA_09_3rd_Ed Design Unit: ReCon SOIL PARAMETERS φ coh γ Retained Soil: 32 deg 0 psf 120 pcf Foundation Soil: 32 deg 0 psf 120 pcf Leveling Pad: Crushed Stone GEOMETRY Design Height: 5.33 ft Live Load:50 psf Wall Batter/Tilt: 3.60/ 0.00 deg Live Load Offset: 0.00 ft Embedment: 1.33 ft Live Load Width: 4 ft Leveling Pad Depth: 0.50 ft Dead Load:1000 psf Slope Angle: 0.0 deg Dead Load Offset: 4.0 ft Slope Length: 0.0 ft Dead Load Width: 100 ft Slope Toe Offset: 0.0 ft Leveling Pad Width: 4.25 ft Vertical δ on Single Depth FACTORS OF SAFETY Sliding:1.50 Overturning:1.50 Bearing:2.00 RESULTS FoS Sliding:1.93 (lvlpd) FoS Overturning:2.10 Bearing 1267.24 FoS Bearing:7.27 Name Elev.ka Pa Paq Paqd - PaC PaT FSsl (base of leveling pad)FoS OT TC 4.00 0.250 26 18 0 0 45 100.00 18.43 24 2.67 0.250 106 35 0 0 141 51.35 6.10 24 1.33 0.250 239 52 0 0 291 25.17 3.18 39 0.00 0.254 432 55 498 0 985 1.93 (1.99)2.10 Civil Design Professionals Page 1 CDP Wall Civil Design Professionals version 3.1.12186 Project: Candy Cove Location: Prior Lake, MN Designer: BTD Date: 7/19/2012 Section: wall 3 Design Method: NCMA_09_3rd_Ed Design Unit: ReCon SOIL PARAMETERS φ coh γ Retained Soil: 32 deg 0 psf 120 pcf Foundation Soil: 32 deg 0 psf 120 pcf Leveling Pad: Crushed Stone GEOMETRY Design Height: 5.33 ft Live Load:50 psf Wall Batter/Tilt: 3.60/ 0.00 deg Live Load Offset: 0.00 ft Embedment: 1.33 ft Live Load Width: 50 ft Leveling Pad Depth: 0.50 ft Dead Load:0 psf Slope Angle: 0.0 deg Dead Load Offset: 0.0 ft Slope Length: 0.0 ft Dead Load Width: 0 ft Slope Toe Offset: 0.0 ft Leveling Pad Width: 3.00 ft Vertical δ on Single Depth FACTORS OF SAFETY Sliding:1.50 Overturning:1.50 Bearing:2.00 RESULTS FoS Sliding:2.20 (lvlpd) FoS Overturning:1.98 Bearing 1039.55 FoS Bearing:7.71 Name Elev.ka Pa Paq Paqd - PaC PaT FSsl (base of leveling pad)FoS OT TC 4.00 0.250 27 17 0 0 43 100.00 19.29 24 2.67 0.250 107 33 0 0 140 51.91 6.19 24 1.33 0.250 239 52 0 0 291 25.17 3.18 24 0.00 0.250 426 68 0 0 494 2.20 (2.28)1.98 Civil Design Professionals Page 1 CDP Wall Civil Design Professionals version 3.1.12186 Project: Candy Cove Location: Prior Lake, MN Designer: BTD Date: 7/19/2012 Section: wall 4 Design Method: NCMA_09_3rd_Ed Design Unit: ReCon SOIL PARAMETERS φ coh γ Reinforced Soil: 32 deg 0 psf 120 pcf Retained Soil: 32 deg 0 psf 120 pcf Foundation Soil: 32 deg 0 psf 120 pcf Leveling Pad: Crushed Stone GEOMETRY Design Height: 5.33 ft Live Load: 50 psf Wall Batter/Tilt: 3.60/ 0.00 deg Live Load Offset: 0.00 ft Embedment: 1.33 ft Live Load Width: 4 ft Leveling Pad Depth: 1.00 ft Dead Load: 1400 psf Slope Angle: 0 deg Dead Load Offset: 4 ft Slope Length: 0 ft Dead Load Width: 100 ft Slope Toe Offset: 0 ft Base Friction: True FACTORS OF SAFETY Sliding: 1.50 Pullout: 1.50 Overturning: 2.00 Uncertainties: 1.50 Bearing: 2.00 Connection: 1.50 Shear: 1.50 Bending: 1.50 RESULTS FoS Sliding: 5.94 FoS Overturning: 25.63 Bearing 1547.11 FoS Bearing: 17.56 Total Pullout 11585 FoS Total Pullout 14.79 ID Height Length Geogrid.Ta TPa TPqll TPqdl TMax Tal/FS FS Ta PkConn/FS FS PO / [Tmax]FS slr [fndn] 3 4.00 13.00 5XT 2458 57 24 0 81 1639 30.42 420 14.04/[81]22.33 2 2.67 13.00 5XT 2458 102 16 0 117 1639 20.93 515 22.87/[117]14.89 1 1.33 13.00 5XT 2458 97 9 43 149 1639 16.55 611 31.32/[149]9.90 [5.94] Civil Design Professionals Page 1 CDP Wall Civil Design Professionals version 3.1.12186 Project: Candy Cove Location: Prior Lake, MN Designer: BTD Date: 7/19/2012 Section: wall 5 Design Method: NCMA_09_3rd_Ed Design Unit: ReCon SOIL PARAMETERS φ coh γ Reinforced Soil: 32 deg 0 psf 120 pcf Retained Soil: 32 deg 0 psf 120 pcf Foundation Soil: 32 deg 0 psf 120 pcf Leveling Pad: Crushed Stone GEOMETRY Design Height: 5.33 ft Live Load: 50 psf Wall Batter/Tilt: 3.60/ 0.00 deg Live Load Offset: 0.00 ft Embedment: 1.33 ft Live Load Width: 4 ft Leveling Pad Depth: 0.50 ft Dead Load: 1300 psf Slope Angle: 0 deg Dead Load Offset: 4 ft Slope Length: 0 ft Dead Load Width: 100 ft Slope Toe Offset: 0 ft Base Friction: True FACTORS OF SAFETY Sliding: 1.50 Pullout: 1.50 Overturning: 2.00 Uncertainties: 1.50 Bearing: 2.00 Connection: 1.50 Shear: 1.50 Bending: 1.50 RESULTS FoS Sliding: 2.99 FoS Overturning: 7.42 Bearing 1424.52 FoS Bearing: 11.13 Total Pullout 6792 FoS Total Pullout 9.00 ID Height Length Geogrid.Ta TPa TPqll TPqdl TMax Tal/FS FS Ta PkConn/FS FS PO / [Tmax]FS slr [fndn] 3 4.00 8.00 5XT 2458 57 24 0 81 1639 30.42 420 4.17/[81]16.09 2 2.67 8.00 5XT 2458 102 16 0 117 1639 20.93 515 9.27/[117]10.79 1 1.33 8.00 5XT 2458 97 9 40 146 1639 16.90 611 15.50/[146]7.11 [2.99] Civil Design Professionals Page 1 CDP Wall Civil Design Professionals version 3.1.12186 Project: Candy Cove Location: Prior Lake, MN Designer: BTD Date: 7/19/2012 Section: Wall 6, 7 Design Method: NCMA_09_3rd_Ed Design Unit: ReCon SOIL PARAMETERS φ coh γ Retained Soil: 32 deg 0 psf 120 pcf Foundation Soil: 32 deg 0 psf 120 pcf Leveling Pad: Crushed Stone GEOMETRY Design Height: 5.33 ft Live Load: 50 psf Wall Batter/Tilt: 3.60/ 0.00 deg Live Load Offset: 0.00 ft Embedment: 1.33 ft Live Load Width: 50 ft Leveling Pad Depth: 0.50 ft Dead Load: 0 psf Slope Angle: 18.4 deg Dead Load Offset: 0.0 ft Slope Length: 35.0 ft Dead Load Width: 0 ft Slope Toe Offset: 0.0 ft Leveling Pad Width: 3.00 ft Vertical δ on Single Depth FACTORS OF SAFETY Sliding: 1.50 Overturning: 1.50 Bearing: 2.00 RESULTS FoS Sliding: 1.70 (lvlpd) FoS Overturning: 1.53 Bearing 1297.89 FoS Bearing: 5.70 Name Elev.ka Pa Paq Paqd - PaC PaT FSsl (base of leveling pad)FoS OT TC 4.00 0.326 35 22 0 0 56 100.00 15.09 24 2.67 0.326 139 43 0 0 182 39.85 4.76 24 1.33 0.326 312 65 0 0 378 19.42 2.46 24 0.00 0.326 556 87 0 0 642 1.70 (1.76)1.53 Civil Design Professionals Page 1 CDP Wall Civil Design Professionals version 3.1.12186 Project: Candy Cove Location: Prior Lake, Minnesota Designer: BTD Date: 7/18/2012 Section: 12' Design Method: NCMA_09_3rd_Ed Design Unit: ReCon SOIL PARAMETERS φ coh γ Reinforced Soil: 40 deg 0 psf 120 pcf Retained Soil: 40 deg 0 psf 120 pcf Foundation Soil: 30 deg 0 psf 120 pcf Leveling Pad: Crushed Stone GEOMETRY Design Height: 12.00 ft Live Load: 50 psf Wall Batter/Tilt: 3.60/ 0.00 deg Live Load Offset: 0.00 ft Embedment: 1.50 ft Live Load Width: 50 ft Leveling Pad Depth: 1.00 ft Dead Load: 0 psf Slope Angle: 0 deg Dead Load Offset: 0 ft Slope Length: 0 ft Dead Load Width: 0 ft Slope Toe Offset: 0 ft Base Friction: True FACTORS OF SAFETY Sliding: 1.50 Pullout: 1.50 Overturning: 2.00 Uncertainties: 1.50 Bearing: 2.00 Connection: 1.50 Shear: 1.50 Bending: 1.50 RESULTS FoS Sliding: 5.84 FoS Overturning: 9.97 Bearing 1811.23 FoS Bearing: 7.41 Total Pullout 42222 FoS Total Pullout 25.92 ID Height Length Geogrid.Ta TPa TPqll TPqdl TMax Tal/FS FS Ta PkConn/FS FS PO / [Tmax]FS slr [fndn] 5 6.67 8.00 5XT 2254 350 49 0 399 1502 5.65 706 6.42/[399]36.50 4 5.33 8.00 5XT 2254 173 11 0 184 1502 12.26 802 21.83/[184]26.19 3 4.00 8.00 5XT 2254 208 11 0 218 1502 10.32 897 26.49/[218]20.07 2 2.67 8.00 5XT 2254 242 11 0 253 1502 8.91 993 31.16/[253]16.10 1 1.33 8.00 5XT 2254 277 11 0 288 1502 7.84 1088 35.83/[288]13.34 [5.84] Civil Design Professionals Page 1 Civil Design Professionals version 3.1.13122 Project: Candy Cove Location: Prior Lake, MN Designer: ACM Date: 5/15/2013 Section: 13.33 Design Method: NCMA_09_3rd_Ed Design Unit: ReCon SOIL PARAMETERS φ coh γ Retained Soil: 38 deg 0 psf 120 pcf Foundation Soil: 38 deg 0 psf 120 pcf Leveling Pad: Crushed Stone GEOMETRY Design Height: 13.33 ft Live Load: 0 psf Wall Batter/Tilt: 3.60/ 0.00 deg Live Load Offset: 0.00 ft Embedment: 1.33 ft Live Load Width: 0 ft Leveling Pad Depth: 1.00 ft Dead Load: 0 psf Slope Angle: 26.6 deg Dead Load Offset: 0.0 ft Slope Length: 24.0 ft Dead Load Width: 0 ft Slope Toe Offset: 0.0 ft Leveling Pad Width: 6.00 ft Vertical δ on Single Depth FACTORS OF SAFETY Sliding: 1.50 Overturning: 1.50 Bearing: 2.00 RESULTS FoS Sliding: 2.17 (lvlpd) FoS Overturning: 2.21 Bearing: 2435.47 FoS Bearing: 13.92 Name Elev.{dpth]ka Pa Paq Paqd - PaC PaT FSsl (base of leveling pad)FoS OT TC 12.00[1.33]0.280 30 0 0 0 30 100.00 32.30 24 10.67[2.66]0.280 119 0 0 0 119 63.92 7.92 24 9.33[4.00]0.280 268 0 0 0 268 28.99 3.65 24 8.00[5.33]0.280 477 0 0 0 477 16.64 2.13 39 6.67[6.66]0.319 850 0 0 0 850 10.47 3.39 39 5.33[8.00]0.319 1224 0 0 0 1224 7.55 2.55 39 4.00[9.33]0.319 1666 0 0 0 1666 5.76 2.01 60 2.67[10.66]0.319 2176 0 0 0 2176 5.00 3.10 60 1.33[12.00]0.319 2755 0 0 0 2755 4.14 2.59 60 0.00[13.33]0.319 3401 0 0 0 3401 2.17 (3.01)2.21 Civil Design Professionals Page 1 COMPOUND RESULTS Compound stability is a global analysis (Bishop) with the failure planes originating at the top of the slope / wall and existing out through the face of the wall. For MSE walls, the resistance of the geogrid reinforcement is included in the analysis and the shear resistance of the face units is included. ID Enter Point X Enter Point Y Exit Point X Exit Point Y Center X Center Y Radius FoS 677 33.08 25.35 5.08 1.33 -202.21 271.32 340.39 3.267 678 33.08 25.35 5.08 1.33 -91.32 142.05 170.57 3.285 679 33.08 25.35 5.08 1.33 -54.25 98.83 114.13 3.308 544 30.41 25.35 5.08 1.33 -191.64 234.21 304.84 3.333 680 33.08 25.35 5.08 1.33 -35.63 77.13 86.03 3.334 712 33.08 25.35 3.50 4.00 -46.17 103.98 111.64 3.344 711 33.08 25.35 3.50 4.00 -78.76 149.15 166.84 3.345 713 33.08 25.35 3.50 4.00 -29.80 81.30 84.17 3.350 710 33.08 25.35 3.50 4.00 -176.25 284.22 332.92 3.353 545 30.41 25.35 5.08 1.33 -86.69 123.50 152.80 3.354 GLOBAL RESULTS Global stability is a global analysis (Bishop) with the failure planes originating at the top of the slope / wall and existing out below the wall in the area infront of the structure. For MSE walls, the resistance of the geogrid reinforcement is included in the analysis. The curve may go through the base of the wall and the wall shear would be included. In most cases the failure plane will pass below the structure. ID Enter Point X Enter Point Y Exit Point X Exit Point Y Center X Center Y Radius FoS 365 27.75 25.35 -18.91 1.33 -5.33 32.27 33.79 1.652 190 22.42 23.18 -16.25 1.33 -4.07 24.91 26.54 1.656 183 22.42 23.18 -13.58 1.33 -2.60 23.81 25.02 1.665 494 30.41 25.35 -21.58 1.33 -6.72 37.44 39.05 1.670 379 27.75 25.35 -21.58 1.33 -6.74 33.52 35.44 1.671 286 25.08 24.51 -21.58 1.33 -6.97 30.48 32.60 1.681 198 22.42 23.18 -18.91 1.33 -5.54 26.05 28.10 1.685 265 25.08 24.51 -16.25 1.33 -3.51 27.05 28.70 1.691 596 33.08 25.35 -16.25 1.33 -3.39 37.59 38.47 1.694 354 27.75 25.35 -16.25 1.33 -3.29 29.91 31.37 1.695 Civil Design Professionals Page 2 c SOIL TYPE RETAINED SOIL ƒ0 PSF 120 PCF ONSITE POORLY GRADED SAND FOUNDATION SOIL ƒ0 PSF 120 PCF ONSITE POORLY GRADED SAND CANDY COVE PRIOR LAKE, MINNESOTA GENERAL NOTES:GENERAL NOTES: QUALITY ASSURANCE PROVISIONS: 1.WALL CONSTRUCTION SHALL BE SUPERVISED BY A QUALIFIED ENGINEER OR TECHNICIAN TO VERIFY FIELD AND SITE SOIL CONDITIONS. IF THIS WORK IS NOT PERFORMED BY THE SITE GEOTECHNICAL ENGINEER, A QUALIFIED GEOTECHNICAL ENGINEER/TECHNICIAN SHALL BE CONSULTED IN THOSE MATTERS PERTAINING TO THE SOIL CONDITIONS AND WALL PERFORMANCE. 2.THE FOUNDATION SOILS AT THE BASE OF THE WALL SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER. ANY UNSUITABLE SOILS OR IMPROPERLY COMPACTED EMBANKMENT MATERIAL SHALL BE REMOVED AND REPLACED AS DIRECTED BY THE ENGINEER PRIOR TO WALL CONSTRUCTION TO PROVIDE ADEQUATE BEARING CAPACITY AND MINIMIZE SETTLEMENT. 3.ALL WALL EXCAVATION AND RETAINED SOILS SHALL BE INSPECTED FOR GROUNDWATER CONDITIONS. ANY ADDITIONAL DRAINAGE PROVISIONS REQUIRED IN THE FIELD SHALL BE INCORPORATED INTO THE WALL CONSTRUCTION AS DIRECTED BY THE GEOTECHNICAL ENGINEER. 4.WALL BACKFILL MATERIAL SHALL BE TESTED AND APPROVED BY THE ENGINEER, MEETING THE MINIMUM REQUIREMENTS OF THE APPROVED DESIGN PLANS OR SPECIFICATIONS. 5.ALL SOIL BACKFILL SHALL BE TESTED BY THE GEOTECHNICAL ENGINEER FOR MOISTURE, DENSITY, AND COMPACTION PERIODICALLY (EVERY 2' VERTICALLY, 100'-200' C/C) MEETING THE MINIMUM REQUIREMENTS OF THE APPROVED DESIGN PLANS OR SPECIFICATIONS. 6.THE CONTRACTOR SHALL ESTABLISH AND MAINTAIN QUALITY CONTROL FOR THE CONSTRUCTION OF THE WALL TO ASSURE COMPLIANCE WITH CONTRACT REQUIREMENTS AND MAINTAIN RECORDS OF ITS QUALITY CONTROL. 7.ALL WALL ELEVATIONS, GRADES, AND BACK SLOPE CONDITIONS SHALL BE VERIFIED BY THE ENGINEER IN THE FIELD FOR CONFORMANCE WITH APPROVED DESIGN PLANS. ANY REVISIONS TO THE STRUCTURE GEOMETRY OR DESIGN CRITERIA SHALL REQUIRE DESIGN MODIFICATIONS PRIOR TO PROCEEDING WITH CONSTRUCTION. SHEET INDEX SHEET DESCRIPTION 1.TITLE SHEET 2.SITE PLAN 3.WALL 1 ELEVATION 4.WALL 1 ELEVATION 5.TYPICAL WALL SECTION 6.TYPICAL UNIT DETAILS 7.SPECIFICATIONS TITLE SHEET N.T.S. Project: Title: Project No: Registration No: Sheet No: Designed By: Scale: Date: No.RevisionDate By ACM MAY 15, 2013 PRIOR LAKE, MINNESOTACANDY COVE 25493 13-144 Date: 1 2 3 4 5 6 COPYRIGHT (c) 2011- 2013 BY CIVIL DESIGN PROFESSIONALS 8609 LYNDALE AVENUE SOUTH, SUITE 200 BLOOMINGTON, MN 55420 PHONE: (952) 303-5312 | FAX: (763) 392-1989 | WEBSITE: WWW.CDP-US.COM CIV IL DES IGNP R O F E S S I O N A L S Michael R. Johnson, P.E. I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. DESIGN PROVISIONS: 1.THE FOLLOWING EFFECTIVE STRENGTH PARAMETERS WERE ASSUMED IN THE PREPARATION OF THE STRUCTURAL CALCULATIONS FOR THE RECON RETAINING WALL SYSTEM: SOIL TYPES AND DESIGN PROPERTIES SHALL BE CONFIRMED BY THE SITE GEOTECHNICAL ENGINEER PRIOR TO WALL CONSTRUCTION. 2.THE WALL IS DESIGNED TO SUPPORT THE FOLLOWING MAXIMUM SURCHARGE LOADINGS AND GEOMETRY: LIVE LOAD: NONE DEAD LOAD: NONE BACK SLOPE: 2H:1V SEISMIC: NOT APPLICABLE HYDROSTATIC: NOT APPLICABLE 3.THE FOUNDATION SOILS AT THE WALL LOCATIONS SHALL BE CAPABLE OF SAFELY SUPPORTING THE MINIMUM APPLIED BEARING PRESSURE AS SHOWN ON THE WALL PROFILES WITHOUT FAILURE OR EXCESSIVE SETTLEMENT. LOCAL BEARING CAPACITY SHALL BE CONFIRMED BY THE SITE GEOTECHNICAL ENGINEER AFTER FOUNDATION EXCAVATION AND PRIOR TO WALL CONSTRUCTION. 4.DESIGN METHOD: NCMA REFER TO PROJECT DESIGN CALCULATIONS FOR FACTORS OF SAFETY. IF ONSITE GEOMETRY DIFFERS FROM THAT SHOWN IN THE CALCULATIONS CDP SHALL BE CONTACTED AND A REDESIGN MAY BE NECESSARY. 964 962 960 9 7 0 9 7 2 9 7 4 9 7 6 9 7 8 9 8 0 9 8 2 9 8 4 963 9 6 6 9 6 8 958 95 6 95 4 S I T E P L A N 1 " = 2 0 ' NOTES:1.THE SITE PLAN SHOWN IS FOR ILLUSTRATIVE PURPOS E S O N L Y . I T W A S REPRODUCED FROM A SKETCH PROVIDED BY JASO N M I L L E R D A T E D 05/06/13.2.ADD TURF REINFORCEMENT MAT ON SLOPE EXCEE D I N G 3 H : 1 V . T H E APPROXIMATE LIMITS IS SHOWN ON THIS SHEET.3.THE CONTRACTOR SHALL VERIFY INVERTS OF PROPOS E D A N D E X I S T I N G UTILITIES TO ENSURE THERE ARE NO CONFLICTS. THE E N G I N E E R S H A L L BE CONTACTED IF CONFLICTS ARISE AND AN ALTERNA T I V E D E S I G N M A Y BE REQUIRED. P r o j e c t : T i t l e : P r o j e c t N o : R e g i s t r a t i o n N o : S h e e t N o : D e s i g n e d B y : S c a l e : D a t e : No.RevisionDate B y A C M M A Y 1 5 , 2 0 1 3 P R I O R L A K E , M I N N E S O T A C A N D Y C O V E 2 5 4 9 3 1 3 - 1 4 4 D a t e : 123456 COPYRIGHT (c) 2011- 2013 BY CIVIL DESIGN PROFESSIONALS 8609 LYNDALE AVENUE SOUTH, SUITE 200 BLOOMINGTON, MN 55420PHONE: (952) 303-5312 | FAX: (763) 392-1989 | WEBSITE: WWW.CDP-US.COM CIVIL DESIGNP R O F E S S I O N A L S M i c h a e l R . J o h n s o n , P . E . I h e r e b y c e r t i f y t h a t t h i s p l a n , s p e c i f i c a t i o n , o r r e p o r t w a s p r e p a r e d b y m e o r u n d e r m y d i r e c t s u p e r v i s i o n a n d t h a t I a m a d u l y L i c e n s e d P r o f e s s i o n a l E n g i n e e r u n d e r t h e l a w s o f t h e S t a t e o f M i n n e s o t a . Know what's RBEGIN WALL E N D W A L L A A 1 = T U R F R E I N F O R C E M E N T 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M T L C T 6 0 B 3 9 M 3 9 M 3 9 M 2 4 M 2 4 M 2 4 M T 2 4 M 2 4 M 2 4 M 3 9 M 3 9 M 3 9 M 2 4 M 2 4 M 2 4 M 2 4 M 3 9 M 3 9 M 3 9 M 3 9 M 3 9 M 3 9 M 3 9 M 3 9 M 2 4 M 2 4 M 2 4 M 2 4 M 2 4 M T 2 4 M 2 4 M 24 M 3 9 B 3 9 B 24M24M24M24B EL = 965.33 EL = 968.00 E L = 9 7 2 . 0 0 EL = 961.33 E L = 9 5 8 . 6 7 F I N I S H E D G R A D E A T B O T T O M O F W A L L 12" LEVELING PAD 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 24B24B24B24B24B 24M24M24M24M24M LCT2HTT LCT24M24M24M24MTT LCT24M24M 2 4 M 39B39B T T L C T 2 4 M 2 4 M 2 4 M T 3 9 M 3 9 M 3 9 M 2 4 M T L C T T T 2 4 M 6 0 M 6 0 M 6 0 B 6 0 B 6 0 B 6 0 B E L = 9 5 8 . 6 7 E L = 9 7 2 . 0 0 R E C O N W A L L 1 - F R O N T F A C E E L E V A T I O N WALL (FEET)DIST ALONG DEPTH (FEET)REINFORCEMENT BEARING CAPACITY BEGIN WALL MATCH LINE 120.00 0.00 74.00 BEGIN RADIUS 90.00 END RADIUS S H E E T 4 58.00 ¾ BEARING CAPACITY 960.00958.00 962.00 964.00 966.00 968.00 970.00 972.00 974.00 9 5 8 . 0 0 9 6 0 . 0 0 9 6 2 . 0 0 9 6 4 . 0 0 9 6 6 . 0 0 9 6 8 . 0 0 9 7 0 . 0 0 9 7 2 . 0 0 9 7 4 . 0 0 010 BEARING CAPACITY2030 4 0 5 0 6 0 7 0 8 0 9 0 1 0 0 1 1 0 1 2 0 G R A V I T Y W A L L 6 ( 5 , ( 6     8 1 , 7 6       ƒ  % $ 7 7 ( 5 2 , 5 0 0 P S F M I N I M U M 2,000 PSF MINIMU M 2 H = 2 4 " D E E P H A L F M I D D L E B L O C K T = 2 4 " D E E P T O P B L O C K L C T = L E F T C O R N E R T O P B L O C K 6 3 3 3 2 4 M = 2 4 " D E E P M I D D L E B L O C K 9 8 2 4 B = 2 4 " D E E P B O T T O M B L O C K 6 6 0 B = 6 0 " D E E P B O T T O M B L O C K 2 5 6 H B = 6 0 " D E E P H A L F B O T T O M B L O C K 1 6 0 M = 6 0 " D E E P M I D D L E B L O C K 4 3 R E C O N B L O C K K E Y : 3 9 M = 3 9 " D E E P M I D D L E B L O C K 7 7 3 9 B = 3 9 " D E E P B O T T O M B L O C K 4 6 H = 6 0 " D E E P H A L F M I D D L E B L O C K 1 3 H = 3 9 " D E E P H A L F M I D D L E B L O C K 1 ELEVATION ELEVATION W A L L 1 E L E V A T I O N 1 " = 1 0 ' P r o j e c t : T i t l e : P r o j e c t N o : R e g i s t r a t i o n N o : S h e e t N o : D e s i g n e d B y : S c a l e : D a t e : No.RevisionDate B y A C M M A Y 1 5 , 2 0 1 3 P R I O R L A K E , M I N N E S O T A C A N D Y C O V E 2 5 4 9 3 1 3 - 1 4 4 D a t e : 123456 COPYRIGHT (c) 2011- 2013 BY CIVIL DESIGN PROFESSIONALS 8609 LYNDALE AVENUE SOUTH, SUITE 200 BLOOMINGTON, MN 55420PHONE: (952) 303-5312 | FAX: (763) 392-1989 | WEBSITE: WWW.CDP-US.COM CIVIL DESIGNP R O F E S S I O N A L S M i c h a e l R . J o h n s o n , P . E . I h e r e b y c e r t i f y t h a t t h i s p l a n , s p e c i f i c a t i o n , o r r e p o r t w a s p r e p a r e d b y m e o r u n d e r m y d i r e c t s u p e r v i s i o n a n d t h a t I a m a d u l y L i c e n s e d P r o f e s s i o n a l E n g i n e e r u n d e r t h e l a w s o f t h e S t a t e o f M i n n e s o t a . GENERAL NOTES:1.WALL SHALL BE CONSTRUCTED WITH RECON 24", 39", AND 60" D E E P U N I T S U S I N G ƒ%$77(52.THE WALL IS DESIGNED AS A GRAVITY WALL REQUIRIN G N O G E O G R I D REINFORCEMENT.3.A GEOTEXTILE FABRIC SHALL BE PLACED WHERE RETAINING W A L L S A B U T T O EXISTING FOUNDATIONS AS SHOWN ON SITE PLAN (SHEET 2 ) . O V E R L A P A L L ABUTMENT JOINTS 24" WITH A MINIMUM 48" WIDE FABRIC T O P R E V E N T T H E COREFILL AND BACKFILL FROM MIGRATING THROUGH THE ABU T M E N T J O I N T S . 4.SEE MANUFACTURER INFORMATION FOR ADDITIONAL CONSTR U C T I O N D E T A I L S FOR THE RECON RETAINING WALL SYSTEM. THE MANUFACTURE R I N F O R M A T I O N SHALL ACCOMPANY THE CONSTRUCTION PLANS. 6 H B 3 H 2 H 2 H 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 6 0 B 3 9 M 3 9 M T 2 4 M 2 4 M 2 4 M 3 9 M 3 9 M T 2 4 M E L = 9 7 2 . 0 0 E L = 9 5 8 . 6 7 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 0 M 6 H F I N I S H E D G R A D E A T B O T T O M O F W A L L 1 2 " L E V E L I N G P A D R E C O N W A L L 1 - F R O N T F A C E E L E V A T I O N W A L L ( F E E T ) D I S T A L O N G D E P T H ( F E E T ) R E I N F O R C E M E N T B E A R I N G C A P A C I T Y END WALL MATCH LINE 120.00 146.00 A B U T T O E X I S T I N G F O U N D A T I O N 9 6 0 . 0 0 9 5 8 . 0 0 9 6 2 . 0 0 9 6 4 . 0 0 9 6 6 . 0 0 9 6 8 . 0 0 9 7 0 . 0 0 9 7 2 . 0 0 9 7 4 . 0 0 9 5 8 . 0 0 9 6 0 . 0 0 9 6 2 . 0 0 9 6 4 . 0 0 9 6 6 . 0 0 9 6 8 . 0 0 9 7 0 . 0 0 9 7 2 . 0 0 9 7 4 . 0 0 1 4 6 . 0 0 1 2 0 1 3 0 1 4 0 2 , 5 0 0 P S F M I N I M U M G R A V I T Y W A L L 6 ( 5 , ( 6     8 1 , 7 6       ƒ  % $ 7 7 ( 5 2 H = 2 4 " D E E P H A L F M I D D L E B L O C K T = 2 4 " D E E P T O P B L O C K L C T = L E F T C O R N E R T O P B L O C K 6 3 3 3 2 4 M = 2 4 " D E E P M I D D L E B L O C K 9 8 2 4 B = 2 4 " D E E P B O T T O M B L O C K 6 6 0 B = 6 0 " D E E P B O T T O M B L O C K 2 5 6 H B = 6 0 " D E E P H A L F B O T T O M B L O C K 1 6 0 M = 6 0 " D E E P M I D D L E B L O C K 4 3 R E C O N B L O C K K E Y : 3 9 M = 3 9 " D E E P M I D D L E B L O C K 7 7 3 9 B = 3 9 " D E E P B O T T O M B L O C K 4 6 H = 6 0 " D E E P H A L F M I D D L E B L O C K 1 3 H = 3 9 " D E E P H A L F M I D D L E B L O C K 1 ELEVATION ELEVATION W A L L 1 E L E V A T I O N 1 " = 1 0 ' P r o j e c t : T i t l e : P r o j e c t N o : R e g i s t r a t i o n N o : S h e e t N o : D e s i g n e d B y : S c a l e : D a t e : No.RevisionDate B y A C M M A Y 1 5 , 2 0 1 3 P R I O R L A K E , M I N N E S O T A C A N D Y C O V E 2 5 4 9 3 1 3 - 1 4 4 D a t e : 123456 COPYRIGHT (c) 2011- 2013 BY CIVIL DESIGN PROFESSIONALS 8609 LYNDALE AVENUE SOUTH, SUITE 200 BLOOMINGTON, MN 55420PHONE: (952) 303-5312 | FAX: (763) 392-1989 | WEBSITE: WWW.CDP-US.COM CIVIL DESIGNP R O F E S S I O N A L S M i c h a e l R . J o h n s o n , P . E . I h e r e b y c e r t i f y t h a t t h i s p l a n , s p e c i f i c a t i o n , o r r e p o r t w a s p r e p a r e d b y m e o r u n d e r m y d i r e c t s u p e r v i s i o n a n d t h a t I a m a d u l y L i c e n s e d P r o f e s s i o n a l E n g i n e e r u n d e r t h e l a w s o f t h e S t a t e o f M i n n e s o t a . GENERAL NOTES:1.WALL SHALL BE CONSTRUCTED WITH RECON 24", 39", AND 60" D E E P U N I T S U S I N G ƒ%$77(52.THE WALL IS DESIGNED AS A GRAVITY WALL REQUIRIN G N O G E O G R I D REINFORCEMENT.3.A GEOTEXTILE FABRIC SHALL BE PLACED WHERE RETAINING W A L L S A B U T T O EXISTING FOUNDATIONS AS SHOWN ON SITE PLAN (SHEET 2 ) . O V E R L A P A L L ABUTMENT JOINTS 24" WITH A MINIMUM 48" WIDE FABRIC T O P R E V E N T T H E COREFILL AND BACKFILL FROM MIGRATING THROUGH THE ABU T M E N T J O I N T S . 4.SEE MANUFACTURER INFORMATION FOR ADDITIONAL CONSTR U C T I O N D E T A I L S FOR THE RECON RETAINING WALL SYSTEM. THE MANUFACTURE R I N F O R M A T I O N SHALL ACCOMPANY THE CONSTRUCTION PLANS. 6 0 B 1 2 " X 7 2 " M I N C R U S H E D S T O N E O R U N R E I N F O R C E D C O N C R E T E L E V E L I N G P A D A P P R O X I M A T E L I M I T S O F E X C A V A T I O N E L = 9 5 8 . 6 7 13.33' E X P A N S I O N M A T E R I A L 6 0 M 6 0 " M I D D L E B L O C K 4 5 M 4 5 " M I D D L E B L O C K 3 9 M 3 9 M 3 9 M 3 9 " M I D D L E B L O C K 2 4 M 2 4 M 2 4 M 2 4 " M I D D L E B L O C K T 2 4 " T O P B L O C K E L = 9 7 2 . 0 0 4 " D I A D R A I N T I L E ( S E E N O T E 7 ) 1 2 " M I N D R A I N A G E Z O N E ( 1 " C R U S H E D S T O N E ) 6 0 " B O T T O M B L O C K F I N I S H E D G R A D E 2 M I N 1 8 " L O W P E R M E A B L E S O I L C O M P A C T E D O N S I T E S O I L R E T A I N E D S O I L 8 O Z F I L T E R F A B R I C T Y P I C A L G R A V I T Y W A L L S E C T I O N ( W A L L 1 S E C T I O N S H O W N A T 1 1 0 ' )    ƒ S A N D Y L E A N C L A Y E L E = 9 6 9 . 0 0 O N S I T E P O O R L Y G R A D E S A N D E X I S T I N G P R O P E R T Y L I N E E L = 9 8 4 . 0 0 T Y P I C A L W A L L S E C T I O N 1 " = 5 ' P r o j e c t : T i t l e : P r o j e c t N o : R e g i s t r a t i o n N o : S h e e t N o : D e s i g n e d B y : S c a l e : D a t e : No.RevisionDate B y A C M M A Y 1 5 , 2 0 1 3 P R I O R L A K E , M I N N E S O T A C A N D Y C O V E 2 5 4 9 3 1 3 - 1 4 4 D a t e : 123456 COPYRIGHT (c) 2011- 2013 BY CIVIL DESIGN PROFESSIONALS 8609 LYNDALE AVENUE SOUTH, SUITE 200 BLOOMINGTON, MN 55420PHONE: (952) 303-5312 | FAX: (763) 392-1989 | WEBSITE: WWW.CDP-US.COM CIVIL DESIGNP R O F E S S I O N A L S M i c h a e l R . J o h n s o n , P . E . I h e r e b y c e r t i f y t h a t t h i s p l a n , s p e c i f i c a t i o n , o r r e p o r t w a s p r e p a r e d b y m e o r u n d e r m y d i r e c t s u p e r v i s i o n a n d t h a t I a m a d u l y L i c e n s e d P r o f e s s i o n a l E n g i n e e r u n d e r t h e l a w s o f t h e S t a t e o f M i n n e s o t a . 1.THE SECTION SHOWN IS A REPRESENTATIVE WALL SECTION. THE WALL HEIGH T S , ELEVATIONS, TOE SLOPES, AND BACK SLOPES VARY ACCORDING TO THE ELEVATI O N PLAN AND SITE PLAN RESPECTIVELY.2.UPON EXCAVATION, WHERE UNSUITABLE SOILS ARE FOUND, SUBCUT TO DEPTH "D" A S REQUIRED BY THE ONSITE GEOTECHNICAL ENGINEER AND REPLACE WITH SUITAB L E COMPACTED STRUCTURAL FILL TO ACHIEVE THE REQUIRED BEARING CAPACITY. T H E STRUCTURAL FILL SHALL BE COMPACTED TO A MINIMUM 95% STANDARD PROCT O R DENSITY.3.APPROXIMATE LIMITS OF EXCAVATION VARIES WHERE SUBCUT IS REQUIRED. ACTU A L LIMITS AND SIDE SLOPES SHALL BE DETERMINED BY OSHA REGULATIONS AND MAT C H FIELD CONDITIONS AS DETERMINED BY THE CONTRACTOR.4.ALL WORK AND MATERIALS SHALL COMPLY WITH ALL STATE, COUNTY AND CI T Y REGULATIONS AND CODES AS WELL AS OSHA STANDARDS.5.THE WALL SHALL BE CONSTRUCTED WITH SERIES 50: 24", 39", 45" AND 60" DEEP UNI T S 86,1*ƒ%$77(56.THE WALL IS DESIGNED AS A GRAVITY WALL REQUIRING NO GEOGRID REINFORCEMEN T . 7.4" DIAMETER CORRUGATED PERFORATED PLASTIC DRAINPIPE WRAPPED WITH A GEOTEXTILE FABRIC INSTALLED AS LOW AS POSSIBLE AND OUTLET UNDER T H E DRIVEWAY INTO DETENTION BASIN.8.AN EXPANSION MATERIAL SHALL BE REQUIRED BETWEEN THE RETAINING WALL BLO C K AND ALL POURED IN PLACE CONCRETE (EXCLUDING THE LEVELING PAD).9.ALL AVAILABLE MEANS AND METHODS SHALL BE USED TO KEEP EXCAVATION FOR T H E RETAINING WALLS WITHIN THE CONSTRUCTION LIMITS SHOWN ON THE PLA N S . EXCAVATION SLOPES SHALL BE DETERMINED BY OSHA REGULATIONS AND IN-SITU S O I L CONDITIONS.10.CONSTRUCTION FOR WALLS WITH AN ABUTMENT SHALL ALWAYS BEGIN FROM EXISTI N G STRUCTURES TOWARDS THE OPEN END OF THE WALL. A GEOTEXTILE FABRIC SHALL B E PLACED WHERE RETAINING WALLS ABUT TO THE BRIDGE FOUNDATION AS SHOWN O N THE PLAN SHEETS. OVERLAP ALL ABUTMENT JOINTS 24" WITH A MINIMUM 48" WI D E FABRIC TO PREVENT AGGREGATE BACKFILL FROM MIGRATING THROUGH T H E ABUTMENT JOINTS.11.THE CONTRACTOR SHALL FIELD VERIFY ALL LOCATIONS AND DEPTHS OF EXISTI N G UTILITIES PRIOR TO COMMENCING CONSTRUCTION. IF CONFLICTS EXIST THE ENGINE E R SHALL BE CONTACTED IMMEDIATELY. THE CONTRACTOR SHALL COORDINA T E RELOCATION OF ALL EXISTING CONDUITS AND SERVICES WITH THE UTILITY PROVIDER.12.DO NOT BRING HEAVY COMPACTION OR PAVING EQUIPMENT WITHIN 3 FEET OF T H E BACK OF THE RETAINING WALL. ONLY HAND-OPERATED COMPACTION EQUIPMENT (E . G . TAMPER, PLATE COMPACTOR, SHEEP'S FOOT ROLLER) SHALL BE USED WITHIN 3 FEET O F THE BACK OF THE RETAINING WALL UNITS.13.SEE MANUFACTURERS INFORMATION FOR ADDITIONAL DETAILS ON THE RETAINI N G WALL SYSTEM. THE MANUFACTURER INFORMATION SHALL ACCOMPANY T H E CONSTRUCTION PLANS.14.CIVIL DESIGN PROFESSIONALS SHALL NOT BE LIABLE FOR CONTRACTOR NEGLIGENCE.GENERAL NOTES: T Y P I C A L U N I T D E T A I L S A S N O T E D P r o j e c t : T i t l e : P r o j e c t N o : R e g i s t r a t i o n N o : S h e e t N o : D e s i g n e d B y : S c a l e : D a t e : No.RevisionDate B y A C M M A Y 1 5 , 2 0 1 3 P R I O R L A K E , M I N N E S O T A C A N D Y C O V E 2 5 4 9 3 1 3 - 1 4 4 D a t e : 123456 COPYRIGHT (c) 2011- 2013 BY CIVIL DESIGN PROFESSIONALS 8609 LYNDALE AVENUE SOUTH, SUITE 200 BLOOMINGTON, MN 55420PHONE: (952) 303-5312 | FAX: (763) 392-1989 | WEBSITE: WWW.CDP-US.COM CIVIL DESIGNP R O F E S S I O N A L S M i c h a e l R . J o h n s o n , P . E . I h e r e b y c e r t i f y t h a t t h i s p l a n , s p e c i f i c a t i o n , o r r e p o r t w a s p r e p a r e d b y m e o r u n d e r m y d i r e c t s u p e r v i s i o n a n d t h a t I a m a d u l y L i c e n s e d P r o f e s s i o n a l E n g i n e e r u n d e r t h e l a w s o f t h e S t a t e o f M i n n e s o t a . 1 6 "    “    “    “    “ 6 3 R C T / L C T S H I M D E T A I L R E C O N T O P U N I T C O N C R E T E S H I M O R C R U S H E D S T O N E L O W P E R M E A B L E S O I L R E C O N T O P U N I T R E C O N M I D D L E U N I T R E C O N R C T U N I T 6 5RECON UNIT 1.THE LEVELING PAD SHALL BE CONSTRUCTED OF CRUSHED STONE OR 2,000 36,“UNREINFORCED CONCRETE.2.THE BASE FOUNDATION SHALL BE APPROVED BY THE SITE GEOTECHNICALENGINEER PRIOR TO PLACEMENT OF THE LEVELING PAD.BASE LEVELING PAD NOTES:RECON FULL BLOCK RECON TOP BLOCK6RECON/BASE PAD ISOMETRIC VIEW1 S C A L E : N . T . S . SCALE: N.T.S.SCALE: N.T.S.RECON PLAN VIEWRE C O N I S O M E T R I C V I E W RECON 3 9 " U N I T DEPTH:WEIGHT:HEIGHT:WIDTH:2 2 0 1 L B S 1 6 " 3 9 " 4 8 " RECON 24" UNITDEPTH:WEIGHT:HEIGHT:WIDTH:1411LBS 16"24"48"970 LBS RECON TOP UNIT48"WIDTH:DEPTH:HEIGHT:WEIGHT:16"24"RECON ELEVATION VIEW 16" 6 4 T Y P I C A L G U A R D R A I L D E T A I L N O T E : 1 . A U G E R P O S T H O L E . 2 . B A C K F I L L O R C O N C R E T E G U A R D R A I L P O S T I N P L A C E . 3 ' M I N 3 ' ( M I N ) R E C O N M I D D L E U N I T B A C K F I L L O R C O N C R E T E F E N C E P O S T S C A L E : N . T . S . E L E V A T I O N S E C T I O N 6 " M I N V A R I E S 6 " M I N 1 2 " M I N U N R E I N F O R C E D C O N C R E T E O R C R U S H E D S T O N E L E V E L I N G P A D B L O C K D E P T H + 1 2 " M I N 6 2 L E V E L I N G P A D D E T A I L S C A L E : N . T . S . 1 6 S T E P 6 6 1 . T H E D R A I N A G E S Y S T E M S H A L L C O N S I S T O F A 4 " D I A M E T E R P E R F O R A T E D P I P E W R A P P E D W I T H G E O T E X T I L E . 2 . T H E P L A C E M E N T O F T H E D R A I N A G E S Y S T E M S H A L L O C C U R O N L Y D U R I N G T H E C O N S T R U C T I O N B A C K F I L L I N G . N O T E S : 4 " D I A P E R F O R A T E D P I P E W R A P P E D I N G E O T E X T I L E R E C O N B L O C K D R A I N A G E O U T L E T D E T A I L RECON 60 " B L O C K DEPTH:WEIGHT:HEIGHT:WIDTH:1 6 " 6 0 " 4 8 " “     / % 6 ““““EXCAVATION LIMITS UNIT FACE S C A L E : N . T . S . 12" MIN CRUSHED STONE ORCONCRETE LEVELING PAD“ S P E C I F I C A T I O N S N . T . S . P r o j e c t : T i t l e : P r o j e c t N o : R e g i s t r a t i o n N o : S h e e t N o : D e s i g n e d B y : S c a l e : D a t e : No.RevisionDate B y A C M M A Y 1 5 , 2 0 1 3 P R I O R L A K E , M I N N E S O T A C A N D Y C O V E 2 5 4 9 3 1 3 - 1 4 4 D a t e : 123456 COPYRIGHT (c) 2011- 2013 BY CIVIL DESIGN PROFESSIONALS 8609 LYNDALE AVENUE SOUTH, SUITE 200 BLOOMINGTON, MN 55420PHONE: (952) 303-5312 | FAX: (763) 392-1989 | WEBSITE: WWW.CDP-US.COM CIVIL DESIGNP R O F E S S I O N A L S M i c h a e l R . J o h n s o n , P . E . I h e r e b y c e r t i f y t h a t t h i s p l a n , s p e c i f i c a t i o n , o r r e p o r t w a s p r e p a r e d b y m e o r u n d e r m y d i r e c t s u p e r v i s i o n a n d t h a t I a m a d u l y L i c e n s e d P r o f e s s i o n a l E n g i n e e r u n d e r t h e l a w s o f t h e S t a t e o f M i n n e s o t a . PART 1: GENERAL1.01 DESCRIPTIONA.THE WORK TO BE PERFORMED INCLUDES SOURCING,PROVIDING AND INSTALLING CONCRETE RETAINING WALLBLOCKS TO THE LINES AND GRADES AS SPECIFIED ON THEPROJECT CONSTRUCTION DRAWINGS AND AS MAY BEFURTHER SPECIFIED HEREIN.B.WORK INCLUDES PREPARING FOUNDATION SOIL, FURNISHINGAND INSTALLING LEVELING PAD, DRAINAGE AGGREGATE, ANDBACKFILL TO THE LINES AND GRADES SHOWN ON THECONSTRUCTION DRAWINGS.C.WORK INCLUDES FURNISHING AND INSTALLING ALL RELATEDMATERIALS REQUIRED FOR CONSTRUCTION OF THERETAINING WALL AS SHOWN ON THE CONSTRUCTION SHOPDRAWINGS.1.02 REFERENCE STANDARDSA.ASTM D448 SIZES OF AGGREGATE FOR ROAD AND BRIDGECONSTRUCTION.B.ASTM D698 LABORATORY COMPACTION CHARACTERISTICSUSING STANDARD EFFORT.1.03 QUALITY ASSURANCEA.OWNER SHALL BE RESPONSIBLE FOR SOIL TESTING ANDINSPECTION QUALITY CONTROL DURING EARTHWORKOPERATIONS.PART 2: MATERIALS2.01 DEFINITIONSA.RECON RETAINING WALL UNIT - A PRECAST CONCRETE,SEGMENTAL FACING BLOCK PROVIDED BY AN AUTHORIZEDMANUFACTURER UNDER LICENSE TO RECON RETAININGWALL SYSTEMS, INC.B.BASE LEVELING PAD - AN UNREINFORCED CAST-IN-PLACE ORCOMPACTED CRUSHED STONE PAD WHICH SERVES AS A FLATSURFACE FOR PLACING THE INITIAL COURSE OF PRECASTUNITS.C.DRAINAGE AGGREGATE - CLEAN 1" CRUSHED ANGULAR ROCKLOCATED WITHIN AND IMMEDIATELY BEHIND THE RETAININGWALL UNITS TO FACILITATE DRAINAGE AND AVOIDCOMPACTION IN CLOSE PROXIMITY TO THE RETAINING WALLUNITS.D.FOUNDATION SOIL - SOIL ZONE IMMEDIATELY BENEATH THERETAINING WALL FACING UNITS AND THE WALL LEVELINGPAD.E.RETAINED SOIL - SOIL IMMEDIATELY BEHIND THE RETAININGWALL FACING DRAINAGE AGGREGATE OR REINFORCEDBACKFILL IF PRESENT.F.SUBSURFACE DRAINAGE SYSTEM - A SYSTEM FOR REMOVINGWATER FROM BEHIND THE WALL AND CHANNELING IT TO APOINT OF POSITIVE DRAINAGE. 2 . 0 2 R E C O N R E T A I N I N G W A L L U N I T S A . R E C O N W A L L U N I T S S H A L L H A V E A M I N I M U M 2 8 - D A Y C O M P R E S S I V E S T R E N G T H O F 4 , 0 0 0 P S I . S T A N D A R D W E I G H T C O N C R E T E S H A L L H A V E A 4 . 5 - 7 . 5 % A I R E N T R A I N M E N T B Y V O L U M E . W E I G H T O F C O N C R E T E S H A L L B E 1 4 5 P C F . B . T E X T U R E O N T H E F A C E O F T H E B L O C K S H A L L B E S P E C I F I E D . 2 . 0 3 B A S E L E V E L I N G P A D M A T E R I A L A . M A T E R I A L S H A L L C O N S I S T O F U N R E I N F O R C E D C O N C R E T E O R C O M P A C T E D C R U S H E D S T O N E A S S H O W N O N T H E C O N S T R U C T I O N D R A W I N G . 2 . 0 4 D R A I N A G E A G G R E G A T E A . D R A I N A G E A G G R E G A T E S H A L L C O N S I S T O F C L E A N 1 " C R U S H E D S T O N E O R C R U S H E D G R A V E L M E E T I N G T H E F O L L O W I N G G R A D A T I O N : S I E V E S I Z E % P A S S I N G 1 " 1 0 0 3 / 4 " 1 0 0 - 7 5 N O . 4 0 - 1 0 N O . 5 0 0 - 5 2 . 0 5 R E T A I N E D B A C K F I L L A . B A C K F I L L S H A L L B E F R E E O F D E B R I S O R O R G A N I C M A T E R I A L M E E T I N G T H E F O L L O W I N G G R A D A T I O N : S I E V E S I Z E % P A S S I N G 2 " 1 0 0 3 / 4 " 1 0 0 - 7 5 N O . 4 2 0 - 1 0 0 N O . 4 0 0 - 6 0 N O . 2 0 0 0 - 2 5 P L A S T I C I T Y I N D E X ( P I ) < 6 B . T H E M A X I M U M A G G R E G A T E S I Z E S H A L L B E L I M I T E D T O 2 " U N L E S S F I E L D T E S T S H A V E B E E N P E R F O R M E D T O E V A L U A T E P O T E N T I A L S T R E N G T H R E D U C T I O N T O I N S T A L L A T I O N . C . M A T E R I A L C A N B E S I T E E X C A V A T E D M A T E R I A L W H E N T H E A B O V E R E Q U I R E M E N T S A R E M E T . U N S U I T A B L E S O I L S F O R B A C K F I L L ( H I G H P L A S T I C C L A Y S O R O R G A N I C M A T E R I A L S ) S H A L L N O T B E U S E D I N T H E R E T A I N E D S O I L M A S S . D . C O N T R A C T O R S H A L L S U B M I T R E T A I N E D F I L L S A M P L E A N D T E S T R E S U L T S T O T H E A R C H I T E C T / E N G I N E E R F O R A P P R O V A L P R I O R T O C O N S T R U C T I O N . P A R T 3 : E X E C U T I O N 3 . 0 1 E X C A V A T I O N A . C O N T R A C T O R S H A L L E X C A V A T E T O T H E L I N E S A N D G R A D E S S H O W N O N T H E C O N S T R U C T I O N D R A W I N G S . C O N T R A C T O R S H A L L B E C A R E F U L N O T T O D I S T U R B E M B A N K M E N T A N D F O U N D A T I O N M A T E R I A L S B E Y O N D L I N E S S H O W N . 3 . 0 2 F O U N D A T I O N S O I L P R E P A R A T I O N A . F O U N D A T I O N S O I L S H A L L B E E X C A V A T E D A S R E Q U I R E D F O R L E V E L I N G P A D D I M E N S I O N S S H O W N O N T H E C O N S T R U C T I O N D R A W I N G S , O R A S D I R E C T E D B Y T H E G E O T E C H N I C A L E N G I N E E R . B . U N S U I T A B L E S O I L S S H A L L B E R E M O V E D A N D R E P L A C E D W I T H A C C E P T A B L E M A T E R I A L . C . O V E R - E X C A V A T E D A R E A S S H A L L B E B A C K F I L L E D W I T H A P P R O V E D C O M P A C T E D B A C K F I L L M A T E R I A L . 3 . 0 3 B A S E L E V E L I N G P A D A . L E V E L I N G P A D M A T E R I A L S S H A L L B E P L A C E D U P O N A P P R O V E D F O U N D A T I O N A S S H O W N O N T H E C O N S T R U C T I O N D R A W I N G S T O A M I N I M U M T H I C K N E S S O F 1 2 " . B . A G G R E G A T E M A T E R I A L S H A L L B E C O M P A C T E D T O P R O V I D E A D E N S E , L E V E L S U R F A C E O N W H I C H T O P L A C E T H E F I R S T C O U R S E O F M O D U L A R U N I T S . C O M P A C T I O N S H A L L B E T O 9 5 % O F S T A N D A R D P R O C T O R D E N S I T Y A S D E T E R M I N E D I N A C C O R D A N C E W I T H A S T M D 6 9 8 . F O R C R U S H E D R O C K , M A T E R I A L S H A L L B E D E N S E L Y C O M P A C T E D A S D E T E R M I N E D B Y V I S U A L O B S E R V A T I O N . 3 . 0 4 U N I T I N S T A L L A T I O N A . T H E F I R S T C O U R S E O F C O N C R E T E M O D U L A R W A L L U N I T S S H A L L B E C A R E F U L L Y P L A C E D O N T H E B A S E L E V E L I N G P A D . E A C H U N I T S H A L L B E C H E C K E D F O R L E V E L A N D A L I G N M E N T . B . U N I T S A R E P L A C E D S I D E B Y S I D E F O R F U L L L E N G T H O F W A L L A L I G N M E N T . A L I G N M E N T M A Y B E D O N E B Y M E A N S O F A S T R I N G L I N E O R O F F S E T F R O M A B A S E L I N E . C . S W E E P E X C E S S M A T E R I A L F R O M T O P O F U N I T S A N D I N S T A L L N E X T C O U R S E . E N S U R E T H A T E A C H C O U R S E I S C O M P L E T E L Y U N I T F I L L E D , B A C K F I L L E D , A N D C O M P A C T E D P R I O R T O P R O C E E D I N G T O N E X T C O U R S E . 3 . 0 5 F I L L P L A C E M E N T A . B A C K F I L L M A T E R I A L S H A L L B E P L A C E D W I T H A M A X I M U M O F 8 " L I F T S A N D C O M P A C T E D T O 9 5 % O F S T A N D A R D P R O C T O R D E N S I T Y . A S D E T E R M I N E D I N A C C O R D A N C E W I T H A S T M D 6 9 8 . T H E I N P L A C E M O I S T U R E C O N T E N T S H A L L N O T E X C E E D T H E O P T I M U M M O I S T U R E C O N T E N T A S D E T E R M I N E D I N A C C O R D A N C E W I T H A S T M D 6 9 8 A N D B E N O L O W E R T H A N 2 % B E L O W O P T I M U M M O I S T U R E C O N T E N T . B . O N L Y H A N D - O P E R A T E D C O M P A C T I O N E Q U I P M E N T S H A L L B E A L L O W E D W I T H I N 3 ' O F T H E B A C K S U R F A C E O F T H E C O N C R E T E U N I T S .