Loading...
HomeMy WebLinkAboutCandy Cove Summary Letter 09_10_13 Engineering  Planning  Environmental  Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 Minneapolis  St. Cloud Equal Opportunity Employer K:\01905-040\Structures\Candy Cove Summary Letter.doc September 10, 2013 4646 Dakota Street S.E. Prior Lake, MN, 55372-1714 Re: Candy Cove Retaining Wall Review WSB Project No. 01905-040 Dear Mr. Hutchins: We have completed our reviews of the Retaining Wall Project. The project began with general excavation and construction of wall #4 on November 2, 2012 and finished with the completion of the add-on southwestern wall on August 10, 2013. Each of the seven original walls and the additional wall received multiple site visits from WSB Inc. Site visit observations included but were not limited to block reviews, drainage rock measurements, geogrid examinations and geogrid measurements. Per information provided by Braun Intertec and Civil Design Professionals, the retaining walls met or exceeded the structural requirements of the specifications. Braun Intertec also visited the site and observed the walls. Braun Intertec provided WSB information on soils borings and soils requirements. A final soils report was not provided, and should be requested through the contractor for verification that the retaining walls meet or exceed the required soils specifications. Please find attached a hard copy of the report and a CDs which include all of the project observations, designs, specifications, reports, construction photos, and Braun Intertec submittals. I have also included in a separate CD for the additional southwestern wall added in June 2013. If you have any questions regarding this letter please call me at 763.231.4844. Sincerely, WSB & Associates, Inc. Aaron Nelson, PE Project Manager