HomeMy WebLinkAboutStructural Steel Report 2014 r';':4't , � . ,.t:. ,. BRAUN Braun Intertec Corporation Phone:952.995.2000 I NTE RTEC now.Hampshire Ave S Fax: 952.995.2020 Minneapolis,MN 55438 Web: braunintertec.com July 17, 2014 Project B14-02444 Mr.Steve Svendsen Black-Dew, LLC 2586 7th Avenue East, Suite 301 North St. Paul, MN 55109 Re: Structural Steel Special Inspection Procedural and Final Report Twin Oaks Middle School 15860 Fish Pond Road SE Prior Lake, Minnesota Dear Mr. Svendsen: Please find attached to this procedural report the Structural Steel Special Inspection Final Report for the Twin Oaks Middle School Project and the supporting Special Inspection Daily Reports. Special Inspection and Testing Procedures The special inspection services were periodically provided by International Code Council (ICC) certified special inspectors in accordance with the requirements of the Minnesota State Building Code, Chapter 17 of the International Building Code (IBC) and the project plans and specifications. The purpose of special inspections is to provide a review of the contractor's work designated by the project structural engineer as needing special inspection under the guidelines of the IBC to determine compliance with the approved construction documents. The special inspector does not have the responsibility or authority to, nor is it the intent of special inspections to have them,judge or modify the construction documents. Only the structural engineer of record can do this. As the special inspections were completed,a Special Inspection Daily Report was prepared to summarize the results of our inspections and testing. A copy of this report was provided to the contractor's site representative for their review and records. As part of this report, items needing correction or discrepancies observed from the approved construction documents were noted. As needed, we also contacted the project structural engineer for additional clarification on specific issues related to the drawings or discrepancies observed. Plans and Specifications The plans and project documents available at the site were used for our inspections. From time to time, we received plan modifications from the structural engineer. When received, these were used to evaluate the work completed in the field. Visual Examination of the Field-Made Welds Visual examination of the field welds was conducted in accordance with American Welding Society (AWS) D1.1-2010, Figure 5.4 and Table 6.1 requirements and the requirements of the project plans and specifications. AA/EOE Providing engineering and environmental solutions since 1957 Black-Dew, LLC Project B14-02444 July 17, 2014 Page 2 Tension-Control Bolted Connection Observations Tension-control bolted connection observations were conducted to determine if the bolt holes were filled, if the correct bolts were used, if the nuts were fully engaged and if the splined end of the tension- control bolts had separated from the body of the bolt. Removal of the splined end is a direct indicator the bolt has been torqued to the minimum snap-off load. At connections where the splined ends were not, or could not be removed,the torque applied to the bolt by the contractor was determined using a hand-held torque wrench. In addition, each connection was observed for fit-up and to determine if the various plies were in contact with one another. Drilled-In Epoxy Anchors Observations were performed during the installation of the drilled-in epoxy anchors to determine if they were installed according to the requirements of the manufacturer and the project documents. Items observed included the placement, depth of embedment, cleanliness of the drilled hole and application of the epoxy adhesive. The type of epoxy used was also documented for compliance with the requirements of the specifications. As part of these observations, we documented that the adjoining plies were in contact with one another and that the nuts were fully engaged and snug tight. General In performing its services, Braun Intertec used that level of care and skill ordinarily exercised by reputable members of its profession currently practicing in the same locality. No warranty, express or implied, is made. Thank you for the opportunity to provide the special inspection and testing services for this project. After review of the attached Special Inspection Final Report, if you have any questions or require additional information, please call Dan Graham at 952.995.2524 or Mary Denne at 952.995.2510. Sincerely, BRAUN INTERTEC CORP RATION \41 ,1,7 7/2G ' Daniel P. Graha ICC Certified Special Inspector-Structural Steel and Welding Christopher R. Kehl, PE Principal-Senior Engineer Attachment: Structural Steel Special Inspection Final Report c: Mukhtar Giader, PE; Structural Design Associates, Inc. Robert Dana Hutchins; City of Prior Lake Inspections Department BRAUN INTERTEC BRAUN Braun Intertec Corporation Phone:952.995.2000 I NT E RT EC 11001 Hampshire Ave S Fax: 952.995.2020 Minneapolis,MN 55438 Web: braunintertec.com Structural Steel Special Inspection Final Report City of: Prior Lake Date: July 17, 2014 Attention: Mr.Steve Svendsen Project: Twin Oaks Middle School 15860 Fish Pond Road SE Prior Lake, Minnesota Braun Intertec Project: In accordance with the Minnesota State Building Code, Section 1704 of the International Building Code and the agreed-upon scope of services,the required special inspections and testing have been provided for the following items: Bolting. The bolted connections detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the plans and specifications.There are currently no outstanding or unresolved bolted connection-related issues. Structural Field Welding. The welded connections detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the project plans and specifications.There are currently no outstanding or unresolved structural welding-related issues. Drilled-In Epoxy Anchor Bolts. The drilled-in epoxy anchor connections detailed in the attached Special Inspection Daily Reports were observed in general accordance with the requirements of the plans and specifications. The procedures used by the contractor to install the drilled-in epoxy anchors were documented by the special inspector as required by the IBC and the ICC ER documents.The placement was done in accordance with the drawings, the nuts were fully engaged,the adjoining plies were in contact with one another and the nuts were snug tight. There are currently no outstanding or unresolved drilled-in epoxy anchor-related issues. AA/EOE Providing engineering and environmental solutions since 1957 • Black-Dew, LLC Project B14-02444 July 17, 2014 Page 2 Conclusion Based upon the inspections conducted, the testing performed and the attached reports, it is our professional judgment that,to the best of our knowledge,the inspected work was performed and completed in accordance with the approved plans, specifications, structural-engineer-provided modifications and applicable workmanship provisions of the Minnesota State Building Code and the International Building Code. Inspecting Firm: Braun Intertec Corporation I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. /' ,.....ix diz z.....air ,.. „ootiituillis„,e .4.?"•-i6/4191 oyy Christopher R. Kehl, PE ��; K oy Principal-Senior Engineer fix; E ,/t 4: . License Number: 43459 'O• 43459 �,... July 17, 2014 -›,S) •. 4.,s Attachments: • ' Special Inspection Daily Reports 1 through 3 BRAUN INTERTEC Issue Date: 2013/01/01 Rev No.: 0 v k Special Inspection Daily Report City of Prior Lake, MN. Page 1 of 1 Report No.: Structural Steel#1 Date of this Report: 6-25-14 Project Name: Twin Oaks Middle School Project No.: B14-02444 Project Address: 15860 Fish Pointe Rd SE Client: Black and Dew Client Project No.: Weather: Sunny Temperature: 70 ° F Type of Inspection: Inspection Coverage: ❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases: ® Periodic ®Welding & Bolting ❑ Concrete Placement ❑ Fireproofing ❑ Piles& Piers ❑ Tendon Placement ❑ Soils Did the architect or engineer authorize changes to City-approved plans? ❑ Yes (Listed Below) ❑ No Description and location of work completed: 1) Observed epoxy installation, embedment and hole cleanliness on Hilti HIT-HY 200 with HIT-Z 3/4"x 9 3/4"anchors on new mech. unit support framing detail 10/S3.1. Per telephone conversation with the SER, Mr. Mukhtar Giader, north column, south bolt only 4 1/2" embedment will be acceptable as is. No discrepancy noted 2) Stub column base plate to existing beam fillet welds on new mech. unit support framing detail 9/S3.1. No discrepancy noted 3) Per tephone conversation with the SER, Mr. Mukhtar Giader, stub column to welded to new beam with a partial penetration weld and beam to beam connections to be full penetration welds with backer bars, details 9/S3.1 and 10/S3.1. Periodic inspections to be performed during fitup and welding of connections. Welding not completed at this time. SER: Structural Design Associates, Inc. 10900 Noble Avenue North Champlin, MN. 55316 763-560-5300 Mr. Mukhtar Giader List tests performed: Visual • Are there any discrepancies noted from this day's observations? Yes ❑ No • Are there any outstanding discrepancies on this project? Yes ❑ No If yes, see attached Summary Sheet. • Report given to Contractor: Yes ® No ❑ To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications, and applicable workmanship provisions of the current IBC, except as noted above. Signed: Graham, Dan Date: 6-25-14 Print Full Name: Daniel P. Graham I.D. No.: 1054095 S1&S2 Adhesive Anchors Inspection Checklist for Concrete & Masonry Special inspection shall be in compliance with Section 1701 of the UBC and Section 1704 of the IBC as described below(see Structural Drawings for inspection requirements). Codes ❑UBC 1997 BRAUN Project Name: B14-02444 ❑IBC 2000 ❑IBC 2003 INTERTEC ❑O IBC 2006 Weather: Sunny Air Temperature: 70 (°F/°C) Product Name/Manufacturer: HILTI HIT-HY 200 Lot No.: 120616L2 ICC-ES Report No.: 3187 Adhesive Expiration Date: 05 / / 15 LlL1 Specified Dispenser ❑Specified Mixer Discard Initial Adhesive: 3 (#trigger pulls) a Adhesive Temperature: 70 (°F/°C) Gel Time: 15min Cure Time: 60min (per manufacturers installation instructions) Type: UAII-Thread ❑ Internally Threaded ❑Torque-Controlled ❑ Rebar ❑Other Material: Standard ❑Stainless Steel ❑High Strength W Steel Grade/Coating: .N Length: (in/mm) • Rod Diameter: ❑3/8" ❑ 1/2" ❑5/8" 03/4" ❑7/8" ❑ 1" ❑ 1 1/4" • Rebar: ❑#3 ❑#4 ❑#5 ❑#6 ❑#7 ❑#8 ❑#9 ❑#10 ❑#11 ❑ Other Base Material Type: ❑NW Concrete ❑ LW Concrete ❑ Brick ❑ CMU ❑Other Y Base Material Strength: ❑2000psi ❑3000psi 04000psi ❑Other Base Material Thickness: (in/mm) Base Material Temperature: (°F/°C) tin Drill Bit Diameter: 7/8" (in/mm) Hole Depth: 6" (in/mm) 'c (core bit diameter,if approved) Drill Bit Type: !]Carbide-Tip Drill Bit ❑ Diamond Core Bit ❑Other (ANSI 8212.15-1994) (If appropriate and allowed) = Hole Condition:ODry ❑Water Saturated ❑Water Filled ❑ Under Water t Hole Cleaning: U Compressed Air OO Hand Pump lWire Brush ❑Nylon Brush ❑Other Hole cleaning in accordance with manufacturers'printed installation instructions: DYes ❑ No Anchor Application:(please check all that apply) ❑Tension IX!Shear ❑Overhead ❑Other o Anchor Insertion: ❑x Twisting motion ❑ Annular gap filled with adhesive ❑Air-void free injection Anchor Spacing: (in/mm) Edge Distance: (in/mm) , Embedment(he): 6" (in/mm) Installation Torque(if required): (ft-lb/Nm) Detail 10/S3.1 Completed by: Graham Dan (Signature) Date: 6-25-14 Daniel P.Graham (Print) Issue Date: 2013/01/01 Rev No.: 0 Special Inspection Daily Report City of Prior Lake, MN. Page 1 of 1 Report No.: Structural Steel#2 Date of this Report: 6-26-14 Project Name: Twin Oaks Middle School Project No.: B14-02444 Project Address: 15860 Fish Pointe Rd SE Client: Black and Dew Client Project No.: Weather: Sunny Temperature: 70 ° F Type of Inspection: Inspection Coverage: ❑ Continuous ❑ Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases: ® Periodic ®Welding & Bolting ❑ Concrete Placement ❑ Fireproofing ❑ Piles& Piers ❑ Tendon Placement ❑ Soils Did the architect or engineer authorize changes to City-approved plans? ❑ Yes (Listed Below) ❑ No Description and location of work completed: 1) Stub column to new beam welds on new mech. unit support framing detail 9/S3.1. Backer bars were in place inside stub column with a 1/4" root opening and root pass installed. Intermittent and cover pass welds in progress not completes at this time. List tests performed: Visual • Are there any discrepancies noted from this day's observations? Yes ❑ No EI • Are there any outstanding discrepancies on this project? Yes ❑ No o If yes, see attached Summary Sheet. • Report given to Contractor. Yes ® No ❑ To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications, and applicable workmanship provisions of the current IBC, except as noted above. ~—' Graham, Dan Signed: Date: 6-26-14 Print Full Name: Daniel P. Graham I.D. No.: 1054095 S1&S2 *`U vIssue Date: 2013/01/01 Rev No.: 0 � ' a0 t- Special Inspection Daily Report City of Prior Lake, MN. Page 1 of 1 Report No.: Structural Steel#3 Date of this Report: 6-30-14 Project Name: Twin Oaks Middle School Project No.: B14-02444 Project Address: 15860 Fish Pointe Rd SE Client: Black and Dew Client Project No.: Weather: Sunny Temperature: 70 ° F Type of Inspection: Inspection Coverage: ❑ Continuous El Masonry ❑ Rebar Placement ❑ Foundations ❑ Special Cases: ►1 Periodic ®Welding &Bolting ❑ Concrete Placement El Fireproofing ❑ Piles & Piers ❑ Tendon Placement ❑ Soils Did the architect or engineer authorize changes to City-approved plans? ❑Yes (Listed Below) ❑ No Description and location of work completed: 1) Stub column to new beam welds on new mech. unit support framing detail 9/S3.1 now installed and completed. 2) Moment plate top top beam flange and groove weld at bottom beam flange at new mech. unit support framing per revised detail and SER reviewal. No discrepancy noted 3) A325 3/4"tension control bolts at new mech. unit support framing. No discrepancy noted This will conclude steel observations for the project. List tests performed: Visual • Are there any discrepancies noted from this day's observations? Yes ❑ No • Are there any outstanding discrepancies on this project? Yes ❑ No o If yes, see attached Summary Sheet. • Report given to Contractor: Yes ® No ❑ To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications, and applicable workmanship provisions of the current IBC, except as noted above. Signed: Graham, Dan Date: 6-30-14 Print Full Name: Daniel P. Graham I.D. No.: 1054095 S1&S2 STRUCTURAL DESIGN ASSOCIATES, INC. 10900 Noble Avenue North,Champlin,Minnesota 55316 517 NW Fourth Street,Ste 113,Brainerd,MN 56401 763-560-5300 • Fax:763-560-5400 218-824-1585 • Fax:218-824-1586 5 n KSI k ik )4 6. X L (-NI Gal!-I -S y r►2.G ) 3 6 k-S t �`' 3i ,t Gtr A ►r r► c- Etro m_( Mew • ,) / } ' 511(61/ G BkC-16 64 CA/ )4- 6 2r PROJECT: '7iW4r o - S ft✓;, S JOB#: ( 3 k 0 5 MQ ivt I T- CONN. ftAa0 i T• SHT#: CLIENT: IQ--( v S S O L U Tio+--3 S BY: (Vs. pJ CI DATE: C 7...4 ( 0 CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR A BOVEGROUND PIPING PROCEDURE Upon completion of work, Inspection and tests shall be made by the contractor's representative and witnessed by an owners representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the Job..,, A certificate shall be filled out and signed by both representatives. Copies shall be'prepared for approving'authorities, owners, and contractor, It Is understood the owner's representative's signature in no way prejudices anyclaim against contractor for faulty material,poor workmanship,or failure to comply with approving authority's requirements or local ordinances. PROPERTY NAME • • Dale .3\. OAKS tM)LE Sc-H�%► T � Y't� it-LC- 14- PROPERTY ADDRESS 1 S86e FISH c - SE, A2.tc - I-444e', Mtn SS 312. ACCEPTED BY APPROVING AUTHORITY('S)NAMES • ADDRESS PLANS INSTALLATION CONFORMS TO ACCEPTED PLANS ❑YES ❑ NO EQUIPMENT USED IS'APPROVED ❑YES ❑ NO IF NO,EXPLAIN DEVIATIONS • HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION El YES ❑ NO OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? IF NO,EXPLAIN INSTRUCTIONS HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: • 1.SYSTEM COMPONENTS INSTRUCTIONS ❑YES ❑ NO 2.CARE AND MAINTENANCE INSTRUCTIONS 3, NFPA 25 CI YES CI NO ❑YES ❑ NO LOCATION SUPPLIES BUILDING: OF SYSTEM • • MAKE YEAR OF ORIFICE TEMPERATURE MODEL MANUFACTURE SIZE QUANTITY RATING T4<-c.. TY FK 6 ctiaume PeNtc). ?_oi3 Vi" 4t.t KS• Tyr_o TYFz. atALi oft9-41IT -2.0 t% '/-s." 4D ISS* SPRINKLERS PIPE AND Type-of Pipe: Sc...kft i IC> % %)4 . ScAk. 41=6 tS s 'raC.bl 1.-trAE1 FITTINGS Type of Fittings: 'pt. . • MAXIMUM TIME TO OPERATE ALARM DEVICE THRU TEST CONNECTION ALARM VALVE TYPE MAKE MODEL MIN. SEC. OR FLOW, , INDICATOR DRY VALVE Q.O.D. . MAKE MODEL . SERIAL NO. MAKE MODEL SERIAL NO. • TIME TO TRIP TRIP POINT TIME WATER ALARM THRU TEST WATER PRESSURE AIR PRESSURE AIR REACHED OPERATED CONNECTION` PRESSURE TEST OUTLET' PROPERLY DRY PIPE • MIN. SEC. PSI • PSI PSI MIN. SEC. YES NO OPERATING Without TEST Q.O.D. CI NO With CI CI Q.O.D. IF NO,EXPLAIN: `MEASURED FROM TIME INSPECTOR'S TEST CONNECTION OPENED. (OVER) 5 o e(i4 et( I 5-73(ell)r. 44 JJ . 416 SPECIAL INSPECTION AND TESTING SCHEDULE (To be used in accordance with the "Guidelines for Special Inspection and Testing") .-----, r" t Z..-1 PROJECT NAME: Prior Loke-Sovoqe Area Schools PROJECT NO: 13105 LOCATION: Twin Oaks Middle School PERMIT NO: Prior t.oke, Minnesolc____ — -- — SPECIAL INSPECTION SCHEDULE Intl. Bldg. Code Type or Section Article , Assigned ' Description (2) Firm (3) rreq""" Firm (41 1704.7 Structural Steel F Full 1704.3 1 Field Welding SI Fl 1704.3.3 Field Bolting Si F2 1704 Post Installed Anchors Si F3 TESTING SCHEDULE ------- _ Notes: Fill out schedule and include in project specification Informotion available at thot time to bc filled out when applying for o building permit (I) Permit No lo be provided by Building Official 2 Use ciescrlptions per 1,B.0 Section 1704 3 Special Inspector, Testing Agent, or Fabricator. 4 Firm contracted to perform services 5 Sec 1. frequency below for detoils. 1 AC.• !. kLEDGMENTS: Loch oppropriote representative 'oust sum below. Ow 4,111/11\A. Firm Prior loke-Sova,e Area Schools Date. coniroctor; - f 47 / ."----- rim: - , 1:+petuthe c Dote. 2 4 Mechanical: .i'' Firm Nexus Scluticos Dole 5Z A 14-- SCR:A :AA- - 1 k ilm: Structural Design Associates, Inc Dole,5 T.)ki . ._ . s.. rum- / ,_ ,„,.. Dale: • r S. r L.'C'eji";7\--/ il y•_c Illik r",',.., ..:71/-__,±s..._Coe Dale...5-ii IA Firm I Dale: TA. non Date: Firrn , Dote. fiv rietw int( 00, r - Firm Dole: Toe iiidioduor names cf oil prospective special inspectors ond tic v.orl, they intend to observe must be identified above on this form Legend SER =.- Stiucturoi Irgineer of Record SI ••- Speciol Inspecto• TA .- lestinc Agcrl F - Fobricoto• Accepted for ll c Building Deportmcnt by Owe i2