Loading...
HomeMy WebLinkAbout9D - Playground Equipment MEETING DATE: AGENDA # PREPARED BY: REVIEWED BY: AGENDA ITEM: DISCUSSION: 6/1/2005 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 CITY COUNCIL AGENDA REPORT JUNE 6, 2005 9D AL FRIEDGES, PARKS SUPERVISOR BUD OSMUNDSON, PUBLIC WORKS DIRECTOR CONSIDER APPROVAL OF A RESOLUTION ACCEPTING THE BIDS AND AWARDING THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT TO INSTALL PLAYGROUND EQUIPMENT AT TWO CITY PARKS. Historv At the April 18th, 2005 regularly scheduled meeting, the City Council approved the plans and specifications and authorized the advertisement for bids for the installation of playground equipment at Wilds North and Sand Point Beach parks. City staff had prepared plans and specifications similar to those prepared in 2003. The purpose of this agenda item is to accept the bids and award the contract to install playground equipment as identified in the resolution passed by the City Council on April 18, 2005. CurrentCucumsmnces Wilds North Park was identified to receive a play structure in 2004. At that time, staff recommended holding off on the Wilds North play equipment until 2005 to receive a more favorable price by bidding it with Sand Point Beach Park. The 2005-2009 C.I.P. includes funds to install playgrounds at Sand Point Beach and Hawk Ridge Development. These parks are identified in the 2005 C.I.P. with a total estimated cost of $115,000. Due to the timing of the development in Wilds North and Hawk Ridge, staff recommends that recreational needs would be better served by substituting Wilds North Park in 2005 for Hawk Ridge Park, since the expected development of Hawk Ridge area has not happened. The followin is a breakdown of the cost estimates for each ark: Pia round E ui ment Sites Estimated Cost Sand Point Beach Park $80,000 Wilds North Park $35,000 Total $115,000 Bids were received and opened on May 27, 2005 at 10 a.m. A total of two (2) bids were received. The low bid was submitted by St. Croix Recreation, in the amount of $92,724.00. A second bid was submitted by Webber Recreational Design, Inc. in the amount of $97,140.57. The City has worked with St. Croix Recreation on several projects, including a similar playground layout at Lakefront Park and is satisfied with their past performance. Issues Wilds North Park is a new park. The play structures that will be installed will meet the Americans with Disabilities Act (ADA) Accessibility Standards and Consumer www.cityofpriorlake.com Phone 952.447.4230 / Fax 952.447.4245 FISCAL IMPACT: ALTERNATIVES: RECOMMENDED MOTION: REVIEWED BY: 6/1/2005 Product Safety Commission (CPSC) guidelines. The new playground equipment will be modular; compliant with current safety standards; provide accessibility and will be durable and attractive, and provides equipment suitable for 5-12 year olds as in all our neighborhood parks. Sand Point Beach Park is an existing community park that receives a lot of attendance throughout the summer. At present, play equipment at the park serves 5 to 12 year olds. The new playground structures (5-12 years and 2-5 years) at the community park will serve many area residents that local parks cannot provide. The Public Works and Parks maintenance crews will complete all grading and preparation work including hauling sand, preparation of base work for the curbing, resilient surface (wood carpet), sidewalks and complete all landscaping and sodding. The City will contract for the concrete curb placement. The total costs for this portion of the project will not exceed $18,500. St. Croix Recreation was the lowest bidder for play equipment identified at Wilds North and Sand Point Beach parks. Their bid meets the selection criteria, offers the best design, and has the lowest total bid. Budeet Imoact The 2005-2009 C.I.P. has $115,000 programmed for two parks. The cost for the play structures will be drawn from the Capital Park Fund. The project costs including St. Croix Recreation's bid of $92,724 and the city staff portion of the project ($18,500) will not exceed $115,000. The alternatives are as follows: 1. Approve a Resolution accepting the bids and awarding the city's standardized construction contract for playground equipment, not to exceed $115,000. 2. Table this item for a specific reason. 3. Deny this agenda item for a specific reason and provide staff with direction. Staff recommends alternative number 1. 16200 Eagle Creek Avenue S.E. Prior Lake, MN 55372-1714 RESOLUTION 05-XX RESOLUTION ACCEPTING THE BIDS AND AWARDING THE CITY'S STANDARDIZED CONSTRUCTION CONTRACT FOR THE INSTALLATION OF PLAYGROUND EQUIPMENT AT TWO CITY PARKS. MOTION BY: WHEREAS, SECOND BY: The estimated cost to construct the play structures identified in Wilds North Park and Sand Point Beach Park, is $115,000; and WHEREAS, Advertisement for Bids for the installation of playground equipment at two City parks which was approved by the Council at the April 18, 2005 meeting; and WHEREAS, The following bids complying with the advertisement were received, opened, and bId dO h I ta u ate accor lng to t e aw: BIDDER AMOUNT OF BID St. Croix Recreation $92,724.00 Webber Recreational Design, Inc. $97,140.57 WHEREAS, The City Council has determined that St. Croix Recreation of Stillwater, Minnesota is the lowest responsible bidder. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA, that: 1. The recitals set forth above are incorporated herein. 2. The Mayor and City Manager are hereby authorized to execute the city's standardized construction contract with St. Croix Recreation of Stillwater, Minnesota for the installation of playground equipment at two City parks. 3. The City Manager is hereby authorized and directed to return to all bidders the deposits made with their bid once the contracts have been signed. 4. Staff is authorized to purchase sand and landscaping material, and to contract for the installation of concrete curb and gutter, sidewalk, and resilient surface (wood carpet) at the two sites per the City's purchasing policy in an amount not to exceed $18,500. 5. The funding for the playground equipment, concrete curb and gutter, and landscaping materials shall come from the Capital Park Fund. Passed this 6th day of June 2005. Haugen Haugen Fleming Fleming LeMair LeMair Petersen Petersen Zieska Zieska YES NO { Seal } Frank Boyles, City Manager 6/1/2005 www.cityofpriorlake.com Phone 952.447.4230 / Fax 952.447.4245