HomeMy WebLinkAbout8A Manitou Road Approve Plan and Bid Presentation2016 Neighborhood Improvement
Project
Manitou Road
March 14, 2016
Project Area
Watermain Improvements
Watermain Improvements
P
R
O
P
O
S
E
D
1
6
”
W
M
1
6
”
D
I
P
Questions/Comments
Sanitary Sewer Improvements
Existing 15” RCP
Mineral Deposit at joint
(Causes blockage of flow and
allows groundwater to enter
system)
Existing 8” VCP
Broken Pipe
(Allows infiltration of
groundwater and surrounding
material, pipe may collapse)
Sanitary Sewer Improvements
36
”
R
C
P
Storm Sewer Improvements
Storm Sewer
•Install storm sewer system for Manitou
Road
•Upgrade System to Meet Hydrology Rules
36
”
R
C
P
Watermain Improvements
•Existing Condition
•6-inch Cast Iron Pipe
installed in 1970’s
•Approximately 21
break incidents within
the last 20 years (last
one in Jan. 2014)
•Proposed Improvements
•Install 8-inch Ductile
Iron Pipe
•Replace Water
Services to Curb
Shutoff/Right-of-Way
•Replace Hydrants and
Gate Valves
Estimated Project Costs
2016 Improvement Project -Funding
Funding Source Cost (Option D)
Ad Valorem (Tax Levy)$761,681
Assessment (40%)$507,787
Utility Fund –Sewer $1,020,630
Utility Fund –Water $1,169,900
Water Quality Fund $12,193
Total Estimated Costs $3,472,191
2017 Tax Levy Impact 0.9%
Estimated Assessments
Costs
Assessment (40%)
Street & Storm
$507,787
Assessment –Unit Method
Assessable Units -Reconstruction 46 Units
Estimated Unit Assessment –
Reconstruction
$11,039/Unit
•MN State Statute Chapter 429 Requires Assessment to be a minimum
of 20% of Bonding Amount
•Street and Storm Assessment 10 Year Period
•Assessment Rate 2% greater than Project Bond Rate (2015 Rate
4.44%)
•More details will Emerge During Public Hearing and Assessment
Hearing Meetings and Mailings
Assessment Map
(Manitou Road)
Public Improvement Process
Preliminary Project Schedule
ACTIVITY DATE
Held First Informational Meeting September 15, 2015
Accept Feasibility Report / Call for Public Hearing November 23, 2015
Hold Second Informational Meeting December 16, 2015
Conduct Public Hearing/Accept Project January 11, 2016
Hold Third Informational Meeting (Open House)Jan/Feb 2016
Approve Plans and Specifications / Order Advertisement for Bids Feb/March 2016
Open Bids March 2016
Accept Bids/Award Contract April 2016
Begin Construction May 2016
Complete Base Course of Bituminous Pavement October 2016
Authorize Amount to be Assessed/Schedule Assessment Hearing October 2016
Conduct Assessment Hearing/Adopt Assessment Roll Oct/Nov 2016
Complete Final Course of Bituminous Pavement July 2016
Assessment Review Workgroup
•Met on October 20, 2015
•Reviewed the Assessment Map
•Reviewed the Estimated Project Cost
•Reviewed the Unit Method of Assessment
•Reviewed the Estimated Assessment Amount
Project Feedback
Second Informational Meeting
•Held December 16th
•Meeting notice sent to all properties within original project
area
•45-50 property owners in attendance
•Discussion Topics
•Assessment Amount
•Street alignment
•Street Width
•Street lights
•Type of concrete curbing
•Access
Construction Impacts
Before & After Photos
Frequently Asked Questions
•What are working hours?
•Monday-Friday 7 am-7 pm, Saturday
8 am-5 pm
•Residential/driveway access?
•Must provide access after each
working day
•Mailboxes and Mail Delivery?
•A cluster of temporary mailboxes will
be used throughout duration of
project
•Garbage service and other deliveries?
•Access will be maintained as much
as practical
•Water Service during Construction?
•Use of temporary water
Frequently Asked Questions
•Construction staging and sequence?
•Clear and grubbing of vegetation
•Mill existing pavement
•Replace existing sanitary sewer,
watermain, storm sewer
•Haul away existing material, build street
section
•Install concrete curb and gutter, pave
street, pave driveways
•Yard Restoration (topsoil, sod, etc)
•Duration of construction?
•Substantial completion in late 2016, final
lift of pavement in 2017
Frequently Asked Questions
•Project Communications?
•Mailings
•Newsletters
•Email Updates
•City Contacts?
Seng Thongvanh, Project Engineer
sthongvanh@cityofpriorlake.com
Office: 952-447-9834 Cell: 952-451-4486
Kevin Kleist, Engineering Tech. IV
kkleist@cityofpriorlake.com
Office: 952-447-9835 Cell: 952-292-1350
Larry Poppler, City Engineer
lpoppler@cityofpriorlake.com
Office: 952-447-9832
Nate Briese, Engineering Tech. III
nbriese@cityofpriorlake.com
Office: 952-447-9837 Cell: 952-292-6867
Estimated Project Costs
Manitou Road
Funding Source Amount
Ad Valorem (Tax Levy)$783,097
Assessment (40%)$522,065
Utility Fund –Sewer $484,027
Utility Fund –Water $561,591
Water Quality Fund $12,536
Total Estimated Costs $2,363,316
2017 Tax Levy Impact .91%
•Gate Valve Replacement for Raspberry Ridge Neighborhood : Add $20,000
•Assessment : $11,349/Unit
Recommended Actions
Resolution
•Accept Feasibility Report
•Calls for Public Hearing on January 11, 2016
•Authorizes Design of Plans and Specifications
Staff Recommendation
•Approve Proposed Resolution
•Option A (Reconstruction of all Streets)
Street Improvements
Pavement Management
•Overall Condition Index
•Scale 0-100 (100 New or Improved)
•OCI<65 signals a need for
improvement
•OCI 35-45 : Reclamation
•OCI<35: Reconstruction
Project Objectives
•Reconstruct Deteriorated Streets
•Upgrade Underground Infrastructure
•Sanitary Sewer
•Watermain
•Storm Sewer
Agenda
•Project Objectives
•Project Area
•Existing Conditions/Proposed
Improvements
•Estimated Project Costs
•Estimated Preliminary
Assessments
•Special Assessment Process (MN
Statutes Chapter 429)
•Preliminary Project Schedule
•FAQ
Project Area
2016 IMPROVEMENT PROJECT -FUNDING
Funding Source Option A Option B Option C Option D Option E
Ad Valorem $ 1,622,068.95 $ 1,353,644.35 $ 1,223,927.07 $ 761,680.87 $ 783,097.00
Assessment (40%)$ 1,018,685.46 $ 839,887.13 $ 815,951.38 $ 507,787.25 $ 522,065.00
Utility Fund -Sewer $ 1,064,811.83 $ 1,005,318.80 $ 1,052,195.43 $ 1,020,629.55 $ 484,027.00
Utility Fund -Water $ 1,190,049.86 $ 1,861,240.14 $ 1,006,417.90 $ 1,169,900.35 $ 561,591.00
Water Quality Fund $27,907.64 $29,961.62 $24,977.82 $12,193.27 $12,536.00
Assessment (Per Unit) -
Reclamation $6,533.03 ---
Assessment (Per Unit) -
Reconstruction $10,394.75 $10,873.26 $ 10,596.77 $11,038.85 $11,349.00
Total $ 4,923,523.74 $ 5,090,052.03 $ 4,123,469.60 $ 3,472,191.30 $ 2,363,316.00
Improved Street
Mileage 1.43 1.43 0.86 0.52 0.52
Street
Manitou: Reconstruct
Black Oak: Reconstruct
Hidden Pond: Reconstruct
Raspberry Ridge: Reconstruct
Timberglade: Reconstruct
Appaloosa: Overlay
Highland: Overlay
Manitou: Reconstruct
Black Oak: Reclamation
Hidden Pond: Reclamation
Raspberry Ridge:
Reclamation
Timberglade: Reclamation
Appaloosa: Overlay
Highland: Overlay
Manitou: Reconstruct
Black Oak: None
Hidden Pond: Reconstruct
(Raspberry to Timberglade)
Raspberry Ridge: Reconstruct
(CR 21 to Appaloosa)
Timberglade: Reconstruct
Appaloosa: None
Highland: None
Manitou: Reconstruct
Black Oak: None
Hidden Pond: None
Raspberry Ridge: None
Timberglade: None
Appaloosa: None
Highland: None
Manitou: Reconstruct
Black Oak: None
Hidden Pond: None
Raspberry Ridge: None
Timberglade: None
Appaloosa: None
Highland: None
Watermain
Manitou: Replace
Black Oak: Replace
Hidden Pond: Replace
Raspberry Ridge: Replace
Timberglade: Replace
Appaloosa: None
Highland: None
Manitou: Replace
Black Oak: Line
Hidden Pond: Line
Raspberry Ridge: Line
Timberglade: Line
Appaloosa: Line
Highland: Line
Manitou: Replace
Black Oak: None
Hidden Pond: Replace
(Raspberry Ridge to
Timberglade)
Raspberry Ridge: Replace (CR
21 to Manitou)
Timberglade: Replace
Appaloosa: None
Highland: None
Manitou: Replace
Black Oak: None
Hidden Pond: Line
(Raspberry Ridge to
Timberglade)
Raspberry Ridge: Line
(CR 21 to Manitou)
Timberglade: Line
Appaloosa: None
Highland: None
Manitou: Replace
Black Oak: None
Hidden Pond: None
Raspberry Ridge: None
Timberglade: None
Appaloosa: None
Highland: None
Sanitary Sewer
Manitou: Replace
Raspberry Ridge Neighborhood:
Line 15" RCP
Manitou: Replace
Raspberry Ridge
Neighborhood: Line 15" RCP
Manitou: Replace
Raspberry Ridge Neighborhood:
Line 15" RCP
Manitou: Replace
Raspberry Ridge
Neighborhood: Line
15" RCP
Manitou: Replace
Raspberry Ridge
Neighborhood: None
Storm Sewer
Manitou: Install new
Raspberry Ridge Neighborhood:
Existing
Manitou: Install new
Raspberry Ridge
Neighborhood: Existing
Manitou: Install new
Raspberry Ridge Neighborhood:
Existing
Manitou: Install new
Raspberry Ridge
Neighborhood: Existing
Manitou: Install new
Raspberry Ridge
Neighborhood: Existing