HomeMy WebLinkAbout9C County Raod 81 Stemmer Ridge Road Process Phone 952.447.9800 / Fax 952.447.4245 / www.cityofpriorlake.com 4646 Dakota Street SE Prior Lake, MN 55372 CITY COUNCIL AGENDA REPORT MEETING DATE: MARCH 28, 2016 AGENDA #: 9C PREPARED BY: LARRY POPPLER, CITY ENGINEER/INSPECTIONS DIRECTOR PRESENTER: LARRY POPPLER AGENDA ITEM: CONSIDER APPROVAL OF A PROCESS, TIMELIME, AND COMMUNICATION STEPS PROPOSED FOR THE CONSTRUCTION OF COUNTY ROAD 81/STEMMER RIDGE ROAD DISCUSSION: Introduction The connection of County Road 81/Stemmer Ridge Road from CSAH 12 to CSAH 82 is shown in the City’s Comprehensive Plan and discussed for many years. A portion of that connection was completed some years ago with the Spring Lake Estates Subdivision. Three actions are either completed or underway which will allow for construction of the remainder of this road and the utilities thereunder by 2017. The actions are: 1. SMSC and Scott County entered into Memorandum of Understanding which identifies roadway alignment, easement, construction, utility access and ongoing maintenance responsibilities. 2. The City entered into an agreement with the SMSC addressing utility costs, annexation area and city response to fee to trust application and 3. The BIA is reviewing the fee to trust application to determine whether it should be approved. Bureau of Indian Affairs (BIA) action is expected in the next 30 to 60 days. Assuming trust status is approved by the BIA, the SMSC will be prepared to begin construction including installation of utility pipes by this fall. The bituminous surface would not be completed until 2017 at which time the road would then become open for public use. History The history associated with the roadway connection between CSAH 12 and CSAH 82 is shown below:  2003 – Orderly Annexation Agreement Approved which defines orderly annexation area. (An earlier agreement as well existed but the annexation area was different.)  2006 – City Comprehensive Plan Approved Including Planning of Utilities and Roadway through Former Stemmer and Menden Parcels  2006 – Development of Stemmer Ridge Road South of Former 2 Menden Parcel as part of the Spring Lake Estates Subdivision.  Aug, 2012 – County Road 81/Stemmer Ridge Road Extension Added to City Capital Improvement Plan  2013 – County Road 12 Reconstruction which includes City installed capital infrastructure to serve annexation area.  Oct, 2013 – Aug, 2014 – Feasibility Report and Environmental Assessment Worksheet Preparation for Stemmer/CR 81  Fall, 2014 – SMSC Purchases Former Menden Property  Dec, 2014 – Public Hearing and City Council Orders Project which Extends County Road 81/Stemmer Ridge Road to County Road 82. Council directs the staff to assure that traffic calming be incorporated into the existing stretch of County Road 81/Stemmer Ridge Road as part of roadway completion.  Spring, 2015 –City and SMSC unsuccessfully attempt to negotiate an agreement with respect to the new roadway and proposed trust property.  June, 2015 – SMSC Applies to Place Property into Trust  Fall, 2015 – SMSC Begins Preliminary Roadway Design to Define Right of Way. City and SMSC work to incorporate the resident concerns from the Spring Lake Estates area into the design of the new section of road.  Dec, 2015 – SMSC and Scott County Enter into an Agreement to Dedicate Right of Way as County Road 81 which includes SMSC design, construction and ongoing maintenance of the road.  March, 2016 – City of Prior Lake Enters into Agreement with the SMSC on Trust Application and Extension of City Utilities Current Circumstances To provide stakeholder input, transparency, and assure that City Staff is acting in accordance with City Council desires, the Staff has prepared a draft process, timeline, and communication steps. Staff would appreciate comments and direction on these elements. Process Attached to the report is a flowchart showing the typical project delivery steps. In this case there are unique circumstances in which this flowchart would not apply but in other areas the steps are more extensive in an effort to keep stakeholders informed and involved. A review of the existing portion of County Road 81/Stemmer Ridge Road is proposed to include a work group of stakeholders from the Spring Lake Road area to study and review potential options for traffic calming measures. The work group is proposed to meet on several occasions to study and make recommendations for possible improvements. Once 3 recommendations are formed it is proposed that the Traffic Safety Committee review this issue prior to City Council approval through the Capital Improvement Plan. Timeline for Stemmer Ridge / County Road 81 (New Road) City Staff has met with the SMSC staff to discuss the anticipated timeline for delivery of this project. These tentative dates are for the delivery of the County Road 81 and Stemmer Ridge Road Project.  March – May, 2016 - Preparation of Final Plans and Specifications  April 20, 2016 – Joint SMSC/City Open House for Project so input may be included in project plans where appropriate  June, 2016 – Open Bids for Project  July, 2016 – City and SMSC Cost Sharing Agreement Approvals  July, 2016 – Award Bids  August, 2016 – Begin Construction  Fall, 2016 – Utility Pipe Installed  Summer, 2017 – Pave Roadway, Open to traffic Timeline for Existing Stemmer Ridge Road Separately, City Staff would begin a process to review the existing portion of Stemmer Ridge Road for incorporation of traffic calming elements. A timeline for study of this area is proposed:  April, 2016 – Study Group composed of Spring Lake Estates representatives organized/Ideas collected at April 20th Open House  May and June 2016 – Work Group meets to discuss options and provide recommendation  June, 2016 – Traffic Safety Committee reviews recommendations from work group  August, 2016 – City Council reviews recommendations as a part of the Capital Improvement Plan  Spring 2017 – Traffic Calming Devices installed on existing stretch of Stemmer Ridge Road Communication Steps Several communication steps are outlined in the timeline. These include the following: 1. March 18, 2016 E-mail Blast – An e-mail was already sent to those residents who have provided their e-mail address to the City during the Stemmer Ridge Road Feasibility Study in 2014. The e-mail is attached and alerts residents of the recent agreement between the City Council and the SMSC and to the fact that a Work Group is 4 being formed and that we would like volunteers to identify themselves at the April 20 open house. 2. This has already resulted in a response from Spring Lake Estates neighbors asking for more information. Councilor Keeney has responded as has City Engineer Poppler. 3. Newsletter – A newsletter providing general information and inviting residents to the April 20th Open House will be sent out the week of March 28th. The newsletter will include residents in the general vicinity from County Road 82 on the north to County Road 12 on the south and from spring Lake Park on the east to County Road 17 on the west. This mailing list will be used for subsequent efforts. 4. Notification of Spring Lake Township and joint meeting with staffs. 5. April 20th Open House – This open house will showcase the design for the County Road 81 / Stemmer Ridge Road Project. This open house will provide opportunity for residents to comment on the design and offer ideas for the existing portion of Stemmer Ridge Road. 6. Subsequent newsletters will be sent out at key points, for example when the project is awarded, beginning of construction, completion of key elements, etc. 7. Capital Improvement Plan Public Hearing – A public hearing is proposed in August regarding the Capital Improvement Plan. Citizens may provide comments to the City Council at this public hearing regarding the existing portion of Stemmer Ridge Road. 8. Fall 2016 – When City utilities are installed by the fall of 2016, City Staff will contact developers to alert them that development can occur in the annexation area. A mailed document to landowners within the annexation area could also be sent to communicate the availability of City utilities. Conclusion This process and timeline is a work in progress. Suggestions from the city council are encouraged. ISSUES: As the City Council is aware the annexation has been part of the city’s comprehensive plan for decades. At least two different annexation agreements over the last four decades testify to this fact. While we do have an obligation to develop the annexation area as included in the city’s 2030 Comprehensive Plan we must also be sensitive to property owners in this area whether in Spring Lake Estates, farmers, potential developers and intended long term residents. By the same token County Road 81/Stemmer Ridge Road has long been contemplated as a reliever road for County Road 17 and a connection between County Road 82 and County Road 12 as well as for access and egress to the county and city parks. The new roadway design incorporates single lane divided roadway. The road is curvilinear to slow traffic. The design speed of the road is 35 miles per hour which does not equate to the speed limit but instead the speed at which it can safely be travelled. A roundabout is included in the road at the entry to the parks to control traffic. Finally traffic calming is intended to be incorporated into the existing roadway before the entire road is opened. The interests of people in this area are much too diverse to think that 5 everyone will be satisfied. But by working to communicate and gather input we can try to achieve the best project which will satisfy the greatest diversity of interests. The process and timeline will be shared electronically and in newsletter. FINANCIAL IMPACT: The Capital Improvement Plan includes this project including $2,000,000 in City funding. The City and SMSC agreement stipulates that the City is responsible for materials and installation of City Utilities. The SMSC is funding the street construction components. Funding for traffic calming on the existing portion of Stemmer Ridge Road, would be incorporated as a part of the Capital Improvement Plan process. ALTERNATIVES: 1. Approve a process, timeline, and communication steps for the County Road 81/Stemmer Ridge Road project as proposed or with amendments. 2. Table this item until some date in the future. RECOMMENDED MOTION: Motion and second to approve alternative #1