HomeMy WebLinkAbout5H 2017 Order Feasibility Report4646 Dakota Street SE
Prior Lake, MN 55372
CITY COUNCIL AGENDA REPORT
MEETING DATE: SEPTEMBER
5H
26, 2016
AGENDA #:
PREPARED BY: LARRY POPPLER, CITY ENGINEER/INSPECTIONS DIRECTOR
PRESENTED BY: LARRY POPPLER
AGENDA ITEM: CONSIDER APPROVAL OF FOUR RESOLUTIONS FOR 2017 ROAD IM-
PROVEMENT PROJECTS: 1) ORDERING THE PREPARATION OF A FEASI-
BILITY REPORT FOR THE ALBANY AVENUE, CATES STREET, CJ CIRCLE,
FIVE HAWKS AVENUE, AND PARK AVENUE IMPROVEMENT PROJECT AND
2) ORDERING THE PREPARATION OF A FEASIBILITY REPORT FOR THE
FRANKLIN TRAIL IMPROVEMENT PROJECT AND 3) ORDERING THE PREP-
ARATION OF A FEASIBILITY REPORT FOR THE BALSAM STREET, SUNRISE
AVENUE, SPRUCE COURT, AND SPRUCE TRAIL IMPROVEMENT PROJECT
AND 4) ORDERING THE PREPARATION OF A FEASIBILITY REPORT FOR
THE SYCAMORE TRAIL IMPROVEMENT PROJECT
DISCUSSION: Introduction
The purpose of this agenda item is to initiate the process for local improvements
set forth in the 2017 portion of the 2017-2021 Capital Improvement Program in ac-
cordance with Minnesota Statutes (M.S.), Chapter 429.
History
The City uses the Five Year Capital Improvement Program to plan its infrastruc-
ture improvements and the financing for capital improvements. The 2017 Im-
provement Projects proposes to reconstruct the street and upgrade utilities within
the project areas.
The M.S. Chapter 429 process applies to all projects that will be financed in whole
or part through special assessments or bond proceeds. The first step in the pro-
cess is for the Council to order the preparation of a Feasibility Report for the im-
provement projects.
The Feasibility Reports will address options and costs for the utility upgrades and
street reconstruction of the streets. City assessment policy will be applied to the
preliminary assessment calculation which is completed as a part of the Feasibility
Reports.
Current Circumstances
The projects are in the 2017 Capital Improvement Program. The projects require
special assessments and financing through bond proceeds, and therefore require
the City to follow the requirements of M.S. Chapter 429 including the preparation
of the Feasibility Reports.
2
The primary purpose for proceeding with these projects is to upgrade the street
conditions and utilities. The pavement condition is extremely poor and requires re-
construction in accordance with the city’s objective to maintain an average OCI of
70 on its roadways.
Conclusion
Ordering the Feasibility Reports is the first step in the reconstruction process. The
Feasibility Reports will provide the details needed for the City to make decisions
on how to proceed.
ISSUES: The City is required to assess a minimum of 20% of the cost of a public improve-
ment project completed through the Chapter 429 process and financed through
G.O. bonds. The Feasibility Reports will determine the estimated costs of im-
provements and methods of financing. The Feasibility Reports will also determine
if the assessment will meet the minimum requirement as set forth in the Chapter
429 process.
The preparation of the Feasibility Reports is only the first step in the public im-
provement project process. Following receipt of the Feasibility Reports, the Coun-
cil will direct City staff to abandon or proceed with each improvement project, de-
pending upon whether the requirements for the Chapter 429 process are being
met. If the Chapter 429 process is to proceed, the Council can then schedule a
Public Hearing to consider resident feedback on each project. Following a Public
Hearing, the Council will consider whether to move forward by authorizing the
preparation of plans and specifications. Once completed, the City Council will be
asked to approve the plans and specifications, authorize advertisement for bids
and then award the contract.
FINANCIAL
IMPACT:
Due to current staff limitations and backlog of work on older projects, engineering
for these projects will be completed by consultants based upon quotes we receive.
The financial impact of each project will be further analyzed in the Feasibility Re-
ports including the preparation of preliminary assessment calculations. The CIP
estimate for the Albany Avenue, Cates Street, CJ Circle, Five Hawks Avenue and
Park Avenue improvement project is $2,174,932. The CIP estimate for the Franklin
Trail Improvement Project is $2,866,403. The CIP estimate for the Balsam Street,
Sunrise Avenue, Spruce Court and Spruce Trail Improvement Project is
$2,478,346. The CIP estimate for the Sycamore Trail Improvement Project is
$752,182
ALTERNATIVES: 1. Approve a resolution as part of the consent agenda ordering the preparation of
a Feasibility Report for the Albany Avenue, Cates Street, CJ Circle, Five
Hawks Avenue, and Park Avenue Improvement Project.
2. Approve a resolution as part of the consent agenda ordering the preparation of
a Feasibility Report for the Franklin Trail Improvement Project.
3. Approve a resolution as part of the consent agenda ordering the preparation of
a Feasibility Report for the Balsam Street, Sunrise Avenue, Spruce Court and
Spruce Trail Improvement Project.
4. Approve a resolution as part of the consent agenda ordering the preparation of
a Feasibility Report for the Sycamore Trail Improvement Project.
5. Remove this item from the consent agenda for additional discussion.
3
RECOMMENDED
MOTION:
A motion and a second as part of the consent agenda to approve Alternatives #1,
#2, #3, and #4.
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 16-XXX
A RESOLUTION ORDERING THE PREPARATION OF A FEASIBILITY REPORT FOR THE
ALBANY AVENUE, CATES STREET, CJ CIRCLE, FIVE HAWKS AVENUE, AND PARK
AVENUE IMPROVEMENT PROJECT
Motion By: Second By:
WHEREAS, The 2017-2021 Capital Improvement Program identifies improvement of Albany
Avenue, Cates Street, CJ Circle, Five Hawks Avenue, and Park Avenue in 2017;
and
WHEREAS,
WHEREAS,
It is necessary to determine the feasibility of undertaking the construction of said
improvements within this project area including the construction of storm sewer,
sanitary sewer, watermain, aggregate base, concrete curb and gutter, bituminous
surfacing, street lights, and appurtenant work; and
It is proposed to assess the benefited property for all or a portion of the cost of the
improvements, pursuant to Minnesota Statutes, Chapter 429.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. That the proposed improvements be referred to the City Engineer for study and that the City
Engineer is instructed to report to the Council with all convenient speed advising the Council
in a preliminary way as to whether the proposed improvements are necessary, cost-effective
and feasible and as to whether they should best be made as proposed or in connection with
other improvements, and the estimated costs for the improvements as recommended.
PASSED AND ADOPTED THIS 26th DAY OF SEPTEMBER 2016.
VOTE Hedberg Keeney McGuire Morton Thompson
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
______________________________
Frank Boyles, City Manager
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 16-XXX
A RESOLUTION ORDERING THE PREPARATION OF A FEASIBILITY REPORT FOR THE
FRANKLIN TRAIL IMPROVEMENT PROJECT
Motion By: Second By:
WHEREAS, The 2017-2021 Capital Improvement Program identifies improvement of Franklin
Trail in 2017; and
WHEREAS,
WHEREAS,
It is necessary to determine the feasibility of undertaking the construction of said
improvements within this project area including the construction of storm sewer,
sanitary sewer, watermain, aggregate base, concrete curb and gutter, bituminous
surfacing, street lights, and appurtenant work; and
It is proposed to assess the benefited property for all or a portion of the cost of the
improvements, pursuant to Minnesota Statutes, Chapter 429.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. That the proposed improvements be referred to the City Engineer for study and that the City
Engineer is instructed to report to the Council with all convenient speed advising the Council
in a preliminary way as to whether the proposed improvements are necessary, cost-effective
and feasible and as to whether they should best be made as proposed or in connection with
other improvements, and the estimated costs for the improvements as recommended.
PASSED AND ADOPTED THIS 26th DAY OF SEPTEMBER 2016.
VOTE Hedberg Keeney McGuire Morton Thompson
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
______________________________
Frank Boyles, City Manager
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 16-XXX
A RESOLUTION ORDERING THE PREPARATION OF A FEASIBILITY REPORT FOR THE
BALSAM STREET, SUNRISE AVENUE, SPRUCE COURT, AND SPRUCE TRAIL
IMPROVEMENT PROJECT
Motion By: Second By:
WHEREAS, The 2017-2021 Capital Improvement Program identifies improvement of Balsam
Street, Sunrise Avenue, Spruce Court, and Spruce Trail in 2017; and
WHEREAS,
WHEREAS,
It is necessary to determine the feasibility of undertaking the construction of said
improvements within this project area including the construction of storm sewer,
sanitary sewer, watermain, aggregate base, concrete curb and gutter, bituminous
surfacing, street lights, and appurtenant work; and
It is proposed to assess the benefited property for all or a portion of the cost of the
improvements, pursuant to Minnesota Statutes, Chapter 429.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. That the proposed improvements be referred to the City Engineer for study and that the City
Engineer is instructed to report to the Council with all convenient speed advising the Council
in a preliminary way as to whether the proposed improvements are necessary, cost-effective
and feasible and as to whether they should best be made as proposed or in connection with
other improvements, and the estimated costs for the improvements as recommended.
PASSED AND ADOPTED THIS 26th DAY OF SEPTEMBER 2016.
VOTE Hedberg Keeney McGuire Morton Thompson
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
______________________________
Frank Boyles, City Manager
4646 Dakota Street SE
Prior Lake, MN 55372
RESOLUTION 16-XXX
A RESOLUTION ORDERING THE PREPARATION OF A FEASIBILITY REPORT FOR THE
SYCAMORE TRAIL IMPROVEMENT PROJECT
Motion By: Second By:
WHEREAS, The 2017-2021 Capital Improvement Program identifies improvement of Sycamore
Trail in 2017; and
WHEREAS,
WHEREAS,
It is necessary to determine the feasibility of undertaking the construction of said
improvements within this project area including the construction of storm sewer,
sanitary sewer, watermain, aggregate base, concrete curb and gutter, bituminous
surfacing, street lights, and appurtenant work; and
It is proposed to assess the benefited property for all or a portion of the cost of the
improvements, pursuant to Minnesota Statutes, Chapter 429.
NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE,
MINNESOTA as follows:
1. The recitals set forth above are incorporated herein.
2. That the proposed improvements be referred to the City Engineer for study and that the City
Engineer is instructed to report to the Council with all convenient speed advising the Council
in a preliminary way as to whether the proposed improvements are necessary, cost-effective
and feasible and as to whether they should best be made as proposed or in connection with
other improvements, and the estimated costs for the improvements as recommended.
PASSED AND ADOPTED THIS 26th DAY OF SEPTEMBER 2016.
VOTE Hedberg Keeney McGuire Morton Thompson
Aye ☐ ☐ ☐ ☐ ☐
Nay ☐ ☐ ☐ ☐ ☐
Abstain ☐ ☐ ☐ ☐ ☐
Absent ☐ ☐ ☐ ☐ ☐
______________________________
Frank Boyles, City Manager