Loading...
HomeMy WebLinkAbout10 24 2016 Joint Meeting PL.PLSAS PresentationOctober 24, 2016 150th/TH13 Intersection Update The end of construction is near! The project is scheduled to be ‘substantially completed’ by the end of October. Development Update 82 single-family residential permits through September Down 4.65% from same 9 months in 2015 2 multi-family projects in 2016 (222 total units) Grainwood (168 senior) & Courtwood Village II (54 family) First multi-family development in a decade Potential for two additional multi-family projects in 2017 (218 family rental units, all within ISD 719) Total Permit Valuation of $59,772,000 through September is 56.65% higher than the same period last year Grainwood Permit Valuation = $21,500,000 Metro and Greater MN Single Family Housing Data MN, Metro and Greater MN Multifamily Housing Data Residential Development Residential Development Source: Metropolitan Council, Community Profile, Building Permits, Residential, Twin Cities Region (7 Counties) Building Permit Valuation 2016 Prior Lake Subdivisions Lochwood (Chatonka Heights) = 22 Lots Maple Place = 12 Lots 145 vacant lots estimated for 12/31/16 +/-1.0 Year of SF Detached Lot Inventory Commercial/Ind. Development 2015-2016 ‘NEW’ Comm./Ind. Construction Examples: Versatile Vehicles Pro Service Auto Repair Charlie’s on Prior Kwik Trip Annexation City Council Resolution Proposed October 24, 2016 Orderly Annex Areas: 8.1 –7 rural parcels (179 acres) 10.3 –23 residential parcels (68 acres) Demographic-Facility Review Process Joint PLSAS School Board/City of Prior Lake City Council Meeting October 24th, 2016 Presentation Overview •Purpose of the Review •Focus Areas of Study •Proposed Timeline Recommendations by October 24th Work Session •Discussion Purpose of the Study ●Increased student enrollment and unprecedented growth in 2015-2016 and 2016-2017: ○Study actual student enrollment ○Update housing starts, building permits, real estate market, and community growth ■Mtgs with City of Prior Lake and Savage ○Study and Update student projection: 250/year projection ●Study the impact of student enrollment on current sites and facilities: ○Classroom space ○Specialist space ○Program space ●Identify recommendations for Short-Term and Long-Term solutions: ○Short-Term: 2017-2018 ○Long-Term: 2018-2019 Focus Area of Study Overview ●Facility Usage and Capacity at Elementary and Secondary Schools ○Maintaining current class size averages ○Increasing class size averages: 1-2 student average ●Current Reality of Student Enrollment at Elementary Schools ○Students within the neighborhood boundary ○Open Enrollment Students ○In-District Transfer Students ●Current Reality of Student Enrollment at Secondary Schools ○Open Enrollment Students ○Classroom Space ○Core Space ■Cafeteria/Servery ○Specialist Space Focus Area of Study Overview ●Open Enrollment/In-District Transfer Procedures ○Review, update, and implement open enrollment and in-district transfer procedures and timelines for students in PLSAS ●Elementary School Boundary Change Scenarios ○2016-2017 ○2017-2018 and beyond ●Conduct a New Demographic Study ○Hazel Reinhardt Consulting Services ○Provide Demographic K -12 Enrollment Projections Recommendations -To be presented at October 24th Work Session •Recommendation: Timeframe: •Recommendation: Timeframe: •Recommendation: Timeframe: Discussion