Loading...
HomeMy WebLinkAbout9D Balsam St Area Accept Feasibility Report 4646 Dakota Street SE Prior Lake, MN 55372 CITY COUNCIL AGENDA REPORT MEETING DATE: NOVEMBER 28, 2016 AGENDA #: 9D PREPARED BY: LARRY POPPLER, CITY ENGINEER/INSPECTIONS DIRECTOR PRESENTED BY: LARRY POPPLER, AGENDA ITEM: CONSIDER APPROVAL OF A RESOLUTION ACCEPTING THE FEASIBILITY REPORT AND SCHEDULING A PUBLIC HEARING TO CONSIDER THE BAL- SAM STREET AREA IMPROVEMENT PROJECT, CITY PROJECT #TRN17- 000003 DISCUSSION: Introduction The purpose of this agenda item is to accept the Feasibility Report and schedule a Public Hearing to be held on December 12, 2016 for the Balsam Street Area Im- provement Project. History The City uses the Five Year Capital Improvement Program and its Pavement Man- agement program to plan its infrastructure improvements and the financing for capital improvements. The Balsam Street area including Balsam Street, Spruce Trail, Spruce Circle, and Sunrise Avenue are part of the plan for reconstruction in 2017. At its September 26, 2016 meeting the City Council adopted Resolution 16- 120 authorizing staff to prepare a Feasibility Report for the Balsam Street Area Trail Improvement Project as outlined in the CIP. The M.S. Chapter 429 process applies to all projects that will be financed in whole or part through special assessments or bond proceeds. The Balsam Street Street area is considered in the report and includes improve- ments to Sunset Hills Addition located in Section 10, Township 114, Range 22. Structures in this area were built in the late 1980s and early 1990s. A map of the project area (Appendix A) is included in the Feasibility Report. The proposed im- provements include street reconstruction or reclamation, storm sewer, storm water quality, sanitary sewer, watermain, concrete curb and gutter, and appurtenant work. Current Circumstances The Feasibility Report includes total estimated costs, preliminary assessment amounts, and a project financing summary. Also included in the report are design criteria, estimates and information on watermain, sanitary sewer, storm sewer, and streets. The primary purpose for proceeding with the project is to upgrade the street condi- tion and utilities. The pavement condition is extremely poor and requires recon- struction in accordance with the city’s desire to maintain high overall condition index (OCI) ratings on its roadways. This project has two areas for improvement. A large 2 portion is proposed as a reclamation project and the rest is proposed as a recon- struction project. The reconstruction area will include the construction of concrete curb and gutter and full depth removal and replacement of the road section including addition of granular base for the roadway. The reclamation area already has con- crete curb and gutter. The reclamation will include pavement and aggregate base milling, minor subgrade correction and full depth paving as well as spot replacement of settled curbing. Conclusion A public hearing is proposed for December 12, 2016. At that meeting the pro- posed improvements, project schedule and assessments will be presented to resi- dents. The information contained in the Feasibility Report will also be presented at a neighborhood meeting that will take place prior to the public hearing. The attached Feasibility Report outlines which portions of the cost for the above project will be assessed to the benefiting properties. If the Council approves the Feasibility Report, the Chapter 429 special assessment statute requires a public hearing be conducted prior to proceeding with the project to determine if it is to move forward. In summary, the project is feasible from an engineering and economic standpoint. Approval of the Feasibility Report does not grant final approval of the project. ISSUES: The Assessment Review Work Group met on November 16th, 2016, and recom- mended the unit assessment method and assessment in accordance with the City’s Assessment Policy of assessing 40% of the street and storm sewer cost. The Assessment Review Work Group also discussed combining the reconstruction and the reclamation assessments. Ultimately, there was not consensus for that approach. Considering the improvements are different between the reclamation and reconstruction areas, Staff believes that separating the assessment is the fairest method for computing the assessments. The City Council should provide direction on this point. FINANCIAL IMPACT: The Balsam Street Area Improvement Project is proposed to be financed by Spe- cial Assessments, tax levy, Sewer Fund, Water Fund, and Water Quality Fund. The funding of each option and the corresponding estimated amounts are shown below: 3 BALSAM STREET AREA IMPROVEMENT PROJECT - FUNDING Ad Valorem $870,468 Assessment (40%) $580,312 Utility Fund - Sewer $320,180 Utility Fund - Water $337,730 Water Quality Fund $20,000 Assessment (Per Unit) – Recclamation $4,337 Assessment (Per Unit) – Reconstruction $10,435 Total $2,128,690 The Capital Improvement Plan contemplated $2,478,346 for this project. ALTERNATIVES: 1. Approve a Resolution Accepting the Feasibiilty Report and Establishing a Pub- lic Hearing date for the Balsam Street Area Improvement Project, City Project #TRN17-000003. 2. Deny this item for a specific reason and provide staff with direction. 3. Table this item until some date in the future. RECOMMENDED MOTION: A motion and a second for approval of Alternative #1. 4646 Dakota Street SE Prior Lake, MN 55372 RESOLUTION 16-xxx A RESOLUTION ACCEPTING THE FEASIBILITY REPORT AND CALLING FOR A PUBLIC HEARING FOR THE BALSAM STREET AREA IMPROVEMENT PROJECT, CITY PROJECT #TRN17-000003 Motion By: Second By: WHEREAS, Pursuant to Resolution 16-120, the City Council, on September 26, 2016 ordered a Feasibility Report to be prepared under the direction of the City’s Engineering Department with reference to the Balsam Street Area Improvement Project; and WHEREAS, The Feasibility Report for the Balsam Street Area Improvement Project dated November 2016 contains information that the proposed project is necessary, cost effective, and feasible; and NOW THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF PRIOR LAKE, MINNESOTA as follows: 1. The recitals set forth above are incorporated herein. 2. The City Council hereby accepts the Feasibility Report as submitted. 3. The Council will consider the improvement of such streets and areas in accordance with the Report and the assessment of property as described in the Report for all or a portion of the cost of the improvements pursuant to Minnesota Statutes Chapter 429 at an estimated total cost of the improvements of $2,128,690. 4. A Public Hearing shall be held on such proposed improvements on the 12th of December, 2016 at Prior Lake City Hall, with the address of 4646 Dakota Street SE, City of Prior Lake, Minnesota at 7:00 p.m. statutory notice and publication requirements shall be followed. PASSED AND ADOPTED THIS 28th DAY OF NOVEMBER 2016 VOTE Hedberg Keeney McGuire Morton Thompson Aye ☐ ☐ ☐ ☐ ☐ Nay ☐ ☐ ☐ ☐ ☐ Abstain ☐ ☐ ☐ ☐ ☐ Absent ☐ ☐ ☐ ☐ ☐ ______________________________ Frank Boyles, City Manager Photo Feasibility Report for 2017 Street Reconstruction Project Balsam Street Area Improvements City of Prior Lake, MN City Project No. TRN17-000003 BMI Project No. T18.112541 November 21, 2016 Submitted by: Bolton & Menk, Inc. 12224 Nicollet Avenue Burnsville, MN 55337-1649 P: 952-890-0509 F: 952-890-8065 Prepared by: Bolton & Menk, Inc.Certification 2017 Street Reconstruction Project ǀ T18.112541 Certification Feasibility Report for 2017 Street Reconstruction Project - Balsam Street Area Improvements City of Prior Lake Prior Lake, MN City Project No. TRN17-000003 BMI Project No. T18.112541 November 21, 2016 I hereby certify that this plan, specification or report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. By: Michael Warner, P.E. License No. 44693 Date: November 21, 2016 Prepared by: Bolton & Menk, Inc.Table of Contents 2017 Street Reconstruction Project ǀ T18.112541 Table of Contents I. INTRODUCTION ................................................................................................................. 1 II. BACKGROUND ................................................................................................................... 1 III. FULL STREET RECONSTRUCTION AREA ............................................................................... 2 Existing Conditions ................................................................................................... 2 Proposed Street Improvements ................................................................................ 3 Proposed Sanitary Sewer Improvements .................................................................. 4 Proposed Watermain Improvements ........................................................................ 4 Proposed Storm Sewer Improvements ..................................................................... 4 IV. FULL DEPTH RECLAMATION AREA ...................................................................................... 4 Existing Conditions ................................................................................................... 4 Proposed Street Improvements ................................................................................ 5 Proposed Sanitary Sewer Improvements .................................................................. 6 Proposed Watermain Improvements ........................................................................ 6 Proposed Storm Sewer Improvements ..................................................................... 6 V. DRIVEWAY RECONSTRUCTION PROGRAM.......................................................................... 7 VI. STREET LIGHTING .............................................................................................................. 7 VII. ESTIMATED COST/FINANCING ........................................................................................... 7 Street Reconstruction Cost Estimate and Financing .................................................. 8 Street Reclamation Cost Estimate and Financing ...................................................... 8 Total Project Cost Estimate and Financing ................................................................ 9 VIII. PROJECT SCHEDULE ........................................................................................................... 9 IX. CONCLUSION ................................................................................................................... 10 Appendix Appendix A: Figures Appendix B: Preliminary Cost Estimate Appendix C: Preliminary Assessment Map & Roll Appendix D: Resident Questionnaire Appendix E: Geotechnical Evaluation Prepared by: Bolton & Menk, Inc.INTRODUCTION 2017 Street Reconstruction Project ǀ T18.112541 Page 1 I.INTRODUCTION On September 26, 2016, the Prior Lake City Council adopted Resolution 16-120, which ordered the preparation of a Feasibility Report for improvements to the City of Prior Lake’s 2017 Street Reconstruction Project – Balsam Street Area including the following streets: ·Balsam Street ·Spruce Trail ·Spruce Circle ·Sunrise Avenue The above streets are located within Section 10, Township 114, Range 22, as described on the following plat: Sunset Hills Addition, Scott County, Minnesota. See Figure 1 in Appendix A for the proposed project location map. This report will review the existing conditions in the project area and discuss, in detail, the proposed improvements. The proposed improvements will consist of two methods: complete street and utility reconstruction, and pavement reclamation with minor utility repairs. The complete utility reconstruction will consist of water main replacement, sanitary sewer main replacement, water and sanitary sewer service replacement, and storm sewer upgrades. The minor utility repairs will consist of removal and replacement of structure castings and rings, addition of hydrants to meet coverage standards, and any other general utility maintenance items. The report will also provide preliminary cost estimates for the proposed improvements with financing for the project coming from a combination of special assessments, the City’s general tax levy, and the City’s sewer and water utility funds. See Figure 2 in Appendix A for the proposed street improvements map. See Figure 3 in Appendix A for the existing City owned utilities. If the City decides to proceed with the proposed street and utility improvements described in this report, it is anticipated construction would begin in 2017 as shown in the detailed project schedule found on page 9. II.BACKGROUND The City has a Capital Improvement Program (CIP) which prioritizes the infrastructure improvement needs within the City and has identified the above listed project area as requiring improvement during the 2017 calendar year. The deteriorated bituminous surface and aging utility infrastructure resulted in the selection of these neighborhood areas. The City of Prior Lake utilizes a Pavement Management Program to rate an existing public street’s pavement condition. Each street segment is reviewed in the field and this information is then used to determine an Overall Condition Index (OCI) for each street section. The OCI is a tool for comparing streets when considering where roadway improvements are most needed within the City. The street OCI is a number between 0-100, with 100 being the best or signifying a newly paved street and 0 being the worst. In the pavement industry, it’s generally agreed that streets with an OCI ≤ 65 need some improvement. Streets in need of a mill and overlay generally have an OCI in the range of 45-65, while streets with an OCI in the range of 35-45 usually require a full depth reclamation. When the OCI reaches a range of 0-35 or when a need for utility repair is determined, the street usually requires full reconstruction. A neighborhood meeting was held on October 19, 2016. The purpose of the meeting was to inform the property owners located within the project area of the improvements being considered, to gather input from the impacted residents, and to answer any questions that the property owners had. Prepared by: Bolton & Menk, Inc.FULL STREET RECONSTRUCTION AREA 2017 Street Reconstruction Project ǀ T18.112541 Page 2 Successful projects incorporate a very proactive public process in order to provide information and awareness of the project, as well as to provide comments on potential design options. To facilitate this public input a project questionnaire has been developed, informational pamphlets were distributed (explaining typical infrastructure projects and detailing the MN Statue 429 Assessment Process), and a project website is available with up-to-date project information. Copies of the completed questionnaires already returned to the City can be found in Appendix D. III.FULL STREET RECONSTRUCTION AREA Balsam Street, Spruce Trail and Sunrise Avenue Existing Conditions The following are local residential roads in Prior Lake serving residential single family homes with direct access and have been determined to require complete street and utility reconstruction: ·Balsam Street – between Sunset Trail and Sunrise Avenue ·Spruce Trail – between Sunset Trail and Sunrise Avenue ·Sunrise Avenue – between Spruce Trail and Balsam Avenue The streets within the reconstruct project area are all bituminous surfaced with low bituminous curb. The following table shows the existing street widths and approximate right-of-way widths. Table 1 –Street Widths LOCATION Curb & Gutter Street Width ROW Balsam Street No 32’50’ Spruce Trail No 31’50’ Sunrise Avenue No 31’50’ All measurement are from edge of bituminous to edge of bituminous. There are no sidewalks or trails along the roadway. There are no existing street lights located within the reconstruction project area. City records show the roadway, water main, sanitary sewer, and storm sewer were constructed in the late 1970’s to early 1980’s. The OCI of the pavement for this area is 19, making the area a candidate for reconstruction. The bituminous pavement within the study area exhibits wear and distress due to traffic loading as well as typical weathering effects experienced with aged asphalt pavement. Significant roadway patching is visible and the existing pavement contains large transverse cracking (cracks running perpendicular across the roadway) and significant alligator-type cracking. Alligator cracking in pavement is an indicator of potential subgrade problems. Soil borings were completed in the area by Northern Technologies to determine the existing roadway section and the report is included in Appendix E. The existing bituminous pavement thickness ranges from 2 - 4 inches with a gravel aggregate base thickness range of 5 - 6 inches. Existing subgrade soils found beneath the aggregate base consist of a clayey sand and silty sand fill Existing Pavement on Sunrise Avenue Prepared by: Bolton & Menk, Inc.FULL STREET RECONSTRUCTION AREA 2017 Street Reconstruction Project ǀ T18.112541 Page 3 material. There is an existing 6-inch diameter ductile iron pipe (DIP) water main which runs the entire length of Balsam Street, Sunrise Avenue and Spruce Trail. Service lines to individual homes within the project area are anticipated to be 1-inch diameter copper pipe. There is an existing 8-inch vitrified clay pipe (VCP) sanitary sewer main on Sunrise Avenue, Spruce Trail and Balsam Street. Most of Sunrise Avenue flows south to Spruce Trail where it then flows west to a 24-inch reinforced concrete pipe (RCP) trunk main that flows north through Sunset Hills Park. The north portion of Sunrise Avenue flows north to Balsam Street where it then flows west to the 24-inch RCP trunk main that flows north between homes to 170th Street. A lift station located at the southeast corner of Sunset Trail and Balsam Street also pumps to the RCP trunk main. The existing condition of the sanitary sewer system was documented by televising the sewer main. The televising revealed the presence of some sags and cracks in the pipe. Pipe cracks can lead to pipe collapse and sewage backups if left untreated. The 24” trunk pipe was determined to be in good condition. Service laterals to individual homes within the project area are anticipated to be 4” VCP. There is an existing storm sewer system on Sunrise Avenue consisting of catch basin structures mid-block and at the intersection of Spruce Trail. The collected stormwater flows by reinforced concrete pipe (RCP) to the south on Sunrise Avenue and then west on Spruce Trail where it connects to an existing system on Sunset Trail. Proposed Street Improvements Based on the roadway age, surface deterioration, OCI rating, and sub-soils, the proposed improvement for Balsam Avenue (between Sunset Trail and Sunrise Avenue), Spruce Trail (between Sunset Trail and Sunrise Avenue) and Sunrise Avenue is a complete reconstruction of the existing road section. The new roadway is proposed to be constructed with new B618 concrete curb and gutter to improve drainage and support the edge of pavement. B618 concrete curb and gutter is the current city standard curb style. It has better water conveyance properties, eliminates off tracking from on-street parking, and is better suited to keep snow plows within the roadway during snow removal operations than surmountable types. The new roadway width is proposed to be constructed in accordance to the current City standard of 32-feet back of curb to back of curb. The new roadway horizontal alignment and vertical profile is expected to remain similar to the existing roadway. The street will be reconstructed to a minimum 7-ton design requirement, which holds up to garbage trucks, school buses, and infrequent contractor truck loading. Based on geotechnical recommendations the proposed road section will include: 1.5” Bituminous Wearing Course 2.5” Bituminous Non-Wearing Course 8” Class 5 Aggregate Base 12” Select Granular Borrow Additionally, subsurface drain tile will be installed at the bottom of the street section under the curb line to help ensure the new roadway section will remain free draining. This helps to reduce stress on pavement from freeze thaw action. During construction if areas of poorer soil conditions than what the soil borings have shown are discovered, additional subgrade excavation and replacement material will be required. All driveways will be replaced with new in kind material within the City Right-of-Way, from the new back of curb to edge of Right-of-Way. All disturbed boulevard areas will be restored with 5- inches of topsoil and new sod. Prepared by: Bolton & Menk, Inc.FULL DEPTH RECLAMATION AREA 2017 Street Reconstruction Project ǀ T18.112541 Page 4 According to the sidewalk and trails gap analysis performed by the City, no gaps are present in the project area, and therefore no sidewalk or trail is proposed to be added to any of these streets. Proposed Sanitary Sewer Improvements Based on the sewer pipe age, material type, and televising results, the proposed improvement for the existing sanitary sewer is full replacement of the existing 8-inch VCP with new 8-inch polyvinyl chloride (PVC) pipe. Sanitary sewer manholes on the 8-inch line are proposed for replacement with new precast concrete structures and new castings that meet City standards. The 24-inch RCP trunk main is proposed to remain in place. All sewer services are proposed for replacement from the new main to the property line (City Right-of-Way) with new PVC wyes and 4-inch PVC pipe. Proposed Watermain Improvements Based on the watermain pipe age and size, the proposed improvement for the existing watermain is full replacement with new 8-inch PVC pipe. All hydrants, valves, and fittings will also be replaced along with the mainline pipe. All water service lines to individual residences are proposed for replacement from the new main to the property line (City Right-of-Way) with new 1-inch copper lines and curb stop and box. Proposed Storm Sewer Improvements The existing catch basins are recommended to be removed and replaced with new catch basins meeting current City standards. The storm sewer system within the roadway is anticipated to be replaced due to its proximity to the sanitary sewer and water mains that will be replaced. Additionally, stormwater quality improvements will be analyzed to help remove sediments and pollutant loads to the downstream system. See Figure 3 in Appendix A for the existing sanitary sewer, watermain and storm sewer utilities. IV.FULL DEPTH RECLAMATION AREA Balsam Street, Spruce Trail and Spruce Circle Existing Conditions The following are local residential roads in Prior Lake serving residential single family homes with direct access and have been determined to require a pavement rehabilitation: ·Balsam Street – between Sunrise Avenue and east end ·Spruce Trail – between Sunrise Avenue and 170th Street ·Spruce Circle The streets within the reclamation project area are all bituminous surfaced with D412 mountable concrete curb and gutter. The following table shows the existing street widths and approximate right-of-way widths. Prepared by: Bolton & Menk, Inc.FULL DEPTH RECLAMATION AREA 2017 Street Reconstruction Project ǀ T18.112541 Page 5 Table 1 –Street Widths LOCATION Curb & Gutter Street Width ROW Balsam Street Yes 32’50’ Spruce Trail Yes 32’50’ Spruce Circle Yes 32’50’ All measurements are from face of curb to face of curb. There are no sidewalks or trails along the roadway. However, there are 2 trails which tee into the roadways, one at the east end of Balsam Street and one on Spruce Trail east of Sunrise Avenue. There are no existing street lights located within the reclamation project area. City records show the roadway, water main, sanitary sewer, and storm sewer were constructed in the mid 1980’s. The OCI for Balsam Street, Spruce Trail and Spruce Circle is 21, making it a candidate for a full reconstruction. Due to the presence of concrete curb and gutter as well as age and condition of the existing utilities, it was determined this area would receive a pavement rehabilitation method of reclamation. Significant roadway patching is visible and the existing pavement contains large transverse cracking (cracks running perpendicular across the roadway) and significant alligator-type cracking. Alligator cracking in pavement is an indicator of potential subgrade problems. Soil borings were completed in the area by Northern Technologies to determine the existing roadway section and the report is included in Appendix E. The existing bituminous pavement thickness ranges from 4.0 to 6.0 inches with a gravel aggregate base thickness range of 4.0 to 12.0 inches. Existing subgrade soils found beneath the aggregate base consist of a clayey sand and silty sand fill material. There is an existing 6-inch diameter DIP water main which runs the entire length of Balsam Avenue, Spruce Trail and Spruce Circle. Service lines to individual homes within the project area are anticipated to be 1-inch diameter copper pipe. There is an existing 8-inch PVC sanitary sewer main which runs the entire length of Spruce Trail. Starting at the manhole located at the intersection of Balsam Street, the sanitary sewer flows south to a manhole at Sunrise Avenue. This main receives flow from Spruce Circle and half of Balsam Street. The western half of Balsam Street flows west through an existing 8-inch PVC sanitary sewer main to an existing manhole at Sunrise Avenue. The existing condition of the sanitary sewer system was documented by televising the sewer main. The televising revealed the pipe in good condition with no physical defects. Service lines to individual homes within the project area are anticipated to be 4-inch diameter PVC pipe. An existing set of catch basins are located to the north of Spruce Circle on Spruce Trail. These catch basins flow southeast between homes to a wetland. Proposed Street Improvements Based on the roadway age, surface deterioration, OCI rating, and assumed sub-soils, the proposed improvement for Balsam Street (between Sunrise Avenue and east end), Spruce Trail (between Sunrise Avenue and 170th Street) and Spruce Circle is a full depth reclamation of the existing road section. The existing pavement thickness and underlying aggregate base is proposed to be ground up (reclaimed) to a maximum depth of about 8 inches. The process effectively removes all existing cracking in the pavement and improves the upper portions of the aggregate base by combining the Prepared by: Bolton & Menk, Inc.FULL DEPTH RECLAMATION AREA 2017 Street Reconstruction Project ǀ T18.112541 Page 6 existing aggregate base and bituminous pavement into a new aggregate base. After grinding and blending these layers, the resultant material is then salvaged and stockpiled. The street is then excavated to the depth needed for the full pavement section. Once the street subgrade is prepared, the salvaged reclaimed material is hauled back and placed as aggregate base. Space is made for the required new pavement thickness and the roadway is paved with new bituminous pavement. The proposed street will match the existing concrete curb and gutter, making the horizontal and vertical alignments of the roadway the same as the existing roadway. Spot curb and gutter repairs will be completed where required. The pavement will be rehabilitated to a minimum 7-ton design requirement, which holds up to garbage trucks, school buses, and infrequent contractor truck loading. Based on geotechnical recommendations and current City standards, the proposed road section will include: 1.5” Bituminous Wearing Course 2.5” Bituminous Non-Wearing Course 8” Compacted Reclaim Material The vacation of the right-of-way for Balsam Street, east of Spruce Trail, was reviewed and it is proposed to remain to provide service to 2 existing driveways and a trail connection to the neighborhood to the east. Proposed Sanitary Sewer Improvements Based on the sewer pipe age, material type, and televising results, it was determined no improvements are necessary for the existing sanitary sewer along the reclamation project area. All existing sanitary sewer manholes castings are proposed for replacement with new concrete adjustments rings and new castings that meet current City standards. No improvements are proposed for the existing sewer services based on no proposed improvements to the existing sewer main line. Proposed Watermain Improvements Based on the watermain pipe age, material type, and lack of break history, it was determined no improvements are necessary for the existing watermain along the reclamation project area. No improvements are proposed for the existing water services based on no proposed improvements to the existing watermain. The addition of 2 hydrants to fill gaps in current spacing standards are proposed along Balsam Street and Spruce Trail. Proposed Storm Sewer Improvements Based on the storm sewer pipe age, it was determined no improvements are necessary for the existing storm sewer along the reclamation project area. All existing storm sewer manholes and catch basin castings are to be replaced with new concrete adjustments rings and new castings that meet current City standards. See Figure 3 in Appendix A for the existing sanitary sewer, watermain and storm sewer utilities. Prepared by: Bolton & Menk, Inc.DRIVEWAY RECONSTRUCTION PROGRAM 2017 Street Reconstruction Project ǀ T18.112541 Page 7 V.DRIVEWAY RECONSTRUCTION PROGRAM Starting in 2008, the City introduced a Driveway Reconstruction Program as part of reconstruction projects. Residents within the reconstruction project area could reconstruct their driveway using the City’s Contractor. The driveway work was bid through the large City contract allowing for the potential of reduced pricing on the driveway work. Residents were required to pay the costs up front prior to construction based on the calculation and letter from the City’s Engineering Department. In 2013, the City revised the program in order to streamline the process. Private driveway bid items were still included in the project bids but estimates and payments for the private driveway was between the property owner and contractor. The City was not involved in the transaction except for auditing of the contractor’s quotes when requested by the property owner. This program in the revised form is proposed to be continued for the 2017 Improvement Project. While the driveway program is a good service for property owners, it introduces the city into private property improvements. This results in additional city staff time and involvement. VI.STREET LIGHTING As previously described within the report, the number of existing street lights within both project areas is limited. The replacement of existing street lights and the addition of new street lights, especially at intersections has been standard practice on past improvements projects within the City and is expected to be incorporated into this project as well. The actual number and location of the new proposed street lights will be determined during final design. For the purposes of this report, street light costs for both the reconstruction and reclamation areas have been estimated based upon the addition of street lights at the roadway intersections only. This appeared to be the preference of the property owners as shown in the project questionnaires. VII.ESTIMATED COST/FINANCING Assessments are proposed for the benefited properties per the City’s Assessment Policy for Public and Development-Initiated Improvements. The proposed assessments are broken down into two different areas as shown on Figure 4 – Balsam-Spruce-Sunrise Assessment Map found in Appendix C. For all proposed full street reconstruction and street rehabilitation areas, all identified properties are proposed to be assessed at a calculated unit assessment rate of 40% of the total street and storm sewer project costs for each area. Properties were categorized according to the property location adjacent to, and with driveway access to, the roadway being reconstructed or rehabilitated. The property tax levy will be used to finance the costs of the remaining 60% of the street and storm sewer project costs. The project costs for the sanitary sewer and water main improvements are considered general maintenance and supported by utility fees under the City sewer and water utilities funds and will not be assessed. The proposed project assessments and funding summary are based on preliminary estimated project costs. These costs may be revised at the time of the final assessment hearing depending on final design of the project, required easements and/or right-of-way, soil conditions, bids received, and actual work performed. The unit assessment rates are proposed to be assessed over a 10-year period at a rate equal to 2.0% higher than the net interest cost of the bonds to be sold for the project. For this estimate, the interest rate is assumed to be 4.0% based upon the previous 2 years of bond sales. The estimated project cost to complete the improvements proposed herein are presented below. These costs include estimated construction costs, a 10% contingency, and 20% project support cost: financial (2.5%), legal (2.5%), administrative (5%), and engineering (10%). Prepared by: Bolton & Menk, Inc.ESTIMATED COST/FINANCING 2017 Street Reconstruction Project ǀ T18.112541 Page 8 Street Reconstruction Cost Estimate and Financing Table 2 - Estimated Project Costs and Financing (Reconstruction) ITEM ESTIMATED PROJECT COSTS ASSESSMENTS CITY SHARE Streets $776,660 $310,664 $465,996 Sanitary Sewer $320,180 $320,180 Watermain $323,140 $323,140 Storm Sewer1 $130,310 $44,124 $86,186 Total $1,550,290 $354,788 $1,195,502 1 Includes $20,000 in Water Quality Improvements that are not assessable The assessments shown above in Table 2 would be divided between the properties abutting, and with driveway access to, the reconstruction area on a unit basis. This unit assessment is calculated below: Reconstruction Area Amount to be Assessed =$354,788 Number of Units =34 Proposed Unit Assessment =$10,434.94 Street Reclamation Cost Estimate and Financing Table 3 - Estimated Project Costs and Financing (Reclamation) ITEM ESTIMATED PROJECT COSTS ASSESSMENTS CITY SHARE Streets $563,810 $225,524 $338,286 Watermain $14,590 $14,590 Total $578,400 $225,524 $352,876 The assessments shown above in Table 3 would be divided between the properties abutting, and with driveway access to, the reclamation area on a unit basis. This unit assessment is calculated below: Rehabilitation Area Amount to be Assessed =$225,524 Number of Units =52 Proposed Unit Assessment =$4,337.00 Prepared by: Bolton & Menk, Inc.PROJECT SCHEDULE 2017 Street Reconstruction Project ǀ T18.112541 Page 9 Total Project Cost Estimate and Financing Table 4 - Project Funding ITEM RECONSTRUCTION AREA RECLAMATION AREA TOTAL Ad Valerum $532,182 $338,286 $870,468 Assessments (40%)$354,788 $225,524 $580,312 Utility Fund - Sewer $320,180 $0 $320,180 Utility Fund - Water $323,140 $14,590 $337,730 Water Quality Fund $20,000 $0 $20,000 Assessment Roll (Per Unit) Reconstruction $10,434.94 Assessment Roll (Per Unit) Reclamation $4,337.00 Total $1,550,290 $578,400 $2,128,690 VIII.PROJECT SCHEDULE The proposed project schedule is shown below: First Informational Meeting ........................................................................... October 19, 2016 Accept Feasibility Report* .........................................................................November 28, 2016 Call for Public Improvement Hearing* .......................................................November 28, 2016 Second Informational Meeting ........................................................ November/December 2016 Conduct Public Improvement Hearing* ...................................................... December 12, 2016 Order Improvement Project* ..................................................................... December 12, 2016 Order Preparation of Final Plans & Specifications* .................................... December 12, 2016 Third Informational Meeting ..............................................................................February 2017 Approve Plans and Specifications* .....................................................................February 2017 Order Advertisement for Bids* .......................................................................... February 2017 Open Bids ............................................................................................................. March 2017 Accept Bids/Award Contract* ................................................................................. April 2017 Begin Construction ......................................................................... Late April/Early May 2017 Conduct Assessment Hearing/Adopt Assessment* .............................................. October 2017 * City Council Meeting Prepared by: Bolton & Menk, Inc.CONCLUSION 2017 Street Reconstruction Project ǀ T18.112541 Page 10 IX.CONCLUSION From an engineering standpoint, this proposed project, is feasible, cost effective, and necessary and can best be accomplished by letting competitive bids for the work under one contract in order to complete the work in an orderly and efficient manner. The City and the persons assessed will have to determine the economic feasibility of the proposed improvements. Prepared by: Bolton & Menk, Inc. 2017 Street Reconstruction Project ǀ T18.112541 Appendix A: Figures G±WX G±WX GrWX GuWX GuWX ?±A@ ?±A@ GkWX GÝWX GÜWX GqWX GqWXGnWX G³WX ?ÒA@ SÐ GwWX ?±A@ Credit River Louisville Prior Lake Sand Creek Savage Shakopee Spring Lake Spring Lake UpperPrior Lake LowerPriorLake Rice Lake CrystalLake Ma p D o c u m e n t : \ \ m e t r o s o u t h 1 \ g i s \ P L A K \ T 1 8 1 1 2 5 4 1 \ E S R I \ M a p s \ 1 1 2 5 4 1 _ F i g u r e 1 _ M a p b o o k _ 8 5 x 1 1 L . m x d | D a t e S a v e d : 1 1 / 1 0 / 2 0 1 6 1 : 5 5 : 1 8 P M 2017 Street Reconstruction Projects City of Prior Lake Figure 1 - Balsam-Spruce-Sunrise Project Location November 2016CLIENTLOGO Legend Project Location Public Waters - Watercourses Public Waters - Basins Municipal Boundaries 0 4,000 FeetSource: MnGeo, MnDOT, Scott County !I ?±A@ S P R U C E T R L S W BALSAM ST SW S U N R I S E A V S W LANGFO R D B L V D S W ?±A@ 3432 3440 3441 35913581 358835823576 3570 3564 3425341734093401 32503314 3324 3331332316989 16963 3311 17274 17264 3233 3217 3207 3193 16991 3214 16986 16982 3165 16994 17254 17244 17226 17232 17214 17200 17182 17094 17164 17132 17126 17148 17080 17106 17052 3224 3203 17010 17030 347017007 3210 3228 3246 3262 3282 3298 3310 3326 3342 3360 3376 3392 3404 3420 3436 17051 3319 3337 3355 3371 3387 3399 3413 3433 3520 35003480 3460 3360 335033403335 3345 3355 3410 3388 3364 3340 332033003286 17173 17159 17143 17125 17115 17103 17085 3251 3281 17072 17090 17108 17124 17140 17160 3258 3244 3228 32143200 3471 3535 3515 350534953477 3459 3443 3425 3407 3389 3371 3355 3345 3335 3313329932873275 3255 3237 32193201 17033 3235 S U N S E T T R L S W S Y C A M O R E T R L S W V A L E C I R S W BALSAM ST SW 170 ST SW SPRUCETRLSW SP R U C E C I R S W S U N R A Y B L V D S W D E W I T T E A V S W M O N R O E A V S W LANGF O R D B L V D S W WILLOW BEACH TR L S W S U N R I S E A V S W S U N R A Y C I R S W G R I G G S S T S W 2017 Street Reconstruction Projects City of Prior Lake Figure 2 - Balsam-Spruce-Sunrise Project Areas November 2016 Ma p D o c u m e n t : \ \ m e t r o s o u t h 1 \ g i s \ P L A K \ T 1 8 1 1 2 5 4 1 \ E S R I \ M a p s \ 1 1 2 5 4 1 _ B a l s a m _ S p r u c e _ S u n r i s e _ P r o j e c t A r e a s _ 8 5 x 1 1 . m x d | D a t e S a v e d : 1 1 / 1 0 / 2 0 1 6 1 : 5 4 : 4 6 P M Legend !I2017 Street Improvements Reclaim Reconstruct 0 250 FeetSource: Scott County, City of Prior Lake, MnGeo !5 !5 !5 !5 !5 !5 !5!5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5!5 !5!5!5!5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5!5!5 !5 !5 !5 !5 !5!5 !5!5 !5 !5 !5 !5!5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 !5 "/ "/ "/"/ "/ "/ "/ "/ "/ "/ "/ "/"/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/"/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/ "/"/ "/"/ "/ "/"/ !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !(!( !( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !( G!. G!. G!. G!. G!. G!. G!. G!. G!.G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!. G!.G!. G!. G!. G!. G!. G!. ?±A@ 3432 3440 3441 35913581 358835823576 3570 3564 3425341734093401 32503314 3324 3331332316989 16963 3311 17274 17264 32333217 3207 3193 16991 3214 16986 16982 3165 17254 17244 17226 17232 17214 17200 17182 17094 17164 17132 17126 17148 17080 17106 17052 3224 3203 17010 17030 347017007 3210 3228 3246 3262 3282 3298 3310 3326 3342 3360 3376 3392 3404 3420 3436 17051 3319 3337 3355 3371 3387 3399 3413 3433 3520 35003480 3460 3360 335033403335 3345 3355 3410 3388 3364 3340 332033003286 17173 17159 17143 17125 17115 17103 17085 3251 3281 17072 17090 17108 17124 17140 17160 3258 3244 3228 32143200 3471 3535 3515 35053495 3477 3459 3443 3425 3407 3389 3371 3355 3345 3335 3313329932873275 3255 3237 32193201 17033 3235 SU N S E T T R L S W BALSAM ST SW 170 ST SW SPRU C E T R L S W D E W I T T E A V S W LANGF O R D B L V D S W WILLOW BEAC H T R L S W S U N R I S E A V S W SUNRAYCIRSW G R I G G S S T S W 24" 12 " 18 " 1 5 " 1 5 " 12 " 15" 15" 12" 1 2 " 21" 3 0 " 18" 12" 1 8 " 30" 18" 18 " 27 " 16'' 8'' 6'' 6'' 6'' 6'' 6' ' 8'' 6' ' 6'' 6'' 6' ' 6' ' 6'' 16'' 8'' 6''6'' 16'' 8'' 6'' 16 ' ' 16 ' ' 2017 Street Reconstruction Projects City of Prior Lake Figure 3 - Balsam-Spruce-Sunrise Utilities November 2016 Ma p D o c u m e n t : \ \ m e t r o s o u t h 1 \ g i s \ P L A K \ T 1 8 1 1 2 5 4 1 \ E S R I \ M a p s \ 1 1 2 5 4 1 _ B a l s a m _ S p r u c e _ S u n r i s e _ U t i l i t i e s _ 8 5 x 1 1 . m x d | D a t e S a v e d : 1 1 / 1 0 / 2 0 1 6 1 2 : 5 3 : 1 5 P M Legend !I "/Storm Inlets !5 Storm Outlets !5 Storm Manholes Storm Mains !5 Sanitary Manholes Sanitary Mains G!.Water Hydrants Water Fittings !(Water Valves Water Laterals Water Mains Project Area 0 250 FeetSource: Scott County, City of Prior Lake, MnGeo Prepared by: Bolton & Menk, Inc. 2017 Street Reconstruction Project ǀ T18.112541 Appendix B: Preliminary Cost Estimate SCHEDULE "A" - STREETS (RECONSTRUCTION AREA) ITEM NO.DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1 MOBILIZATION LUMP SUM 1 75,000.00$$75,000.00 2 CLEAR AND GRUB EACH 20 350.00$$7,000.00 3 REMOVE CURB & GUTTER LF 20 6.00$$120.00 4 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SF 6850 0.50$$3,425.00 5 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 111 8.00$$888.00 6 REMOVE BITUMINOUS PAVEMENT SQ YD 7331 1.25$$9,163.75 7 REMOVE SIGN POST EACH 15 50.00$$750.00 8 SAWING CONCRETE PAVEMENT (FULL DEPTH)LF 110 5.00$$550.00 9 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)LF 720 4.00$$2,880.00 10 SALVAGE & REINSTALL WOOD RAIL FENCE LF 7 20.00$$140.00 11 SALVAGE & REINSTALL LANDSCAPE EDGING LF 87 9.00$$783.00 12 SALVAGE & REINSTALL SPRINKLER SYSTEM LF 146 16.00$$2,336.00 13 SALVAGE & REINSTALL MAILBOX EACH 33 100.00$$3,300.00 14 SALVAGE & REINSTALL LANDSCAPE ROCK SY 13 20.00$$260.00 15 SALVAGE & REINSTALL CONCRETE PAVERS SF 23 6.00$$138.00 16 SALVAGE & REINSTALL RETAINING WALL SF 29 15.00$$435.00 17 COMMON EXCAVATION CY 5906 10.00$$59,060.00 18 SUBGRADE EXCAVATION CY 885 14.00$$12,390.00 19 SELECT GRANULAR BORROW CY 2952 12.00$$35,424.00 20 SELECT TOPSOIL BORROW CY 953 30.00$$28,590.00 21 AGGREGATE BACKFILL CY 885 14.00$$12,390.00 22 STREET SWEEPER (WITH PICKUP BROOM)HOUR 50 125.00$$6,250.00 23 WATER DUST CONTROL MG 35 50.00$$1,750.00 24 AGGREGATE BASE CLASS 5 MOD. (100% CRUSHED)TON 3729 14.50$$54,070.50 25 BITUMINOUS MATERIAL FOR TACK COAT GAL 409 5.00$$2,045.00 26 TYPE SP 9.5 WEARING COURSE MIXTURE (3,B)TON 622 67.00$$41,674.00 27 TYPE SP 12.5 NON-WEARING COURSE MIXTURE (3,B)TON 1035 64.00$$66,240.00 28 TYPE SP 9.5 WEAR CRS MIX (3,B) 3" THICK DRIVEWAY PAVEMENT SY 816 20.00$$16,320.00 29 6" CONCRETE DRIVEWAY PAVEMENT SY 122 40.00$$4,880.00 30 CONCRETE CURB AND GUTTER DESIGN B618 LF 4358 12.00$$52,296.00 31 4" PERF TP PIPE DRAIN (WITH GEOTEXTILE FILTER SOCK)LF 4358 5.00$$21,790.00 32 REMOVE AND REPLACE RINGS AND CASTING (MANHOLES)EACH 4 450.00$$1,800.00 33 TEMPORARY MAILBOXES LUMP SUM 1 3,000.00$$3,000.00 34 LIGHTING UNIT (INCLUDES LIGHT, POLE, CONDUIT, WIRING)EACH 4 4,000.00$$16,000.00 35 TRAFFIC CONTROL LUMP SUM 1 10,000.00$$10,000.00 36 INSTALL SIGN TYPE C EACH 13 250.00$$3,250.00 37 INSTALL SIGN TYPE SPECIAL (STREET NAME)EACH 3 300.00$$900.00 38 TREE 2.5" CAL B&B (VARIETY - SEE SPEC)EACH 20 350.00$$7,000.00 39 SHRUB 18" HT (VARIETY - SEE SPEC)EACH 15 50.00$$750.00 40 STORM DRAIN INLET PROTECTION EACH 8 250.00$$2,000.00 41 FILTER LOG TYPE WOOD FIBER BIOROLL LF 100 4.00$$400.00 42 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 2 1,000.00$$2,000.00 43 SODDING TYPE LAWN SY 6314 3.00$$18,941.00 SCHEDULE "A" - STREETS (RECONSTRUCTION AREA)SUBTOTAL $588,379.25 10% CONTINGENCY $58,840.75 ESTIMATED CONSTRUCTION COSTS $647,220.00 20% PROJECT SUPPORT COSTS $129,440.00 SCHEDULE "A" ESTIMATED PROJECT COSTS $776,660.00 SCHEDULE "B" - SANITARY SEWER (RECONSTRUCTION AREA) ITEM NO.DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 44 REMOVE SEWER PIPE (SANITARY)LF 1375 10.00$$13,750.00 45 REMOVE MANHOLE EACH 5 500.00$$2,500.00 46 REMOVE SEWER SERVICE PIPE LF 1380 5.00$$6,900.00 47 DEWATERING LUMP SUM 1 50,000.00$$50,000.00 ENG EST RECON 11/21/2016 1 of 3 City of Prior Lake, MN 48 PIPE BEDDING MATERIAL CY 367 40.00$$14,666.67 49 CONNECT TO EXISTING MANHOLES (SAN)EACH 4 1,200.00$$4,800.00 50 8"X4" PVC SDR 26 WYE EACH 30 250.00$$7,500.00 51 4" PVC SEWER SCH 40 LF 1380 25.00$$34,500.00 52 RECONNECT SEWER SERVICE EACH 30 150.00$$4,500.00 53 8" PVC SEWER SDR 35 LF 1375 35.00$$48,125.00 54 SANITARY MANHOLE EXTRA DEPTH (>8FT)LIN FT 17 120.00$$2,040.00 55 48" DIAMETER SANITARY MANHOLE EACH 5 2,400.00$$12,000.00 56 CASTING ASSEMBLY SPECIAL - TRACER WIRE LOCATE BOX EACH 30 350.00$$10,500.00 57 CLEAR AND GRUB EACH 6 350.00$$2,100.00 58 TREE 2.5" CAL B&B (VARIETY - SEE SPEC)EACH 6 350.00$$2,100.00 59 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SF 1028 0.50$$514.00 60 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 17 8.00$$136.00 61 TYPE SP 9.5 WEAR CRS MIX (3,B) 3" THICK DRIVEWAY PAVEMENT SY 115 20.00$$2,300.00 62 6" CONCRETE DRIVEWAY PAVEMENT SY 17 40.00$$680.00 63 SALVAGE & REINSTALL WOOD RAIL FENCE LF 7 20.00$$140.00 64 SALVAGE & REINSTALL LANDSCAPE EDGING LF 87 9.00$$783.00 65 SALVAGE & REINSTALL SPRINKLER SYSTEM LF 146 16.00$$2,336.00 66 SALVAGE & REINSTALL LANDSCAPE ROCK SY 13 20.00$$260.00 67 SALVAGE & REINSTALL CONCRETE PAVERS SF 23 6.00$$138.00 68 SALVAGE & REINSTALL RETAINING WALL SF 29 15.00$$435.00 69 SODDING TYPE LAWN SY 2767 3.00$$8,300.00 70 SELECT TOPSOIL BORROW CY 352 30.00$$10,560.00 SCHEDULE "B" - SANITARY SEWER (RECONSTRUCTION AREA)SUBTOTAL $242,563.67 10% CONTINGENCY $24,256.33 ESTIMATED CONSTRUCTION COSTS $266,820.00 20% PROJECT SUPPORT COSTS $53,360.00 SCHEDULE "B" ESTIMATED PROJECT COSTS $320,180.00 SCHEDULE "C" - WATERMAIN (RECONSTRUCTION AREA) ITEM NO.DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 71 REMOVE WATERMAIN LF 1560 10.00$$15,600.00 72 REMOVE GATE VALVE & BOX EACH 5 200.00$$1,000.00 73 REMOVE HYDRANT AND VALVE EACH 3 500.00$$1,500.00 74 REMOVE WATER SERVICE LF 1600 5.00$$8,000.00 75 REMOVE CURB STOP AND BOX EACH 32 50.00$$1,600.00 76 TEMPORARY WATER SERVICE LUMP SUM 1 5,000.00$$5,000.00 77 CONNECT TO EXISTING WATERMAIN EACH 4 1,500.00$$6,000.00 78 HYDRANT WITH 6" GATE VALVE & BOX EACH 3 4,500.00$$13,500.00 79 8" GATE VALVE AND BOX EACH 5 1,600.00$$8,000.00 80 8" SADDLE EACH 32 350.00$$11,200.00 81 1" CORPORATION STOP EACH 32 300.00$$9,600.00 82 1" CURB STOP & BOX EACH 32 400.00$$12,800.00 83 1" WATER SERVICE LF 1600 20.00$$32,000.00 84 RECONNECT WATER SERVICE EACH 32 500.00$$16,000.00 85 6" WATERMAIN PVC C900 LF 45 35.00$$1,575.00 86 8" WATERMAIN PVC C900 LF 1560 37.00$$57,720.00 87 DUCTILE IRON FITTINGS LBS 2340 5.00$$11,700.00 88 CURB STOP BOX DRIVEWAY CASTING ASSEMBLY EACH 7 175.00$$1,225.00 89 CLEAR AND GRUB EACH 6 350.00$$2,100.00 90 TREE 2.5" CAL B&B (VARIETY - SEE SPEC)EACH 6 350.00$$2,100.00 91 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SF 1028 0.50$$514.00 92 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 17 8.00$$136.00 93 TYPE SP 9.5 WEAR CRS MIX (3,B) 3" THICK DRIVEWAY PAVEMENT SY 115 20.00$$2,300.00 94 6" CONCRETE DRIVEWAY PAVEMENT SY 17 40.00$$680.00 95 SALVAGE & REINSTALL WOOD RAIL FENCE LF 7 20.00$$140.00 96 SALVAGE & REINSTALL LANDSCAPE EDGING LF 87 9.00$$783.00 97 SALVAGE & REINSTALL SPRINKLER SYSTEM LF 146 16.00$$2,336.00 ENG EST RECON 11/21/2016 2 of 3 City of Prior Lake, MN 98 SALVAGE & REINSTALL LANDSCAPE ROCK SY 13 20.00$$260.00 99 SALVAGE & REINSTALL CONCRETE PAVERS SF 23 6.00$$138.00 100 SALVAGE & REINSTALL RETAINING WALL SF 29 15.00$$435.00 101 SODDING TYPE LAWN SY 2767 3.00$$8,300.00 102 SELECT TOPSOIL BORROW CY 352 30.00$$10,560.00 SCHEDULE "C" - WATERMAIN (RECONSTRUCTION AREA)SUBTOTAL $244,802.00 10% CONTINGENCY $24,478.00 ESTIMATED CONSTRUCTION COSTS $269,280.00 20% PROJECT SUPPORT COSTS $53,860.00 SCHEDULE "C" ESTIMATED PROJECT COSTS $323,140.00 SCHEDULE "D" - STORM SEWER (RECONSTRUCTION AREA) ITEM NO.DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 103 REMOVE SEWER PIPE (STORM)LF 1090 10.00$$10,900.00 104 REMOVE DRAINAGE STRUCTURE EACH 10 500.00$$5,000.00 105 15" RC PIPE SEWER CL V DESIGN 3006 (STORM)LF 100 35.00$$3,500.00 106 18" RC PIPE SEWER CL V DESIGN 3006 (STORM)LF 1040 38.00$$39,520.00 107 CONNECT TO EXISTING STORM SEWER EACH 1 800.00$$800.00 108 CONST DRAINAGE STRUCTURE DES 48-4020 EACH 2 2,100.00$$4,200.00 109 CONST DRAINAGE STRUCTURE DES (2'X3') (PLATE#301)EACH 4 1,500.00$$6,000.00 110 CONST DRAINAGE STRUCTURE DES 48-4022 (PLATE#300)EACH 4 2,200.00$$8,800.00 111 CONST DRAINAGE STRUCTURE DES SPECIAL 1 (WATER QUALITY)LUMP SUM 1 20,000.00$$20,000.00 SCHEDULE "D" - STORM SEWER (RECONSTRUCTION AREA)SUBTOTAL $98,720.00 10% CONTINGENCY $9,870.00 ESTIMATED CONSTRUCTION COSTS $108,590.00 20% PROJECT SUPPORT COSTS $21,720.00 SCHEDULE "D" ESTIMATED PROJECT COSTS $130,310.00 SCHEDULE "A" - STREETS (RECONSTRUCTION AREA)ESTIMATED PROJECT COSTS $776,660.00 SCHEDULE "B" - SANITARY SEWER (RECONSTRUCTION AREA)ESTIMATED PROJECT COSTS $320,180.00 SCHEDULE "C" - WATERMAIN (RECONSTRUCTION AREA)ESTIMATED PROJECT COSTS $323,140.00 SCHEDULE "D" - STORM SEWER (RECONSTRUCTION AREA)ESTIMATED PROJECT COSTS $130,310.00 TOTAL ESTIMATED PROJECT COSTS (RECONSTRUCTION AREA)$1,550,290.00 ENG EST RECON 11/21/2016 3 of 3 City of Prior Lake, MN SCHEDULE "E" - STREETS (RECLAMATION AREA) ITEM NO.DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1 MOBILIZATION LUMP SUM 1 20,000.00$$20,000.00 2 REMOVE CURB & GUTTER (SPOT REPAIR)LF 1188 10.00$$11,880.00 3 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SF 750 0.50$$375.00 4 REMOVE CONCRETE DRIVEWAY PAVEMENT SY 16 8.00$$128.00 5 REMOVE SIGN POST EACH 17 50.00$$850.00 6 SUBGRADE EXCAVATION CY 2464 14.00$$34,496.00 7 SELECT TOPSOIL BORROW CY 1513 30.00$$45,390.00 8 AGGREGATE BACKFILL CY 2464 14.00$$34,496.00 9 STREET SWEEPER (WITH PICKUP BROOM)HOUR 45 125.00$$5,625.00 10 WATER DUST CONTROL MG 45 50.00$$2,250.00 11 FULL DEPTH RECLAMATION SY 10163 2.00$$20,326.00 12 SALVAGE AND REINSTALL RECLAIM MATERIAL CY 2258 5.00$$11,290.00 13 COMMON EXCAVATION CY 1129 10.00$$11,290.00 14 BITUMINOUS MATERIAL FOR TACK COAT GAL 578 5.00$$2,890.00 15 TYPE SP 9.5 WEARING COURSE MIXTURE (3,B)TON 877 67.00$$58,759.00 16 TYPE SP 12.5 NON-WEARING COURSE MIXTURE (3,B)TON 1462 64.00$$93,568.00 17 TYPE SP 9.5 WEAR CRS MIX (3,B) 3" THICK DRIVEWAY PAVEMENT SY 84 20.00$$1,680.00 18 6" CONCRETE DRIVEWAY PAVEMENT SY 16 40.00$$640.00 19 CONCRETE VALLEY GUTTER SY 66 50.00$$3,300.00 20 CONCRETE CURB AND GUTTER DESIGN D412 (SPOT REPAIR)LF 1188 20.00$$23,760.00 21 CONCRETE PEDESTRIAN CURB RAMP SF 192 5.00$$960.00 22 TRUNCATED DOME PANELS SF 32 40.00$$1,280.00 23 REMOVE AND REPLACE RINGS AND CASTING (MANHOLES)EACH 12 450.00$$5,400.00 24 REMOVE AND REPLACE RINGS AND CASTING (CATCH BASINS)EACH 4 500.00$$2,000.00 25 ADJUST VALVE BOX EACH 6 120.00$$720.00 26 TEMPORARY MAILBOXES LUMP SUM 1 3,000.00$$3,000.00 27 LIGHTING UNIT (INCLUDES LIGHT, POLE, CONDUIT, WIRING)EACH 5 4,000.00$$20,000.00 28 TRAFFIC CONTROL LUMP SUM 1 5,000.00$$5,000.00 29 INSTALL SIGN TYPE C EACH 15 250.00$$3,750.00 30 STORM DRAIN INLET PROTECTION EACH 4 250.00$$1,000.00 31 SODDING TYPE LAWN SY 204 5.00$$1,020.00 SCHEDULE "E" - STREETS (RECLAMATION AREA)SUBTOTAL $427,123.00 10% CONTINGENCY $42,717.00 ESTIMATED CONSTRUCTION COSTS $469,840.00 20% INDIRECT COSTS $93,970.00 SCHEDULE "E" ESTIMATED PROJECT COSTS $563,810.00 SCHEDULE "F" - WATERMAIN (RECLAMATION AREA) ITEM NO.DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 32 CUT IN TEE EACH 2 1,500.00$$3,000.00 33 HYDRANT WITH 6" GATE VALVE & BOX EACH 2 3,500.00$$7,000.00 34 6" WATERMAIN PVC C900 LF 30 35.00$$1,050.00 SCHEDULE "F" - WATERMAIN (RECLAMATION AREA)SUBTOTAL $11,050.00 10% CONTINGENCY $1,110.00 ESTIMATED CONSTRUCTION COSTS $12,160.00 20% INDIRECT COSTS $2,430.00 SCHEDULE "F" ESTIMATED PROJECT COSTS $14,590.00 SCHEDULE "E" - STREETS (RECLAMATION AREA)ESTIMATED PROJECT COSTS $563,810.00 SCHEDULE "F" - WATERMAIN (RECLAMATION AREA)ESTIMATED PROJECT COSTS $14,590.00 TOTAL ESTIMATED PROJECT COSTS (RECLAMATION AREA)$578,400.00 ENG EST RECLAIM 11/21/2016 1 of 1 City of Prior Lake, MN Prepared by: Bolton & Menk, Inc. 2017 Street Reconstruction Project ǀ T18.112541 Appendix C: Preliminary Assessment Map & Roll ?±A@ 3432 3440 3441 3581 3588 35823576 3570 3564 3425341734093401 32503314 3324 3331332316989 16963 331132333217 3207 3193 16991 3214 16986 16982 17254 17244 17226 17232 17214 17200 17182 17094 17164 17132 17126 17148 17080 17106 17052 3224 3203 17010 17030 347017007 3210 3228 3246 3262 3282 3298 3310 3326 3342 3360 3376 3392 3404 3420 3436 17051 3319 3337 3355 3371 3387 3399 3413 3433 3520 35003480 34603360 3350 33403335 3345 3355 3410 3388 3364 3340 332033003286 17173 17159 17143 17125 17115 17103 17085 3251 3281 17072 17090 17108 17124 17140 17160 3258 3244 3228 32143200 3471 3535 3515 3505 3495 3477 3459 3443 3425 3407 3389 3371 3355 3345 3335 3313329932873275 3255 32373219 3201 17033 3235 S Y C A M O R E T R L S W 170 ST SW BALSAM ST SW LANGF O R D B L V D S W S P R U C E TR L S W SP R U C E C I R S W SU N S E T T R L S W D E W I T T E A V S W S U N R I S E A V S W S U N R A Y C I R S W G R I G G S S T S W 2017 Street Reconstruction Projects City of Prior Lake Figure 4 - Balsam-Spruce-Sunrise Assessment Map November 2016 Ma p D o c u m e n t : \ \ m e t r o s o u t h 1 \ g i s \ P L A K \ T 1 8 1 1 2 5 4 1 \ E S R I \ M a p s \ A s s e s s m e n t R o l l s \ 1 1 2 5 4 1 _ B a l s a m _ S p r u c e _ S u n r i s e _ A s s e s s m e n t R o l l s _ 8 5 x 1 1 . m x d | D a t e S a v e d : 1 1 / 1 0 / 2 0 1 6 2 : 2 6 : 0 8 P M Legend !I2017 Street Improvements Reclaim Reconstruct Reclaim Assessment Parcels Reconstruct Assessment Parcels 0 250 FeetSource: Scott County, City of Prior Lake, MnGeo STREET AND STORM SEWER Interest % 10 YEAR STREETS 2017 # of days # of Parcels EQUAL PRINCIPAL No.Parcel Address Parcel Number Property Owner & Address *Assessible Units Unit Assessment Amount Total Assessment Amount 1 17143 SUNRISE AVE SW 251720460 BORNHORST JASON & LISA 1 $10,434.94 $10,434.94 2 3219 SPRUCE TRL SW 251720860 BULLOCK RACHEL L 1 $10,434.94 $10,434.94 3 3235 BALSAM ST SW 254670010 CEBALLOS DAVID W 1 $10,434.94 $10,434.94 4 17159 SUNRISE AVE SW 251720450 CHRISTENSON NATHAN L 1 $10,434.94 $10,434.94 5 17125 SUNRISE AVE SW 251720470 FOUTS PATRICK A & DARLENE R 1 $10,434.94 $10,434.94 6 17160 SUNRISE AVE SW 251720590 FRITZE CASSANDRA M 1 $10,434.94 $10,434.94 7 3200 SPRUCE TRL SW 251720640 GONZALEZ BATISTA JAIME 1 $10,434.94 $10,434.94 8 3298 BALSAM ST SW 251720080 GRIFFIN FREDRICK M 8 Hartford Ln Bella Vista Ark 72714 1 $10,434.94 $10,434.94 9 17051 SUNRISE AVE SW 251720180 HAAS BROOK R 1515 45th St, Des Moines, IA 50311 1 $10,434.94 $10,434.94 10 3201 SPRUCE TRL SW 251720870 HOLM KARL W 1 $10,434.94 $10,434.94 11 3275 SPRUCE TRL SW 251720830 JANET K FRANTA REVOCABLE TRUST 1 $10,434.94 $10,434.94 12 17103 SUNRISE AVE SW 251720490 JORGENSON JEFFREY C & LEANN 1 $10,434.94 $10,434.94 13 3228 SPRUCE TRL SW 251720620 KASPER DARLA J 1 $10,434.94 $10,434.94 14 17140 SUNRISE AVE SW 251720580 KATH MARSHALL C 1 $10,434.94 $10,434.94 2017 BALSAM STREET AREA - RECONSTRUCTION 15 17072 SUNRISE AVE SW 251720540 KENDALL EDDIE L & KATHLEEN A 1 $10,434.94 $10,434.94 16 3262 BALSAM ST SW 251720060 KODET VIRGINIA A & BRADLEY G 1 $10,434.94 $10,434.94 17 3214 SPRUCE TRL SW 251720630 LANCELLO JR RICHARD P 1 $10,434.94 $10,434.94 18 3228 BALSAM ST SW 251720040 LIEN HOLLY S 1 $10,434.94 $10,434.94 19 3255 SPRUCE TRL SW 251720840 LIST RANDY 1 $10,434.94 $10,434.94 20 17090 SUNRISE AVE SW 251720550 MCCORD ARCHIBALD & KATHLEEN 1 $10,434.94 $10,434.94 21 3251 BALSAM ST SW 251720520 O'CONNELL KATHIE A 1 $10,434.94 $10,434.94 22 3281 BALSAM ST SW 251720530 O'KEEFE DANIEL E & CYNTHIA D 1 $10,434.94 $10,434.94 23 3244 SPRUCE TRL SW 251720610 OLSON MINDA A 1 $10,434.94 $10,434.94 24 3237 SPRUCE TRL SW 251720850 OVERBY BRAD W 1 $10,434.94 $10,434.94 25 3287 SPRUCE TRL SW 251720820 PETERSON TERESA A 1 $10,434.94 $10,434.94 26 17115 SUNRISE AVE SW 251720480 SJULSTAD RYAN 1 $10,434.94 $10,434.94 27 17108 SUNRISE AVE SW 251720560 SKLUZACEK BRIAN 1 $10,434.94 $10,434.94 28 17173 SUNRISE AVE SW 251720440 SLICK ALLISON 1 $10,434.94 $10,434.94 29 3282 BALSAM ST SW 251720070 SMITH KARILYN KAY 1 $10,434.94 $10,434.94 30 3210 BALSAM ST SW 251720030 STEINBERG CHERYL 1 $10,434.94 $10,434.94 31 3258 SPRUCE TRL SW 251720600 WALTERS KRISTINA M 1 $10,434.94 $10,434.94 32 17124 SUNRISE AVE SW 251720570 WALTERS TERRY F 995 174th St E, Jordan, MN 55352 1 $10,434.94 $10,434.94 33 3246 BALSAM ST SW 251720050 WINEGAR GREGORY & PAMELA 1 $10,434.94 $10,434.94 34 17085 SUNRISE AVE SW 251720500 WOELFLE GLENN M 1 $10,434.94 $10,434.94 TOTAL # OF PARCELS 34 $354,787.96*if same address as parcel then owner address not shown STREET AND STORM SEWER Interest % 10 YEAR STREETS 2017 # of days # of Parcels EQUAL PRINCIPAL No.Parcel Address Parcel Number Property Owner & Address*Assessible Units Street Assessment Total Assessment Amount 1 3420 BALSAM ST SW 251720160 3420 BALSAM LLC 17038 Huntington Path, Lakeville, MN. 55044 1 $4,337.00 $4,337.00 2 3443 SPRUCE TRL SW 251720720 ADLER JOHN F & NANCY S 1 $4,337.00 $4,337.00 3 3337 BALSAM ST SW 251720200 ARIAS MARIA D 1 $4,337.00 $4,337.00 4 3313 SPRUCE TRL SW 251720800 BREKKE CURTIS E & KARLA M 1 $4,337.00 $4,337.00 5 3364 SPRUCE TRL SW 251720390 BURDSAL JONATHAN & SHANNON K 1 $4,337.00 $4,337.00 6 3410 SPRUCE TRL SW 251720370 BUSSE GARY M & JODI N 1 $4,337.00 $4,337.00 7 3340 SPRUCE CIR SW 251720330 BUSSE ROGER C & NANCY J 18547 Hadley Ave, Prior Lake, MN 55372 1 $4,337.00 $4,337.00 8 3345 SPRUCE TRL SW 251720780 CAMERON WILLIAM JAMES 1 $4,337.00 $4,337.00 9 3389 SPRUCE TRL SW 251720750 CHRISTOPHER JEFFREY & KATHRYN 1 $4,337.00 $4,337.00 10 3520 SPRUCE TRL SW 251720270 COOKE SUSAN KAY 1 $4,337.00 $4,337.00 11 3471 BALSAM ST SW 251720650 COYLE DARRELL & NANCY R 1 $4,337.00 $4,337.00 12 3326 BALSAM ST SW 251720100 DAUST SUSAN M 1 $4,337.00 $4,337.00 13 3376 BALSAM ST SW 251720130 DEMKO SCOTT A & STEPHANIE S 1 $4,337.00 $4,337.00 14 3286 SPRUCE TRL SW 251720430 DICKENSON GARY L & NANCY J 1 $4,337.00 $4,337.00 15 3310 BALSAM ST SW 251720090 DIETER DIRK D 1 $4,337.00 $4,337.00 16 3360 SPRUCE CIR SW 251720310 EDLUND JOEY J & LISA A 1 $4,337.00 $4,337.00 2017 BALSAM STREET AREA - RECLAMATION 17 3407 SPRUCE TRL SW 251720740 EVELYN J CHRISTENSEN TRUST 1 $4,337.00 $4,337.00 18 3436 BALSAM ST SW 251720170 FELDMAN JOSEPH A 19120 Oak Grove Ave, Prior Lake, MN 55372 1 $4,337.00 $4,337.00 19 3355 SPRUCE TRL SW 251720770 FORD BRUCE J & BRENDA J 1 $4,337.00 $4,337.00 20 3404 BALSAM ST SW 251720150 FREER JOHN K 1 $4,337.00 $4,337.00 21 3535 SPRUCE TRL SW 251720660 FREEZE HANS & LORELI VANHERTEN 1 $4,337.00 $4,337.00 22 3387 BALSAM ST SW 251720230 HANSON KATIE L 1 $4,337.00 $4,337.00 23 3319 BALSAM ST SW 251720190 HOLM BRETT L 1 $4,337.00 $4,337.00 24 3300 SPRUCE TRL SW 251720420 HVINDEN LARRY R 1 $4,337.00 $4,337.00 25 3470 BALSAM ST SW 251720010 JACKSON CAROL 1 $4,337.00 $4,337.00 26 3515 SPRUCE TRL SW 251720670 JANKE DENNIS D 1 $4,337.00 $4,337.00 27 3360 BALSAM ST SW 251720120 JOHNSON LARRY V & LYNETTE R 18981 E Clear Creek Dr, Parker, Co 80134 1 $4,337.00 $4,337.00 28 3355 BALSAM ST SW 251720210 KIRSCHT THOMAS A & LISA MARIE 1 $4,337.00 $4,337.00 29 3505 SPRUCE TRL SW 251720680 KOP JR JOHN E & KRISTINA L 1 $4,337.00 $4,337.00 30 3392 BALSAM ST SW 251720140 KRAMER POLLY A 1 $4,337.00 $4,337.00 31 3342 BALSAM ST SW 251720110 KRAUS BENJAMIN L 1 $4,337.00 $4,337.00 32 3480 SPRUCE TRL SW 251720290 KROCAK KEVIN M 1 $4,337.00 $4,337.00 33 3388 SPRUCE TRL SW 251720380 LIEN SARA R 1 $4,337.00 $4,337.00 34 3459 SPRUCE TRL SW 251720710 MCCANN PATRICK 1 $4,337.00 $4,337.00 35 3399 BALSAM ST SW 251720240 MELLUM DEBRA 1 $4,337.00 $4,337.00 36 3335 SPRUCE TRL SW 251720790 MILLION GELILA 1 $4,337.00 $4,337.00 37 3335 SPRUCE CIR SW 251720340 MOETELL MARGARET L 1 $4,337.00 $4,337.00 38 3340 SPRUCE TRL SW 251720400 MONNENS PATRICK J & ANN 1 $4,337.00 $4,337.00 39 3355 SPRUCE CIR SW 251720360 MOYNIHAN MICHAEL 1 $4,337.00 $4,337.00 40 3299 SPRUCE TRL SW 251720810 NOER VICTOR 5527 Highpointe Ct SE, Prior Lake, MN 55372 1 $4,337.00 $4,337.00 41 3460 SPRUCE TRL SW 251720300 PUENTE DAVID M 1 $4,337.00 $4,337.00 42 3371 BALSAM ST SW 251720220 RATH LARRY JACOB 1 $4,337.00 $4,337.00 43 3371 SPRUCE TRL SW 251720760 RINGDAHL LYNN O & STEPHANIE J 1 $4,337.00 $4,337.00 44 3433 BALSAM ST SW 251720260 SASSE HARLEY G & CAROLYN S 1 $4,337.00 $4,337.00 45 3413 BALSAM ST SW 251720250 STECKELBERG AMY 1 $4,337.00 $4,337.00 46 3495 SPRUCE TRL SW 251720690 STRUKEL MICHAEL J & COREEN A 1 $4,337.00 $4,337.00 47 3425 SPRUCE TRL SW 251720730 TAFT DONALD E & LILA 1 $4,337.00 $4,337.00 48 3320 SPRUCE TRL SW 251720410 TN INVESTMENTS LLC 16180 Hasstings Ave #301, Prior Lake, MN 55372 1 $4,337.00 $4,337.00 49 3477 SPRUCE TRL SW 251720700 TREMMEL KARL 1 $4,337.00 $4,337.00 50 3500 SPRUCE TRL SW 251720280 WERMERSKIRCHEN TRAVIS M 1 $4,337.00 $4,337.00 51 3345 SPRUCE CIR SW 251720350 WEUM LOREN J 1 $4,337.00 $4,337.00 52 3350 SPRUCE CIR SW 251720320 ZOBECK STEVEN J & BRENDA S 1 $4,337.00 $4,337.00 *If same address as parcel, address not shown Total # of Parcels 52 $225,524.00 Prepared by: Bolton & Menk, Inc. 2017 Street Reconstruction Project ǀ T18.112541 Appendix D: Resident Questionnaire Prepared by: Bolton & Menk, Inc. 2017 Street Reconstruction Project ǀ T18.112541 Appendix E: Geotechnical Evaluation November 11, 2016 Bolton & Menk, Inc. Attention: Michael S. Nill, P.E. 2035 County Road D East Maplewood, MN 55109-5314 Subject : Geotechnical Exploration and Engineering Review City of Prior Lake – 2017 Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 In accordance with your request and subsequent authorization, Northern LLC. (NTI) conducted a Geotechnical Exploration for the above referenced project. Our services included advancement of exploration borings and preparation of an engineering report with recommendations developed from our geotechnical services. Our work was performed in general accordance with our proposal dated September 8, 2016. Soil samples obtained at the site will be held for 60 days at which time they will be discarded. Please advise us in writing if you wish to have us retain them for a longer period. Y ou will be assessed an additional fee if soil samples are retained beyond 60 days. PROJECT AND SITE DESCRIPTION The proposed project consists of improvements to a number of different streets within the City of Prior Lake, Minnesota. The proposed roadways include Albany Avenue, Cate Street, CJ Circle, Five Hawks Avenue, Park Avenue, Balsam Street, Sunrise Avenue, Sunrise Circle, Spruce Trail, Sycamore Trail and Franklin Avenue from CSAH 21 to TH13. City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 Page 2 of 7 SCOPE OF SERVICES Explore the project subsurface by means of 28 standard penetration test (SPT) borings extending to depths ranging from 5 and 15 feet below existing grade, and conduct laboratory test(s) on representative samples for characterizing the index and engineering properties of the soils at the project site. The scope of services also included determining existing subsurface conditions, and providing recommendations for site preparation, excavations, engineered fill and compaction, groundwater management and potential difficulties during construction. SUBSURFACE EXPLORATION SUMMARY Northern LLC. (NTI) performed the subsurface exploration program between Oct ober 25 and 31, 2016 with a two-person crew using an ATV -mounted CME -750 drill rig . Samples were generally collected in accordance with ASTM D 1586 “Standard Test Method for Standard Penetration Testing (SPT) and Split - Barrel Sampling of Soils.” The boring locations, depths, and elevations were determined and staked in the field by a representative of the client . Please refer to the Boring Location Diagram and the Boring Logs in Appendix C. Table 1 summarizes the encountered subsurface conditions at the boring locations. Table 1: Pavement and Subgrade Summary1 Boring No. Bituminous Pavement Thickness (inches) Apparent Aggregate Base Thickness2 (inches) Subgrade Material Estimated Pavement Subgrade R-Value SB-1 5 1/2 2 SM 30 SB-2 6 1/4 2 SM 30 SB-3 6 1/2 1.5 SM 30 SB-4 6 1 SM 30 SB-5 8 1/2 2 SM 30 SB-6 6 6 SC 20 SB-7 2 1/4 4 SC 20 SB-8 4 4.5 SM 30 SB-9 2 1/4 5 SC 20 SB-10 4 1/4 6 SM 30 SB-11 2 1/4 6 SC 20 SB-12 2 3/4 5 SM 30 SB-13 6 1/4 5 SC 20 City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 Page 3 of 7 Boring No. Bituminous Pavement Thickness (inches) Apparent Aggregate Base Thickness2 (inches) Subgrade Material Estimated Pavement Subgrade R-Value SB-14 4 8 SC 20 SB-15 5 1/2 11.5 SC 20 SB-16 4 3/4 5 SM 30 SB-17 4 1/2 4 SC 20 SB-18 4 3/4 4 SC 20 SB-19 5 1/2 5.5 SC 20 SB-20 5 1/2 8 SC 20 SB-21 1 3/4 1.5 SC 20 SB-22 5 1/2 1.5 SM 30 SB-23 2 8 SM 30 SB-24 3 12 SM 30 SB-25 3 1/4 7 SC 20 SB-26 8 1/4 3 SC 20 SB-27 6 1/2 2 SC 20 SB-28 5 1/2 7 SC 20 1. Table summary is a generalization of subsurface conditions at the individual soil boring locations only. They may not reflect variations in subsurface strata occurring on site between boring locations. The general geologic origin of retained soil samples is listed on the boring logs. 2. Apparent aggregate base thickness, at time of our fieldwork, by visual inspection only and is not meant to confer conformance with DOT specifications. GROUNDWATER AND GROUNDWATER CONTROL The drill crew observed the borings for groundwater (if any) during and at the completion of drilling activities. Groundwater was observed at depths ranging between 7 ½ feet and 12 feet in seven of the borings. NTI did not observe groundwater in the remaining borings at the time of our field exploration. However, the on-site clay and silt laden soils along with the underlying apparent bedrock have the potential to be somewhat impervious and conducive to the development of zones of perc hed water at varying elevations and locations across the project site. Overall, the site soils are conducive to movement of groundwater both laterally and vertically. The moisture content of such soils can vary annually and per recent precipitation. Such soils and other regional dependent conditions may produce groundwater entry of project excavations. City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 Page 4 of 7 LABORATORY TEST PROG RAM Our analysis and recommendations within this report are based upon our interpretation of the standard penetration test resistance determined while sampling soils, laboratory test results and experience with similar soils from other sites near the project. The results of such tests are summarized on the boring log or laboratory test reports. UTILITIES Utility trenches should be backfilled in 6-inch maximum depth loose lifts. It is especially important that you compact trench backfill of underground utilities to minimize future settlement of green space, walkways, and pavement areas. Please refer to Appendix B for compact ion specifications. The stability of embankments along utility excavations is dependent on soil strength, site geometry, moisture content, and any surcharge load for excavated soils and equipment. Cautionary comment on excavation stability is provided within other report sections. Groundwater will likely be encountered in some of the utility trenches, in particular the wate r and sanitary sewers. Groundwater encountered in trenches within sandy lean clay soils can typically be controlled through the use of sump pits and pumps, although there may be significant discharge from sand seams. Excavations within a foot or two of the groundwater surface in clayey sands may also be controlled through sump pits and pumps, deeper excavations will likely require dewatering ahead of the excavation. Contract provisions should be made for dewatering in the event that heavier groundwater flow conditions are encountered. We herein note that the Contractor is solely responsible for assessing the stability of and executing underground utility and project excavations using safe methods. Contractor is also responsible for naming the “competent individual” as per Subpart P of 29 CFR 1926.6 (Federal Register - OSHA). PAVEMENT SUBGRADE R-VALUE RECOMMENDATIONS The performance of stabilometer or similar tests, were beyond the scope of this report; however, they may be performed, upon request, for an additional fee. Based on the encountered soil conditions, we estimate that a properly prepared subgrade would have an average stabilometer R -value of 20 for the predominantly sandy clay soil conditions encountered at the boring locations, and an R -value of 30 for the silty sand soil conditions. City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 Page 5 of 7 PAVEMENT THICKNESS RECOMMENDATIONS We assume project traffic will be separated into two distinct classes; State Aid Highway (Franklin Trail) and Residential feeder streets. It is our understanding that the current year Average Annual Daily Traffic (AADT) count for Franklin Trail is 4600. For a 20 year performance life, this would correspond to approximately 1.1 million 18-kip Equivalent Single Axle Loads (ESALS), assuming a standard metro area traffic distribution and MnDOT’s standard load factors. The remaining residential streets are assumed to have 500 or less AADT, resulting in minimum pavement sections. Our pavement recommendations are predicated on separation of this traffic. The resulting subgrade following site grading should first be scarified and re-compacted to a depth of 12 inc hes. A proof roll test should then be performed to determine soft or unstable subgrade areas. If rutting or localized unstable subgrade areas are observed, those areas should be subcut, moisture - conditioned, and re-compacted or removed to a stable depth. Excavations for soil corrections (if any) in paved areas should allow for a 2 foot oversize beyond the edges of the pavement. The proof roll should be performed with a tandem axle dump truck loaded to gross capacity (at least 20 tons). Acceptance criteria of the proof roll shall be limited to rut formation no more than one inch (1”) depth (front or rear axles) and no pumping (rolling) observed during the visual inspection. Proof roll tests should be observed by an experienced technician or geotechnical engineer prior to placement of the aggregate base course to verify the subgrade will provide adequate pavement support. If fill is required in paved areas, we recommend that it consist of soils similar in composition to the existing subgrade soils. Individual lifts of engineered fill in proposed paved areas should be tempered for moisture content, placed and compacted as listed in the Compaction Guidelines table in Appendix B. The performance of stabilometer or similar tests, were beyond the scope of this report; however, they may be performed, upon request, for an additional fee. We estimate that a properly prepared subgrade would have an average stabilometer R -value of 30. For a 20-year design pavement life and light commercial traffic volumes, Table 7 presents our thickness recommendations for flexible (bituminous) pavement. Table 7: Recommended Flexible Pavement Thickness Design Alternative – Residential Streets Pavement Section 7-Ton 9-Ton Bituminous Wear Course (inches) 1.5 2.0 Bituminous Base Course (inches) 2.0 2.0 Class 5 or 6 Aggregate Base (inches) 6.0 8.0 We recommend rigid Portland cement concrete pavements be constructed at driveway aprons, trash enclosures, loading and unloading freight areas, and other areas where point loads and turning stresses City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 Page 6 of 7 are more likely to damage the pavement. Based on the performance of concrete pavements at similar sites, we recommend the concrete pavement design alternative listed in Table 8. Table 8: Recommended Flexible Pavement Thickness Design Alternative – Franklin Trail Pavement Section Unreinforced Section Geogrid Reinforced 1 Bituminous Wear Course (inches) 2.0 2.0 Bituminous Base Course (inches) 4.0 3.0 Class 5 or 6 Aggregate Base (inches) 6.0 6.0 1. Punched and drawn, multiaxial geogrid placed in the middle of the aggregate base layer Pavement recommendations assume the subgrade soils and aggregate section below paved surfaces will drain to subsurface piping for eventual discharge into storm sewer, or above grade to ditching, or similar acceptable systems. Lack of surface and subsurface drainage will significantly reduce the capacity and longevity of the pavement systems indicated above. We recommend pavements receive annual maintenance, as a minimum, to correct damages to the pavement structure, clea n and infill cracks which develop, and repair or resurface areas which exhibit reduced subgrade performance. The lack of maintenance can lead to moisture infiltration of the pavement structure and softening of the subgrade soils. This, in turn, can degrade the performance of the pavement system and result in poorly performing pavements with shortened life expectancy. City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 Page 7 of 7 CLOSURE Our conclusions are predicated on observation and testing of the earthwork directed by Geotechnical Engineer of Record. Our opinions are based on data assumed representative of the project area. However, the area coverage of borings in relation to the entire project is very small. For this and other reasons, we do not warrant conditions below the depth of our borings, or that the strata logged from our borings are necessarily typical of the site. Deviations from our recommendations by plans, written specifications, or field applications shall relieve us of responsibility unless our written concurrence with such deviations has been established. The scope of services for this project does not include either specifically or by implication any environmental or biological assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of Bolton and Menk, Inc. and The City of Prior Lake and its agents for specific application to the proposed City of Prior Lake - Street Rehabilitation project , in Prior Lake, Minnesota. Northern LLC. has endeavored to comply with generally accepted geotechnical engineering practice common to the local area. Northern LLC. makes no other warranty, express or implied. Northern LLC. Debra A. Schroeder, P.E. Senior Engineer Steven D. Gerber, P.E. Senior Engineer SDG Attachments Appendix A - General Notes Appendix B - Groundwater Issues, Compaction and Placement of Fill Appendix C - Attachments: Boring Location Diagram (1), Soil Boring Logs (9) I her eby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a Duly Licensed Professional Engineer under the Laws of the State of Minnesota. Steven D. Gerber Date: 11/11/201 6 Reg. No. 52743 City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 APPENDIX A City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 GEOTECHNICAL EVALUATION OF RECOVERED SOIL SAMPLES We visually examined recovered soil samples to estimate distribution of grain sizes, plasticity, consistency, moisture condition, color, presence of lenses and seams, and apparent geologic origin. We then classified the soils according using the Unified Soil Classification System (ASTM D2488). A chart describing this classification system and general notes explaining soil sampling procedures are presented within appendices attachments. The stratification depth lines between soil types on the logs are estimated based on the available data. In-situ, the transition between type(s) may be distinct or gradual in either the horizontal or vertical directions. The soil conditions have been established at our specific boring locations only. Variations in the soil stratigraphy may occur between and around the borings, with the nature and extent of such change not readily evident until exposed by excavation. These variations must be properly assessed when utilizing information presented on the boring logs. We request that you, your design team or contractors contact NTI immediately if local conditions differ from those assumed by this report, as we would need to review how such changes impact our recommendations. Such contact would also allow us to revise our recommendations as necessary to account for the changed site conditions. FIELD EXPLORATION PROCEDURES Soil Sampling – Standard Penetration Boring: Soil sampling was performed according to the procedures described by ASTM D -1586. Using this procedure, a 2 inch O.D. split barrel sampler is driven into the soil by a 140 pound weight falling 30 inches. After an initial set of six inches, the number of blows required to drive the sampler an additional 12 inches is recorded (known as the penetration resistance (i.e. “N-value”) of the soil at the point of sampling. The N -value is an index of the relative density of cohesionless soils and an approximation of the consistency of cohesive soils. Soil Sampling – Power Auger Boring: The boring(s) was/were advanced with a 6 inch nominal diameter continuous flight auger. As a result, samples recovered from the boring are disturbed, and our determination of the depth, extend of various stratum and layers, and relative density or consistency of the soils is approximate. Soil Classification: Soil samples were visually and manually classified in general conformance with ASTM D -2488 as they were removed from the sampler(s). Representative fractions of soil samples were then sealed within respective containers and returned to the laboratory for further examination and verification of the field classification. In addition, select samples were submitted for laboratory tests. Individual sample information, identification of sampling methods, method of advancement of the samples and other pertinent information concerning the soil samples are presented on boring logs and related report attachments. City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 General Notes DRILLING & SAMPLING SYMBOLS LABORATORY TEST SYMBOLS SYMBOL DEFINITION SYMBOL DEFINITION C.S. Continuous Sampling W Moisture content-percent of dry weight P.D. 2-3/8” Pipe Drill D Dry Density-pounds per cubic foot C.O. Cleanout Tube LL, PL Liquid and plastic limits determined in accordance with ASTM D 423 and D 424 3 HSA 3 ¼” I.D. Hollow Stem Auger Qu Unconfined compressive strength-pounds per square foot in accordance with ASTM D 2166- 66 4 FA 4” Diameter Flight Auger 6 FA 6” Diameter Flight Auger 2 ½ C 2 ½” Casing 4 C 4” Casing Additional insertions in Qu Column D.M. Drilling Mud Qp Penetrometer reading-tons/square foot J.W. Jet Water S Torvane reading-tons/square foot H.A. Hand Auger G Specific Gravity – ASTM D 854 -58 NXC Size NX Casing SL Shrinkage limit – ASTM 427 -61 BXC Size BX Casing pH Hydrogen ion content-meter method AXC Size AX casing O Organic content-combustion method SS 2” O.D. Split Spoon Sample M.A.* Grain size analysis 2T 2” Thin Wall Tube Sample C* One dimensional consolidation 3T 3” Thin Wall Tube Sample Qc* Triaxial Compression * See attached data Sheet and/or graph Water Level Symbol Water levels shown on the boring logs are the levels measured in the borings at the time and under the conditions indicated. In sand, the indicated levels can be considered reliable ground water levels. In clay soils, it is not possible to determine the ground water level within the normal scope of a test boring investigation, except where lenses or layers of more pervious water bearing soil is present and then a long period of time may be necessary to reach equilibrium. Therefore, the position of the water level symbol for cohesive or mixed soils may not indicate the true level of the ground water table. The available water level information is given at the bottom of the log sheet. Descriptive Terminology DENSITY CONSISTENCY TERM “N” VALUE TERM “N” VALUE Very Loose 0 -4 Soft 0-4 Loose 5 -8 Medium 5-8 Medium Dense 9 – 15 Rather Stiff 9 – 15 Dense 16 – 30 Stiff 16 – 30 Very Dense Over 30 Very Stiff Over 30 Standard “N” Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2 inch OD split spoon. Relative Proportions Particle Sizes TERMS RANGE Boulders Over 3” Trace 0-5% Gravel - Coarse ¾” – 3” A little 5-15% Medium #4 – ¾” Some 15-30% Sand - Coarse #4 - #10 With 30-50% Medium #10 - #40 Fine #40 - #200 Silt and Clay Determined by plasticity characteristics. Note: Sieve sizes are U.S. Standard. City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 Classification of Soils for Engineering Purposes ASTM Designation D-2487 and D 2488 (Unified Soil Classification System) Major Divisions Group Symbols Typical Names Classification Criteria Co u r s e G r a i n e d S o i l s Mo r e t h a n 5 0 % r e t a i n e d o n N o . 2 0 0 s i e v e * Gr a v e l s 50 % o r m o r e o f c o a r s e f r a c t i o n re t a i n e d o n N o . 4 s i e v e . Cl e a n G r a v e l s GW Well –graded gravels and gravel-sand mixtures, little or no fines. Cl a s s i f i c a t i o n o n b a s i s o f p e r c e n t a g e o f f i n e s . Le s s t h a n 5 % p a s s i n g N o . 2 0 0 S i e v e : GW , G P , S W , S P M o r e t h a n 1 2 % p a s s i n g N o . 2 0 0 S i e v e : GM , G C , S M , S C F r o m 5 % t o 1 2 % p a s s i n g N o . 2 0 0 S i e v e : Bo r d e r l i n e C l a s s i f i c a t i o n re q u i r i n g u s e o f d u e l s y m b o l s . Cu = D60 / D10 greater than 4. Cz = (D30)2 / (D10 x D60) between 1 & 3. GP Poorly graded gravels and gravel-sand mixtures, little or no fines. Not meeting both criteria for GW materials. G r a v e l s w i t h Fi n e s GM Silty gravels, gravel-sand-silt mixtures. Atterberg limits below “A” line, or P.I. less than 4. Atterberg limits plotting in hatched area are borderline classifications requiring use of dual symbols. GC Clayey gravels, gravel-sand-clay mixtures. Atterberg limits above “A” line with P.I. greater than 7. Sa n d s Mo r e t h a n 5 0 % o f c o a r s e f r a c t i o n pa s s e s N o 4 s i e v e . Cl e a n S a n d s SW Well-graded sands and gravelly sands, little or no fines. Cu = D60 / D10 greater than 6. Cz = (D30)2 / (D10 x D60) between 1 & 3. SP Poorly -graded sands and gravelly sands, little or no fines. Not meeting both criteria for SW materials. Sa n d s w i t h Fi n e s SM Silty sands, sand- silt mixtures. Atterberg limits below “A” line, or P.I. less than 4. Atterberg limits plotting in hatched area are borderline classifications requiring use of dual symbols. SC Clayey sands, sand-clay mixtures. Atterberg limits above “A” line with P.I. greater than 7. Fi n e G r a i n e d S o i l s Mo r e t h a n 5 0 % p a s s e s N o . 2 0 0 si e v e * Si l t s a n d C l a y s Li q u i d L i m i t o f 5 0 % o r l e s s ML Inorganic silts, very fine sands, rock flour, silty or clayey fine sands. CL Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays. OL Organic silts and organic silty clays of low plasticity. Si l t s a n d C l a y s Li q u i d L i m i t g r e a t e r t h a n 50 % . MH Inorganic silts, micaceous or diatomaceous fine sands or silts, elastic silts. CH Inorganic clays of high plasticity, fat clays. OH Organic clays of medium to high plasticity. Hi g h l y Or g a n i c So i l s Pt Peat, muck and other highly organic soils. Plasticity Index Chart 0 10 20 30 40 50 60 0 10 20 30 40 50 60 70 80 90 100 Liquid Limit Pl a s t i c i t y L i m i t Chart for classification of fine grained soils and the fin fraction of coarse grained soils. Atterberg Limits plotting in hatched area are borderline classifications requiring use of dual symbols. OH & MH Soils CH Soils CL Soils OL & ML Soils "A" Line CL-ML Soils City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 APPENDIX B City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 GROUNDWATER ISSUES The following presents additional comment and soil specific issues related to measurement of ground water conditions at your project site. Note that our ground water measurements, or lack thereof, will vary depending on the time allowed for equilibrium to occur in the borings. Extended observation time was not available during the scope of the field exploration program and, therefore, ground water measurements as noted on the borings logs may or may not accurately reflect actual conditions at your site. Seasonal and yearly fluctuations of the ground water level, if any, occur. Perched ground water may be present within sand and silt lenses bedded within cohesive soil formations. Perched water encountered in excavations can likely be controlled by the use of sump pits and pumps. Excavations that go below the groundwater surface should be dewatered at least 2 feet below the bottom of the excavation at all times. City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 PLACEMENT AND COMPACTION OF ENGINEERED FILL Unless otherwise superseded within the body of the Geotechnical Exploration Report, the following criteria shall be utilized for placement of engineered fill on project. This includes, but is not limited to earthen fill placement to improve site grades, fill placed below structural footings, fill placed interior of structure, and fill placed as backfill of foundations. Engineered fill placed for construction, if necessary should consist of natural, non-organic, competent soils native to the project area. Such soils may include, but are not limited to gravel, sand, or clays with Unified Soil Classification System (ASTM D2488) classifications of GW, SP, SM, SC, or CL. Use of silt or clayey silt as project fill will require additional review and approval of project Geotechnical Engineer of Record. Such soils have USCS classifications of ML, MH, ML-CL, MH -CH or CH . Use of topsoil, marl, peat, other organic soils construction debris and/or other unsuitable materials as fill is not allowed. Such soils have USCS classifications of OL, OH, Pt. Engineered fill, classified as clay, should be tempered such that the moisture content at the time of placement is equal to and no more than 3 percent above the optimum content for as defined by the appropriate proctor test. Likewise, engineered fill classified as gravel or sand should be tempered such that the moisture content at the time of placement is within 3 percent of the optimum content. All engineered fill for construction should be placed in individual 8 inch maximum depth lifts. Each lift of fill should be compacted by large vibratory equipment until the in-place soil density is equal to or greater than the criteria established within the following tabulation. Type of Construction Compaction Criteria (% respective Proctor) 1 Clay Sand or Gravel Engineered Fill placed as Pavement Subgrade (more than 3 feet below bottom of final grade) Min. 95 Min. 95 Engineered Fill placed as Pavement Subgrade (less than 3 feet below bottom of final grade) Min. 100 Min. 100 Engineered Fill placed as Pavement Aggregate Base NA Min. 100 Note 1 Unless otherwise required, compaction criteria shall be based on the Standard Proctor Test (ASTM D698). Density tests should be taken during engineered fill placement to document earthwork has achieved necessary compaction of the material(s). City of Prior Lake–Street Rehabilitation Prior Lake, Minnesota NTI Project No. 16.61746.100 APPENDIX C Boring Location Diagram Prior Lake 2017 Street Improvement Projects – Franklin Trail Neighborhood Prior Lake, Minnesota NTI Project #: 16.61746.100 NOTE: Boring locations are approximate. Completed Soil Borings: Boring Location Diagram Prior Lake 2017 Street Improvement Projects –Sycamore Trail Neighborhood Prior Lake, Minnesota NTI Project #: 16.61746.100 NOTE: Boring locations are approximate. Sy c a m o r e T r l . S W Completed Soil Borings: Kent St. SW Boring Location Diagram Prior Lake 2017 Street Improvement Projects – Balsam Street / Sunrise Avenue / Sunrise Circle / Spruce Trail Neighborhood Prior Lake, Minnesota NTI Project #: 16.61746.100 NOTE: Boring locations are approximate. 170th St SW Completed Soil Borings: v v Su n s e t T r l . SW Boring Location Diagram Prior Lake 2017 Street Improvement Projects – Albany Avenue / Cates Street / CJ Circle and Five Hawks Avenue Neighborhood Prior Lake, Minnesota NTI Project #: 16.61746.100 NOTE: Boring locations are approximate. Pleasant St. SE Completed Soil Borings: v v Al b a n y A v e . S E AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 8-9-10 (19) 4-6-5 (11) 5-3-3 (6) 3-5-6 (11) 2-2-3 (5) 2-2-3 (5) 99.5 99.4 98.0 92.0 84.0 67 78 72 100 100 100 0.5 0.6 2.0 8.0 16.0 BITUMINOUS PAVEMENT (5 1/2 Inches) APPARENT AGGREGATE BASE (2 Inches) SILTY SAND WITH GRAVEL, (SM) dark brown, fine to medium grained, moist (Fill) POORLY GRADED SAND WITH SILT, (SP-SM) brown to light brown, fine to medium grained, moist, trace gravel (Fill) NOTE: Occasional bituminous debris at 4.5 feet. SANDY LEAN CLAY, (CL) brown to gray, moist, medium to rather stiff, trace gravel (Glacial Till) NOTE: Gray below 12 feet. Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/28/16 COMPLETED 10/28/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)4 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-1 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-4-3 (7) 2-2-7 (9) 2-2-2 (4) 2-4-5 (9) 2-3-5 (8) 2-4-6 (10) 99.5 99.3 95.0 93.0 90.5 84.0 94 67 56 100 100 89 0.5 0.7 5.0 7.0 9.5 16.0 BITUMINOUS PAVEMENT (6 1/4 Inches) APPARENT AGGREGATE BASE (2 Inches) SILTY SAND, (SM) brown to dark brown, fine to medium grained, moist, trace gravel (Fill) NOTE: Occasional black seams with trace organics below 3 feet. SANDY LEAN CLAY, (CL) brown to light brown, moist, rather stiff, trace gravel (Glacial Till) CLAYEY SAND, (SC) light brown, fine to medium grained, moist to saturated, very loose, trace gravel (Glacial Till) SANDY LEAN CLAY, (CL) gray, wet, medium to rather stiff, trace gravel (Glacial Till) NOTE: Sand seam at 12 feet NOTE: Gray below 14.5 feet. Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/28/16 COMPLETED 10/28/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)3 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING 7.50 ft / Elev 92.50 ft ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-2 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 3-5-6 (11) 3-3-4 (7) 3-3-3 (6) 2-3-5 (8) 3-8-5 (13) 3-4-7 (11) 99.5 99.3 98.0 95.5 90.5 88.0 84.0 78 100 100 89 89 100 0.5 0.7 2.0 4.5 9.5 12.0 16.0 BITUMINOUS PAVEMENT (6 1/2 Inches) APPARENT AGGREGATE BASE (1 1/2 Inches) SILTY SAND, (SM) brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown to black, fine to medium grained, moist, trace gravel, trace organics (Fill) SANDY LEAN CLAY, (CL) brown to light brown, moist, medium, trace gravel, occasional silt (ML) seams (Glacial Till) SANDY SILT, (ML) brown to light brown, moist, medium, trace gravel (Glacial Till) SILTY SAND, (SM) brown to light brown, fine to medium grained, moist, medium dense, trace gravel (Glacial Till) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/28/16 COMPLETED 10/28/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)3 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-3 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 3-4-5 (9) 3-5-5 (10) 6-11-12 (23) 4-10-11 (21) 4-7-5 (12) 4-8-7 (15) 99.5 99.4 98.0 95.5 88.0 84.0 56 89 78 89 89 100 0.5 0.6 2.0 4.5 12.0 16.0 BITUMINOUS PAVEMENT (6 Inches) APPARENT AGGREGATE BASE (1 Inch) SILTY SAND, (SM) brown, fine to medium grained, moist, trace gravel (Fill) SANDY LEAN CLAY, (CL) light brown, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown, fine to medium grained, moist, medium dense to dense, trace gravel (Glacial Till) NOTE: Occasional light brown clay (CL) layers above 7 feet. SANDY LEAN CLAY, (CL) brown, moist, rather stiff, trace gravel (Glacial Till) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/28/16 COMPLETED 10/28/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)4 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-4 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-5-9 (14) 3-4-6 (10) 7-13-14 (27) 4-8-12 (20) 4-9-6 (15) 4-8-9 (17) 99.3 99.1 98.0 95.5 93.0 88.0 85.5 84.0 89 78 89 100 100 33 0.7 0.9 2.0 4.5 7.0 12.0 14.5 16.0 BITUMINOUS PAVEMENT (8 1/2 Inches) APPARENT AGGREGATE BASE (2 Inches) SILTY SAND, (SM) brown to dark brown, fine to medium grained, moist, little gravel (Fill) SANDY LEAN CLAY, (CL) brown, moist, trace gravel (Fill) CLAYEY SAND, (SC) light brown, fine to medium grained, moist, medium dense, trace gravel (Glacial Till) SILTY SAND, (SM) light brown, fine to medium grained, moist, dense, trace gravel (Glacial Till) SANDY LEAN CLAY, (CL) light brown, moist, rather stiff, trace gravel (Glacial Till) SILTY SAND, (SM) light brown, fine to medium grained, moist, dense, trace gravel (Glacial Till) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/28/16 COMPLETED 10/28/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)6 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-5 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 8-4-3 (7) 5-3-2 (5) 2-2-2 (4) 2-2-2 (4) 5-7-8 (15) 10-7-8 (15) 99.5 99.0 90.5 87.0 84.0 33 39 28 39 67 78 0.5 1.0 9.5 13.0 16.0 BITUMINOUS PAVEMENT (6 Inches) APPARENT AGGREGATE BASE (6 Inches) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel, occasional bituminous debris (Fill) CLAYEY SAND, (SC) brown, fine to medium grained, moist, very loose, trace gravel (Glacial Till) POORLY GRADED SAND WITH SILT, (SP-SM) brown, fine to medium grained, moist, medium dense, trace gravel (Glacial Outwash) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/31/16 COMPLETED 10/31/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-6 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 4-6-5-5 (11) 2-2-3-4 (5) 7-8-8-9 (16) 5-6-6-6 (12) 5-7-6-6 (13) 3-4-3-3 (7) 99.8 99.5 95.5 85.5 83.5 71 50 100 75 79 63 0.2 0.5 4.5 14.5 16.5 BITUMINOUS PAVEMENT (2 1/4 Inches) APPARENT AGGREGATE BASE (4 Inches) CLAYEY SAND, (SC) dark brown to black, fine to medium grained, moist, trace gravel, occasional bituminous debris, trace organics (Fill) NOTE: Brown below 2 feet. CLAYEY SAND, (SC) brown, fine to medium grained, moist, loose to medium dense, trace gravel (Glacial Till) NOTE: Brown to light brown below 7 feet. SILTY SAND, (SM) light brown to brown, fine to medium grained, moist, loose, trace gravel (Glacial Till) Bottom of borehole at 16.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/31/16 COMPLETED 10/31/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-7 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 5-7-8-8 (15) 4-5-6-6 (11) 3-2-2-3 (4) 1-1-1-1 (2) 2-2-2-1 (4) 1-2-2-2 (4) 99.7 99.3 98.0 93.0 90.5 83.5 63 67 71 67 63 67 0.3 0.7 2.0 7.0 9.5 16.5 BITUMINOUS PAVEMENT (4 1/4 Inches) APPARENT AGGREGATE BASE (4 1/2 Inches) SILTY SAND, (SM) black to dark brown, fine to medium grained, moist, trace gravel, occasional bituminous debris (Fill) CLAYEY SAND, (SC) gray, fine to medium grained, moist, trace gravel, occasional black seams, trace organics (Glacial Till) NOTE: Brown to dark brown below 4.5 feet. SILTY SAND, (SM) brown, fine to medium grained, moist, very loose, trace gravel (Glacial Till) CLAYEY SAND, (SC) brown, fine to medium grained, moist, very loose, trace gravel (Glacial Till) Bottom of borehole at 16.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/31/16 COMPLETED 10/31/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-8 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 7-8-19 (27) 10-12-5 (17) 6-7-6 (13) 6-10-11 (21) 5-5-7 (12) 6-7-6 (13) 99.8 99.4 95.5 90.5 84.0 72 44 83 100 67 78 0.2 0.6 4.5 9.5 16.0 BITUMINOUS PAVEMENT (2 1/4 Inches) APPARENT AGGREGATE BASE (5 Inches) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown, fine to medium grained, moist, dense to medium dense, trace gravel (Glacial Till) SANDY LEAN CLAY, (CL) brown, moist, stiff to rather stiff, trace gravel (Glacial Till) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/30/16 COMPLETED 10/30/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-9 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 15-16-14 (30) 8-7-6 (13) 14-16-12 (28) 14-13-10 (23) 6-12-19 (31) 14-12-17 (29) 99.7 99.2 90.5 84.0 44 67 50 83 72 61 0.4 0.9 9.5 16.0 BITUMINOUS PAVEMENT (4 1/4 Inches) APPARENT AGGREGATE BASE (6 Inches) SILTY SAND, (SM) brown to dark brown, fine to medium grained, moist, trace gravel (Fill) SILTY SAND, (SM) brown, fine to medium grained, moist, dense to very dense, little gravel (Glacial Till) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/30/16 COMPLETED 10/30/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-10 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 13-50/3" 16-21-18 (39) 13-12-14 (26) 23-13-15 (28) 19-14-20 (34) 19-18-9 (27) 99.8 99.3 98.0 95.5 92.0 84.0 78 100 28 44 89 78 0.2 0.7 2.0 4.5 8.0 16.0 BITUMINOUS PAVEMENT (2 1/4 Inches) APPARENT AGGREGATE BASE (6 Inches) CLAYEY SAND WITH GRAVEL, (SC) brown to dark brown, fine to medium grained, moist (Fill) SILTY SAND, (SM) brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel (Fill) POORLY GRADED SAND WITH SILT AND GRAVEL, (SP-SM) brown, fine to medium grained, moist, dense to very dense (Glacial Outwash) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/30/16 COMPLETED 10/30/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)9 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-11 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 5-4-5 (9) 6-5-7 (12) 20-30-24 (54) 34-50/4" 6-9-10 (19) 9-10-9 (19) 99.8 99.4 98.0 95.5 84.0 72 89 33 70 50 39 0.2 0.6 2.0 4.5 16.0 BITUMINOUS PAVEMENT (2 3/4 Inches) APPARENT AGGREGATE BASE (5 Inches) SILTY SAND, (SM) brown to dark brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown to dark brown, fine to medium grained, moist, trace gravel (Fill) POORLY GRADED SAND WITH SILT, (SP-SM) brown, fine to medium grained, moist, medium dense to very dense, little gravel (Glacial Outwash) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/30/16 COMPLETED 10/30/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-12 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 13-8-15 (23) 7-8-7 (15) 99.5 99.1 96.5 100 100 0.5 0.9 3.5 BITUMINOUS PAVEMENT (6 1/4 Inches) APPARENT AGGREGATE BASE (5 Inches) CLAYEY SAND, (SC) brown to gray, fine to medium grained, moist, trace gravel (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/31/16 COMPLETED 10/31/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-13 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 8-9-10 (19) 9-7-8 (15) 99.7 99.0 96.5 100 100 0.3 1.0 3.5 BITUMINOUS PAVEMENT (4 Inches) APPARENT AGGREGATE BASE (8 Inches) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/31/16 COMPLETED 10/31/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-14 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 6-7-9 (16) 13-13-12 (25) 99.5 98.6 96.5 78 100 0.5 1.4 3.5 BITUMINOUS PAVEMENT (5 1/2 Inches) APPARENT AGGREGATE BASE (12 Inches) CLAYEY SAND, (SC) gray, fine to medium grained, moist, trace gravel, occasional black seams, trace organics (Fill) NOTE: Brown below 2 feet. Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/31/16 COMPLETED 10/31/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-15 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 5-10-6 (16) 10-11-13 (24) 99.6 99.2 98.0 96.5 78 100 0.4 0.8 2.0 3.5 BITUMINOUS PAVEMENT (4 3/4 Inches) APPARENT AGGREGATE BASE (5 Inches) SILTY SAND, (SM) brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/31/16 COMPLETED 10/31/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-16 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 7-6-5 (11) 6-8-10 (18) 99.6 99.3 97.0 96.5 83 100 0.4 0.7 3.0 3.5 BITUMINOUS PAVEMENT (4 1/2 Inches) APPARENT AGGREGATE BASE (4 Inches) CLAYEY SAND, (SC) brown to dark brown, fine to medium grained, moist, trace gravel (Fill) POORLY GRADED SAND WITH SILT, (SP-SM) brown, fine to medium grained, moist, trace gravel (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/30/16 COMPLETED 10/30/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-17 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 8-16-5 (21) 6-4-5 (9) 99.6 99.3 96.5 94 100 0.4 0.7 3.5 BITUMINOUS PAVEMENT (4 3/4 Inches) APPARENT AGGREGATE BASE (4 Inches) CLAYEY SAND, (SC) brown to light brown, fine to medium grained, moist, trace gravel (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/28/16 COMPLETED 10/28/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-18 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 6-5-5 (10) 7-7-15 (22) 99.6 99.1 96.5 67 100 0.5 0.9 3.5 BITUMINOUS PAVEMENT (5 1/2 Inches) APPARENT AGGREGATE BASE (5 1/2 Inches) CLAYEY SAND, (SC) brown to dark brown, fine to medium grained, moist, trace gravel (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/28/16 COMPLETED 10/28/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-19 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 8-6-10 (16) 6-3-4 (7) 2-2-2 (4) 3-3-4 (7) 6-8-9 (17) 13-9-13 (22) 99.6 98.9 93.0 90.5 85.5 84.0 89 89 72 89 89 100 0.5 1.1 7.0 9.5 14.5 16.0 BITUMINOUS PAVEMENT (5 1/2 Inches) APPARENT AGGREGATE BASE (8 Inches) CLAYEY SAND, (SC) brown to dark brown, fine to medium grained, moist, trace gravel (Fill) NOTE: Dark brown with trace organics at 2 feet. NOTE: Brown to gray below 4.5 feet. SANDY LEAN CLAY, (CL) gray, moist, soft, occasional fine roots, trace organics (Alluvial) CLAYEY SAND, (SC) gray, fine to medium grained, moist to saturated, loose to dense, trace gravel (Alluvial) POORLY GRADED SAND WITH SILT, (SP-SM) gray, fine to coarse grained, saturated, dense, trace gravel, occasional clay (CL) layers (Alluvial) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/25/16 COMPLETED 10/25/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)9 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING 12.00 ft / Elev 88.00 ft ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-20 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 2-2-3 (5) 2-3-2 (5) 2-2-2 (4) 2-2-3 (5) 2-3-5 (8) 5-6-3 (9) 99.9 99.7 98.0 92.0 85.5 84.0 67 72 78 56 100 100 0.1 0.3 2.0 8.0 14.5 16.0 BITUMINOUS PAVEMENT (1 3/4 Inches) APPARENT AGGREGATE BASE (1 1/2 Inches) CLAYEY SAND, (SC) brown to dark brown, fine to medium grained, moist, trace gravel (Fill) SANDY LEAN CLAY, (CL) gray, moist, trace gravel, occasional black layers, trace organics (Fill) CLAYEY SAND, (SC) gray, fine to coarse grained, moist to saturated, very loose to loose, trace gravel (Alluvial) CLAYEY SAND, (SC) brown, fine to coarse grained, saturated, medium dense, trace gravel (Alluvial) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/25/16 COMPLETED 10/25/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)9 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING 9.00 ft / Elev 91.00 ft ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-21 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 2-3-4 (7) 2-2-2 (4) 2-2-2 (4) 2-2-2 (4) 2-3-3 (6) 5-7-6 (13) 99.6 99.4 98.0 90.5 87.0 84.0 78 78 72 67 44 100 0.5 0.6 2.0 9.5 13.0 16.0 BITUMINOUS PAVEMENT (5 1/2 Inches) APPARENT AGGREGATE BASE (1 1/2 Inches) SILTY SAND, (SM) brown, fine to medium grained, moist, little gravel (Fill) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel, occasional black seams, trace organics (Fill) CLAYEY SAND, (SC) gray to black, fine to medium grained, moist to saturated, very loose, trace gravel, trace organics (Alluvial) POORLY GRADED SAND WITH SILT, (SP-SM) gray, fine to coarse grained, saturated, loose to medium dense, trace gravel (Alluvial) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/25/16 COMPLETED 10/25/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)8 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING 10.00 ft / Elev 90.00 ft ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-22 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 3-3-3 (6) 2-3-5 (8) 5-6-9 (15) 6-8-12 (20) 10-20-20 (40) 50/6" 99.8 99.2 95.5 85.0 67 78 56 78 0 0 0.2 0.8 4.5 15.0 BITUMINOUS PAVEMENT (2 Inches) APPARENT AGGREGATE BASE (8 Inches) SILTY SAND, (SM) brown, fine to medium grained, moist, trace gravel (Fill) NOTE: clayey sand (SC) seam at 2 feet. POORLY GRADED SAND WITH SILT, (SP-SM) brown, fine to medium grained, moist, loose to very dense, trace gravel (Glacial Outwash) NOTE: No recovery in sample 6. Auger cuttings sampled. NOTE: No recovery in sample 7. Auger cuttings sampled. Bottom of borehole at 15.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/27/16 COMPLETED 10/27/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)10 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-23 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 9-8-7 (15) 3-2-3 (5) 2-2-3 (5) 2-2-3 (5) 2-4-7 (11) 2-2-7 (9) 99.8 98.8 98.0 92.0 85.5 84.0 72 56 78 44 72 89 0.3 1.3 2.0 8.0 14.5 16.0 BITUMINOUS PAVEMENT (3 Inches) APPARENT AGGREGATE BASE (12 Inches) POORLY GRADED SAND WITH SILT, (SP-SM) brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) gray, fine to medium grained, moist to saturated, loose to medium dense, trace gravel, occasional black seams, trace organics (Alluvial) POORLY GRADED SAND WITH SILT, (SP-SM) brown, fine to coarse grained, saturated, medium dense, trace gravel (Alluvial) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/25/16 COMPLETED 10/25/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)9 NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING 9.00 ft / Elev 91.00 ft ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-24 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 6-6-7 (13) 6-5-4 (9) 2-2-3 (5) 9-10-3 (13) 2-2-2 (4) 3-2-3 (5) 99.7 99.2 98.0 95.5 93.0 88.0 84.0 78 72 56 28 100 67 0.3 0.9 2.0 4.5 7.0 12.0 16.0 BITUMINOUS PAVEMENT (3 1/4 Inches) APPARENT AGGREGATE BASE (7 Inches) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel (Fill) POORLY GRADED SAND WITH SILT, (SP-SM) brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel (Fill) CLAYEY SAND, (SC) brown, fine to coarse grained, moist to saturated, loose to medium dense, little gravel (Alluvial) POORLY GRADED SAND WITH SILT, (SP-SM) brown, fine to coarse grained, saturated, very loose to loose, little gravel (Alluvial) Bottom of borehole at 16.0 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/25/16 COMPLETED 10/25/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING 9.00 ft / Elev 91.00 ft ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 5 10 15 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-25 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 12-13-10 (23) 4-5-7 (12) 99.3 99.1 96.5 89 100 0.7 0.9 3.5 BITUMINOUS PAVEMENT (8 1/4 Inches) APPARENT AGGREGATE BASE (3 Inches) CLAYEY SAND, (SC) dark brown to black, fine to medium grained, moist, trace gravel (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/27/16 COMPLETED 10/27/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-26 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 8-8-7 (15) 7-4-4 (8) 99.5 99.3 96.5 78 89 0.5 0.7 3.5 BITUMINOUS PAVEMENT (6 1/2 Inches) APPARENT AGGREGATE BASE (2 Inches) CLAYEY SAND, (SC) dark brown to black, fine to medium grained, moist, trace gravel, trace organics (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/27/16 COMPLETED 10/27/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-27 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 SS 1 SS 2 9-10-11 (21) 12-13-10 (23) 99.6 99.0 96.5 78 83 0.5 1.0 3.5 BITUMINOUS PAVEMENT (5 1/2 Inches) APPARENT AGGREGATE BASE (7 Inches) CLAYEY SAND, (SC) brown, fine to medium grained, moist, trace gravel (Fill) Bottom of borehole at 3.5 feet. DRILLING METHOD 3 1/4 in H.S.A LOGGED BY Robert Hawkins CHECKED BY Steve Gerber DATE STARTED 10/25/16 COMPLETED 10/25/16 DRILLING CONTRACTOR NTI GROUND WATER LEVELS: AT END OF DRILLING --- AFTER DRILLING ---FROST DEPTH (ft)---CAVE IN (ft)--- NOTES Elevation assumed to be 100.0. GROUND ELEVATION 100 ft HOLE SIZE 6 1/2 in. AT TIME OF DRILLING --- No groundwater encountered ATTERBERG LIMITS PL A S T I C LI M I T GR A P H I C LO G DE P T H (f t ) 0 SA M P L E T Y P E NU M B E R BL O W CO U N T S (N V A L U E ) PO C K E T P E N . (t s f ) MO I S T U R E CO N T E N T ( % ) LI Q U I D LI M I T RE C O V E R Y % (R Q D ) FI N E S DR Y U N I T W T . (p c f ) PL A S T I C I T Y IN D E X MATERIAL DESCRIPTION PAGE 1 OF 1 BORING NUMBER SB-28 PROJECT LOCATION Prior Lake, MN CLIENT Bolton & Menk, Inc. PROJECT NUMBER 16.61746.100 PROJECT NAME Prior Lake 2017 Street Improvement Projects NT I G E O T E C H C O L U M N S W / N O T E S - N T I 2 0 1 6 - 0 8 - 1 0 . G D T - 1 1 / 1 4 / 1 6 1 2 : 3 9 - H : \ 1 - P R O J E C T S \ 2 0 1 6 P R O J E C T S \ P R I O R L A K E 2 0 1 7 S T R E E T I M P R O V E M E N T S - C M T - ( 1 6 . 6 1 7 4 6 . 1 0 0 ) \ E N G I N E E R I N G \ E N G I N E E R I N G R E P O R T S \ G I N T \ P R I O R L A K E 2 0 1 7 S T R E E T S . G P J NTI 6160 Carmen Drive Inver Grove Heights, Minnesota P: 763-433-9175 Services Provided: Civil and Municipal Engineering Water and Wastewater Engineering Traffic and Transportation Engineering Aviation Planning and Engineering Water Resources Engineering Coatings Inspection Services Landscape Architecture Services Surveying and Mapping Geographic Information System Services Funding Assistance www.bolton-menk.com