HomeMy WebLinkAboutPVB TEST REPORT 9/13/2016 Pressure Vacuum Breaker Assembly (PVB) & Spill Resistant Pressure Vacuum Breaker
Test Report
[3geeA
3 S q 1 ucner Or S ce/ / r'�t c3 r G--q l 'c4 _._.
:1/ Simj e6-c 6_ , , v
' { :;,0 Vii: :. r,-.< ,
Vv .
PVB ------------> Shutoff#2 Gate Check Valve Air Inlet Valve SRPVB - Tightness of
Valve Check Valve
Leaking( )
Initial Test Leaking ( ) Closed Tight( ) Failed to Open ( ) Failed to Open ( )
Pressure Drop Across
Closed Tight (, Check Valve#1 1.`/pd Opened atZ7 sid _.__psid
Any Repairs/parts
Used
Air Inlet Valve
Leaking( )
Final Test Leaking ( ) Closed Tight( ) Opened at__psid Failed to Open ( )
Pressure Drop Across ( )
Closed Tight( ) Check Valve#1 —psid Opened at psid
Certification
I hereby certify the foregoing data to be correct and that the device Assembly Final Test Performance
tested is functio ' within th�_1'nlits of the standards
'
-Ao. 1 Pass
Signature: ti t- �. v II
....
Fail Li
' Date: 13 ,g f i (
Royce Roberts Certification #PM063607
Gary Pegues Cerification #PM064908
Sabre Plumbing Heating and AIC
15535 Medina Road, Plymouth, MN 55447
763-473-2267
Plumbing Bond License: PM645349